This risk assessment form is for a documentary being produced by Sunderland College students titled "Sunderland documentary". It will involve filming at locations around Sunderland like Queen Alex Bridge and the Glass Centre.
Hazards identified include falling into a river, objects falling or moving, fire, and trip hazards. The people exposed are the student filmmakers Joshua, Matthew, Daniel, and Eddie. Risks are initially assessed as high but will be lowered by taking safety precautions like being careful near water, watching for falling objects, knowing fire exits, and sticking to footpaths. Permission will also be needed to film publicly.
The assessment must be signed by the assessor Daniel and an authorizer before filming can begin. It will help