O L I V E R W I G H T C A S E S T U D Y S E R I E S
Henkel Mexicana AC Division
Takes the First Step On The
Journey To Sustainable High
Performance And Profitability
“Proyecto Impacto addressed the basic needs our
company had to acheive our strategic goals...”
Jorge Treviño
General Manager
Henkel Mexicana AC Division, Latin America North
®
together we make a difference
The Need For Structure:
Adopting and implementing a structured methodology for sustainable high
performance and profitability provided Henkel Mexicana AC Division with quite a
challenge. It required adopting a structured methodology; an integrated business
model with correctly sequenced tasks. “Proyecto Impacto” was launched
successfully and concluded in Oliver Wight Class A awards in Planning and Control.
Among The Bottom-Line Benefits:
Customer on-time shipment performance now exceeds 98 percent and executable
sales plan performance is consistently within 5 percent of target as a result of
demand forecasts being accurate within tolerance for product families and
subfamilies. Inventory record accuracy now exceeds the Class A threshold of 95
percent which contributes to production efficiency, exceeding prior levels by at least
two percentage points, which equates to millions in savings. Mill compliance with
the master schedule exceeds 95 percent, which enhances the ability to keep
commitments to customers.
Excellence Program Including S&OP to Improve Service Levels
In 2005, the Adhesives Division Board of Directors decided that the service level of
Henkel Mexicana AC and all associated processes were unacceptable. Their stated
vision is “To be recognized as the world's leading and most competent company for
adhesives, sealants, and surface treatments”. The board members made the
decision to launch a continuous improvement program, including Sales & Operations
Planning. Henkel headquarters in Germany had been working on an Excellence
Program with Oliver Wight Europe's Dave Manning and felt that Henkel Mexicana
AC could benefit from a similar program. The first step taken, by Wilson Stefano Jr.
of Oliver Wight Americas, was to conduct a Basic Assessment - completed in March
of 2006. The results showed they were operating at a Class “D” level. This rating
drove them to focus on Planning and Control using the Oliver Wight ABCD Checklist
for Operational Excellence - Fifth Edition.
The Case for Change:
Many areas of operations and planning were inefficient, impeded, or non-existent
causing management to seek a better way. There was dissatisfaction on the part of
the Board of Directors with the service level, the processes, and the associated costs.
The company lacked a formal Sales and Operations Planning process. Overall, there
was a misalignment with the Vision. No structured process existed to improve sales
plan accuracy and sales had tunnel vision to the top-line number. Supply Chain
Integration was lacking, contributing to difficulties in managing seasonality. Silo
thinking caused poor communication and cooperation. There was little or no Supply
Chain Collaboration, reducing control of the business. Inventory levels were not
considered a business priority. There was no structured process to improve data
quality. Systems issues/insufficiencies were not addressed. Root cause analysis to
support KPI improvement was inconsistent. There was no formal education program
within the company, and the culture of the business was not conducive to
improvement.
Throughout the Project:
The Executive Team regularly communicated their commitment to change the way
they were doing business and to adopt the culture and behavior of a Class A
organization. General Manager Trevino said “It started with a change of culture
where people were thinking in silos rather than (as) an integrated business unit.”
They reinforced that it requires discipline and common sense. The leadership of the
project was directly taken by board members and cascaded through the entire
organization with strong support from Manual Macedo, the president during the
project.
Changes:
Sales and Operations Planning was implemented.
Capable Supply Planning and Control was implemented after the base line
was established.
The executive team communicated clearly to the entire organization about
their commitment and understanding of the journey and the focus required.
Teams were organized to facilitate change and lean execution.
A sustainable culture change was achieved supporting the new way of
operating the organization.
A formal education and training program was established that supported
the changes required.
Task Teams:
59 participants were grouped into 8 teams; each team had a specific piece of
the project with dedicated responsibilities; the goal being the application of the
Oliver Wight Integrated Business Model. Jean Daniel Mottais points out, “(A)
project such as "Class A" requires a full-time project leader in order to assure
its complete implementation within a set time frame (to)… motivate, plan,
control, and finally assure that all the team is aligned to the common target:
Achieving the Class A certification.” Assessments were conducted throughout
the project to monitor performance, and results were communicated
continually. Maria Salceda points out; “From the Shared Service function's
point of view, it was of absolute help to be part of it, we had the opportunity
to know more about the business, to put all the information that we manage
daily in a more objective and measurable way and it made our work (of) much
more of value... Now we have the process, we aligned our internal tools and …
(will) work to continue improving our performance within the company.”
Maria is Head of Corporate Communications for Henkel Latin America North.
Knowledge Transfer:
An education program was established to support the project. Together with
Oliver Wight, several courses and workshops were conducted including
Business Excellence, Demand Management, Supply Management, and Sales
and Operations Planning. Stefano indicates: “Many companies omit this
important phase of their project. But without it, the concept of lean execution
and the culture of continuous improvement could not have been
implemented.” Learning by doing was the critical success factor, but the
correct education program and the correct sequence, supported by Stefano,
was the baseline to transform the project into a total success and implement
the culture of Class A to become a world-class organization.
Business Excellence Implemented
Integrated Business Planning processes and tools (technology solution) to
support these processes were implemented; Key Performance Indicators were
established, monitored, and used to improve the processes. These changes
were made and measured using the Oliver Wight Class A Checklist for Business
Excellence, Sixth Edition.
Improvements include:
PRODUCT LIFE MANAGEMENT PROCESS: - The implementation of the product
management process, a process to track progress from the origin of an idea to the final
product launch, included three years post-launch. Part of this process is an innovation tool
to support and manage the pipeline of the new ideas. Portfolio management is an
important part of the process that manages the lifecycle of a product. It is integrated into
the S&OP cycle. Launch control is a “structured process” to manage from the launch
through to the performance demonstrated by the product, including:
GP - Gross Profit management; comparing the estimated and the actual
Inventory level - adjustments made during the initial phase of the launch
Demand plan - data collection and adjustment to understand the performance and
project the future.
KPIs were implemented to measure the performance of the product management process.
The first measurement is the project schedule performance - planned launch date versus
reality for all projects, and the second one is the milestone schedule performance - the
measurement of the milestones achieved in the stage and gate process.
DEMAND MANAGEMENT / DEMAND PLANNING: - A formal demand management
process was implemented and included the demand planning process and demand control
process which involved the sales force. General Manager Trevino adds, “One key area
which made the difference was the demand planning process which was barely
established. By getting the right input into the process by assessing market and customer
needs, we were able to increase our fill rate levels, therefore our invoicing, while reducing
our net working capital at the same time." Once the demand planning function was
created, it was necessary to add a demand planner.
KPIs - Sales plan performance/accuracy at aggregate and detail levels:
The measurement of the sales plan or demand plan performance at the aggregate,
family, and subfamily levels was important in order to make the demand
management process a success and add value to the business.
Sales compensation system:
Another significant initiative was to make changes to the compensation system for
the sales force. Typically the organization calculated compensation based on the
amount of money made by the business which injected bias into the sales plan, so
the compensation system, now based on the accuracy of the mix planned, was
revamped.
A rolling sales plan going out 18 months displays the first three months at a detail
level and the remaining months at an aggregate level. For ease of use and to support
the promises to the shareholders, the horizon was extended to 18 rolling months.
MASTER SCHEDULING / MASTER PLANNING - Closed-loop processes - MP / MPS / MRP /
SFC - were implemented.
DATA ACCURACY - Steps were taken to improve the data accuracy on bills of material,
routing structures, work locations, item master data, and supporting data, as well as
inventory record accuracy.
TOOLS - The mySAP was implemented successfully in August 2007 making use of
functionality to support the processes.
PEOPLE AND BEHAVIORS - The culture of Class A really became ingrained during and after
the final certification by Oliver Wight.
ALL CLASS A KPIs were achieved and sustained for three months prior to the final
certification.
Class A Certifications and Benefits Received - PROYECTO IMPACTO
Henkel Mexicana AC Division received two recognitions simultaneously from Oliver Wight:
The Oliver Wight ABCD Checklist for Operational Excellence - Fifth Edition - Chapter 5 -
Planning and Control Processes and The Oliver Wight Class A Checklist for Business Excellence
- Sixth Edition - Class A Milestone Award in Capable Planning and Control - the first milestone
of eighteen.
These accomplishments were the result of Henkel Mexicana AC Division receiving benefits
such as:
Quantitative
Savings of 2,336 TEUR in one year from:
- Reduction in manufacturing costs
- Inventory cost reductions
- Improved position in Cash - Net Working Capital
- Improvement in customer on-time delivery performance and reductions in backorders
Qualitative
Team work - development of cross-functional capabilities led to an increased
understanding of other colleagues' roles.
SAP - technology solution - knowledge was broadened.
Common language and set of performance measures are being used.
Discipline has been instilled.
Integration and communication has improved - developing a “strong team spirit”.
A rolling, long-term view of the business is now available.
Management has attained full control of the business.
Established goals were aligned throughout the organization.
There is an increased agility in the decision process.
Rodolfo Milan, Director Operations and Supply Chain - Adhesive Technologies, points out that
“The process allows … the company to be focused and aligned to the key priorities …
Increase(d) …credibility with customers, reduce(d) manufacturing cost, overtime and
inventories, improve(ment of the) new product introduction process, and Demand and Supply
are synchronized to achieve high profit.”
Conclusion
It became clear to Henkel Mexicana AC Division that sustainable high performance and
profitability is a continuous journey. The “Proyecto Impacto” has introduced Class A behaviors,
and all functions within the company are operating in that manner. Trevino concludes,
“Proyecto Impacto addressed the (requirements) our company had to achieve our strategic
goals.” The quantitative and qualitative benefits received from the project show that this has
been truly a business-based project, and the culture change achieved will enable continuing
success.
Case study kindly authorized for publication by Henkel Mexicana AC Division
“The process allows … the company to be
focused and aligned to the key priorities...”
- Rodolfo Milan
Oliver Wight Americas, Inc
292 Main Street, New London
New Hampshire, 03257, USA
Telephone: 1 800-258-3862
1 603-526-5800
Facsimile: 1 603-526-5809
info@oliverwight.com
www.oliverwight.com
®
Americas
292 Main Street, New London
New Hampshire 03257, USA
Europe, Africa & Middle East
The Willows, The Steadings Business Centre
Maisemore, Gloucester GL2 8EY, UK
Asia/Pacific
131 Martin Street, Brighton
VIC 3186, Australia

More Related Content

What's hot

Hale j logistics resume 2016
Hale j logistics resume 2016Hale j logistics resume 2016
Hale j logistics resume 2016Jacquelyn Hale
 
Successful Management of Change
Successful Management of ChangeSuccessful Management of Change
Successful Management of Changexynergie Ltd
 
CV_Solange_English Jan 2017
CV_Solange_English Jan 2017CV_Solange_English Jan 2017
CV_Solange_English Jan 2017Solange Zein
 
dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013Alina Aronova, MBA
 
Resume Peter Hutchings Cw August 13 12
Resume Peter Hutchings Cw August 13 12Resume Peter Hutchings Cw August 13 12
Resume Peter Hutchings Cw August 13 12phutchings
 
Developing project controls - Leap of faith or the path to enlightenment
Developing project controls  - Leap of faith or the path to enlightenmentDeveloping project controls  - Leap of faith or the path to enlightenment
Developing project controls - Leap of faith or the path to enlightenmentAssociation for Project Management
 
Agile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessAgile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessCognizant
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Daniele Pinto
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5Julian Earl
 

What's hot (18)

MTF Resume 101215
MTF Resume 101215MTF Resume 101215
MTF Resume 101215
 
Hale j logistics resume 2016
Hale j logistics resume 2016Hale j logistics resume 2016
Hale j logistics resume 2016
 
PRINCE2 quick guide
PRINCE2 quick guidePRINCE2 quick guide
PRINCE2 quick guide
 
Nelson Resume(dec)
Nelson Resume(dec)Nelson Resume(dec)
Nelson Resume(dec)
 
Successful Management of Change
Successful Management of ChangeSuccessful Management of Change
Successful Management of Change
 
CV_Solange_English Jan 2017
CV_Solange_English Jan 2017CV_Solange_English Jan 2017
CV_Solange_English Jan 2017
 
dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013
 
Ryans Resume
Ryans ResumeRyans Resume
Ryans Resume
 
Resume Peter Hutchings Cw August 13 12
Resume Peter Hutchings Cw August 13 12Resume Peter Hutchings Cw August 13 12
Resume Peter Hutchings Cw August 13 12
 
Resume_Feb 2015
Resume_Feb 2015Resume_Feb 2015
Resume_Feb 2015
 
Developing project controls - Leap of faith or the path to enlightenment
Developing project controls  - Leap of faith or the path to enlightenmentDeveloping project controls  - Leap of faith or the path to enlightenment
Developing project controls - Leap of faith or the path to enlightenment
 
Agile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessAgile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for Success
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
Malick Shahzad CV-15
Malick Shahzad CV-15Malick Shahzad CV-15
Malick Shahzad CV-15
 
Business Process And Program Expert
Business Process And Program ExpertBusiness Process And Program Expert
Business Process And Program Expert
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5
 

Similar to SOP-case-study-Henkel-Mexicana

Q4 Impact Group Introduction
Q4 Impact Group IntroductionQ4 Impact Group Introduction
Q4 Impact Group IntroductionRob Vogel
 
Michael Mohar Resume
Michael Mohar ResumeMichael Mohar Resume
Michael Mohar ResumeMichael Mohar
 
James Moore CV - 0.7
James Moore CV - 0.7James Moore CV - 0.7
James Moore CV - 0.7James Moore
 
7 factors driving Transformation Management - prepared by Husam Alasker
7 factors driving Transformation Management - prepared by Husam Alasker7 factors driving Transformation Management - prepared by Husam Alasker
7 factors driving Transformation Management - prepared by Husam AlaskerConsulting Firm / Government Sector
 
Leading Innovation and Change Best Practice Case Study Cl.docx
Leading Innovation and Change Best Practice Case Study Cl.docxLeading Innovation and Change Best Practice Case Study Cl.docx
Leading Innovation and Change Best Practice Case Study Cl.docxcroysierkathey
 
Asad_Resume V1
Asad_Resume V1Asad_Resume V1
Asad_Resume V1Asad Khan
 
Sarah_McCarthy_Resume_May15 Project
Sarah_McCarthy_Resume_May15 ProjectSarah_McCarthy_Resume_May15 Project
Sarah_McCarthy_Resume_May15 ProjectSarah McCarthy
 
Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaperNewport Consulting
 
University of Phoenix Change initiative for Nokia Paper.docx
University of Phoenix Change initiative for Nokia Paper.docxUniversity of Phoenix Change initiative for Nokia Paper.docx
University of Phoenix Change initiative for Nokia Paper.docxwrite5
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentTKMG, Inc.
 
Malcolm keith woodward blank
Malcolm keith woodward blankMalcolm keith woodward blank
Malcolm keith woodward blankmkbeefy
 
KatherineMurrayresume_1-15-16
KatherineMurrayresume_1-15-16KatherineMurrayresume_1-15-16
KatherineMurrayresume_1-15-16Katherine Murray
 
Innovation process gets reinvigorated
Innovation process gets reinvigoratedInnovation process gets reinvigorated
Innovation process gets reinvigoratedJoachim Cronquist
 
Resume Kathy Doyle PM
Resume   Kathy Doyle PMResume   Kathy Doyle PM
Resume Kathy Doyle PMkdoyle8794
 
KMC Excellence in Transformation
KMC Excellence in TransformationKMC Excellence in Transformation
KMC Excellence in TransformationHans Jonkers
 

Similar to SOP-case-study-Henkel-Mexicana (20)

WCM Newsletter
WCM NewsletterWCM Newsletter
WCM Newsletter
 
Q4 Impact Group Introduction
Q4 Impact Group IntroductionQ4 Impact Group Introduction
Q4 Impact Group Introduction
 
Michael Mohar Resume
Michael Mohar ResumeMichael Mohar Resume
Michael Mohar Resume
 
James Moore CV - 0.7
James Moore CV - 0.7James Moore CV - 0.7
James Moore CV - 0.7
 
Dev Resume
Dev ResumeDev Resume
Dev Resume
 
7 factors driving Transformation Management - prepared by Husam Alasker
7 factors driving Transformation Management - prepared by Husam Alasker7 factors driving Transformation Management - prepared by Husam Alasker
7 factors driving Transformation Management - prepared by Husam Alasker
 
Leading Innovation and Change Best Practice Case Study Cl.docx
Leading Innovation and Change Best Practice Case Study Cl.docxLeading Innovation and Change Best Practice Case Study Cl.docx
Leading Innovation and Change Best Practice Case Study Cl.docx
 
Asad_Resume V1
Asad_Resume V1Asad_Resume V1
Asad_Resume V1
 
Sarah_McCarthy_Resume_May15 Project
Sarah_McCarthy_Resume_May15 ProjectSarah_McCarthy_Resume_May15 Project
Sarah_McCarthy_Resume_May15 Project
 
Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaper
 
University of Phoenix Change initiative for Nokia Paper.docx
University of Phoenix Change initiative for Nokia Paper.docxUniversity of Phoenix Change initiative for Nokia Paper.docx
University of Phoenix Change initiative for Nokia Paper.docx
 
DPPM2
DPPM2DPPM2
DPPM2
 
Developing quality program
Developing quality programDeveloping quality program
Developing quality program
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
 
Malcolm keith woodward blank
Malcolm keith woodward blankMalcolm keith woodward blank
Malcolm keith woodward blank
 
KatherineMurrayresume_1-15-16
KatherineMurrayresume_1-15-16KatherineMurrayresume_1-15-16
KatherineMurrayresume_1-15-16
 
Innovation process gets reinvigorated
Innovation process gets reinvigoratedInnovation process gets reinvigorated
Innovation process gets reinvigorated
 
Resume Kathy Doyle PM
Resume   Kathy Doyle PMResume   Kathy Doyle PM
Resume Kathy Doyle PM
 
Resume MB 2016
Resume MB 2016Resume MB 2016
Resume MB 2016
 
KMC Excellence in Transformation
KMC Excellence in TransformationKMC Excellence in Transformation
KMC Excellence in Transformation
 

SOP-case-study-Henkel-Mexicana

  • 1. O L I V E R W I G H T C A S E S T U D Y S E R I E S Henkel Mexicana AC Division Takes the First Step On The Journey To Sustainable High Performance And Profitability “Proyecto Impacto addressed the basic needs our company had to acheive our strategic goals...” Jorge Treviño General Manager Henkel Mexicana AC Division, Latin America North ® together we make a difference
  • 2. The Need For Structure: Adopting and implementing a structured methodology for sustainable high performance and profitability provided Henkel Mexicana AC Division with quite a challenge. It required adopting a structured methodology; an integrated business model with correctly sequenced tasks. “Proyecto Impacto” was launched successfully and concluded in Oliver Wight Class A awards in Planning and Control. Among The Bottom-Line Benefits: Customer on-time shipment performance now exceeds 98 percent and executable sales plan performance is consistently within 5 percent of target as a result of demand forecasts being accurate within tolerance for product families and subfamilies. Inventory record accuracy now exceeds the Class A threshold of 95 percent which contributes to production efficiency, exceeding prior levels by at least two percentage points, which equates to millions in savings. Mill compliance with the master schedule exceeds 95 percent, which enhances the ability to keep commitments to customers. Excellence Program Including S&OP to Improve Service Levels In 2005, the Adhesives Division Board of Directors decided that the service level of Henkel Mexicana AC and all associated processes were unacceptable. Their stated vision is “To be recognized as the world's leading and most competent company for adhesives, sealants, and surface treatments”. The board members made the decision to launch a continuous improvement program, including Sales & Operations Planning. Henkel headquarters in Germany had been working on an Excellence Program with Oliver Wight Europe's Dave Manning and felt that Henkel Mexicana AC could benefit from a similar program. The first step taken, by Wilson Stefano Jr. of Oliver Wight Americas, was to conduct a Basic Assessment - completed in March of 2006. The results showed they were operating at a Class “D” level. This rating drove them to focus on Planning and Control using the Oliver Wight ABCD Checklist for Operational Excellence - Fifth Edition. The Case for Change: Many areas of operations and planning were inefficient, impeded, or non-existent causing management to seek a better way. There was dissatisfaction on the part of the Board of Directors with the service level, the processes, and the associated costs. The company lacked a formal Sales and Operations Planning process. Overall, there was a misalignment with the Vision. No structured process existed to improve sales plan accuracy and sales had tunnel vision to the top-line number. Supply Chain Integration was lacking, contributing to difficulties in managing seasonality. Silo thinking caused poor communication and cooperation. There was little or no Supply Chain Collaboration, reducing control of the business. Inventory levels were not considered a business priority. There was no structured process to improve data quality. Systems issues/insufficiencies were not addressed. Root cause analysis to support KPI improvement was inconsistent. There was no formal education program within the company, and the culture of the business was not conducive to improvement. Throughout the Project: The Executive Team regularly communicated their commitment to change the way they were doing business and to adopt the culture and behavior of a Class A organization. General Manager Trevino said “It started with a change of culture where people were thinking in silos rather than (as) an integrated business unit.” They reinforced that it requires discipline and common sense. The leadership of the project was directly taken by board members and cascaded through the entire organization with strong support from Manual Macedo, the president during the project.
  • 3. Changes: Sales and Operations Planning was implemented. Capable Supply Planning and Control was implemented after the base line was established. The executive team communicated clearly to the entire organization about their commitment and understanding of the journey and the focus required. Teams were organized to facilitate change and lean execution. A sustainable culture change was achieved supporting the new way of operating the organization. A formal education and training program was established that supported the changes required. Task Teams: 59 participants were grouped into 8 teams; each team had a specific piece of the project with dedicated responsibilities; the goal being the application of the Oliver Wight Integrated Business Model. Jean Daniel Mottais points out, “(A) project such as "Class A" requires a full-time project leader in order to assure its complete implementation within a set time frame (to)… motivate, plan, control, and finally assure that all the team is aligned to the common target: Achieving the Class A certification.” Assessments were conducted throughout the project to monitor performance, and results were communicated continually. Maria Salceda points out; “From the Shared Service function's point of view, it was of absolute help to be part of it, we had the opportunity to know more about the business, to put all the information that we manage daily in a more objective and measurable way and it made our work (of) much more of value... Now we have the process, we aligned our internal tools and … (will) work to continue improving our performance within the company.” Maria is Head of Corporate Communications for Henkel Latin America North. Knowledge Transfer: An education program was established to support the project. Together with Oliver Wight, several courses and workshops were conducted including Business Excellence, Demand Management, Supply Management, and Sales and Operations Planning. Stefano indicates: “Many companies omit this important phase of their project. But without it, the concept of lean execution and the culture of continuous improvement could not have been implemented.” Learning by doing was the critical success factor, but the correct education program and the correct sequence, supported by Stefano, was the baseline to transform the project into a total success and implement the culture of Class A to become a world-class organization. Business Excellence Implemented Integrated Business Planning processes and tools (technology solution) to support these processes were implemented; Key Performance Indicators were established, monitored, and used to improve the processes. These changes were made and measured using the Oliver Wight Class A Checklist for Business Excellence, Sixth Edition.
  • 4. Improvements include: PRODUCT LIFE MANAGEMENT PROCESS: - The implementation of the product management process, a process to track progress from the origin of an idea to the final product launch, included three years post-launch. Part of this process is an innovation tool to support and manage the pipeline of the new ideas. Portfolio management is an important part of the process that manages the lifecycle of a product. It is integrated into the S&OP cycle. Launch control is a “structured process” to manage from the launch through to the performance demonstrated by the product, including: GP - Gross Profit management; comparing the estimated and the actual Inventory level - adjustments made during the initial phase of the launch Demand plan - data collection and adjustment to understand the performance and project the future. KPIs were implemented to measure the performance of the product management process. The first measurement is the project schedule performance - planned launch date versus reality for all projects, and the second one is the milestone schedule performance - the measurement of the milestones achieved in the stage and gate process. DEMAND MANAGEMENT / DEMAND PLANNING: - A formal demand management process was implemented and included the demand planning process and demand control process which involved the sales force. General Manager Trevino adds, “One key area which made the difference was the demand planning process which was barely established. By getting the right input into the process by assessing market and customer needs, we were able to increase our fill rate levels, therefore our invoicing, while reducing our net working capital at the same time." Once the demand planning function was created, it was necessary to add a demand planner. KPIs - Sales plan performance/accuracy at aggregate and detail levels: The measurement of the sales plan or demand plan performance at the aggregate, family, and subfamily levels was important in order to make the demand management process a success and add value to the business. Sales compensation system: Another significant initiative was to make changes to the compensation system for the sales force. Typically the organization calculated compensation based on the amount of money made by the business which injected bias into the sales plan, so the compensation system, now based on the accuracy of the mix planned, was revamped. A rolling sales plan going out 18 months displays the first three months at a detail level and the remaining months at an aggregate level. For ease of use and to support the promises to the shareholders, the horizon was extended to 18 rolling months. MASTER SCHEDULING / MASTER PLANNING - Closed-loop processes - MP / MPS / MRP / SFC - were implemented. DATA ACCURACY - Steps were taken to improve the data accuracy on bills of material, routing structures, work locations, item master data, and supporting data, as well as inventory record accuracy. TOOLS - The mySAP was implemented successfully in August 2007 making use of functionality to support the processes. PEOPLE AND BEHAVIORS - The culture of Class A really became ingrained during and after the final certification by Oliver Wight. ALL CLASS A KPIs were achieved and sustained for three months prior to the final certification.
  • 5. Class A Certifications and Benefits Received - PROYECTO IMPACTO Henkel Mexicana AC Division received two recognitions simultaneously from Oliver Wight: The Oliver Wight ABCD Checklist for Operational Excellence - Fifth Edition - Chapter 5 - Planning and Control Processes and The Oliver Wight Class A Checklist for Business Excellence - Sixth Edition - Class A Milestone Award in Capable Planning and Control - the first milestone of eighteen. These accomplishments were the result of Henkel Mexicana AC Division receiving benefits such as: Quantitative Savings of 2,336 TEUR in one year from: - Reduction in manufacturing costs - Inventory cost reductions - Improved position in Cash - Net Working Capital - Improvement in customer on-time delivery performance and reductions in backorders Qualitative Team work - development of cross-functional capabilities led to an increased understanding of other colleagues' roles. SAP - technology solution - knowledge was broadened. Common language and set of performance measures are being used. Discipline has been instilled. Integration and communication has improved - developing a “strong team spirit”. A rolling, long-term view of the business is now available. Management has attained full control of the business. Established goals were aligned throughout the organization. There is an increased agility in the decision process. Rodolfo Milan, Director Operations and Supply Chain - Adhesive Technologies, points out that “The process allows … the company to be focused and aligned to the key priorities … Increase(d) …credibility with customers, reduce(d) manufacturing cost, overtime and inventories, improve(ment of the) new product introduction process, and Demand and Supply are synchronized to achieve high profit.” Conclusion It became clear to Henkel Mexicana AC Division that sustainable high performance and profitability is a continuous journey. The “Proyecto Impacto” has introduced Class A behaviors, and all functions within the company are operating in that manner. Trevino concludes, “Proyecto Impacto addressed the (requirements) our company had to achieve our strategic goals.” The quantitative and qualitative benefits received from the project show that this has been truly a business-based project, and the culture change achieved will enable continuing success. Case study kindly authorized for publication by Henkel Mexicana AC Division “The process allows … the company to be focused and aligned to the key priorities...” - Rodolfo Milan
  • 6. Oliver Wight Americas, Inc 292 Main Street, New London New Hampshire, 03257, USA Telephone: 1 800-258-3862 1 603-526-5800 Facsimile: 1 603-526-5809 info@oliverwight.com www.oliverwight.com ® Americas 292 Main Street, New London New Hampshire 03257, USA Europe, Africa & Middle East The Willows, The Steadings Business Centre Maisemore, Gloucester GL2 8EY, UK Asia/Pacific 131 Martin Street, Brighton VIC 3186, Australia