A risk assessment was conducted for a film shoot in the Green Screen Room at De Aston School on 07/12/15. Hazards identified included cables, a tripod, and a table leg that could pose trip hazards. Measures taken to prevent injury included neatly securing cables to the floor with bright tape, pointing out the tripod legs to cast and crew, and pulling a table forward during shots. Responsible parties were assigned to each hazard identified. The overall risks were determined to be adequately addressed and given a green "G" rating.