SlideShare a Scribd company logo
1 of 4
Download to read offline
1
Akram Sabri El-Demerdash
PERSONAL DATA
 Date of Birth : 14-7-1983, Male.
 Nationality : Egyptian.
 Marital Status : Married.
 Contact : +966 50 795 7366
 email : eng.akrm.sabri@gmail.com
 Others : valid Saudi driving license.
 Certifications : Saudi Council of Engineers / Membership .
 Courses : PMP Preparation Course [ 35 hours certified by SCE. ]
 Military status : Done.
OBJECTIVE
Improve the knowledge to keep growing up as a professional with hard work contribution
inside a respectable organization.
WORK EXPERIENCE
 From april 2013. till Now
Working with Ranco & Zamil Concrete Industries Co. Ltd. As
Erection site manager, in Riyadh and all around the Kingdom .
accomplished projects :
1- Jarir Bookstore. In Riyadh
2- Nakhla & Qurtoba Plaza. In Riyadh
3- Ministry Of Higher Education.[ Car Parking ]. Riyadh
4- Construction of New Muhayil West Substation 380/132/13.8KV BSP, client/Al-Toukhi
co. for industry at Muhayil Asir .
5- King khaled university [Housing Bldgs.] client:Al-Mobty co. at Abha & Muhayil Asir .
6- Construction of 132/13.8kv. Substations #8202 & 8204 in Riyadh. Client/Al-Babtain co.
7- Riyadh Metro substations #9051 & 9052- North west 380/33KV. BSP For SEC.
Client:NCC.
8- New Admin. Bldg. at King Khaled Airport – Private Aviation-Advanced Electronics
Co. – FCI.
9- King Salman Center- Prince Sultan University-Riyadh ( ABV ROCK GROUP ) .
10- RANCO Village Expansion - RANCO GROUP.
2
My Tasks:
Directly Reporting to the Projects/Erection Manager, and responsible for all on site activities,
ensuring that they are done on schedule, to budget and in a safe manner. iam the first point of
liaison with clients on site and with various other subcontractors.
Segment Supervision-Technical
 responsible for the day to day supervision of the erection and other subcontractors, ensuring that
they are working on schedule, to budget and in a safe manner.
 Studying & Review GAD,contract scope of work and specifications of erection ,preparing site
requirement/element sequences plan and equipment.
 Direct construction/Erection, operation and final re-touching activities at projects site.
 Managing and distributing the work to staff at sites.
 daily basis contact-reporting to management/factory, planning team and loading for all updates and
requirements .
 Plan, supervise and monitor the activities of the designated area and its progress to ensure
maximum utilization of the given resources.
 Ensure that the erection procedures and required specifications are strictly followed.
 Monitor and follows up the requirements in erection sites such as heavy machinery, tools, manpower
and equipment.
 Review and confirms the erection requirements on all machinery, material & manpower needs.
 Serve as the company representative.
Erection Schedule Compliance
 Request for and monitor the required number of cranes, trailers and manpower in each of the
designated project site to meet the erection schedule.
 Coordinate with the Erection Manager the delivery of materials and precast element to the site.
Erection of Pre-Cast Elements
 Conduct site investigation and prepares the sequence of production, delivery and erection of the
precast elements.
 Prepare and submit to the immediate head the daily/ weekly Erection Status Report.
 Coordinate and monitors with the outsource company the production and delivery of the products to
the job sites.
 Coordinate with the client or client’s representative on site for any problem affecting the work and
submit a written report for management’s review and decision.
 Do project documentation including letters of approval, revisions, report of delays and other
substantial documents in the erection procedures.
Client Support
 Discuss and explain with client’s representative the site problems, coordination on forecast activity,
heavy machineries, manpower, tools and equipment and provides report to the immediate head.
 Monitor and follows up with the client for any change order and seeks approval for management’s
review and recording.
 Discuss and explain to the clients any new project as and when required.
Human Resources Management
 Monitor and conducts periodic performance reviews for all site personnel within the respective area.
 Initiate disciplinary action (if any) to ensure workplace safety, good employee conduct and the like.
 Identify training needs and arranges staff training in achieving company’s strategic plan
 Promote cooperation & team work and leads by example
 Maintain good relationships with internal functional groups and external clients.
Cost Control
 Follow up with the clients regarding monthly or periodic payments for the ongoing projects.
 Review, signs and submits all material invoices to the erection department for management review &
approval.
 Provide immediate decision to either hold or stop the erection activity based on the client’s financial
payment status and capabilities.
3
Health & Safety Environment (HSE) Compliance
 Explain safe working practices and conduct weekly safety meetings.
 Submit reports of the nature of accidents and employee accident history and initiatives preventive
actions.
 Observe and enforce properly the Personal Protective Equipment (PPE) such as hard hats, face
masks and the like while inside the job site.
 From Sep. 2011 Until March 2013
Working with Integrated Contracting co. "one of SIAC companies" as Project Engineer
[Egypt - New Cairo].
Projects I worked in:
 Hyde park - The Garden Heights [ Phase I ]" Residential Buildings".
Five floors of concrete structure.
[Client : DAMAC - Consultant : ECG]
My Tasks :
1- Reviewing drawing and specifications.
2- Supervising and monitoring the quality of works at project site.
3- Managing and distributing work to staff at site.
4- Controlling, and directing the subcontractors at site.
 The Main branch of Egyptian Al Watany Bank "AWB" subsidiary of "NBK group".
Two basement floor concrete structure on 7500m2 ,Seven typical floors of steel structure
on 2000 m2.
[Client : NBK - Consultant : ECU]
 From June 2010 to Aug. 2011
Working with Al.Majal Al.Arabi Group co. as Site Engineer in Saudi Arabia.
Projects I worked in :
 The Psychiatric & Addiction Hospitals "200 beds" in Tabuk & Najran [ phase I] :
 stages of [excavation, foundations and all skeleton items] for 8 villas [male - female] , 2
buildings of occupational therapy [male - female], main hospital 6000 m2, emergency
building, inpatient hostel building & administration building.
My Tasks :
• Direct construction, operation, and maintenance activities at project site.
• Working as QS. Estimate quantities and cost of materials, equipment and manpower to
determine project feasibility.
• Manage, supervise civil works at site.
• Organize the delivery of materials.
• Review and follow up the master Project schedule.
[ Client : Ministry of Health - Consultant : Abdullah Al.Seif & partners ]
 From Aug. 2006 to may 2010
Working with Alexandria Construction co. Talaat Moustafa Group as Site Engineer &
QC. Engineer in Egypt, New Cairo.
My Tasks :
1. Prepare the work requirements on a daily basis.
2. Monitoring all site activities.
3. Responsible for all executing works at site.
4. supervising subcontractors for all items.
5. Follow up distribution of work to supervisors with manpower.
6. Ensure the execution of work according to quality standards.
4
7. Manage the subcontractor’s performance and quality of work.
Project I worked in:
 MADINATY [Residential Buildings] : six floors of concrete structure.
[ Client : TMG - Consultant : ECG ]
IT SKILLS - COURSES
 Auto cad [2000-2010] very good user.
 Structure analysis program [sap2000] good user.
 Very Good user of Microsoft Office [Word – Excel – Power Point-Ms. project].
 Proficient user of internet.
 Ability to adopt with any software.
 PMP Preparation Course [ 35 hours certified by SCE. ]
EDUCATION
 Faculty of Engineering, Faiyum University – Cairo university branch .
 Major: civil structures ,grade: Good.68%
 PROJECT: Reinforcement Concrete. grade : Very Good.84%
 Graduation Year : May / 2006.
TRAINING
 With Alexandria Construction co. in concrete structures work.
PERSONAL SKILLS
 Excelent communication skills.
 Ability to solve problems that arise on the site by economic and process of the
inexpensive to the contractor and not inconsistent with the rest of the other
branches.
 Leadership & responsibility for leading and giving technical support to
supervisors in the site of the same specialization.
 I have experience of managing large construction sites, ideally with experience of
structural precast erection. I possessed strong organisational and communication skills
together with a good eye for detail and the ability to manage teams.
LANGUAGES
 Arabic Language "Mother Tongue".
 Fluent in English language spoken and written.
REFERENCES
 All references are available upon your request

More Related Content

What's hot

Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer - Amir Mohammed
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Akif shirazi
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi Sami
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor Danger Riyas
 

What's hot (19)

khawar Resume
khawar Resumekhawar Resume
khawar Resume
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer -
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1
 
Resume
ResumeResume
Resume
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 
CV farooque
CV farooqueCV farooque
CV farooque
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Cv amit
Cv amitCv amit
Cv amit
 
Resume New
Resume NewResume New
Resume New
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 

Viewers also liked

8. enfermedades de la infancia
8. enfermedades de la infancia8. enfermedades de la infancia
8. enfermedades de la infanciaPatricia López
 
Affordable Designer Rugs Perth | Modern Designer Rugs
Affordable Designer Rugs Perth | Modern Designer RugsAffordable Designer Rugs Perth | Modern Designer Rugs
Affordable Designer Rugs Perth | Modern Designer RugsRug Junction
 
Example slideshare
Example slideshareExample slideshare
Example slideshareLeedsBeckett
 
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...Soipuerta Soy-puerta
 
DES0239 7-18-14
DES0239 7-18-14DES0239 7-18-14
DES0239 7-18-14Seth Shill
 
Lei municipal para instalação de recepientes de pilhas, celulares, etc.
Lei municipal para instalação de recepientes de pilhas, celulares, etc.Lei municipal para instalação de recepientes de pilhas, celulares, etc.
Lei municipal para instalação de recepientes de pilhas, celulares, etc.rcatanese
 
Інформатика 8 клас
Інформатика 8 клас Інформатика 8 клас
Інформатика 8 клас PRESLAVA1972
 
Latinco El Salvador pt - 28 junio 2012 fin
Latinco El Salvador pt - 28 junio 2012 finLatinco El Salvador pt - 28 junio 2012 fin
Latinco El Salvador pt - 28 junio 2012 fincarlos lopez
 
digital presentation
digital presentationdigital presentation
digital presentationMONIE222
 
Las claves de un viaje
Las claves de un viaje Las claves de un viaje
Las claves de un viaje Alfredo corte
 
Curso.fortalezcamos algunos contenidos de español i
Curso.fortalezcamos algunos contenidos de español iCurso.fortalezcamos algunos contenidos de español i
Curso.fortalezcamos algunos contenidos de español iRoberto Pérez
 

Viewers also liked (16)

8. enfermedades de la infancia
8. enfermedades de la infancia8. enfermedades de la infancia
8. enfermedades de la infancia
 
Affordable Designer Rugs Perth | Modern Designer Rugs
Affordable Designer Rugs Perth | Modern Designer RugsAffordable Designer Rugs Perth | Modern Designer Rugs
Affordable Designer Rugs Perth | Modern Designer Rugs
 
Harmeet_CV
Harmeet_CVHarmeet_CV
Harmeet_CV
 
Sound analysis
Sound analysisSound analysis
Sound analysis
 
Example slideshare
Example slideshareExample slideshare
Example slideshare
 
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...
Conrado IMPORTANCIA E INFLUENCIA DE LA LÍNEA FÉRREA PEÑARROYA-PUERTOLLANO EN ...
 
DES0239 7-18-14
DES0239 7-18-14DES0239 7-18-14
DES0239 7-18-14
 
Lei municipal para instalação de recepientes de pilhas, celulares, etc.
Lei municipal para instalação de recepientes de pilhas, celulares, etc.Lei municipal para instalação de recepientes de pilhas, celulares, etc.
Lei municipal para instalação de recepientes de pilhas, celulares, etc.
 
Інформатика 8 клас
Інформатика 8 клас Інформатика 8 клас
Інформатика 8 клас
 
Latinco El Salvador pt - 28 junio 2012 fin
Latinco El Salvador pt - 28 junio 2012 finLatinco El Salvador pt - 28 junio 2012 fin
Latinco El Salvador pt - 28 junio 2012 fin
 
digital presentation
digital presentationdigital presentation
digital presentation
 
Medicina preventiva
Medicina preventivaMedicina preventiva
Medicina preventiva
 
Las claves de un viaje
Las claves de un viaje Las claves de un viaje
Las claves de un viaje
 
H6890 BP
H6890 BPH6890 BP
H6890 BP
 
Curso.fortalezcamos algunos contenidos de español i
Curso.fortalezcamos algunos contenidos de español iCurso.fortalezcamos algunos contenidos de español i
Curso.fortalezcamos algunos contenidos de español i
 
Clasificacion de residuos solidos
Clasificacion de residuos solidosClasificacion de residuos solidos
Clasificacion de residuos solidos
 

Similar to cv.akram sabri

Similar to cv.akram sabri (20)

Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
السي في
السي فيالسي في
السي في
 
osama cv
osama cvosama cv
osama cv
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Yasser Alkhulaifi CV With experience certificates
Yasser Alkhulaifi CV With experience certificates Yasser Alkhulaifi CV With experience certificates
Yasser Alkhulaifi CV With experience certificates
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
cv.
cv.cv.
cv.
 
Eng.ahmed
Eng.ahmedEng.ahmed
Eng.ahmed
 
Eddie Gamella_Resume
Eddie Gamella_ResumeEddie Gamella_Resume
Eddie Gamella_Resume
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
CV_JomarDuyao
CV_JomarDuyaoCV_JomarDuyao
CV_JomarDuyao
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
karthik resume 2016-UAE
karthik resume 2016-UAEkarthik resume 2016-UAE
karthik resume 2016-UAE
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 

cv.akram sabri

  • 1. 1 Akram Sabri El-Demerdash PERSONAL DATA  Date of Birth : 14-7-1983, Male.  Nationality : Egyptian.  Marital Status : Married.  Contact : +966 50 795 7366  email : eng.akrm.sabri@gmail.com  Others : valid Saudi driving license.  Certifications : Saudi Council of Engineers / Membership .  Courses : PMP Preparation Course [ 35 hours certified by SCE. ]  Military status : Done. OBJECTIVE Improve the knowledge to keep growing up as a professional with hard work contribution inside a respectable organization. WORK EXPERIENCE  From april 2013. till Now Working with Ranco & Zamil Concrete Industries Co. Ltd. As Erection site manager, in Riyadh and all around the Kingdom . accomplished projects : 1- Jarir Bookstore. In Riyadh 2- Nakhla & Qurtoba Plaza. In Riyadh 3- Ministry Of Higher Education.[ Car Parking ]. Riyadh 4- Construction of New Muhayil West Substation 380/132/13.8KV BSP, client/Al-Toukhi co. for industry at Muhayil Asir . 5- King khaled university [Housing Bldgs.] client:Al-Mobty co. at Abha & Muhayil Asir . 6- Construction of 132/13.8kv. Substations #8202 & 8204 in Riyadh. Client/Al-Babtain co. 7- Riyadh Metro substations #9051 & 9052- North west 380/33KV. BSP For SEC. Client:NCC. 8- New Admin. Bldg. at King Khaled Airport – Private Aviation-Advanced Electronics Co. – FCI. 9- King Salman Center- Prince Sultan University-Riyadh ( ABV ROCK GROUP ) . 10- RANCO Village Expansion - RANCO GROUP.
  • 2. 2 My Tasks: Directly Reporting to the Projects/Erection Manager, and responsible for all on site activities, ensuring that they are done on schedule, to budget and in a safe manner. iam the first point of liaison with clients on site and with various other subcontractors. Segment Supervision-Technical  responsible for the day to day supervision of the erection and other subcontractors, ensuring that they are working on schedule, to budget and in a safe manner.  Studying & Review GAD,contract scope of work and specifications of erection ,preparing site requirement/element sequences plan and equipment.  Direct construction/Erection, operation and final re-touching activities at projects site.  Managing and distributing the work to staff at sites.  daily basis contact-reporting to management/factory, planning team and loading for all updates and requirements .  Plan, supervise and monitor the activities of the designated area and its progress to ensure maximum utilization of the given resources.  Ensure that the erection procedures and required specifications are strictly followed.  Monitor and follows up the requirements in erection sites such as heavy machinery, tools, manpower and equipment.  Review and confirms the erection requirements on all machinery, material & manpower needs.  Serve as the company representative. Erection Schedule Compliance  Request for and monitor the required number of cranes, trailers and manpower in each of the designated project site to meet the erection schedule.  Coordinate with the Erection Manager the delivery of materials and precast element to the site. Erection of Pre-Cast Elements  Conduct site investigation and prepares the sequence of production, delivery and erection of the precast elements.  Prepare and submit to the immediate head the daily/ weekly Erection Status Report.  Coordinate and monitors with the outsource company the production and delivery of the products to the job sites.  Coordinate with the client or client’s representative on site for any problem affecting the work and submit a written report for management’s review and decision.  Do project documentation including letters of approval, revisions, report of delays and other substantial documents in the erection procedures. Client Support  Discuss and explain with client’s representative the site problems, coordination on forecast activity, heavy machineries, manpower, tools and equipment and provides report to the immediate head.  Monitor and follows up with the client for any change order and seeks approval for management’s review and recording.  Discuss and explain to the clients any new project as and when required. Human Resources Management  Monitor and conducts periodic performance reviews for all site personnel within the respective area.  Initiate disciplinary action (if any) to ensure workplace safety, good employee conduct and the like.  Identify training needs and arranges staff training in achieving company’s strategic plan  Promote cooperation & team work and leads by example  Maintain good relationships with internal functional groups and external clients. Cost Control  Follow up with the clients regarding monthly or periodic payments for the ongoing projects.  Review, signs and submits all material invoices to the erection department for management review & approval.  Provide immediate decision to either hold or stop the erection activity based on the client’s financial payment status and capabilities.
  • 3. 3 Health & Safety Environment (HSE) Compliance  Explain safe working practices and conduct weekly safety meetings.  Submit reports of the nature of accidents and employee accident history and initiatives preventive actions.  Observe and enforce properly the Personal Protective Equipment (PPE) such as hard hats, face masks and the like while inside the job site.  From Sep. 2011 Until March 2013 Working with Integrated Contracting co. "one of SIAC companies" as Project Engineer [Egypt - New Cairo]. Projects I worked in:  Hyde park - The Garden Heights [ Phase I ]" Residential Buildings". Five floors of concrete structure. [Client : DAMAC - Consultant : ECG] My Tasks : 1- Reviewing drawing and specifications. 2- Supervising and monitoring the quality of works at project site. 3- Managing and distributing work to staff at site. 4- Controlling, and directing the subcontractors at site.  The Main branch of Egyptian Al Watany Bank "AWB" subsidiary of "NBK group". Two basement floor concrete structure on 7500m2 ,Seven typical floors of steel structure on 2000 m2. [Client : NBK - Consultant : ECU]  From June 2010 to Aug. 2011 Working with Al.Majal Al.Arabi Group co. as Site Engineer in Saudi Arabia. Projects I worked in :  The Psychiatric & Addiction Hospitals "200 beds" in Tabuk & Najran [ phase I] :  stages of [excavation, foundations and all skeleton items] for 8 villas [male - female] , 2 buildings of occupational therapy [male - female], main hospital 6000 m2, emergency building, inpatient hostel building & administration building. My Tasks : • Direct construction, operation, and maintenance activities at project site. • Working as QS. Estimate quantities and cost of materials, equipment and manpower to determine project feasibility. • Manage, supervise civil works at site. • Organize the delivery of materials. • Review and follow up the master Project schedule. [ Client : Ministry of Health - Consultant : Abdullah Al.Seif & partners ]  From Aug. 2006 to may 2010 Working with Alexandria Construction co. Talaat Moustafa Group as Site Engineer & QC. Engineer in Egypt, New Cairo. My Tasks : 1. Prepare the work requirements on a daily basis. 2. Monitoring all site activities. 3. Responsible for all executing works at site. 4. supervising subcontractors for all items. 5. Follow up distribution of work to supervisors with manpower. 6. Ensure the execution of work according to quality standards.
  • 4. 4 7. Manage the subcontractor’s performance and quality of work. Project I worked in:  MADINATY [Residential Buildings] : six floors of concrete structure. [ Client : TMG - Consultant : ECG ] IT SKILLS - COURSES  Auto cad [2000-2010] very good user.  Structure analysis program [sap2000] good user.  Very Good user of Microsoft Office [Word – Excel – Power Point-Ms. project].  Proficient user of internet.  Ability to adopt with any software.  PMP Preparation Course [ 35 hours certified by SCE. ] EDUCATION  Faculty of Engineering, Faiyum University – Cairo university branch .  Major: civil structures ,grade: Good.68%  PROJECT: Reinforcement Concrete. grade : Very Good.84%  Graduation Year : May / 2006. TRAINING  With Alexandria Construction co. in concrete structures work. PERSONAL SKILLS  Excelent communication skills.  Ability to solve problems that arise on the site by economic and process of the inexpensive to the contractor and not inconsistent with the rest of the other branches.  Leadership & responsibility for leading and giving technical support to supervisors in the site of the same specialization.  I have experience of managing large construction sites, ideally with experience of structural precast erection. I possessed strong organisational and communication skills together with a good eye for detail and the ability to manage teams. LANGUAGES  Arabic Language "Mother Tongue".  Fluent in English language spoken and written. REFERENCES  All references are available upon your request