SlideShare a Scribd company logo
1 of 4
SACHIN B. MAKWANA.
A-4AshwaleshaParkSociety, G.D SchoolRoad,Naroda, Ahmadabad
Contact:+91-9714494139,Email:-Sachinmakwana786@gmail.com
CAREEROBJECTIVE
To make the most ofmy potential and discovernew horizonsin the field of Telecom. To utilize my perfectblend of 5
years’ active experience andcreativity, those enable me to performin the best possible way formany responsibilities &
challenges along with the opportunities togrow.
PROFESSIONALSYNOPSIS
 Over 4+ years of experience in Planning, Deployment, Operations & Maintenance, Network Optimization,
Quality Assurance,Material Management, Vendorappointment and management and Technical Support in the
Telecom Industry.
 Proficiency in managing the deployment, installations, commissioning, testing & maintenance of projects
ensuring quality at every step of project completion and assurance during operations.
 Expertise in Interaction and Vendor management for maximum network availability and to minimize the fault
ratio and resolution within SLA.
 Monitoring & Troubleshooting of Network Fault.
 Proficient in the installation, commissioning & maintenance of a wide range of telecom equipment with sound
knowledge of telecom technologies.
PROFESSIONALEXPERIENCE
1) SamsungElectronicsPvt.Ltd.
 RF Engineer
 Period:- 25th
August2015Onwards
2) IDEACELLULAR LIMITED, AHMEDABAD (2.8 Yrs Exp)
 Network- Technical SupportEngineer.
 Period:-1st January2013 to20th
August2015
3) GEMINI COMMUNICATION LIMITED, AHMEDABAD (1.8 Yrs Exp.)
 Technical Support(O&M-NOC) Engineer(Tikona Digital Network Project)
 Period:- 1st September 2010 to7th May 2012
PERSONALACHIEVEMENTS
 AwardedExcellent for Achieved100%customercomplaintclosure withinTAT, highest among all WiFi circlesin
IDEA
 Effectively looking for CustomerService Delivery (New Installations) and successfullyachievingTAT as per
policy.
 PerusingCCNA certification
 PerformingOperation and Maintenance ofall Wi-Fi networksdeployed in Ahmadabad
 Troubleshooting all networking problems to ensure minimum downtime and maximum availability of network.
PROFESSIONALEXPERIENCE
SAMSUNGELECTRONICS PVT.LTD.
RF Engineer
 CLOTPlanningand on field support.
 To take correctiveaction regardingworst performingcells to improve the KPI.
 Processdevelopment and implementation to carry outplanned activity related to network optimization.
 Study ofKPI and counterfortroubleshootingNetwork Problem.
 Part ofRF optimization team, responsible for planningand optimization of 4Gnetwork.
 Optimization and performancemanagement oflarge 4Gnetwork
 Monitoring &Troubleshooting of 4G Network& to take correctiveaction forresolving Alarm.
 Monitoring E-nodeb Status and Plan Sites accordingly.
 AlsoChange the Parameter using LSMRto achieve required CLOTKPI.
 Manage and guide vendors for Alarm Rectification, site integration and Clot drive.
 CLOT Report Validation & Check RF Condition at site.
 Leading Team of Clot team
IDEACELLULARLIMITED
Network- Technical Support Engineer
 Lookingafter Operation and Maintenance of Entire Wi-Fi Network ofAhmadabad
 Previouslyperformed key role forroll-out WiFi projectin Ahmedabad.
 Planningand commissioning ofnew UBRLink.
 Entirely responsible for integration required Network Elements for WiFi ProjectincludingUBRbackhaul and
mesh networking.
 Assistingin the design &implementation ofnetwork (LAN&WAN),troubleshootingnetworkproblems &
conflicts.
 Integration &Commissioning of BelAir20E& BelAir20EOAccesspointandhaving expertise in BelAir Access
point.
 Having handson experience onWiFi Controller-WLC8000(BelAir) andEMS(EricssonMonitoring System).
 Commissioning & TroubleshootingofWLC 8000 andEMS.
 Addressingperformancebottlenecks and ensuringmaximum networkuptime.
 Suggestingimprovements in the operations and processesto make the system fool proof.
 Proficientin implementation, optimization, troubleshooting& documentationof LAN/WANnetworksystems.
 Had workuponwireless equipment of EricssonBelAir Accesspoints,Telenet and Primatel outdoorandindoor
CPE.
 Manage and guide local infra vendors forinstallation and commissioningof AccessPointsandoutdoorCPE.
 Suggestingimprovements in the operations and processesto make the system fool proof.Planfor the
Engineers’ visit to customerend forPreventive maintenance, troubleshooting or Commissioning ofnew links.
 Carrying outsurveysof variousBuildings accordingto BusinessTeam Requirement and responsible to convert
all those into ActualBusinessby making Live.
 Leading team ofWiFi O&M,Customer installation and service and held customerservice position forentire
Gujaratcircle.
GEMINICOMMUNICATIONLIMITED.(TikonaDigitalNetworkProject)
Technical Support(O&M-NOC) Engineer
 CustomerComplaint Base Optimization.
 Monitoring ofInter & IntraCity Links of Ahmedabad, Barodaand Rajkotcluster ofGujarat State.
 Monitoring &Troubleshooting ofAccessPOP Switches.
 Co-ordinationand Escalation with Different Service-provides.
 Handson CpstoneApplications
 Responsible forall the Radio,AccessPoint,RTS –Mogralite Switchesin the network.
 Handling, Resolving RadioElements Trouble Ticket and maintaining analysis report in desired format.
 Remote troubleshooting forall the problem pertaining toRadio Links, AccessPoints.
 ProActiveMonitoring ofthe links in the NMS (AirControl).
 Maintaining Network Tree forFBN/EFBNLinks & ‘
 Responsible to checkthe traps regarding ACfails, Battery Critical level and actaccordingly
 Had workuponwireless equipment make of Ubiquity:- PowerStation 5 , Nano Bridge 5 ,PowerBridge,Nano
station. Ruckus:-.Accesspoint(zf2741),ruckusCPE.
 Coordinationwith the Field NetworkO&M team forresolution ofTT’s
ACADEMIA
 Diploma in Electronics&CommunicationEngineering,TEB,AmreliPolytechnic,2010,50.65%
 12th, GHSEB,2011,54%
 10th, GSEB , 2007,71%
TOOLS &SOFTWARE
 OpenNMS forRTS –Mogralite Switches &AccessPOP Switches.
 Flex Master foraccess pointof EFDN,PBN,SBN, and TBN & Map NMMAP Sites.
 Ubiquiti air controlforRadio links.
 Wi-Fi Controller-WLC8000(BelAir)
 Wi-Fi Manager-EricssonMonitoring System
 X-CAL-Drive Test Tools for Drive Test
 Actix- PostProcessing/analysing tools fordrive data
 MapInfo8.5for drive routeand frequencyanalyse.
 Siteforge – Database tools forLTE networkparameters data .
ONJOB TRAINING
 Wi-Fi system overview by Ericsson
 EMS Training by Ericsson
PERSONALINFORMATION
 Date Of Birth : 10thJanuary 1992
 Gender : Male
 Marital Status : Single
REFERENCE

More Related Content

What's hot

What's hot (20)

Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
Resume_Dayasant (1)
Resume_Dayasant (1)Resume_Dayasant (1)
Resume_Dayasant (1)
 
Telecom Engineer
Telecom EngineerTelecom Engineer
Telecom Engineer
 
Amith Kumar S N_BE_4.10Years_IMS and SIP Testing
Amith Kumar S N_BE_4.10Years_IMS and SIP TestingAmith Kumar S N_BE_4.10Years_IMS and SIP Testing
Amith Kumar S N_BE_4.10Years_IMS and SIP Testing
 
CV@SAGAR1
CV@SAGAR1CV@SAGAR1
CV@SAGAR1
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Naveen_Resume
Naveen_ResumeNaveen_Resume
Naveen_Resume
 
resume 1 (3)
resume 1 (3)resume 1 (3)
resume 1 (3)
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
CV Vishal
CV VishalCV Vishal
CV Vishal
 
Resume
ResumeResume
Resume
 
internship report 2012 (Propel Network Sdn.Bhd)
internship report 2012 (Propel Network Sdn.Bhd)internship report 2012 (Propel Network Sdn.Bhd)
internship report 2012 (Propel Network Sdn.Bhd)
 
Sri Harsha_Resume
Sri Harsha_ResumeSri Harsha_Resume
Sri Harsha_Resume
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 
Bhavesh Patel
Bhavesh PatelBhavesh Patel
Bhavesh Patel
 
nasrul presentation
nasrul presentationnasrul presentation
nasrul presentation
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Resume_Ajit Kumar
Resume_Ajit KumarResume_Ajit Kumar
Resume_Ajit Kumar
 
DIPU CV
DIPU CVDIPU CV
DIPU CV
 

Viewers also liked

Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...
Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...
Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...CentroMalattieRareFVG
 
Madhu_resume_updated
Madhu_resume_updatedMadhu_resume_updated
Madhu_resume_updatedMadhu R
 
Protein and peptide drug delivery seminar-97-2003-final2
Protein and peptide drug delivery seminar-97-2003-final2Protein and peptide drug delivery seminar-97-2003-final2
Protein and peptide drug delivery seminar-97-2003-final2Pravin Chinchole
 
збереження електроенергії у побуті
збереження електроенергії у побутізбереження електроенергії у побуті
збереження електроенергії у побутіTamara Emec
 
148x210 druzya putina-08-12
148x210 druzya putina-08-12148x210 druzya putina-08-12
148x210 druzya putina-08-12cacds_ukraine
 
actividad en clase, cuadro comparativo y reseña
actividad en clase, cuadro comparativo y reseñaactividad en clase, cuadro comparativo y reseña
actividad en clase, cuadro comparativo y reseñavicente gastelum cortez
 
FinalProjectProposal
FinalProjectProposalFinalProjectProposal
FinalProjectProposalLadan Herovi
 
Targeted drug dellivery system.
Targeted drug dellivery system.Targeted drug dellivery system.
Targeted drug dellivery system.Pravin Chinchole
 
rrc-procedures-in-lte
rrc-procedures-in-lterrc-procedures-in-lte
rrc-procedures-in-lteMorg
 

Viewers also liked (17)

сх всё свежее от саи
сх всё свежее от саисх всё свежее от саи
сх всё свежее от саи
 
Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...
Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...
Storia clinica della Malattia di Gaucher tipo 1 dopo l'introduzione della Ter...
 
Madhu_resume_updated
Madhu_resume_updatedMadhu_resume_updated
Madhu_resume_updated
 
Protein and peptide drug delivery seminar-97-2003-final2
Protein and peptide drug delivery seminar-97-2003-final2Protein and peptide drug delivery seminar-97-2003-final2
Protein and peptide drug delivery seminar-97-2003-final2
 
Aljabar Linier Bab 4 vektor
Aljabar Linier Bab 4 vektorAljabar Linier Bab 4 vektor
Aljabar Linier Bab 4 vektor
 
збереження електроенергії у побуті
збереження електроенергії у побутізбереження електроенергії у побуті
збереження електроенергії у побуті
 
148x210 druzya putina-08-12
148x210 druzya putina-08-12148x210 druzya putina-08-12
148x210 druzya putina-08-12
 
Niosomes
NiosomesNiosomes
Niosomes
 
Organogels.
Organogels.Organogels.
Organogels.
 
Cómo ver una película
Cómo ver una películaCómo ver una película
Cómo ver una película
 
actividad en clase, cuadro comparativo y reseña
actividad en clase, cuadro comparativo y reseñaactividad en clase, cuadro comparativo y reseña
actividad en clase, cuadro comparativo y reseña
 
FinalProjectProposal
FinalProjectProposalFinalProjectProposal
FinalProjectProposal
 
Targeted drug dellivery system.
Targeted drug dellivery system.Targeted drug dellivery system.
Targeted drug dellivery system.
 
Aprendizaje autónomo
Aprendizaje autónomoAprendizaje autónomo
Aprendizaje autónomo
 
rrc-procedures-in-lte
rrc-procedures-in-lterrc-procedures-in-lte
rrc-procedures-in-lte
 
Saneamento básico
Saneamento básicoSaneamento básico
Saneamento básico
 
Six Inches Communication Credentials
Six Inches Communication CredentialsSix Inches Communication Credentials
Six Inches Communication Credentials
 

Similar to Sachin_Makwana

Similar to Sachin_Makwana (20)

Akash srivastava.cv
Akash srivastava.cvAkash srivastava.cv
Akash srivastava.cv
 
Kumar Gunjan
Kumar GunjanKumar Gunjan
Kumar Gunjan
 
Imran Talib Network Engineer
Imran Talib Network EngineerImran Talib Network Engineer
Imran Talib Network Engineer
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
CV__Avisek_Mukherjee_15thNov_2016
CV__Avisek_Mukherjee_15thNov_2016CV__Avisek_Mukherjee_15thNov_2016
CV__Avisek_Mukherjee_15thNov_2016
 
Satheesh Resume
Satheesh ResumeSatheesh Resume
Satheesh Resume
 
Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15Samer_Sammour_CV_NEW_OCT_15
Samer_Sammour_CV_NEW_OCT_15
 
VAIBHAV SONI
VAIBHAV SONIVAIBHAV SONI
VAIBHAV SONI
 
Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)
 
PREETHI_4.5yrs Exp
PREETHI_4.5yrs ExpPREETHI_4.5yrs Exp
PREETHI_4.5yrs Exp
 
Shivayogayya Hiremath
Shivayogayya HiremathShivayogayya Hiremath
Shivayogayya Hiremath
 
Mohammed Fazal Imran CV
Mohammed Fazal Imran CVMohammed Fazal Imran CV
Mohammed Fazal Imran CV
 
Muhammad Faisal
Muhammad Faisal Muhammad Faisal
Muhammad Faisal
 
Shivayogayya Hiremath_CV
Shivayogayya Hiremath_CVShivayogayya Hiremath_CV
Shivayogayya Hiremath_CV
 
Ajay 2016 resume
Ajay 2016 resumeAjay 2016 resume
Ajay 2016 resume
 
Mohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docxMohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docx
 
Brightcomms Company Profile
Brightcomms Company ProfileBrightcomms Company Profile
Brightcomms Company Profile
 
Resume With 5.1 years exp.
Resume With 5.1 years exp.Resume With 5.1 years exp.
Resume With 5.1 years exp.
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 

Sachin_Makwana

  • 1. SACHIN B. MAKWANA. A-4AshwaleshaParkSociety, G.D SchoolRoad,Naroda, Ahmadabad Contact:+91-9714494139,Email:-Sachinmakwana786@gmail.com CAREEROBJECTIVE To make the most ofmy potential and discovernew horizonsin the field of Telecom. To utilize my perfectblend of 5 years’ active experience andcreativity, those enable me to performin the best possible way formany responsibilities & challenges along with the opportunities togrow. PROFESSIONALSYNOPSIS  Over 4+ years of experience in Planning, Deployment, Operations & Maintenance, Network Optimization, Quality Assurance,Material Management, Vendorappointment and management and Technical Support in the Telecom Industry.  Proficiency in managing the deployment, installations, commissioning, testing & maintenance of projects ensuring quality at every step of project completion and assurance during operations.  Expertise in Interaction and Vendor management for maximum network availability and to minimize the fault ratio and resolution within SLA.  Monitoring & Troubleshooting of Network Fault.  Proficient in the installation, commissioning & maintenance of a wide range of telecom equipment with sound knowledge of telecom technologies. PROFESSIONALEXPERIENCE 1) SamsungElectronicsPvt.Ltd.  RF Engineer  Period:- 25th August2015Onwards 2) IDEACELLULAR LIMITED, AHMEDABAD (2.8 Yrs Exp)  Network- Technical SupportEngineer.  Period:-1st January2013 to20th August2015 3) GEMINI COMMUNICATION LIMITED, AHMEDABAD (1.8 Yrs Exp.)  Technical Support(O&M-NOC) Engineer(Tikona Digital Network Project)  Period:- 1st September 2010 to7th May 2012 PERSONALACHIEVEMENTS  AwardedExcellent for Achieved100%customercomplaintclosure withinTAT, highest among all WiFi circlesin IDEA  Effectively looking for CustomerService Delivery (New Installations) and successfullyachievingTAT as per policy.  PerusingCCNA certification  PerformingOperation and Maintenance ofall Wi-Fi networksdeployed in Ahmadabad  Troubleshooting all networking problems to ensure minimum downtime and maximum availability of network.
  • 2. PROFESSIONALEXPERIENCE SAMSUNGELECTRONICS PVT.LTD. RF Engineer  CLOTPlanningand on field support.  To take correctiveaction regardingworst performingcells to improve the KPI.  Processdevelopment and implementation to carry outplanned activity related to network optimization.  Study ofKPI and counterfortroubleshootingNetwork Problem.  Part ofRF optimization team, responsible for planningand optimization of 4Gnetwork.  Optimization and performancemanagement oflarge 4Gnetwork  Monitoring &Troubleshooting of 4G Network& to take correctiveaction forresolving Alarm.  Monitoring E-nodeb Status and Plan Sites accordingly.  AlsoChange the Parameter using LSMRto achieve required CLOTKPI.  Manage and guide vendors for Alarm Rectification, site integration and Clot drive.  CLOT Report Validation & Check RF Condition at site.  Leading Team of Clot team IDEACELLULARLIMITED Network- Technical Support Engineer  Lookingafter Operation and Maintenance of Entire Wi-Fi Network ofAhmadabad  Previouslyperformed key role forroll-out WiFi projectin Ahmedabad.  Planningand commissioning ofnew UBRLink.  Entirely responsible for integration required Network Elements for WiFi ProjectincludingUBRbackhaul and mesh networking.  Assistingin the design &implementation ofnetwork (LAN&WAN),troubleshootingnetworkproblems & conflicts.  Integration &Commissioning of BelAir20E& BelAir20EOAccesspointandhaving expertise in BelAir Access point.  Having handson experience onWiFi Controller-WLC8000(BelAir) andEMS(EricssonMonitoring System).  Commissioning & TroubleshootingofWLC 8000 andEMS.  Addressingperformancebottlenecks and ensuringmaximum networkuptime.  Suggestingimprovements in the operations and processesto make the system fool proof.  Proficientin implementation, optimization, troubleshooting& documentationof LAN/WANnetworksystems.  Had workuponwireless equipment of EricssonBelAir Accesspoints,Telenet and Primatel outdoorandindoor CPE.  Manage and guide local infra vendors forinstallation and commissioningof AccessPointsandoutdoorCPE.  Suggestingimprovements in the operations and processesto make the system fool proof.Planfor the Engineers’ visit to customerend forPreventive maintenance, troubleshooting or Commissioning ofnew links.  Carrying outsurveysof variousBuildings accordingto BusinessTeam Requirement and responsible to convert all those into ActualBusinessby making Live.  Leading team ofWiFi O&M,Customer installation and service and held customerservice position forentire Gujaratcircle.
  • 3. GEMINICOMMUNICATIONLIMITED.(TikonaDigitalNetworkProject) Technical Support(O&M-NOC) Engineer  CustomerComplaint Base Optimization.  Monitoring ofInter & IntraCity Links of Ahmedabad, Barodaand Rajkotcluster ofGujarat State.  Monitoring &Troubleshooting ofAccessPOP Switches.  Co-ordinationand Escalation with Different Service-provides.  Handson CpstoneApplications  Responsible forall the Radio,AccessPoint,RTS –Mogralite Switchesin the network.  Handling, Resolving RadioElements Trouble Ticket and maintaining analysis report in desired format.  Remote troubleshooting forall the problem pertaining toRadio Links, AccessPoints.  ProActiveMonitoring ofthe links in the NMS (AirControl).  Maintaining Network Tree forFBN/EFBNLinks & ‘  Responsible to checkthe traps regarding ACfails, Battery Critical level and actaccordingly  Had workuponwireless equipment make of Ubiquity:- PowerStation 5 , Nano Bridge 5 ,PowerBridge,Nano station. Ruckus:-.Accesspoint(zf2741),ruckusCPE.  Coordinationwith the Field NetworkO&M team forresolution ofTT’s ACADEMIA  Diploma in Electronics&CommunicationEngineering,TEB,AmreliPolytechnic,2010,50.65%  12th, GHSEB,2011,54%  10th, GSEB , 2007,71% TOOLS &SOFTWARE  OpenNMS forRTS –Mogralite Switches &AccessPOP Switches.  Flex Master foraccess pointof EFDN,PBN,SBN, and TBN & Map NMMAP Sites.  Ubiquiti air controlforRadio links.  Wi-Fi Controller-WLC8000(BelAir)  Wi-Fi Manager-EricssonMonitoring System  X-CAL-Drive Test Tools for Drive Test  Actix- PostProcessing/analysing tools fordrive data  MapInfo8.5for drive routeand frequencyanalyse.  Siteforge – Database tools forLTE networkparameters data . ONJOB TRAINING  Wi-Fi system overview by Ericsson  EMS Training by Ericsson PERSONALINFORMATION  Date Of Birth : 10thJanuary 1992  Gender : Male  Marital Status : Single