SlideShare a Scribd company logo
1 of 1
Download to read offline
Project My responsibilities
Fix MEA Sales Pipeline - Oracle
The sales pipeline for Middle East and
Africa hardware sales was drying out.
The exact reasons were unknown.
A quick turn around of the situation was
needed to secure business.
In the end, I was not only able to ensure
an adequate pipeline fill, but the longer
term ability to meet booking goals.
• I was called in as the person with the most experience and widest
trust basis in this area.
• I worked with the management teams and key sales reps in the
UAE, Egypt, Nigeria, Kenya and South Africa to determine the root
causes and set up a Get Well Plan.
• My next challenge was to get the forecasting habits of management
and the openness of sales reps adapted to the mutual needs of the
business and the individuals involved.
• Next, I facilitated some 30 deal reviews, account- and portfolio
planning sessions to secure and uncover new business. In the
process, I had to train and coach people in the underlying
methodologies of TAS and PMP.
Sales Management System – Sun Microsystems
As EMEA Program Manager, I was
responsible for rolling out Siebel (Oracle)
CRM to the MEA Business. Moving from
informal process to formal planning
methodologies (TAS, ESP, PMP and
CHAMP) and tool, showed a need for a
holistic, formal management system. I
was asked to move to a Business
Architect role to take care of this need.
• I designed and established a governance system of agreed
priorities, regular reviews, well documented KPIs and a
communication plan.
• In a Scrum like process, we established tool supported processes
for Forecast, Portfolio Planning, Territory Management, Partner
Management and Revenue Management. I was responsible as a
process architect, the interface to management and leading a team
of developers in Spain.
• In the end, the resulting forecasting process and some of the tools
developed were adopted globally.
Global QS9000 Certification - Motorola
In order to continue to sell semiconductor
products into the automotive industry,
Motorola was required to get their global
design, production and logistics process
QS9000 certified.
I was responsible as the European
Project Manager.
• I was part of a global team, which had to master the standard’s
requirements, first.
• I was responsible to get the design and logistics related sections
written by the various functions and aligned globally.
• During the project, there was a re-org which split the target group
and responsibilities in two. We ended up with two separate projects.
• Towards the end of the projected time, both projects got stuck. I
brought the key global players into a secluded place, not to return
before the Quality Manual was finished.
• We presented the result to our management in Arizona and the
other group’s in Hong Kong. With minor changes it was adopted for
both organizations and achieved certification in time.
TQM and ISO9000 – Informix Databases • As a Support Engineer, I had shown talent in process management
and business acumen early on, by implementing a Case Log
System and establishing the basics for selling support as a service.
As a result, I was asked to take up point w/r to quality topics.
• I was trained on TQM (Total Quality Management)
• When the need came up to be ISO 9000 certified, I was asked to
take the lead to get the UK and German support organizations
certified by LRQA. I worked with both teams to get a Quality Manual
written and led us to ISO9002 certification.
Sample Projects
Unsolicited Application

More Related Content

What's hot

Atelier Lumikha Overview Deck
Atelier Lumikha Overview DeckAtelier Lumikha Overview Deck
Atelier Lumikha Overview DeckJenny Bertol-Tan
 
Start Your Engines PMO Formation - Ontic | FuturePMO 2021
Start Your Engines PMO Formation - Ontic | FuturePMO 2021Start Your Engines PMO Formation - Ontic | FuturePMO 2021
Start Your Engines PMO Formation - Ontic | FuturePMO 2021Wellingtone
 
Implementing SAFe: Why Start at the Program Level?
Implementing SAFe: Why Start at the Program Level?Implementing SAFe: Why Start at the Program Level?
Implementing SAFe: Why Start at the Program Level?Drew Jemilo
 
JimmyClaryResume
JimmyClaryResumeJimmyClaryResume
JimmyClaryResumeJimmy Clary
 
How to Drive Innovation Via Advanced Project Portfolio Management
How to Drive Innovation Via Advanced Project Portfolio ManagementHow to Drive Innovation Via Advanced Project Portfolio Management
How to Drive Innovation Via Advanced Project Portfolio ManagementChangepoint
 
PlamCV-15-Summary
PlamCV-15-SummaryPlamCV-15-Summary
PlamCV-15-SummaryPaul Lam
 
4. Problem Solving in Six Sigma
4.  Problem Solving in Six Sigma4.  Problem Solving in Six Sigma
4. Problem Solving in Six SigmaDeepika Misra
 
NFU Mutual - Our PMO Journey | FuturePMO 2021
NFU Mutual - Our PMO Journey | FuturePMO 2021NFU Mutual - Our PMO Journey | FuturePMO 2021
NFU Mutual - Our PMO Journey | FuturePMO 2021Wellingtone
 
SAFe portfolio management @ Knowit nov 28
SAFe portfolio management @ Knowit nov 28SAFe portfolio management @ Knowit nov 28
SAFe portfolio management @ Knowit nov 28Knowit_TM
 
Agile Network India | Disciplined Agile Through Case Study | Nagaraja Gundappa
Agile Network India | Disciplined Agile Through Case Study | Nagaraja GundappaAgile Network India | Disciplined Agile Through Case Study | Nagaraja Gundappa
Agile Network India | Disciplined Agile Through Case Study | Nagaraja GundappaAgileNetwork
 
Designing for Testability
Designing for TestabilityDesigning for Testability
Designing for TestabilityReifa Tangon
 
A day in the life of a QA
A day in the life of a QAA day in the life of a QA
A day in the life of a QAReifa Tangon
 
Sap Solution Engineer
Sap Solution EngineerSap Solution Engineer
Sap Solution EngineerDanihunt86
 

What's hot (20)

Atelier Lumikha Overview Deck
Atelier Lumikha Overview DeckAtelier Lumikha Overview Deck
Atelier Lumikha Overview Deck
 
Anita_Fernando
Anita_FernandoAnita_Fernando
Anita_Fernando
 
Agile change programmes webinar 150915
Agile change programmes webinar 150915Agile change programmes webinar 150915
Agile change programmes webinar 150915
 
Start Your Engines PMO Formation - Ontic | FuturePMO 2021
Start Your Engines PMO Formation - Ontic | FuturePMO 2021Start Your Engines PMO Formation - Ontic | FuturePMO 2021
Start Your Engines PMO Formation - Ontic | FuturePMO 2021
 
Implementing SAFe: Why Start at the Program Level?
Implementing SAFe: Why Start at the Program Level?Implementing SAFe: Why Start at the Program Level?
Implementing SAFe: Why Start at the Program Level?
 
Resume_Ramendra Maitra
Resume_Ramendra MaitraResume_Ramendra Maitra
Resume_Ramendra Maitra
 
JimmyClaryResume
JimmyClaryResumeJimmyClaryResume
JimmyClaryResume
 
Sarah Powell-Pisareva presentation
Sarah Powell-Pisareva presentationSarah Powell-Pisareva presentation
Sarah Powell-Pisareva presentation
 
How to Drive Innovation Via Advanced Project Portfolio Management
How to Drive Innovation Via Advanced Project Portfolio ManagementHow to Drive Innovation Via Advanced Project Portfolio Management
How to Drive Innovation Via Advanced Project Portfolio Management
 
PlamCV-15-Summary
PlamCV-15-SummaryPlamCV-15-Summary
PlamCV-15-Summary
 
4. Problem Solving in Six Sigma
4.  Problem Solving in Six Sigma4.  Problem Solving in Six Sigma
4. Problem Solving in Six Sigma
 
NFU Mutual - Our PMO Journey | FuturePMO 2021
NFU Mutual - Our PMO Journey | FuturePMO 2021NFU Mutual - Our PMO Journey | FuturePMO 2021
NFU Mutual - Our PMO Journey | FuturePMO 2021
 
Benefits Realization Management إدارة تحقيق المنافع
Benefits Realization Management  إدارة تحقيق المنافعBenefits Realization Management  إدارة تحقيق المنافع
Benefits Realization Management إدارة تحقيق المنافع
 
Dinesh jain
Dinesh jainDinesh jain
Dinesh jain
 
SAFe portfolio management @ Knowit nov 28
SAFe portfolio management @ Knowit nov 28SAFe portfolio management @ Knowit nov 28
SAFe portfolio management @ Knowit nov 28
 
Agile Network India | Disciplined Agile Through Case Study | Nagaraja Gundappa
Agile Network India | Disciplined Agile Through Case Study | Nagaraja GundappaAgile Network India | Disciplined Agile Through Case Study | Nagaraja Gundappa
Agile Network India | Disciplined Agile Through Case Study | Nagaraja Gundappa
 
Designing for Testability
Designing for TestabilityDesigning for Testability
Designing for Testability
 
A day in the life of a QA
A day in the life of a QAA day in the life of a QA
A day in the life of a QA
 
Sap Solution Engineer
Sap Solution EngineerSap Solution Engineer
Sap Solution Engineer
 
The Practice of planning and the PMO, John Barben
The Practice of planning and the PMO, John BarbenThe Practice of planning and the PMO, John Barben
The Practice of planning and the PMO, John Barben
 

Viewers also liked

Driving Schools Leeds
Driving Schools LeedsDriving Schools Leeds
Driving Schools LeedsMarie Rose
 
The legal environment unit5 copy
The legal environment unit5   copyThe legal environment unit5   copy
The legal environment unit5 copyUNBFS
 
The legal environment unit5
The legal environment unit5The legal environment unit5
The legal environment unit5UNBFS
 
Ft Riley Commissary Produce Newsletter February 4 10 ver 2
Ft Riley Commissary Produce  Newsletter February  4 10 ver 2Ft Riley Commissary Produce  Newsletter February  4 10 ver 2
Ft Riley Commissary Produce Newsletter February 4 10 ver 2Frg Combined Arms Battalion
 
La Historia de la Educación Ambiental
La Historia de la Educación AmbientalLa Historia de la Educación Ambiental
La Historia de la Educación AmbientalGreiver Duran Escalona
 
대신리포트_대신브라우저_151116
대신리포트_대신브라우저_151116대신리포트_대신브라우저_151116
대신리포트_대신브라우저_151116DaishinSecurities
 

Viewers also liked (11)

Driving Schools Leeds
Driving Schools LeedsDriving Schools Leeds
Driving Schools Leeds
 
The legal environment unit5 copy
The legal environment unit5   copyThe legal environment unit5   copy
The legal environment unit5 copy
 
Inf tema 2_urok10_6_klas
Inf tema 2_urok10_6_klasInf tema 2_urok10_6_klas
Inf tema 2_urok10_6_klas
 
The legal environment unit5
The legal environment unit5The legal environment unit5
The legal environment unit5
 
Email 1
Email 1Email 1
Email 1
 
рынок погрузчиков
рынок погрузчиковрынок погрузчиков
рынок погрузчиков
 
Ft Riley Commissary Produce Newsletter February 4 10 ver 2
Ft Riley Commissary Produce  Newsletter February  4 10 ver 2Ft Riley Commissary Produce  Newsletter February  4 10 ver 2
Ft Riley Commissary Produce Newsletter February 4 10 ver 2
 
La Historia de la Educación Ambiental
La Historia de la Educación AmbientalLa Historia de la Educación Ambiental
La Historia de la Educación Ambiental
 
Skolkovo robotics program rus
Skolkovo robotics program rusSkolkovo robotics program rus
Skolkovo robotics program rus
 
대신리포트_대신브라우저_151116
대신리포트_대신브라우저_151116대신리포트_대신브라우저_151116
대신리포트_대신브라우저_151116
 
Valentine's 2013
Valentine's 2013Valentine's 2013
Valentine's 2013
 

Similar to Fix MEA Sales Pipeline - Oracle

mark_neveu_resume_2015
mark_neveu_resume_2015mark_neveu_resume_2015
mark_neveu_resume_2015Mark Neveu
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1Sherrill Moore
 
Theresa Dostie-Sjostrom Resume limited
Theresa Dostie-Sjostrom Resume limitedTheresa Dostie-Sjostrom Resume limited
Theresa Dostie-Sjostrom Resume limitedTheresa Sjostrom
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike Marco
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike Marco
 
Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]west5812
 
The Client X Project
The Client X ProjectThe Client X Project
The Client X ProjectEMMAIntl
 
Brochure Excellence in business process improvement
Brochure Excellence in business process improvementBrochure Excellence in business process improvement
Brochure Excellence in business process improvementVlerick Business School
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN PanigrahiSN Panigrahi, PMP
 
CV_Carpenter_Steven_2016
CV_Carpenter_Steven_2016CV_Carpenter_Steven_2016
CV_Carpenter_Steven_2016Steve Carpenter
 
Using Marketing Operations Optimization & Automation for Better Staff and Res...
Using Marketing Operations Optimization & Automation for Better Staff and Res...Using Marketing Operations Optimization & Automation for Better Staff and Res...
Using Marketing Operations Optimization & Automation for Better Staff and Res...Pinpoint Systems Corporation
 
News Revlew 4- Continuous Process Improvement Program Upon successful.pdf
News Revlew 4- Continuous Process Improvement Program Upon successful.pdfNews Revlew 4- Continuous Process Improvement Program Upon successful.pdf
News Revlew 4- Continuous Process Improvement Program Upon successful.pdfAugstore
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project ManagementGregory A. Garrett
 

Similar to Fix MEA Sales Pipeline - Oracle (20)

CV_N Srividya_300kb
CV_N Srividya_300kbCV_N Srividya_300kb
CV_N Srividya_300kb
 
mark_neveu_resume_2015
mark_neveu_resume_2015mark_neveu_resume_2015
mark_neveu_resume_2015
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1
 
Denise van Rooyen
Denise van RooyenDenise van Rooyen
Denise van Rooyen
 
Theresa Dostie-Sjostrom Resume limited
Theresa Dostie-Sjostrom Resume limitedTheresa Dostie-Sjostrom Resume limited
Theresa Dostie-Sjostrom Resume limited
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
 
Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]
 
The Client X Project
The Client X ProjectThe Client X Project
The Client X Project
 
The Client X Project
The Client X ProjectThe Client X Project
The Client X Project
 
Brochure Excellence in business process improvement
Brochure Excellence in business process improvementBrochure Excellence in business process improvement
Brochure Excellence in business process improvement
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi
 
MonicaCuevas July2016
MonicaCuevas July2016MonicaCuevas July2016
MonicaCuevas July2016
 
SOP-case-study-Henkel-Mexicana
SOP-case-study-Henkel-MexicanaSOP-case-study-Henkel-Mexicana
SOP-case-study-Henkel-Mexicana
 
KT_CV_23Jan17
KT_CV_23Jan17KT_CV_23Jan17
KT_CV_23Jan17
 
CV_Carpenter_Steven_2016
CV_Carpenter_Steven_2016CV_Carpenter_Steven_2016
CV_Carpenter_Steven_2016
 
Program Management Office (PMO)
Program Management Office (PMO)Program Management Office (PMO)
Program Management Office (PMO)
 
Using Marketing Operations Optimization & Automation for Better Staff and Res...
Using Marketing Operations Optimization & Automation for Better Staff and Res...Using Marketing Operations Optimization & Automation for Better Staff and Res...
Using Marketing Operations Optimization & Automation for Better Staff and Res...
 
News Revlew 4- Continuous Process Improvement Program Upon successful.pdf
News Revlew 4- Continuous Process Improvement Program Upon successful.pdfNews Revlew 4- Continuous Process Improvement Program Upon successful.pdf
News Revlew 4- Continuous Process Improvement Program Upon successful.pdf
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project Management
 

Fix MEA Sales Pipeline - Oracle

  • 1. Project My responsibilities Fix MEA Sales Pipeline - Oracle The sales pipeline for Middle East and Africa hardware sales was drying out. The exact reasons were unknown. A quick turn around of the situation was needed to secure business. In the end, I was not only able to ensure an adequate pipeline fill, but the longer term ability to meet booking goals. • I was called in as the person with the most experience and widest trust basis in this area. • I worked with the management teams and key sales reps in the UAE, Egypt, Nigeria, Kenya and South Africa to determine the root causes and set up a Get Well Plan. • My next challenge was to get the forecasting habits of management and the openness of sales reps adapted to the mutual needs of the business and the individuals involved. • Next, I facilitated some 30 deal reviews, account- and portfolio planning sessions to secure and uncover new business. In the process, I had to train and coach people in the underlying methodologies of TAS and PMP. Sales Management System – Sun Microsystems As EMEA Program Manager, I was responsible for rolling out Siebel (Oracle) CRM to the MEA Business. Moving from informal process to formal planning methodologies (TAS, ESP, PMP and CHAMP) and tool, showed a need for a holistic, formal management system. I was asked to move to a Business Architect role to take care of this need. • I designed and established a governance system of agreed priorities, regular reviews, well documented KPIs and a communication plan. • In a Scrum like process, we established tool supported processes for Forecast, Portfolio Planning, Territory Management, Partner Management and Revenue Management. I was responsible as a process architect, the interface to management and leading a team of developers in Spain. • In the end, the resulting forecasting process and some of the tools developed were adopted globally. Global QS9000 Certification - Motorola In order to continue to sell semiconductor products into the automotive industry, Motorola was required to get their global design, production and logistics process QS9000 certified. I was responsible as the European Project Manager. • I was part of a global team, which had to master the standard’s requirements, first. • I was responsible to get the design and logistics related sections written by the various functions and aligned globally. • During the project, there was a re-org which split the target group and responsibilities in two. We ended up with two separate projects. • Towards the end of the projected time, both projects got stuck. I brought the key global players into a secluded place, not to return before the Quality Manual was finished. • We presented the result to our management in Arizona and the other group’s in Hong Kong. With minor changes it was adopted for both organizations and achieved certification in time. TQM and ISO9000 – Informix Databases • As a Support Engineer, I had shown talent in process management and business acumen early on, by implementing a Case Log System and establishing the basics for selling support as a service. As a result, I was asked to take up point w/r to quality topics. • I was trained on TQM (Total Quality Management) • When the need came up to be ISO 9000 certified, I was asked to take the lead to get the UK and German support organizations certified by LRQA. I worked with both teams to get a Quality Manual written and led us to ISO9002 certification. Sample Projects Unsolicited Application