Risk Assessment Form – Part A
ProductionName: Skyscraper Organisation N/A
ProductionAddress: Magna Academy Poole,
Ashdown Close, Poole, Dorset.
BH17 8RE
Producer / Editor
Tel:
Mobile:
Bethany Stacey
/
07921***181
Start date 27th
November 2015 End date 6th
December 2015
Distribution
Who gets a copyof the assessment
Bethany Stacey, Andrew Stacey, Alex Warren, Ben Hartw ell- Benison.
Outline of risk assessment
Summary of what is proposed in
terms of sequences and set ups.
A music video based on a break up. Will be filmed mainly on Boscombe Pier but w illinclude the surrounding
areas such as the beach too. Will be filmed around 80% on the pier, but w illinclude flashbacks on the beach
too.
Team members / experts /
contractors / contributors etc.
List those involved
Bethany Stacey, Andrew Stacey, Alex Warren, Ben Hartw ell- Benison.
Locations
Outline locationsinvolved – indicate
any which are hostile environments
Boscombe Pier
Boscombe Beach
Small Café
Assessor Name
Signature
Bethany Stacey Date completed 20th November 2015
Authoriser Name
(if not Assessor) Signature
Date authorised 21st
November 2015
Hazard list – select your hazards from the list belowand use these to complete Part B
Situational hazards Tick Physical / chemical hazards Tick Health hazards Tick
Assault by person X Contact with cold liquid / v apour Disease causativ e agent
Attack by animal X Contact with cold surf ace Inf ection X
Breathing compressed gas Contact with hot liquid / v apour Allergic reaction X
Cold env ironment X Contact with hot surf ace Lack of f ood / water
Crush by load Electric shock Lack of oxy gen
Drowning X Explosiv e blast Phy sical f atigue X
Entanglement in mov ing machinery Explosiv e release of stored pressure Repetitiv e action X
High atmospheric pressure Fire X Static body posture
Hot env ironment Hazardous substance Stress / anxiety X
Manual handling Ionizing radiation Venom poisoning
Object f alling, mov ing or f ly ing X Laser light
Obstruction / exposed f eature X Lightning strike Environmental hazards
Sharp object / material X Noise X Litter X
Shot by f irearm Non-ionizing radiation Nuisance noise / v ibration X
Slippery surf ace X Stroboscopic light Phy sical damage X
Trap in mov ing machinery Vibration Waste substance released into air
Trip hazard X Waste substance released into soil / water
Vehicle impact / collision X Managerial / organisational hazards
Falls f rom height X Management f actors (lack of communication,
co-operation, co-ordination and competence)
Risk matrix – use this to determine risk for
each hazard i.e. ‘how bad and how likely’ Likelihood of Harm
Severity of Harm
Remote
e.g. <1 in 1000 chance
Very unlikely
e.g. 1 in 200 chance
Unlikely
e.g. 1 in 50 chance
Possible
e.g. 1 in 10 chance
Likely
e.g. >1 in 3 chance
Negligible e.g. small bruise Trivial Low Medium High High
Slight e.g. small cut, deep bruise Medium Low Medium High Medium
Moderate e.g. deep cut, torn muscle Low Medium Medium Medium Low
Severe e.g. fracture, loss of consciousness Low Low Low Low Trivial
Very Severe e.g. death, permanent disability Trivial Trivial Trivial Trivial Trivial
Risk Assessment Form – Part B
Activity1
– Each individual activity you are proposing:
Activity of filming on the pier.
Location – w here this activity willtake place: Boscombe Pier, Boscombe Beach ,Small Café Dates / times:
Hazards2
List what could cause harm f rom this activ ity
e.g. falls from height, trip hazard, fire, etc.
Who exposed
List who might be harmed
f rom this activ ity
e.g. staff, contractors,
contributors, public, etc.
Risk3
For each hazard, decide
lev el of risk as if y ou were to
do the activ ity without y our
controls
Control measures
For each hazard, list the measures y ou will be taking to minimise the risk identif ied
e.g. appointing competent persons, training received, planning and rehearsals, use of personal protective
equipment, provision of first aid, etc.
Risk3
For each hazard,
decide lev el of risk
once all y our controls
are in place
Drow ning Staff, contributors and
the public. Medium
Issuing training in case of this event, on sight first aider, equipment on sight in case of this
event i.e. floatation device. Low
Falls from height Staff, contributors and
the public.
Medium On sight first aider, preventions such as barriers, training to avoid situations that could lead to
falling.
Low
Allergic reaction Staff, contributors and
the public.
Low On sight first aider, all crew willbe notified about any allergies, allergic reaction training
issued no contact w ith the allergen.
Trivial
Stress / anxiety Staff, contributors and
the public.
Medium Severalbreaks, minimal stress levels. Low
Litter Staff, contributors and
the public.
High Make sure the area is cleaned, no staff/ crew drops litter. Medium
Continue on separate sheet if necessary
1 – complete separate table for each activity 2 - from hazard list in Part A 3 - from risk matrix in Part A

More Related Content

What's hot

Risk-assessment Hollow Town Media
Risk-assessment Hollow Town Media Risk-assessment Hollow Town Media
Risk-assessment Hollow Town Media
franzzz101
 
Risk assessment Documentary
Risk assessment DocumentaryRisk assessment Documentary
Risk assessment Documentary
ChrisIvanov4
 
Tfm risk assessment!
Tfm risk assessment!Tfm risk assessment!
Tfm risk assessment!
TamannaAli
 
Risk Assessment Documentary
Risk Assessment DocumentaryRisk Assessment Documentary
Risk Assessment Documentary
lucybaker32
 
Risk assessment template interview
Risk assessment template interviewRisk assessment template interview
Risk assessment template interview
ChrisIvanov4
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
bc10482
 
Risk assessment sunderland museum and winter gardens
Risk assessment sunderland museum and winter gardensRisk assessment sunderland museum and winter gardens
Risk assessment sunderland museum and winter gardens
SophieGibson9
 
My risk assessement
My risk assessementMy risk assessement
My risk assessement
isadora-spratling
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
ChloeKyri
 
Risk assessment template ( a game that changed everything )
Risk assessment template ( a game that changed everything )Risk assessment template ( a game that changed everything )
Risk assessment template ( a game that changed everything )
ChrisIvanov4
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
Josh Mand-King
 
Risk assessment template (1)
Risk assessment template (1)Risk assessment template (1)
Risk assessment template (1)
marcelstasiorowski
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
EthanFarrer16
 
Risk assessment form again
Risk assessment form againRisk assessment form again
Risk assessment form again
J_Scott01
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
josh mk
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
zadruzynskrt
 
Risk assessment-covent garden
Risk assessment-covent garden Risk assessment-covent garden
Risk assessment-covent garden
l-heathorn
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
holliejoice
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheet
feartom
 
Risk assessment VFX
Risk assessment VFXRisk assessment VFX
Risk assessment VFX
ChrisIvanov4
 

What's hot (20)

Risk-assessment Hollow Town Media
Risk-assessment Hollow Town Media Risk-assessment Hollow Town Media
Risk-assessment Hollow Town Media
 
Risk assessment Documentary
Risk assessment DocumentaryRisk assessment Documentary
Risk assessment Documentary
 
Tfm risk assessment!
Tfm risk assessment!Tfm risk assessment!
Tfm risk assessment!
 
Risk Assessment Documentary
Risk Assessment DocumentaryRisk Assessment Documentary
Risk Assessment Documentary
 
Risk assessment template interview
Risk assessment template interviewRisk assessment template interview
Risk assessment template interview
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment sunderland museum and winter gardens
Risk assessment sunderland museum and winter gardensRisk assessment sunderland museum and winter gardens
Risk assessment sunderland museum and winter gardens
 
My risk assessement
My risk assessementMy risk assessement
My risk assessement
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
 
Risk assessment template ( a game that changed everything )
Risk assessment template ( a game that changed everything )Risk assessment template ( a game that changed everything )
Risk assessment template ( a game that changed everything )
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Risk assessment template (1)
Risk assessment template (1)Risk assessment template (1)
Risk assessment template (1)
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Risk assessment form again
Risk assessment form againRisk assessment form again
Risk assessment form again
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment-covent garden
Risk assessment-covent garden Risk assessment-covent garden
Risk assessment-covent garden
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheet
 
Risk assessment VFX
Risk assessment VFXRisk assessment VFX
Risk assessment VFX
 

Similar to Risk assessment

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
JakeRose8
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
NathanLukeman
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
emeliacrocker
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
marcelstasiorowski
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
AhesterMedia
 
Risk Culture.docx
Risk Culture.docxRisk Culture.docx
Risk Culture.docx
ZacBainbridge1
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
LucyBurton13
 
risk assessment
risk assessmentrisk assessment
risk assessment
seyitgedik
 
Bb crisk assessment
Bb crisk assessment  Bb crisk assessment
Bb crisk assessment
maddisonallin
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
seyitgedik
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
ScarlettPeverley
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
EllisConlon
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
17000461
 
Risk Assessment Template 99.docx
Risk Assessment Template 99.docxRisk Assessment Template 99.docx
Risk Assessment Template 99.docx
LukeWilson21
 
Risk assessment 1
Risk assessment 1 Risk assessment 1
Risk assessment 1
samtodd10
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
joseph4727
 
Risk assesment drew
Risk assesment drewRisk assesment drew
Risk assesment drew
LucyBurton13
 
Risk assessment for Drew
Risk assessment for Drew Risk assessment for Drew
Risk assessment for Drew
EllisConlon
 
Risk Assessment.docx
Risk Assessment.docxRisk Assessment.docx
Risk Assessment.docx
faithsowerby
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
MatthewCoates18
 

Similar to Risk assessment (20)

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Culture.docx
Risk Culture.docxRisk Culture.docx
Risk Culture.docx
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
risk assessment
risk assessmentrisk assessment
risk assessment
 
Bb crisk assessment
Bb crisk assessment  Bb crisk assessment
Bb crisk assessment
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk Assessment Template 99.docx
Risk Assessment Template 99.docxRisk Assessment Template 99.docx
Risk Assessment Template 99.docx
 
Risk assessment 1
Risk assessment 1 Risk assessment 1
Risk assessment 1
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assesment drew
Risk assesment drewRisk assesment drew
Risk assesment drew
 
Risk assessment for Drew
Risk assessment for Drew Risk assessment for Drew
Risk assessment for Drew
 
Risk Assessment.docx
Risk Assessment.docxRisk Assessment.docx
Risk Assessment.docx
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 

More from Bethany_1998_stacey

Question 2
Question 2 Question 2
Question 2
Bethany_1998_stacey
 
Website mock up
Website mock upWebsite mock up
Website mock up
Bethany_1998_stacey
 
Schedule
ScheduleSchedule
History of pop music
History of pop musicHistory of pop music
History of pop music
Bethany_1998_stacey
 
Shot types and meanings
Shot types and meaningsShot types and meanings
Shot types and meanings
Bethany_1998_stacey
 
Theorists and theories
Theorists and theoriesTheorists and theories
Theorists and theories
Bethany_1998_stacey
 
Floor plans
Floor plansFloor plans
Floor plans
Bethany_1998_stacey
 
Roles and responsibilities
Roles and responsibilitiesRoles and responsibilities
Roles and responsibilities
Bethany_1998_stacey
 
Location shots
Location shotsLocation shots
Location shots
Bethany_1998_stacey
 
Bournemouth Borough Council Permission Letter
Bournemouth Borough Council Permission LetterBournemouth Borough Council Permission Letter
Bournemouth Borough Council Permission Letter
Bethany_1998_stacey
 
Location overview
Location overviewLocation overview
Location overview
Bethany_1998_stacey
 

More from Bethany_1998_stacey (20)

Question 2
Question 2 Question 2
Question 2
 
Website mock up
Website mock upWebsite mock up
Website mock up
 
Schedule
ScheduleSchedule
Schedule
 
History of pop music
History of pop musicHistory of pop music
History of pop music
 
Shot types and meanings
Shot types and meaningsShot types and meanings
Shot types and meanings
 
Review 8
Review 8Review 8
Review 8
 
Review 7
Review 7Review 7
Review 7
 
Review 6
Review 6Review 6
Review 6
 
Review 5
Review 5Review 5
Review 5
 
Review 4
Review 4Review 4
Review 4
 
Review 3
Review 3Review 3
Review 3
 
Review 2
Review 2Review 2
Review 2
 
Review 9
Review 9Review 9
Review 9
 
Review 1
Review 1Review 1
Review 1
 
Theorists and theories
Theorists and theoriesTheorists and theories
Theorists and theories
 
Floor plans
Floor plansFloor plans
Floor plans
 
Roles and responsibilities
Roles and responsibilitiesRoles and responsibilities
Roles and responsibilities
 
Location shots
Location shotsLocation shots
Location shots
 
Bournemouth Borough Council Permission Letter
Bournemouth Borough Council Permission LetterBournemouth Borough Council Permission Letter
Bournemouth Borough Council Permission Letter
 
Location overview
Location overviewLocation overview
Location overview
 

Recently uploaded

ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
LHelferty
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 

Recently uploaded (14)

ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 

Risk assessment

  • 1. Risk Assessment Form – Part A ProductionName: Skyscraper Organisation N/A ProductionAddress: Magna Academy Poole, Ashdown Close, Poole, Dorset. BH17 8RE Producer / Editor Tel: Mobile: Bethany Stacey / 07921***181 Start date 27th November 2015 End date 6th December 2015 Distribution Who gets a copyof the assessment Bethany Stacey, Andrew Stacey, Alex Warren, Ben Hartw ell- Benison. Outline of risk assessment Summary of what is proposed in terms of sequences and set ups. A music video based on a break up. Will be filmed mainly on Boscombe Pier but w illinclude the surrounding areas such as the beach too. Will be filmed around 80% on the pier, but w illinclude flashbacks on the beach too. Team members / experts / contractors / contributors etc. List those involved Bethany Stacey, Andrew Stacey, Alex Warren, Ben Hartw ell- Benison. Locations Outline locationsinvolved – indicate any which are hostile environments Boscombe Pier Boscombe Beach Small Café Assessor Name Signature Bethany Stacey Date completed 20th November 2015 Authoriser Name (if not Assessor) Signature Date authorised 21st November 2015 Hazard list – select your hazards from the list belowand use these to complete Part B Situational hazards Tick Physical / chemical hazards Tick Health hazards Tick Assault by person X Contact with cold liquid / v apour Disease causativ e agent Attack by animal X Contact with cold surf ace Inf ection X Breathing compressed gas Contact with hot liquid / v apour Allergic reaction X Cold env ironment X Contact with hot surf ace Lack of f ood / water Crush by load Electric shock Lack of oxy gen Drowning X Explosiv e blast Phy sical f atigue X Entanglement in mov ing machinery Explosiv e release of stored pressure Repetitiv e action X High atmospheric pressure Fire X Static body posture Hot env ironment Hazardous substance Stress / anxiety X Manual handling Ionizing radiation Venom poisoning Object f alling, mov ing or f ly ing X Laser light Obstruction / exposed f eature X Lightning strike Environmental hazards Sharp object / material X Noise X Litter X Shot by f irearm Non-ionizing radiation Nuisance noise / v ibration X Slippery surf ace X Stroboscopic light Phy sical damage X Trap in mov ing machinery Vibration Waste substance released into air Trip hazard X Waste substance released into soil / water Vehicle impact / collision X Managerial / organisational hazards Falls f rom height X Management f actors (lack of communication, co-operation, co-ordination and competence) Risk matrix – use this to determine risk for each hazard i.e. ‘how bad and how likely’ Likelihood of Harm Severity of Harm Remote e.g. <1 in 1000 chance Very unlikely e.g. 1 in 200 chance Unlikely e.g. 1 in 50 chance Possible e.g. 1 in 10 chance Likely e.g. >1 in 3 chance Negligible e.g. small bruise Trivial Low Medium High High Slight e.g. small cut, deep bruise Medium Low Medium High Medium Moderate e.g. deep cut, torn muscle Low Medium Medium Medium Low Severe e.g. fracture, loss of consciousness Low Low Low Low Trivial Very Severe e.g. death, permanent disability Trivial Trivial Trivial Trivial Trivial
  • 2. Risk Assessment Form – Part B Activity1 – Each individual activity you are proposing: Activity of filming on the pier. Location – w here this activity willtake place: Boscombe Pier, Boscombe Beach ,Small Café Dates / times: Hazards2 List what could cause harm f rom this activ ity e.g. falls from height, trip hazard, fire, etc. Who exposed List who might be harmed f rom this activ ity e.g. staff, contractors, contributors, public, etc. Risk3 For each hazard, decide lev el of risk as if y ou were to do the activ ity without y our controls Control measures For each hazard, list the measures y ou will be taking to minimise the risk identif ied e.g. appointing competent persons, training received, planning and rehearsals, use of personal protective equipment, provision of first aid, etc. Risk3 For each hazard, decide lev el of risk once all y our controls are in place Drow ning Staff, contributors and the public. Medium Issuing training in case of this event, on sight first aider, equipment on sight in case of this event i.e. floatation device. Low Falls from height Staff, contributors and the public. Medium On sight first aider, preventions such as barriers, training to avoid situations that could lead to falling. Low Allergic reaction Staff, contributors and the public. Low On sight first aider, all crew willbe notified about any allergies, allergic reaction training issued no contact w ith the allergen. Trivial Stress / anxiety Staff, contributors and the public. Medium Severalbreaks, minimal stress levels. Low Litter Staff, contributors and the public. High Make sure the area is cleaned, no staff/ crew drops litter. Medium Continue on separate sheet if necessary 1 – complete separate table for each activity 2 - from hazard list in Part A 3 - from risk matrix in Part A