The location in which principal shooting will take place, Steetly, will permit a number
of potential risks to both the group and others, as well as the sequence itself, the
environment and technical equipment. The risks have many different implications
that vary from those that are physical, financial, environmental, and in terms of
marketing.

This document details the most prominent risks and the associated implications of
these coupled with preventative measures.

In order to minimise the above we will conduct an initial assessment of the site when
arriving to determine the visible risks associated with uneven or unsuitable ground
along with any protuberances that could lead to injury. During this initial assessment
camera equipment will be not be mobilised until we are fully certain there is a
suitable place to use if safely.

      There are a lot of potential risks when we will be filming our sequence in
      Steetly as this is a remote location and it adheres various health and safety
      hazards that we have to be aware of. The main hazards that we have to be
      aware of are aspects such as falling over on sharp objects that may cause
      injury this could be things such as glass, sharp rocks, needles etc. Another
      possible hazard we have to be aware of holes in the ground, if not being careful
      where you walk this could lead to you falling in and could result in a serious
      injury. When filming near the water tanks there was a possible chance of falling
      in to avoid this we ensured that we kept a safe distance away from them and
      walked around in a sensible manor. The key principal into staying safe is to use
      common sense and just genrally be carefull what your doing.



      The location is some distance away (from group members’ homes) so therefore
      it will need to be reached by some form of vehicular transport. This has a
      number of obvious risks that are broad, and vary from an RTA in an extreme
      sense to making sure that the car is fully roadworthy and suitable to transport
      all passengers in comfort and safety (i.e. seatbelts). The latter is also the case
      for the camera equipment to ensure it is not broken and protected from theft if
      left unattended. This equipment will not be left in a visible position in the car
      itself but in the lockable boot away from plain sight. The vehicle should also be
      fully insured, hold a valid MOT and tax disc. The camera equipment should be
      covered by owner’s insurance.


      The group will need to ensure the appropriate technical equipment such as the
      camera(s), tripod, etc. is brought along, as these are necessary to film the
      sequence to a high quality. For example, not using a tripod risks camera shake
      and dropping the camera, which has subsequent financial implications. Prior to
      shooting all equipment should be checked for things such as being fully
      charged, fully operational and empty sufficient memory card storage space.

      Before shooting the group should run through what we have planned to re-
      familiarise ourselves with how and when we intend to do things to prevent
      conflict and to iron out any discrepancies, disagreements or problems. This will
      maximise the quality of the final sequence.



                                                                          Liam Hedley
Although needing to incorporate USPs, we must be careful to not deviate too
far from the typical genre conventions, as it is these conventions that attract
audiences. We will need to ensure that we use a combination of conventional
camera shots, for example, as well as developing and experimenting creatively
in this aspect amongst others. We need to keep out audience as mainstream
as possible to maximise revenue streams. With this in mind the film will be
targeted as a 15 as this is not too delimitating, but appropriate for our plot and
themes, etc.

With reference to the above we need to ensure that our film is one which
distributors would approve and market to again maximise revenue streams.




                                                                    Liam Hedley

More Related Content

Similar to Risk Assessment Part 2

Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formAdam Grundy
 
Advertising risk assessment form
Advertising risk assessment formAdvertising risk assessment form
Advertising risk assessment formAdam Grundy
 
Fmp risk assessment
Fmp risk assessmentFmp risk assessment
Fmp risk assessmentSarahMurrayy
 
4A's Production Wrap-Up Program
4A's Production Wrap-Up Program 4A's Production Wrap-Up Program
4A's Production Wrap-Up Program
Buttine Exhibition and Event Insurance
 
Unit 4 pre-production portfolio
Unit 4  pre-production portfolio Unit 4  pre-production portfolio
Unit 4 pre-production portfolio
stephburdess
 
Jacob media Portfolio
Jacob media Portfolio Jacob media Portfolio
Jacob media Portfolio
JacobBarrett11
 
Pre production final
Pre production finalPre production final
Pre production final
19001069
 
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERSDRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
Reputelligence
 
Photography shoot risk assessment
Photography shoot risk assessmentPhotography shoot risk assessment
Photography shoot risk assessmentSarahMurrayy
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheetmaialegg
 
Contingency plan + risk + equipment
Contingency plan + risk + equipmentContingency plan + risk + equipment
Contingency plan + risk + equipment
Daniel Bishun
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formkendellburgess
 
Security Project Proposal Template PowerPoint Presentation Slides
Security Project Proposal Template PowerPoint Presentation SlidesSecurity Project Proposal Template PowerPoint Presentation Slides
Security Project Proposal Template PowerPoint Presentation Slides
SlideTeam
 
Pre production req
Pre production reqPre production req
Pre production req
Travis101
 
TPC Sept issue - 2nd half
TPC Sept issue - 2nd halfTPC Sept issue - 2nd half
TPC Sept issue - 2nd halfjtlunn
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
Carla Appleby
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
Carla Appleby
 
Guide-to-accident-investigation
Guide-to-accident-investigationGuide-to-accident-investigation
Guide-to-accident-investigation
Muhammad Ali Zafar
 

Similar to Risk Assessment Part 2 (20)

Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Advertising risk assessment form
Advertising risk assessment formAdvertising risk assessment form
Advertising risk assessment form
 
Fmp risk assessment
Fmp risk assessmentFmp risk assessment
Fmp risk assessment
 
4A's Production Wrap-Up Program
4A's Production Wrap-Up Program 4A's Production Wrap-Up Program
4A's Production Wrap-Up Program
 
Unit 4 pre-production portfolio
Unit 4  pre-production portfolio Unit 4  pre-production portfolio
Unit 4 pre-production portfolio
 
Jacob media Portfolio
Jacob media Portfolio Jacob media Portfolio
Jacob media Portfolio
 
Pre production final
Pre production finalPre production final
Pre production final
 
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERSDRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
DRONES THE NEW WEAPON OF CHOICE - ALSO FOR HACKERS
 
Photography shoot risk assessment
Photography shoot risk assessmentPhotography shoot risk assessment
Photography shoot risk assessment
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheet
 
Contingency plan + risk + equipment
Contingency plan + risk + equipmentContingency plan + risk + equipment
Contingency plan + risk + equipment
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Security Project Proposal Template PowerPoint Presentation Slides
Security Project Proposal Template PowerPoint Presentation SlidesSecurity Project Proposal Template PowerPoint Presentation Slides
Security Project Proposal Template PowerPoint Presentation Slides
 
Risk
RiskRisk
Risk
 
Pre production req
Pre production reqPre production req
Pre production req
 
TPC Sept issue - 2nd half
TPC Sept issue - 2nd halfTPC Sept issue - 2nd half
TPC Sept issue - 2nd half
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
 
Guide-to-accident-investigation
Guide-to-accident-investigationGuide-to-accident-investigation
Guide-to-accident-investigation
 

More from waqa0121

Shooting schedule (New)
Shooting schedule (New)Shooting schedule (New)
Shooting schedule (New)waqa0121
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedulewaqa0121
 
Call sheet part 2
Call sheet part 2Call sheet part 2
Call sheet part 2waqa0121
 
Saw 4 opening scene analyses
Saw 4 opening scene analysesSaw 4 opening scene analyses
Saw 4 opening scene analyseswaqa0121
 
Screenshots
ScreenshotsScreenshots
Screenshotswaqa0121
 
Audience Research
Audience ResearchAudience Research
Audience Researchwaqa0121
 
Initial ideas
Initial ideasInitial ideas
Initial ideaswaqa0121
 
Presentation1
Presentation1Presentation1
Presentation1waqa0121
 
Horror Movie
Horror MovieHorror Movie
Horror Moviewaqa0121
 

More from waqa0121 (9)

Shooting schedule (New)
Shooting schedule (New)Shooting schedule (New)
Shooting schedule (New)
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Call sheet part 2
Call sheet part 2Call sheet part 2
Call sheet part 2
 
Saw 4 opening scene analyses
Saw 4 opening scene analysesSaw 4 opening scene analyses
Saw 4 opening scene analyses
 
Screenshots
ScreenshotsScreenshots
Screenshots
 
Audience Research
Audience ResearchAudience Research
Audience Research
 
Initial ideas
Initial ideasInitial ideas
Initial ideas
 
Presentation1
Presentation1Presentation1
Presentation1
 
Horror Movie
Horror MovieHorror Movie
Horror Movie
 

Recently uploaded

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
g2nightmarescribd
 

Recently uploaded (20)

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
 

Risk Assessment Part 2

  • 1. Risk Assessment The location in which principal shooting will take place, Steetly, will permit a number of potential risks to both the group and others, as well as the sequence itself, the environment and technical equipment. The risks have many different implications that vary from those that are physical, financial, environmental, and in terms of marketing. This document details the most prominent risks and the associated implications of these coupled with preventative measures. In order to minimise the above we will conduct an initial assessment of the site when arriving to determine the visible risks associated with uneven or unsuitable ground along with any protuberances that could lead to injury. During this initial assessment camera equipment will be not be mobilised until we are fully certain there is a suitable place to use if safely. There are a lot of potential risks when we will be filming our sequence in Steetly as this is a remote location and it adheres various health and safety hazards that we have to be aware of. The main hazards that we have to be aware of are aspects such as falling over on sharp objects that may cause injury this could be things such as glass, sharp rocks, needles etc. Another possible hazard we have to be aware of holes in the ground, if not being careful where you walk this could lead to you falling in and could result in a serious injury. When filming near the water tanks there was a possible chance of falling in to avoid this we ensured that we kept a safe distance away from them and walked around in a sensible manor. The key principal into staying safe is to use common sense and just genrally be carefull what your doing. The location is some distance away (from group members’ homes) so therefore it will need to be reached by some form of vehicular transport. This has a number of obvious risks that are broad, and vary from an RTA in an extreme sense to making sure that the car is fully roadworthy and suitable to transport all passengers in comfort and safety (i.e. seatbelts). The latter is also the case for the camera equipment to ensure it is not broken and protected from theft if left unattended. This equipment will not be left in a visible position in the car itself but in the lockable boot away from plain sight. The vehicle should also be fully insured, hold a valid MOT and tax disc. The camera equipment should be covered by owner’s insurance. The group will need to ensure the appropriate technical equipment such as the camera(s), tripod, etc. is brought along, as these are necessary to film the sequence to a high quality. For example, not using a tripod risks camera shake and dropping the camera, which has subsequent financial implications. Prior to shooting all equipment should be checked for things such as being fully charged, fully operational and empty sufficient memory card storage space. Before shooting the group should run through what we have planned to re- familiarise ourselves with how and when we intend to do things to prevent conflict and to iron out any discrepancies, disagreements or problems. This will maximise the quality of the final sequence. Liam Hedley
  • 2. Although needing to incorporate USPs, we must be careful to not deviate too far from the typical genre conventions, as it is these conventions that attract audiences. We will need to ensure that we use a combination of conventional camera shots, for example, as well as developing and experimenting creatively in this aspect amongst others. We need to keep out audience as mainstream as possible to maximise revenue streams. With this in mind the film will be targeted as a 15 as this is not too delimitating, but appropriate for our plot and themes, etc. With reference to the above we need to ensure that our film is one which distributors would approve and market to again maximise revenue streams. Liam Hedley