SlideShare a Scribd company logo
1 of 8
1
CURRICULUM VITAE
NIMISH RAMDAS BHOYAR
Yashodeep Heights Flat No-1301, C-Wing, Plot No-14 & 15, Sector-29C, Ghansoli Navi Mumbai-
400701.
Cell: 9870986109
Email: nimish.777@rediffmail.com / nimish.bhoyar@gmail.com
Pass Port No-L9947790
ACADEMIC QUALIFICATIONS
Diploma(Electrical) : Secondclassfrom, December1997.
H.S.C. : Secondclassfrom NagpurBoard,March 1994.
S.S.C : SecondclassfromAmravati Board, March 1992.
SOFTWARE PROFICIENCY
Operating : Windows-XP,MSOffice,MSProjects.
PERSONAL INFORMATION
Date of Birth/Age : 7th December,1976 /
Sex / Marital status : Male/Marrie
DrivingLicense No : MH43/3032/04
CAREER OBJECTIVE
To leverage 18years of experience in MEP jobs for residential ,commercial projects
Maintenance encompassing testing,inspection,commissioning & installation function
in residential as well as commercial projects.
2
 Presently working with Pioneer Property Zone Services Pvt Ltd(PPZ)Project management
company (PMC) as a Assist Manager MEP SINCE-JULY-2012
Presently Handling the MEP jobs for 2 Lac sq. ft. Platinum rated Green Building Commercial
projectinThane GhodbunderRoad.
OBJECTIVE:-
My objective is to deliver any MEP jobs assignment in maximum professional and accurate
way by dedicating and utilized my qualification, skills and long work experience. This will
obviously ensure meeting or exceeding the satisfaction of my employer and respective
clients as well as enhancing my aptitude to deal with any other upcoming challenges with
ease andspeed.
SUMMARYOF SKILLS AND RESPONSIBILITY TECHNICAL:-
 MEP designreviewforoptimumenergyconsumption&energyefficiencywithvalue if
engineeringbest performance.
 Electrical buildingsystemdesign,estimating,tendering,QSmanaging&supervisionof
services.
 BuildingdesigncoordinationforHVAC,PLUMNING&othermechanical services.
 Buildingdesigncoordinationfor fire fighting,Fire alarm&IBMS system.
 Designcoordinationforinformation&communicationtechnology.
 Monitoredworkprogressregularlyandconductedmeetingswith contractor.
 Reviewed contractdrawings,specsandotherprocurementmaterials.
 Reviewedfinal scope of MEPworkand providedtechnical guidance,input.
 Preparedthe methodof statementandinspectiontestplan(ITP).
 Preparedthe documentssubmissionandmaterialsrequisition inadvance.
 Handledthe dailyreportandrecordedall activitiesincludingsite issues.
 Reviewedtechnical specifications,estimation,contractdrawingsandBOQ.
 Checkedindividual andcombinedshopdrawingsincludingwork.
 Scope control & deliverables stagesmanagementwithqualitymonitoringchecks.
 Coordinationwith MEPservice consultant,architect&otherconsultantsconcepttoproject.
Intelligenceandjudicioustospace planningof MPE service highend equipments.
 Review&checkingof DBR for Electrical,Fire Fighting,HVAC,IBMS& othermechanical service
as per projects&clientrequirements.
 Give technical inputstothe feasibilityteambyvisitingprospective sites,hightlighting
concernsto the managementandincorporatingtheminthe designof the projects.
 Value engineeringtooptimizeequipmentsandsyscapacities.
 Optimize projectcostbudgetsestimatestechnical commercial negotiationwithvendorsand
contractor.
3
 Tendersoliciting,analysisassessment,recommendation&procurement.
 Award& appointmentof contractorfor MEP works.
 Reviewandprovide inputsonconceptdesigndrawings,tenders,shop drawings.
 ExecutedMEP workat site as pertechnical specification&drawings.
 MonthlytargetsmeetingwithManagement&implementatsite.
 Implementingsafetyrequirementasperstandardoperatingprocedure.
 Monthlyarrange the safetyauditsimplementthe standardoperatingprocedure.
SPECIALTIES:-
 CoordinatedwithLEEDconsultantforconstruction activities.
 Implement site instructionprovide byLEEDconsultant.
 MaintaindocumentationasperLEED requirementsandconduitthe audittocrosscheck
withall actives.
 Checkingof materialsasperLEED requirements
2.The Raheja Universal Ltd, Mumbai.
Workedas Sr. Officer-MEPfrom 09th Dec-2009 to 21st
July 2012
Project Completed 3 Lac sq. ft. Commercial ware house at Juhinager Navi Mumbai &
Residential buildingsinChemburAcropolise.
RICC-I& II (RahejaInternal Corporate City)
RESPONSIBILTY:-
 Managing andcoordinatingwithMEP & other consultants designaspects.
 Reviewthe MEPdesignparameter&requirements.
 CoordinatingwithMEPcontractors.
 Qualityassurance &control.
 Implementingsafetyrequirementasperstandardoperatingprocedure.
 Execute the smooth& timelycompletion of MEP works
 Coordinationwithtenant&full fieldtheirrequirements.
SITE COMPLETED:- AcropolisResidential projectChemburtowers :-
 Successfullyhandedovertenresidential buildingto society.
 Ensuring maximum customizing satisfaction by closely interacting with potential clients
and understandtheirrequirements.
 Coordinationwithsite teamforexecutionworkingonaffordable housingforMEPwork.
4
3.Ackruti CityLtd, MIDC,Marol, Mumbai
Worked as Asst Manager-Engg. (Projects) Since 25th May-2007 to Dec 2009. To handle
residential,SRA &Commercial projects.
In this organization I was responsibility for planning, coordination, tendering & execution of
E & M work.
Site Completed.
 S-ParkThane commercial project NearKhopat.( 1.24 Lacs Sq. ft.)
 K-ParkKanjurmargLBS Road commercial project (2.0Lacs Sq.ft)
Saiwadi Commercial &residential SRA projects Andheri (E)
 Ackruti Star commercial projectinAndheri(E) 6th
basementforAutomaticCarparking.
 BKC Commercial:- Itis Basement+GndFlr.+9 StoreyCommercial Tower nearUTI,BKC.
(2,00,000 Sq.Ft.)
 Pocket-5residential SRA projects AndheriMarol MID
 Tulsiwadi (Mahalaxmi) SRA residential Building Grto 21st
floors(Tadev)
 Shastrinager (Bandra-E) SRA residential BandraEast Gr to 15th
floors.
EXPERIENCE RECORD:-
 CoordinationwithE& M consultant,architect,structural &interiorasperdesign
aspects.
 Reviewof tendersdocuments &BOQas per requirements.
 Responsibilityof projectplanning&coordination.
 Responsible forcost estimation,billing&preparationof projectrecord.
 Coordinationwithresponsiblecontractor.
 Smoothlyexecutethe workatsite coordinatingwithsite team.
 Cost approval & commercial mattersdiscussionwithManagement.
 Handedoverthe commercial office tothe tenants .
 Handedoverthe SRA projectsE & M workto society.
4.Sodexho Facility Management Services Indian Pvt Ltd. ( a Fortune 500 Company) as a
Technical ManagerSince July2006 to May2007.
Nature of work :
 Take dailyroundof whole buildingtocheckthe Chiller, UPS, PAC& Electrical DBs.
 Preparationof workdistributionscheduleforroutine maintenance.
5
 Generatingworkordersto carry out Preventive Maintenance bythe technician.
 Preparationof dutyrostersandschedulesforstaff involvedinall activitiesincluding
all technicians,HKboys.
 Maintenance & monitorof Log Books,CheckListson dailybasis.
 Keepingtrackof OEM servicesunderwarrantymanagement&AMCmanagement.
 Followupon PPM & monitorthe performance of the jobsdone.
 Recordingthe energyconsumptionondaytoday basis& record paymentof monthly
bill forElectricity&Diesel etc.
 To record& monitorruntime of Chiller&all otherequipment.
 Maintenance,monitoring&recordingthe consumptionof spares&consumables.
 Maintenance equipmentdatasheets.
 Procurement(cashandcreditpurchase) of commoditiesandkeepthe trackrecord
ondailybasis.
 Assistthe FacilityManagerforany operationrelatedissue.
 Assistthe FacilityManagerduringtrainingetc.
 Verification&certificationof consumables&service invoices.
Additional Responsibility
 Work as a coordinatorbetweenthe ClientandVendor.
 Work withoutside vendorsandcontractors,asand whenrequired.
 Seekeligible candidatesforpromotionandtraining.
 Applyandfollowthe contractual obligations,policiesandproceduresandalso
maintaingoodrelationshipwithClientall the time.
 Performdutieswheneverrequiredtomaintainaperfectsatisfactionof the Client
. Respondtoemergencysituationsthroughoutthe facilityandhelptocoordinate any
relatedfunctiontoaccommodate safetyof all staffs
Site Managed
6
 HSBC Tower,Mind space,Malad(W).
 Prudential Tower, Powai &VikroliGodrej.
 SiemensTower, Kharghar.
5.Integrated Property Management & Services Ltd (An ISO 9001:2000 company jointly ventured
by Mahindra& Mahindraand ILFS) as a ShiftEngg from June 2005 to 8th
July2006.
Nature of work :
 Take dailyroundof whole buildingtocheckthe Chiller,UPS,PAC& Electrical DBs.
 Preparationof workdistributionscheduleforroutine maintenance.
 Generatingworkordersto carry out Preventive Maintenance bythe technician.
 Preparationof dutyrostersandschedulesforstaff involvedinall activitiesincluding
all technicians,HKboys.
 Maintenance & monitorof Log Books,CheckListson dailybasis.
 Keepingtrackof OEM servicesunderwarrantymanagement&AMCmanagement.
 Followupon PPM& monitorthe performance of the jobsdone.
 Recordingthe energyconsumptionondaytoday basis& record paymentof monthly
bill forElectricity&Diesel etc.
 To record& monitorruntime of Chiller &all otherequipment.
 Maintenance,monitoring&recordingthe consumptionof spares&consumables.
 Maintenance equipmentdatasheets.
 Procurement(cashandcreditpurchase) of commoditiesandkeepthe trackrecord
ondailybasis.
Site Managed
 Intel netTowerII,Mindspace,Malad(W).
 IBM, 4th
flr,IL&FS,BK
6.TRANSERECT, Opp.IIT maingate,Powai,Mumbai-400 076.
.Andworkedasan Maintenance EngineerfromApril2001to May 2005.
Site Managed:
7
 22 kV Sub-station,L&TJohnDeer,Sanaswadi,Pune.
Operation&Maintenance of Electrical accessorieslike
mercuryvapour lamps,Tube lightfittings,AHU’s,Waterpumps,Sub-
station& alsooperationof WTP plant.
 22 kV sub-station,UTI,Mainbuilding,Bandra-KurlaComplex,Mumbai.(1 X 375 kVA
D.G.)
Operation&maintenance of Electrical accessories,
Telephone system&22 kV Sub-stationincludingH.T.& L.T.
Panels,HVACsystem, D.G.panel.
 11 kV Sub-station, ICICIBankLtd,Bandra-KurlaComplex,Mumbai.
(2 X 750 kVA D.G.),This buildingishaving11storey two
towersincludingtwobasements.
Scope of Work :-
Operation&Maintenance of H.T. & L.T. electrical system
and11kV/415 Voltssub-station.P.F.correctedfrom0.866 lag
to 0.991 lag& unity.Loadbalancedof distributioncablesto
reduce lossesdue tocable heatingandtoimprove life of
cables.Highpottestingof cables,Operation&Maintenance of
AHU & centralizedH.V.A.C.System,Maintenanceof 3phase
InductionMotors(Upto40 Hp),WaterPumps,Fire FightingsystemBasic
knowledge of WaterTreatmentplant,Electrical-wiringinstallation
(G.I.pipe wiring) etc
7.Indo Borex Chemical Ltd.
Workedas an Electrical Techniciansince March2000 to April 2001.
Manufacture Plantat M.P.State at PithampurMIDC. Manufacture Borex
Power. Operation&Maintenance of H.T. & L.T. electrical system
and 11kV/415 Voltssub-station.
8. Bombay Battery Pvt Ltd
8
o Workedas an Electrical Techniciansince May1998 to March 2000.
o Manufacture Plantat Kalamvali MIDC
o Operation&Maintenance of H.T. & L.T. electrical system
 and 11kV/415 Voltssub-station.
o Maintenance of L.T. Control Panels.
o Maintenance of Motors 3HP to 100HP
o Maintenance of DG Set 1000KVA.
o Maintenance of Compressorupto50KW.
THANKING YOU
NIMISH R. BHOYAR

More Related Content

What's hot (20)

CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
Mubeen-Mech
Mubeen-MechMubeen-Mech
Mubeen-Mech
 
CV
CVCV
CV
 
CV S.K.Panda
CV S.K.PandaCV S.K.Panda
CV S.K.Panda
 
Resume mh
Resume mhResume mh
Resume mh
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
Esakki raja resume
Esakki raja resumeEsakki raja resume
Esakki raja resume
 
Mohammad Hassan -CV
Mohammad Hassan -CVMohammad Hassan -CV
Mohammad Hassan -CV
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
CV 2015
CV   2015CV   2015
CV 2015
 
CV_JomarDuyao
CV_JomarDuyaoCV_JomarDuyao
CV_JomarDuyao
 
C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.
 
CV RESUME -20.11.2016.docx AGM
CV  RESUME -20.11.2016.docx  AGM  CV  RESUME -20.11.2016.docx  AGM
CV RESUME -20.11.2016.docx AGM
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
CV
CVCV
CV
 
Sundaram_original
Sundaram_originalSundaram_original
Sundaram_original
 
Jasons Resume - 2016
Jasons Resume  - 2016Jasons Resume  - 2016
Jasons Resume - 2016
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 

Viewers also liked

Diab_reference_letter
Diab_reference_letterDiab_reference_letter
Diab_reference_letterm7mdldiab
 
Нутрициальная коррекция метаболических нарушений при Аутизме у детей
Нутрициальная коррекция метаболических нарушений при Аутизме у детейНутрициальная коррекция метаболических нарушений при Аутизме у детей
Нутрициальная коррекция метаболических нарушений при Аутизме у детейIN111
 
2016年2月4日 空間OSのためのビッグデータ技術基盤
2016年2月4日 空間OSのためのビッグデータ技術基盤2016年2月4日 空間OSのためのビッグデータ技術基盤
2016年2月4日 空間OSのためのビッグデータ技術基盤aitc_jp
 
検索エンジンPatheeがAzureとCassandraをどう利用しているのか
検索エンジンPatheeがAzureとCassandraをどう利用しているのか検索エンジンPatheeがAzureとCassandraをどう利用しているのか
検索エンジンPatheeがAzureとCassandraをどう利用しているのかdatastaxjp
 
Manor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkManor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkJose Carlos Ayala
 

Viewers also liked (14)

Diab_reference_letter
Diab_reference_letterDiab_reference_letter
Diab_reference_letter
 
Нутрициальная коррекция метаболических нарушений при Аутизме у детей
Нутрициальная коррекция метаболических нарушений при Аутизме у детейНутрициальная коррекция метаболических нарушений при Аутизме у детей
Нутрициальная коррекция метаболических нарушений при Аутизме у детей
 
Innovation of NYC
Innovation of NYCInnovation of NYC
Innovation of NYC
 
college transcript
college transcriptcollege transcript
college transcript
 
Citizens Guide Leed ND
Citizens Guide Leed NDCitizens Guide Leed ND
Citizens Guide Leed ND
 
ValidityUseCases
ValidityUseCasesValidityUseCases
ValidityUseCases
 
Portfólio Actua
Portfólio ActuaPortfólio Actua
Portfólio Actua
 
Trifermed cbdo short presentation
Trifermed cbdo short presentationTrifermed cbdo short presentation
Trifermed cbdo short presentation
 
Tugas SIM Materi Semester 2
Tugas SIM Materi Semester 2Tugas SIM Materi Semester 2
Tugas SIM Materi Semester 2
 
Final Project (Final Version)
Final Project (Final Version)Final Project (Final Version)
Final Project (Final Version)
 
2016年2月4日 空間OSのためのビッグデータ技術基盤
2016年2月4日 空間OSのためのビッグデータ技術基盤2016年2月4日 空間OSのためのビッグデータ技術基盤
2016年2月4日 空間OSのためのビッグデータ技術基盤
 
検索エンジンPatheeがAzureとCassandraをどう利用しているのか
検索エンジンPatheeがAzureとCassandraをどう利用しているのか検索エンジンPatheeがAzureとCassandraをどう利用しているのか
検索エンジンPatheeがAzureとCassandraをどう利用しているのか
 
Vegetables Packed with Nutrients
Vegetables Packed with NutrientsVegetables Packed with Nutrients
Vegetables Packed with Nutrients
 
Manor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkManor Park Neighborhood Urban Park
Manor Park Neighborhood Urban Park
 

Similar to Resume_Nimish_Bhoyar (20)

Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 
Rajeev_Biodata6
Rajeev_Biodata6Rajeev_Biodata6
Rajeev_Biodata6
 
Eng Aftab CV Dec15N
Eng Aftab CV Dec15NEng Aftab CV Dec15N
Eng Aftab CV Dec15N
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
cv.akram sabri
cv.akram sabricv.akram sabri
cv.akram sabri
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
UNM CV
UNM CVUNM CV
UNM CV
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
Green line profile
Green line profile Green line profile
Green line profile
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
JPResume
JPResumeJPResume
JPResume
 
latest CV_pradeep
latest CV_pradeeplatest CV_pradeep
latest CV_pradeep
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
osama cv
osama cvosama cv
osama cv
 
training report on commercial building
training report on commercial buildingtraining report on commercial building
training report on commercial building
 
PREETAM ALMEIDA-CV
PREETAM ALMEIDA-CVPREETAM ALMEIDA-CV
PREETAM ALMEIDA-CV
 
JEESMON - CV Engineer
JEESMON - CV EngineerJEESMON - CV Engineer
JEESMON - CV Engineer
 
Ma. Clarita E. Pineda
Ma. Clarita E. PinedaMa. Clarita E. Pineda
Ma. Clarita E. Pineda
 

Resume_Nimish_Bhoyar

  • 1. 1 CURRICULUM VITAE NIMISH RAMDAS BHOYAR Yashodeep Heights Flat No-1301, C-Wing, Plot No-14 & 15, Sector-29C, Ghansoli Navi Mumbai- 400701. Cell: 9870986109 Email: nimish.777@rediffmail.com / nimish.bhoyar@gmail.com Pass Port No-L9947790 ACADEMIC QUALIFICATIONS Diploma(Electrical) : Secondclassfrom, December1997. H.S.C. : Secondclassfrom NagpurBoard,March 1994. S.S.C : SecondclassfromAmravati Board, March 1992. SOFTWARE PROFICIENCY Operating : Windows-XP,MSOffice,MSProjects. PERSONAL INFORMATION Date of Birth/Age : 7th December,1976 / Sex / Marital status : Male/Marrie DrivingLicense No : MH43/3032/04 CAREER OBJECTIVE To leverage 18years of experience in MEP jobs for residential ,commercial projects Maintenance encompassing testing,inspection,commissioning & installation function in residential as well as commercial projects.
  • 2. 2  Presently working with Pioneer Property Zone Services Pvt Ltd(PPZ)Project management company (PMC) as a Assist Manager MEP SINCE-JULY-2012 Presently Handling the MEP jobs for 2 Lac sq. ft. Platinum rated Green Building Commercial projectinThane GhodbunderRoad. OBJECTIVE:- My objective is to deliver any MEP jobs assignment in maximum professional and accurate way by dedicating and utilized my qualification, skills and long work experience. This will obviously ensure meeting or exceeding the satisfaction of my employer and respective clients as well as enhancing my aptitude to deal with any other upcoming challenges with ease andspeed. SUMMARYOF SKILLS AND RESPONSIBILITY TECHNICAL:-  MEP designreviewforoptimumenergyconsumption&energyefficiencywithvalue if engineeringbest performance.  Electrical buildingsystemdesign,estimating,tendering,QSmanaging&supervisionof services.  BuildingdesigncoordinationforHVAC,PLUMNING&othermechanical services.  Buildingdesigncoordinationfor fire fighting,Fire alarm&IBMS system.  Designcoordinationforinformation&communicationtechnology.  Monitoredworkprogressregularlyandconductedmeetingswith contractor.  Reviewed contractdrawings,specsandotherprocurementmaterials.  Reviewedfinal scope of MEPworkand providedtechnical guidance,input.  Preparedthe methodof statementandinspectiontestplan(ITP).  Preparedthe documentssubmissionandmaterialsrequisition inadvance.  Handledthe dailyreportandrecordedall activitiesincludingsite issues.  Reviewedtechnical specifications,estimation,contractdrawingsandBOQ.  Checkedindividual andcombinedshopdrawingsincludingwork.  Scope control & deliverables stagesmanagementwithqualitymonitoringchecks.  Coordinationwith MEPservice consultant,architect&otherconsultantsconcepttoproject. Intelligenceandjudicioustospace planningof MPE service highend equipments.  Review&checkingof DBR for Electrical,Fire Fighting,HVAC,IBMS& othermechanical service as per projects&clientrequirements.  Give technical inputstothe feasibilityteambyvisitingprospective sites,hightlighting concernsto the managementandincorporatingtheminthe designof the projects.  Value engineeringtooptimizeequipmentsandsyscapacities.  Optimize projectcostbudgetsestimatestechnical commercial negotiationwithvendorsand contractor.
  • 3. 3  Tendersoliciting,analysisassessment,recommendation&procurement.  Award& appointmentof contractorfor MEP works.  Reviewandprovide inputsonconceptdesigndrawings,tenders,shop drawings.  ExecutedMEP workat site as pertechnical specification&drawings.  MonthlytargetsmeetingwithManagement&implementatsite.  Implementingsafetyrequirementasperstandardoperatingprocedure.  Monthlyarrange the safetyauditsimplementthe standardoperatingprocedure. SPECIALTIES:-  CoordinatedwithLEEDconsultantforconstruction activities.  Implement site instructionprovide byLEEDconsultant.  MaintaindocumentationasperLEED requirementsandconduitthe audittocrosscheck withall actives.  Checkingof materialsasperLEED requirements 2.The Raheja Universal Ltd, Mumbai. Workedas Sr. Officer-MEPfrom 09th Dec-2009 to 21st July 2012 Project Completed 3 Lac sq. ft. Commercial ware house at Juhinager Navi Mumbai & Residential buildingsinChemburAcropolise. RICC-I& II (RahejaInternal Corporate City) RESPONSIBILTY:-  Managing andcoordinatingwithMEP & other consultants designaspects.  Reviewthe MEPdesignparameter&requirements.  CoordinatingwithMEPcontractors.  Qualityassurance &control.  Implementingsafetyrequirementasperstandardoperatingprocedure.  Execute the smooth& timelycompletion of MEP works  Coordinationwithtenant&full fieldtheirrequirements. SITE COMPLETED:- AcropolisResidential projectChemburtowers :-  Successfullyhandedovertenresidential buildingto society.  Ensuring maximum customizing satisfaction by closely interacting with potential clients and understandtheirrequirements.  Coordinationwithsite teamforexecutionworkingonaffordable housingforMEPwork.
  • 4. 4 3.Ackruti CityLtd, MIDC,Marol, Mumbai Worked as Asst Manager-Engg. (Projects) Since 25th May-2007 to Dec 2009. To handle residential,SRA &Commercial projects. In this organization I was responsibility for planning, coordination, tendering & execution of E & M work. Site Completed.  S-ParkThane commercial project NearKhopat.( 1.24 Lacs Sq. ft.)  K-ParkKanjurmargLBS Road commercial project (2.0Lacs Sq.ft) Saiwadi Commercial &residential SRA projects Andheri (E)  Ackruti Star commercial projectinAndheri(E) 6th basementforAutomaticCarparking.  BKC Commercial:- Itis Basement+GndFlr.+9 StoreyCommercial Tower nearUTI,BKC. (2,00,000 Sq.Ft.)  Pocket-5residential SRA projects AndheriMarol MID  Tulsiwadi (Mahalaxmi) SRA residential Building Grto 21st floors(Tadev)  Shastrinager (Bandra-E) SRA residential BandraEast Gr to 15th floors. EXPERIENCE RECORD:-  CoordinationwithE& M consultant,architect,structural &interiorasperdesign aspects.  Reviewof tendersdocuments &BOQas per requirements.  Responsibilityof projectplanning&coordination.  Responsible forcost estimation,billing&preparationof projectrecord.  Coordinationwithresponsiblecontractor.  Smoothlyexecutethe workatsite coordinatingwithsite team.  Cost approval & commercial mattersdiscussionwithManagement.  Handedoverthe commercial office tothe tenants .  Handedoverthe SRA projectsE & M workto society. 4.Sodexho Facility Management Services Indian Pvt Ltd. ( a Fortune 500 Company) as a Technical ManagerSince July2006 to May2007. Nature of work :  Take dailyroundof whole buildingtocheckthe Chiller, UPS, PAC& Electrical DBs.  Preparationof workdistributionscheduleforroutine maintenance.
  • 5. 5  Generatingworkordersto carry out Preventive Maintenance bythe technician.  Preparationof dutyrostersandschedulesforstaff involvedinall activitiesincluding all technicians,HKboys.  Maintenance & monitorof Log Books,CheckListson dailybasis.  Keepingtrackof OEM servicesunderwarrantymanagement&AMCmanagement.  Followupon PPM & monitorthe performance of the jobsdone.  Recordingthe energyconsumptionondaytoday basis& record paymentof monthly bill forElectricity&Diesel etc.  To record& monitorruntime of Chiller&all otherequipment.  Maintenance,monitoring&recordingthe consumptionof spares&consumables.  Maintenance equipmentdatasheets.  Procurement(cashandcreditpurchase) of commoditiesandkeepthe trackrecord ondailybasis.  Assistthe FacilityManagerforany operationrelatedissue.  Assistthe FacilityManagerduringtrainingetc.  Verification&certificationof consumables&service invoices. Additional Responsibility  Work as a coordinatorbetweenthe ClientandVendor.  Work withoutside vendorsandcontractors,asand whenrequired.  Seekeligible candidatesforpromotionandtraining.  Applyandfollowthe contractual obligations,policiesandproceduresandalso maintaingoodrelationshipwithClientall the time.  Performdutieswheneverrequiredtomaintainaperfectsatisfactionof the Client . Respondtoemergencysituationsthroughoutthe facilityandhelptocoordinate any relatedfunctiontoaccommodate safetyof all staffs Site Managed
  • 6. 6  HSBC Tower,Mind space,Malad(W).  Prudential Tower, Powai &VikroliGodrej.  SiemensTower, Kharghar. 5.Integrated Property Management & Services Ltd (An ISO 9001:2000 company jointly ventured by Mahindra& Mahindraand ILFS) as a ShiftEngg from June 2005 to 8th July2006. Nature of work :  Take dailyroundof whole buildingtocheckthe Chiller,UPS,PAC& Electrical DBs.  Preparationof workdistributionscheduleforroutine maintenance.  Generatingworkordersto carry out Preventive Maintenance bythe technician.  Preparationof dutyrostersandschedulesforstaff involvedinall activitiesincluding all technicians,HKboys.  Maintenance & monitorof Log Books,CheckListson dailybasis.  Keepingtrackof OEM servicesunderwarrantymanagement&AMCmanagement.  Followupon PPM& monitorthe performance of the jobsdone.  Recordingthe energyconsumptionondaytoday basis& record paymentof monthly bill forElectricity&Diesel etc.  To record& monitorruntime of Chiller &all otherequipment.  Maintenance,monitoring&recordingthe consumptionof spares&consumables.  Maintenance equipmentdatasheets.  Procurement(cashandcreditpurchase) of commoditiesandkeepthe trackrecord ondailybasis. Site Managed  Intel netTowerII,Mindspace,Malad(W).  IBM, 4th flr,IL&FS,BK 6.TRANSERECT, Opp.IIT maingate,Powai,Mumbai-400 076. .Andworkedasan Maintenance EngineerfromApril2001to May 2005. Site Managed:
  • 7. 7  22 kV Sub-station,L&TJohnDeer,Sanaswadi,Pune. Operation&Maintenance of Electrical accessorieslike mercuryvapour lamps,Tube lightfittings,AHU’s,Waterpumps,Sub- station& alsooperationof WTP plant.  22 kV sub-station,UTI,Mainbuilding,Bandra-KurlaComplex,Mumbai.(1 X 375 kVA D.G.) Operation&maintenance of Electrical accessories, Telephone system&22 kV Sub-stationincludingH.T.& L.T. Panels,HVACsystem, D.G.panel.  11 kV Sub-station, ICICIBankLtd,Bandra-KurlaComplex,Mumbai. (2 X 750 kVA D.G.),This buildingishaving11storey two towersincludingtwobasements. Scope of Work :- Operation&Maintenance of H.T. & L.T. electrical system and11kV/415 Voltssub-station.P.F.correctedfrom0.866 lag to 0.991 lag& unity.Loadbalancedof distributioncablesto reduce lossesdue tocable heatingandtoimprove life of cables.Highpottestingof cables,Operation&Maintenance of AHU & centralizedH.V.A.C.System,Maintenanceof 3phase InductionMotors(Upto40 Hp),WaterPumps,Fire FightingsystemBasic knowledge of WaterTreatmentplant,Electrical-wiringinstallation (G.I.pipe wiring) etc 7.Indo Borex Chemical Ltd. Workedas an Electrical Techniciansince March2000 to April 2001. Manufacture Plantat M.P.State at PithampurMIDC. Manufacture Borex Power. Operation&Maintenance of H.T. & L.T. electrical system and 11kV/415 Voltssub-station. 8. Bombay Battery Pvt Ltd
  • 8. 8 o Workedas an Electrical Techniciansince May1998 to March 2000. o Manufacture Plantat Kalamvali MIDC o Operation&Maintenance of H.T. & L.T. electrical system  and 11kV/415 Voltssub-station. o Maintenance of L.T. Control Panels. o Maintenance of Motors 3HP to 100HP o Maintenance of DG Set 1000KVA. o Maintenance of Compressorupto50KW. THANKING YOU NIMISH R. BHOYAR