Need for Dedicated Freight Corridor
 The increase in transport volume of domestic
freight shows a growth rate of 15 to 18% per annum.
As a part of this strategy, Indian Railways have
planned to build a 10,000 Kms. Network of
dedicated heavy - haul freight Corridor for 25
tonne axle load (or possibly more) movement
called Dedicated Freight Corridor (DFC).
 All this has led to the concept of the Dedicated
Freight Corridors along the Eastern and Western
Routes.
Need for Dedicated Freight Corridor
 The idea is to segregate Passenger and Freight
traffic, and thereby maximising the line capacities.
The new lines would allow movement of heavier
trains as compared to present freight trains.
 The new lines would run parallel to the so-called
Golden Quadrilateral linking Kolkata, Delhi,
Mumbai and Chennai as well as other high-density
corridors. The first two lines will be designated as
the Eastern Corridor and Western corridor.
High Rise OHE
High rise OHE commissioned first time in IR in RE-
RGS-FL section of Jaipur Division (213 RKM/264 TKM)
Design of High Rise OHE
 Development of high rise OHE have the following
salient challenges:
• Design of Foundation
• Design of Portals/Masts
• Design of ATD
• Ensuring adequate Stagger & Span for OHE
 Ensuring proper gradient of transition phase OHE,
so that Pantograph may negotiate it smoothly in
both directions.
 Modification of Tower wagon to make it suitable
for running on high rise OHE lines.
High Rise OHE
Movement of double stack container with maximum
height 6809 mm on electric traction
Single stack container Double stack container
7.100 m
Advantage of Double Stack
Container
 The major advantages of Double Stack
Container operation are:
 Increase in transport volume
 Increased throughput
 Reduction in unit cost.
Parameters High Rise OHE
Description Conventional
OHE
High Rise OHE
Height of contact
wire at support
5.80 m 7.57 m
Height of contact
wire at mid span
5.70
(Pre sag 100mm)
7.52 m
(Pre sag 50mm)
Height of catenary
wire
7.20 m 8.97 m
Maximum OHE
span
72.00 m 54.00 m
Maximum speed 160 kmph 140 kmph
Parameters High Rise OHE
Description Conventional OHE High Rise OHE
SS wire rope of ATD 08.00 m 10.00 m
Guy rod length 09.00 m 12.30 m
Length of OHE mast 9.50 m 11.40 m
Maximum stagger on
tangent track
200 mm +_ 150 mm
Maximum stagger on
curve
300 mm +_ 250 mm
Clearances under over line structure
(High rise OHE)
SN Type of over line structure Minimum
headroom
clearance
1 Light overhead structure, such as
FOB
8.43 m
2 Heavy overhead structure such as
ROB, Flyovers
8.05 m
3 Heavy overhead structure such as
ROB, Flyovers, if any turnout or
crossover is located underside or
nearby 40 m
8.43 m
Clearances under over line structure
(Under restriction)
For these minimum restricted heights, catenary wire shall be
terminated outside overhead structure.
SN Type of over line structure Minimum
restricted
heights
1 Light overhead structure, such as FOB 7.568 m
2 Heavy overhead structure such as ROB,
Flyovers
7.468 m
3 Heavy overhead structure such as ROB,
Flyovers, if any turnout or crossover is
located underside or nearby 40 m
7.568 m
Clearances for Power Line Track
Crossing
SN voltage Minimum clearance
from Rail level (New
crossing or planned for
alteration)
Minimum
clearance b/w
highest
conductor and
lowest
transmission
line crossing
conductor
For
conventional
OHE
For high
rise OHE
1 Above 11 upto 33 kV 14.66 m 16.66 m 2.44 m
2 Above 33 upto 66 kV 14.96 m 16.96 m 2.44 m
3 Above 66 upto 132 kV 15.56 m 17.56 m 3.05 m
4 Above 132 upto 220 kV 16.46 m 18.46 m 4.58 m
5 Above 220 upto 400 kV 18.26 m 20.26 m 5.49 m
6 Above 400 upto 500 kV 19.16 m 21.16 m 7.94 m
7 Above 500 upto 800 kV 21.86 m 23.86 m 7.94 m
Maintenance of High rise OHE
Schedules of maintenance are as under:-
 Foot Patrolling
 Trolley Inspection / Foot Plate
 Current Collection Tests
 Annual Maintenance & TOWER WAGON Checking
 Periodical Overhauling (POH)
 Live line checking / HOT Line Checking
 Special Checks
Foot patrolling
Due to more height of
OHE visibility during
foot patrolling is
difficult
Constraints in Maintenance in High
Rise OHE
Tower Wagon Design
 Due to almost 2mtr
higher height of OHE
during live line checking
visibility is not proper.
 Pantograph needs
modification with high
reach OHE.
 Deck needs modification
for working on high rise
OHE
Constraints in Maintenance in High
Rise OHE
As height of OHE is
7.57 m (Contact) and
8.97 m (Catenary),
working of staff at this
height is difficult.
Constraints in Maintenance in High
Rise OHE
Emergency Mast
Height of Emergency
mast in conventional OHE
is 8.90 m
(as per RDSO spec. ETI/C/0072)
For High rise OHE no
drawing of emergency
mast has been provided
by RDSO the matter was
discussed in 30th MSG
and matter is under
consideration of RDSO
Constraints in Maintenance in High
Rise OHE
Tools & Plants for High Rise
OHE
Discharge rod
Length of cable is 10.50
m + 2.50 mtr in compare
to conventional discharge
rod of length 7.50 m +
1.50 mtr cable
Folding fibre sticks
(1.66m each) for holding
cable – 04 nos.
 Erection of discharge
rod demands extra
manpower.
Tools & plants for High Rise OHE
Discharge Rod
 It needs to be bound at
bottom fitting instead of
number plate as in
conventional hence unsafe.
 Due to too much length of
discharge rod while erecting
it in mid lines of yard it
enters in to another
elementary sections.
 It is very difficult to handle
when lifting it for erection.
Tools & Plants for High Rise OHE
Extensible ladder
 Length of extensible
straight ladder has been
proposed as 13.00 m
compared to conventional
ladder of 11.00 m
Tools & plants for High Rise
OHE
 Extensible ladder
• More manpower needs to be
employed for working on it.
• It swings due to increased
length but no modification in
thickness.
Merging with Conventional OHE with
High Rise OHE
Height of Conventional Contact wire = 5.80 m
Height of High Rise Contact wire = 7.57 m
Difference between contact wire = 1.77m
Gradient @ 10 mm/m
PANTOGRAPH SELECTION

More Related Content

What's hot

Traction system
Traction systemTraction system
Traction system
atul giri
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
AmitKumar6931
 
Railway Electrification - Traction
Railway Electrification - TractionRailway Electrification - Traction
Railway Electrification - Traction
SUDIN BISWAS
 
ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)
Arshad Hussain
 
Railway electrification
Railway electrificationRailway electrification
Railway electrification
Suresh Sunny
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drives
Vivek Thakkar
 
transmission line
transmission line transmission line
transmission line
singh1515
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductorDineshsenthil
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
Nawaz Nz
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
Parvez Pathan
 
Design of substation
Design of substationDesign of substation
Design of substation
SayanSarkar55
 
RDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training ReportRDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training Report
Neha Arya
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
GRBabu Naidu
 
Classification of transmission lines
Classification of transmission linesClassification of transmission lines
Classification of transmission lines
HamzaAbbas43
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
SaikumarDendi
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
ragulkncet
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.
SaiSampath16
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCES
Pawan Sharma
 

What's hot (20)

Traction system
Traction systemTraction system
Traction system
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Railway Electrification - Traction
Railway Electrification - TractionRailway Electrification - Traction
Railway Electrification - Traction
 
ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)
 
Railway electrification
Railway electrificationRailway electrification
Railway electrification
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drives
 
transmission line
transmission line transmission line
transmission line
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductor
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
 
Design of substation
Design of substationDesign of substation
Design of substation
 
RDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training ReportRDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training Report
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
Classification of transmission lines
Classification of transmission linesClassification of transmission lines
Classification of transmission lines
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCES
 

Similar to Revised ppt High rise OHE (1).pptx

Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
salem123gmaal
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptx
ssuserca5764
 
Track Performance
Track PerformanceTrack Performance
Track Performance
Railways and Harbours
 
final document epgt train overhead sytem
final document epgt train overhead sytemfinal document epgt train overhead sytem
final document epgt train overhead sytem
darshanarkasali2
 
traction-3.pptx
traction-3.pptxtraction-3.pptx
traction-3.pptx
muhammadasif165175
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
DrAyyarKandasamy
 
Lahore orange line train project
Lahore orange line train projectLahore orange line train project
Lahore orange line train project
Qurat1255
 
SC Range Brochure
SC Range BrochureSC Range Brochure
SC Range BrochureRon Farr
 
Alternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignAlternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment Design
Constantin Ciobanu
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET Journal
 
IRJET- Numerical Analysis of Hyperloop Transportation Structure
IRJET-  	  Numerical Analysis of Hyperloop Transportation StructureIRJET-  	  Numerical Analysis of Hyperloop Transportation Structure
IRJET- Numerical Analysis of Hyperloop Transportation Structure
IRJET Journal
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
sameed4
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
mechanical Singh
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
Kumar M.
 
Vishwas jain
Vishwas jainVishwas jain
Vishwas jain
Vishwas Jain
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)Sindhuja Balaji
 
Hyperloop
HyperloopHyperloop
Hyperloop
Ayush Mathur
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in ServiceAndrea Bracciali
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
aarshipathan
 
Pantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction ControlPantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction Control
Kelvin Lam
 

Similar to Revised ppt High rise OHE (1).pptx (20)

Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptx
 
Track Performance
Track PerformanceTrack Performance
Track Performance
 
final document epgt train overhead sytem
final document epgt train overhead sytemfinal document epgt train overhead sytem
final document epgt train overhead sytem
 
traction-3.pptx
traction-3.pptxtraction-3.pptx
traction-3.pptx
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
 
Lahore orange line train project
Lahore orange line train projectLahore orange line train project
Lahore orange line train project
 
SC Range Brochure
SC Range BrochureSC Range Brochure
SC Range Brochure
 
Alternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignAlternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment Design
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
IRJET- Numerical Analysis of Hyperloop Transportation Structure
IRJET-  	  Numerical Analysis of Hyperloop Transportation StructureIRJET-  	  Numerical Analysis of Hyperloop Transportation Structure
IRJET- Numerical Analysis of Hyperloop Transportation Structure
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
 
Vishwas jain
Vishwas jainVishwas jain
Vishwas jain
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
 
Pantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction ControlPantograph I - Analysis on Pantographs & Traction Control
Pantograph I - Analysis on Pantographs & Traction Control
 

Recently uploaded

Viksit bharat till 2047 India@2047.pptx
Viksit bharat till 2047  India@2047.pptxViksit bharat till 2047  India@2047.pptx
Viksit bharat till 2047 India@2047.pptx
rakeshsharma20142015
 
Structures and textures of metamorphic rocks
Structures and textures of metamorphic rocksStructures and textures of metamorphic rocks
Structures and textures of metamorphic rocks
kumarmathi863
 
Anemia_ different types_causes_ conditions
Anemia_ different types_causes_ conditionsAnemia_ different types_causes_ conditions
Anemia_ different types_causes_ conditions
muralinath2
 
GBSN- Microbiology (Lab 3) Gram Staining
GBSN- Microbiology (Lab 3) Gram StainingGBSN- Microbiology (Lab 3) Gram Staining
GBSN- Microbiology (Lab 3) Gram Staining
Areesha Ahmad
 
justice-and-fairness-ethics with example
justice-and-fairness-ethics with examplejustice-and-fairness-ethics with example
justice-and-fairness-ethics with example
azzyixes
 
Hemoglobin metabolism_pathophysiology.pptx
Hemoglobin metabolism_pathophysiology.pptxHemoglobin metabolism_pathophysiology.pptx
Hemoglobin metabolism_pathophysiology.pptx
muralinath2
 
GBSN - Biochemistry (Unit 5) Chemistry of Lipids
GBSN - Biochemistry (Unit 5) Chemistry of LipidsGBSN - Biochemistry (Unit 5) Chemistry of Lipids
GBSN - Biochemistry (Unit 5) Chemistry of Lipids
Areesha Ahmad
 
platelets_clotting_biogenesis.clot retractionpptx
platelets_clotting_biogenesis.clot retractionpptxplatelets_clotting_biogenesis.clot retractionpptx
platelets_clotting_biogenesis.clot retractionpptx
muralinath2
 
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
Sérgio Sacani
 
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
Sérgio Sacani
 
NuGOweek 2024 Ghent - programme - final version
NuGOweek 2024 Ghent - programme - final versionNuGOweek 2024 Ghent - programme - final version
NuGOweek 2024 Ghent - programme - final version
pablovgd
 
platelets- lifespan -Clot retraction-disorders.pptx
platelets- lifespan -Clot retraction-disorders.pptxplatelets- lifespan -Clot retraction-disorders.pptx
platelets- lifespan -Clot retraction-disorders.pptx
muralinath2
 
EY - Supply Chain Services 2018_template.pptx
EY - Supply Chain Services 2018_template.pptxEY - Supply Chain Services 2018_template.pptx
EY - Supply Chain Services 2018_template.pptx
AlguinaldoKong
 
Cancer cell metabolism: special Reference to Lactate Pathway
Cancer cell metabolism: special Reference to Lactate PathwayCancer cell metabolism: special Reference to Lactate Pathway
Cancer cell metabolism: special Reference to Lactate Pathway
AADYARAJPANDEY1
 
Orion Air Quality Monitoring Systems - CWS
Orion Air Quality Monitoring Systems - CWSOrion Air Quality Monitoring Systems - CWS
Orion Air Quality Monitoring Systems - CWS
Columbia Weather Systems
 
Nutraceutical market, scope and growth: Herbal drug technology
Nutraceutical market, scope and growth: Herbal drug technologyNutraceutical market, scope and growth: Herbal drug technology
Nutraceutical market, scope and growth: Herbal drug technology
Lokesh Patil
 
plant biotechnology Lecture note ppt.pptx
plant biotechnology Lecture note ppt.pptxplant biotechnology Lecture note ppt.pptx
plant biotechnology Lecture note ppt.pptx
yusufzako14
 
Seminar of U.V. Spectroscopy by SAMIR PANDA
 Seminar of U.V. Spectroscopy by SAMIR PANDA Seminar of U.V. Spectroscopy by SAMIR PANDA
Seminar of U.V. Spectroscopy by SAMIR PANDA
SAMIR PANDA
 
Lab report on liquid viscosity of glycerin
Lab report on liquid viscosity of glycerinLab report on liquid viscosity of glycerin
Lab report on liquid viscosity of glycerin
ossaicprecious19
 
FAIR & AI Ready KGs for Explainable Predictions
FAIR & AI Ready KGs for Explainable PredictionsFAIR & AI Ready KGs for Explainable Predictions
FAIR & AI Ready KGs for Explainable Predictions
Michel Dumontier
 

Recently uploaded (20)

Viksit bharat till 2047 India@2047.pptx
Viksit bharat till 2047  India@2047.pptxViksit bharat till 2047  India@2047.pptx
Viksit bharat till 2047 India@2047.pptx
 
Structures and textures of metamorphic rocks
Structures and textures of metamorphic rocksStructures and textures of metamorphic rocks
Structures and textures of metamorphic rocks
 
Anemia_ different types_causes_ conditions
Anemia_ different types_causes_ conditionsAnemia_ different types_causes_ conditions
Anemia_ different types_causes_ conditions
 
GBSN- Microbiology (Lab 3) Gram Staining
GBSN- Microbiology (Lab 3) Gram StainingGBSN- Microbiology (Lab 3) Gram Staining
GBSN- Microbiology (Lab 3) Gram Staining
 
justice-and-fairness-ethics with example
justice-and-fairness-ethics with examplejustice-and-fairness-ethics with example
justice-and-fairness-ethics with example
 
Hemoglobin metabolism_pathophysiology.pptx
Hemoglobin metabolism_pathophysiology.pptxHemoglobin metabolism_pathophysiology.pptx
Hemoglobin metabolism_pathophysiology.pptx
 
GBSN - Biochemistry (Unit 5) Chemistry of Lipids
GBSN - Biochemistry (Unit 5) Chemistry of LipidsGBSN - Biochemistry (Unit 5) Chemistry of Lipids
GBSN - Biochemistry (Unit 5) Chemistry of Lipids
 
platelets_clotting_biogenesis.clot retractionpptx
platelets_clotting_biogenesis.clot retractionpptxplatelets_clotting_biogenesis.clot retractionpptx
platelets_clotting_biogenesis.clot retractionpptx
 
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
Observation of Io’s Resurfacing via Plume Deposition Using Ground-based Adapt...
 
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
THE IMPORTANCE OF MARTIAN ATMOSPHERE SAMPLE RETURN.
 
NuGOweek 2024 Ghent - programme - final version
NuGOweek 2024 Ghent - programme - final versionNuGOweek 2024 Ghent - programme - final version
NuGOweek 2024 Ghent - programme - final version
 
platelets- lifespan -Clot retraction-disorders.pptx
platelets- lifespan -Clot retraction-disorders.pptxplatelets- lifespan -Clot retraction-disorders.pptx
platelets- lifespan -Clot retraction-disorders.pptx
 
EY - Supply Chain Services 2018_template.pptx
EY - Supply Chain Services 2018_template.pptxEY - Supply Chain Services 2018_template.pptx
EY - Supply Chain Services 2018_template.pptx
 
Cancer cell metabolism: special Reference to Lactate Pathway
Cancer cell metabolism: special Reference to Lactate PathwayCancer cell metabolism: special Reference to Lactate Pathway
Cancer cell metabolism: special Reference to Lactate Pathway
 
Orion Air Quality Monitoring Systems - CWS
Orion Air Quality Monitoring Systems - CWSOrion Air Quality Monitoring Systems - CWS
Orion Air Quality Monitoring Systems - CWS
 
Nutraceutical market, scope and growth: Herbal drug technology
Nutraceutical market, scope and growth: Herbal drug technologyNutraceutical market, scope and growth: Herbal drug technology
Nutraceutical market, scope and growth: Herbal drug technology
 
plant biotechnology Lecture note ppt.pptx
plant biotechnology Lecture note ppt.pptxplant biotechnology Lecture note ppt.pptx
plant biotechnology Lecture note ppt.pptx
 
Seminar of U.V. Spectroscopy by SAMIR PANDA
 Seminar of U.V. Spectroscopy by SAMIR PANDA Seminar of U.V. Spectroscopy by SAMIR PANDA
Seminar of U.V. Spectroscopy by SAMIR PANDA
 
Lab report on liquid viscosity of glycerin
Lab report on liquid viscosity of glycerinLab report on liquid viscosity of glycerin
Lab report on liquid viscosity of glycerin
 
FAIR & AI Ready KGs for Explainable Predictions
FAIR & AI Ready KGs for Explainable PredictionsFAIR & AI Ready KGs for Explainable Predictions
FAIR & AI Ready KGs for Explainable Predictions
 

Revised ppt High rise OHE (1).pptx

  • 1.
  • 2. Need for Dedicated Freight Corridor  The increase in transport volume of domestic freight shows a growth rate of 15 to 18% per annum. As a part of this strategy, Indian Railways have planned to build a 10,000 Kms. Network of dedicated heavy - haul freight Corridor for 25 tonne axle load (or possibly more) movement called Dedicated Freight Corridor (DFC).  All this has led to the concept of the Dedicated Freight Corridors along the Eastern and Western Routes.
  • 3. Need for Dedicated Freight Corridor  The idea is to segregate Passenger and Freight traffic, and thereby maximising the line capacities. The new lines would allow movement of heavier trains as compared to present freight trains.  The new lines would run parallel to the so-called Golden Quadrilateral linking Kolkata, Delhi, Mumbai and Chennai as well as other high-density corridors. The first two lines will be designated as the Eastern Corridor and Western corridor.
  • 4. High Rise OHE High rise OHE commissioned first time in IR in RE- RGS-FL section of Jaipur Division (213 RKM/264 TKM)
  • 5. Design of High Rise OHE  Development of high rise OHE have the following salient challenges: • Design of Foundation • Design of Portals/Masts • Design of ATD • Ensuring adequate Stagger & Span for OHE  Ensuring proper gradient of transition phase OHE, so that Pantograph may negotiate it smoothly in both directions.  Modification of Tower wagon to make it suitable for running on high rise OHE lines.
  • 6. High Rise OHE Movement of double stack container with maximum height 6809 mm on electric traction Single stack container Double stack container 7.100 m
  • 7. Advantage of Double Stack Container  The major advantages of Double Stack Container operation are:  Increase in transport volume  Increased throughput  Reduction in unit cost.
  • 8. Parameters High Rise OHE Description Conventional OHE High Rise OHE Height of contact wire at support 5.80 m 7.57 m Height of contact wire at mid span 5.70 (Pre sag 100mm) 7.52 m (Pre sag 50mm) Height of catenary wire 7.20 m 8.97 m Maximum OHE span 72.00 m 54.00 m Maximum speed 160 kmph 140 kmph
  • 9. Parameters High Rise OHE Description Conventional OHE High Rise OHE SS wire rope of ATD 08.00 m 10.00 m Guy rod length 09.00 m 12.30 m Length of OHE mast 9.50 m 11.40 m Maximum stagger on tangent track 200 mm +_ 150 mm Maximum stagger on curve 300 mm +_ 250 mm
  • 10. Clearances under over line structure (High rise OHE) SN Type of over line structure Minimum headroom clearance 1 Light overhead structure, such as FOB 8.43 m 2 Heavy overhead structure such as ROB, Flyovers 8.05 m 3 Heavy overhead structure such as ROB, Flyovers, if any turnout or crossover is located underside or nearby 40 m 8.43 m
  • 11. Clearances under over line structure (Under restriction) For these minimum restricted heights, catenary wire shall be terminated outside overhead structure. SN Type of over line structure Minimum restricted heights 1 Light overhead structure, such as FOB 7.568 m 2 Heavy overhead structure such as ROB, Flyovers 7.468 m 3 Heavy overhead structure such as ROB, Flyovers, if any turnout or crossover is located underside or nearby 40 m 7.568 m
  • 12. Clearances for Power Line Track Crossing SN voltage Minimum clearance from Rail level (New crossing or planned for alteration) Minimum clearance b/w highest conductor and lowest transmission line crossing conductor For conventional OHE For high rise OHE 1 Above 11 upto 33 kV 14.66 m 16.66 m 2.44 m 2 Above 33 upto 66 kV 14.96 m 16.96 m 2.44 m 3 Above 66 upto 132 kV 15.56 m 17.56 m 3.05 m 4 Above 132 upto 220 kV 16.46 m 18.46 m 4.58 m 5 Above 220 upto 400 kV 18.26 m 20.26 m 5.49 m 6 Above 400 upto 500 kV 19.16 m 21.16 m 7.94 m 7 Above 500 upto 800 kV 21.86 m 23.86 m 7.94 m
  • 13. Maintenance of High rise OHE Schedules of maintenance are as under:-  Foot Patrolling  Trolley Inspection / Foot Plate  Current Collection Tests  Annual Maintenance & TOWER WAGON Checking  Periodical Overhauling (POH)  Live line checking / HOT Line Checking  Special Checks
  • 14. Foot patrolling Due to more height of OHE visibility during foot patrolling is difficult Constraints in Maintenance in High Rise OHE
  • 15. Tower Wagon Design  Due to almost 2mtr higher height of OHE during live line checking visibility is not proper.  Pantograph needs modification with high reach OHE.  Deck needs modification for working on high rise OHE Constraints in Maintenance in High Rise OHE
  • 16. As height of OHE is 7.57 m (Contact) and 8.97 m (Catenary), working of staff at this height is difficult. Constraints in Maintenance in High Rise OHE
  • 17. Emergency Mast Height of Emergency mast in conventional OHE is 8.90 m (as per RDSO spec. ETI/C/0072) For High rise OHE no drawing of emergency mast has been provided by RDSO the matter was discussed in 30th MSG and matter is under consideration of RDSO Constraints in Maintenance in High Rise OHE
  • 18. Tools & Plants for High Rise OHE Discharge rod Length of cable is 10.50 m + 2.50 mtr in compare to conventional discharge rod of length 7.50 m + 1.50 mtr cable Folding fibre sticks (1.66m each) for holding cable – 04 nos.  Erection of discharge rod demands extra manpower.
  • 19. Tools & plants for High Rise OHE Discharge Rod  It needs to be bound at bottom fitting instead of number plate as in conventional hence unsafe.  Due to too much length of discharge rod while erecting it in mid lines of yard it enters in to another elementary sections.  It is very difficult to handle when lifting it for erection.
  • 20. Tools & Plants for High Rise OHE Extensible ladder  Length of extensible straight ladder has been proposed as 13.00 m compared to conventional ladder of 11.00 m
  • 21. Tools & plants for High Rise OHE  Extensible ladder • More manpower needs to be employed for working on it. • It swings due to increased length but no modification in thickness.
  • 22. Merging with Conventional OHE with High Rise OHE Height of Conventional Contact wire = 5.80 m Height of High Rise Contact wire = 7.57 m Difference between contact wire = 1.77m Gradient @ 10 mm/m