This risk assessment form is for a single camera shoot taking place over 7 days at Sunderland College. It lists the production details and team members involved. Hazards identified include hot environment, objects falling, and trip hazards. Controls such as regular breaks, water, caution, training, and tidying equipment are outlined to minimize risks. The risks are reduced to low or trivial levels once controls are implemented.