Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Sample Detail Pipa Isntallation For H.pdf
1. P
MATERIAL TAKE OFF
NO DESCRIPTION SIZE QTY
50 50
200
300
50 50
300
300
300
200
300
50
50
200
700
750
150
150
450
200
250
KEY PLAN
LEGEND :
APPROVAL
REV DATE REVISION STATUS SIGN
DRAWING NUMBER :
SIZE PROJECT NO. DISCIPLINE
SCALE
DRAWING TITTLE
PROJECT
APPROVED
SUBMIT
NAME SIGN DATE
DRAWN
CHECKED
REVIEWED
FILE
CONTRACTOR
CONTRUCTION MANAGEMENT
M&E CONSULTANT
REFERENCE DRAWNGS :
REVISED NO.
PT. TOTAL TEKNIK INDONESIA
NORTH
OWNER
TEAMWORX INDONESIA
MEP ENG
CIVIL ENG
PM
MUA-TTI-SD-FIN-08-205.10