- Planning / Scheduling -
- Cost Management -
- Materials Management -
-
-
-
-
Lead Planner
-
-
-
-
-
-
-
-
-
-
Software Designer, Developer and Administrator
-
-
-
-
-
-
-
Acted as Planning Lead for the Project Core Team(s).
Planning and scheduling of new jobs and or added work.
Daily updating and reporting.
Managed 1 or more planners through all phases on the following activities:
Job package development, review, buyoff and distribution.
Assisted in the development of the project work lists.
Materials and Equipment planning, review, buyoff and distribution.
Schedule development, review, buyoff and distribution.
Budget development and submittal.
Planning Status
Materials Management
Cost Management
Project Management
Highly driven Project Management Professional with 15 years experience in the oil & gas industry.
Software Developer June 2015 - February 2016
Private Fleet Backhaul Anderson, Indiana 46013
Performed monitoring and associated maintenance on existing software system.
Designed, developed and rolled out new functionality per request.
Performed maintenance per schedule to existing data back-ends.
Data collection and reporting
Designed, developed and managed local project management tools to include:
Acted as the local admistrator for the Primavera Scheduling tool.
Acted as a local administrator for Valero's corporate planning tool (VTEP).
Designed, developed and maintained new software tool.
Project Management
Planning / Scheduling
Database design, development and management
MS SQL / Visual basic for applications
System Development and implimentation
Areas of Expertise:
Professional Summary:
Experience:
January 2005 - November 2015
Benicia, Ca 94591
Led planning effort on multiple maintenance, turnaround and capital projects.
Valero Refining Company
Joseph Racutt
1518 Applecreek way Anderson, Indiana 46013 / 707-246-4227 / joe@projectservicesplus.com
Turnaround Planning Group
SuperNova Design, Development and Mainenance
Nova Development and Maintenance
Project Controls Lead
-
-
-
-
Materials Manager (1Q11 Plantwide)
-
-
-
-
Planner / Scheduler
-
-
-
-
-
Materials Buyer / Coordinator
-
-
-
-
-
-
General Studies
Project Management Certificate Program
New Horizons Learning
The Turnaround Management Company
Microsoft Projects
Turnaround Planning & Scheduling
Certifications:
Primavera 102 / 106P Primavera
Seattle, Washington 98195
Oak Harbor, Washington 98277
Ensured timely accurate ordering, receiving and distribution of materials.
University of Washington September 2016
Updated schedule and reported status per frequency requirements.
Oak Harbor High School 1991
Ensured timely accurate ordering, receiving and distribution of materials.
Acted as committee lead for materials process development team.
Managed materials receiving and distribution yard(s).
Received materials requests from project planning teams.
Contacted vendors to source materials.
Ordered materials using designated ordering tool (SAP).
Provide other miscellaneous cost and schedule data as requested.
Scheduled and managed deliveries based on specific requirements.
Was responsible for timely ordering and accurate receipt of all required equipment.
Built job packages for every job to be executed during project. This included original and added scope items.
Built individual job as well as overall project schedules using designated scheduling tool (Primavera).
Was responsible for timely ordering and accurate receipt of all required materials / consumables.
Managed material ordering, receipt and distribution for the 2011 plantwide turnaround.
Managed multiple offsite, onsite ordering, receiving and distribution teams / facilities.
Assisted in the development and submittal of project budgets.
Tracked and reported up to date project cost per frequency requirements.
Managed project cost for all turnaround projects.
Education:

More Related Content

What's hot

SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
Senthil Kumar, PMP®
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
Reema
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
Jeanette C. Patindol
 
Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.
TURKI , PMP
 
Enterprise Program Management Office Span of Interest
Enterprise Program Management Office Span of InterestEnterprise Program Management Office Span of Interest
Enterprise Program Management Office Span of Interest
Glen Alleman
 
project portfolio management software
project portfolio management softwareproject portfolio management software
project portfolio management software
Allan Saoke
 
Project Control
Project ControlProject Control
Project Control
Martin Sillaots
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
Agus Suhanto
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
Dejened
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
Imran Jamil
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
Martin Sillaots
 
Primavara
PrimavaraPrimavara
Primavara
danabl
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
Mazhar Poohlah
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
Tùng Trần Thanh
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
Dr. Pramod Deshpande
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
Farhana Rehman
 
Primavera Training P6
Primavera Training P6Primavera Training P6
Primavera Training P6
Suresh G Sankarankutty
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
Joshua Render
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Charlie Jackson
 
Chap09
Chap09Chap09
Chap09
Niki Tabuty
 

What's hot (20)

SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.
 
Enterprise Program Management Office Span of Interest
Enterprise Program Management Office Span of InterestEnterprise Program Management Office Span of Interest
Enterprise Program Management Office Span of Interest
 
project portfolio management software
project portfolio management softwareproject portfolio management software
project portfolio management software
 
Project Control
Project ControlProject Control
Project Control
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
Primavara
PrimavaraPrimavara
Primavara
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Primavera Training P6
Primavera Training P6Primavera Training P6
Primavera Training P6
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
Chap09
Chap09Chap09
Chap09
 

Viewers also liked

Willian de paula convite para os professores
Willian de paula   convite para os professoresWillian de paula   convite para os professores
Willian de paula convite para os professores
André Bathista
 
Agenda sesion nro 2
Agenda  sesion nro 2Agenda  sesion nro 2
Agenda sesion nro 2
rosalba212
 
Ev. modulo
Ev. moduloEv. modulo
Puri anand villas subvention
Puri anand villas subventionPuri anand villas subvention
Puri anand villas subventionlandandhomesncr
 
Long tail
Long tailLong tail
Long tail
Oscar Rincòn
 
302614 me
302614 me302614 me
Presentation1.PPTX
Presentation1.PPTXPresentation1.PPTX
Presentation1.PPTX
jameschloejames
 
Alugo apto tipo kitinete
Alugo apto tipo kitineteAlugo apto tipo kitinete
Alugo apto tipo kitinete
Gil Fichalimpa
 
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
desarrollotrabajadores17
 
En el día de hoy estaremos presentándole la
En el día de hoy estaremos presentándole laEn el día de hoy estaremos presentándole la
En el día de hoy estaremos presentándole la
argelia80
 
Informativo nº 2 4º basico a- 07 de marzo de 2014 (2)
Informativo nº 2  4º basico a- 07 de marzo de 2014 (2)Informativo nº 2  4º basico a- 07 de marzo de 2014 (2)
Informativo nº 2 4º basico a- 07 de marzo de 2014 (2)
Colegio Camilo Henríquez
 
Esquemacontexto mundial de la tecnologia
Esquemacontexto mundial de la tecnologiaEsquemacontexto mundial de la tecnologia
Esquemacontexto mundial de la tecnologia
diegochivi
 
Josefa contexto mundial del tic
Josefa contexto mundial del ticJosefa contexto mundial del tic
Josefa contexto mundial del tic
josefa2014
 
Alugo apto tipo kitinete
Alugo apto tipo kitineteAlugo apto tipo kitinete
Alugo apto tipo kitinete
Gil Fichalimpa
 
Ts103988565
Ts103988565Ts103988565
Ts103988565
UNPRG
 
Sommerhøjskole program 2013
Sommerhøjskole program 2013Sommerhøjskole program 2013
Sommerhøjskole program 2013Tyge Mortensen
 
EDUCAÇÃO TÉCNICA E APRENDIZAGEM
EDUCAÇÃO TÉCNICA E APRENDIZAGEMEDUCAÇÃO TÉCNICA E APRENDIZAGEM
EDUCAÇÃO TÉCNICA E APRENDIZAGEM
SUPORTE EDUCACIONAL
 

Viewers also liked (20)

Willian de paula convite para os professores
Willian de paula   convite para os professoresWillian de paula   convite para os professores
Willian de paula convite para os professores
 
Agenda sesion nro 2
Agenda  sesion nro 2Agenda  sesion nro 2
Agenda sesion nro 2
 
Ev. modulo
Ev. moduloEv. modulo
Ev. modulo
 
Puri anand villas subvention
Puri anand villas subventionPuri anand villas subvention
Puri anand villas subvention
 
Long tail
Long tailLong tail
Long tail
 
302614 me
302614 me302614 me
302614 me
 
Pancasila dalam bahasa muna
Pancasila dalam bahasa munaPancasila dalam bahasa muna
Pancasila dalam bahasa muna
 
Presentation1.PPTX
Presentation1.PPTXPresentation1.PPTX
Presentation1.PPTX
 
Alugo apto tipo kitinete
Alugo apto tipo kitineteAlugo apto tipo kitinete
Alugo apto tipo kitinete
 
Doc1
Doc1Doc1
Doc1
 
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
Gane un ingreso extra Massive Como Coach Realtor
 
En el día de hoy estaremos presentándole la
En el día de hoy estaremos presentándole laEn el día de hoy estaremos presentándole la
En el día de hoy estaremos presentándole la
 
950,00 tenho kitinete
950,00   tenho kitinete950,00   tenho kitinete
950,00 tenho kitinete
 
Informativo nº 2 4º basico a- 07 de marzo de 2014 (2)
Informativo nº 2  4º basico a- 07 de marzo de 2014 (2)Informativo nº 2  4º basico a- 07 de marzo de 2014 (2)
Informativo nº 2 4º basico a- 07 de marzo de 2014 (2)
 
Esquemacontexto mundial de la tecnologia
Esquemacontexto mundial de la tecnologiaEsquemacontexto mundial de la tecnologia
Esquemacontexto mundial de la tecnologia
 
Josefa contexto mundial del tic
Josefa contexto mundial del ticJosefa contexto mundial del tic
Josefa contexto mundial del tic
 
Alugo apto tipo kitinete
Alugo apto tipo kitineteAlugo apto tipo kitinete
Alugo apto tipo kitinete
 
Ts103988565
Ts103988565Ts103988565
Ts103988565
 
Sommerhøjskole program 2013
Sommerhøjskole program 2013Sommerhøjskole program 2013
Sommerhøjskole program 2013
 
EDUCAÇÃO TÉCNICA E APRENDIZAGEM
EDUCAÇÃO TÉCNICA E APRENDIZAGEMEDUCAÇÃO TÉCNICA E APRENDIZAGEM
EDUCAÇÃO TÉCNICA E APRENDIZAGEM
 

Similar to Resume_Joe_Racutt

Advanced program management resource, content and knowledge management
Advanced program management   resource, content and knowledge managementAdvanced program management   resource, content and knowledge management
Advanced program management resource, content and knowledge management
Marcus Vannini
 
Judy Stewart - Resume
Judy Stewart - ResumeJudy Stewart - Resume
Judy Stewart - Resume
Judy Stewart
 
Tracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation ProjectsTracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation Projects
Saiff Solutions, Inc.
 
Sandesh_Resume
Sandesh_ResumeSandesh_Resume
Sandesh_Resume
Sandesh Kadam
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
Christina R
 
Resume_Abu_Sufian May 25 2016
Resume_Abu_Sufian May 25 2016Resume_Abu_Sufian May 25 2016
Resume_Abu_Sufian May 25 2016
Abu Sufian
 
ron_petrola_cv_27Sep2015
ron_petrola_cv_27Sep2015ron_petrola_cv_27Sep2015
ron_petrola_cv_27Sep2015
Ronald Petrola
 
Noah Chiu Resume
Noah Chiu ResumeNoah Chiu Resume
Noah Chiu Resume
Noah Chiu
 
Carol Norman Resume 07-21-16
Carol Norman Resume 07-21-16Carol Norman Resume 07-21-16
Carol Norman Resume 07-21-16
Carol Norman
 
The project plan
The project planThe project plan
The project plan
VatsalaPG
 
Gitanjali - SAP (MM)
Gitanjali - SAP (MM)Gitanjali - SAP (MM)
Gitanjali - SAP (MM)
Gitanjali Govindan
 
Production and planning control
Production  and planning controlProduction  and planning control
Production and planning control
সারন দাস
 
Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1
Fekadu Ambissa
 
Logistics analyst
Logistics analystLogistics analyst
Logistics analyst
Fekadu Ambissa
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
Suzanne Pearce
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinator
James Dahlberg
 
Kanchan_Chivate_Resume V3
Kanchan_Chivate_Resume V3Kanchan_Chivate_Resume V3
Kanchan_Chivate_Resume V3
Kanchan S Chivate
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
Roshanak Jalili
 
Magendran New Resume
Magendran New ResumeMagendran New Resume
Magendran New Resume
Magendran Pandiyan
 
Resouces.pdf
Resouces.pdfResouces.pdf
Resouces.pdf
VineethNair54
 

Similar to Resume_Joe_Racutt (20)

Advanced program management resource, content and knowledge management
Advanced program management   resource, content and knowledge managementAdvanced program management   resource, content and knowledge management
Advanced program management resource, content and knowledge management
 
Judy Stewart - Resume
Judy Stewart - ResumeJudy Stewart - Resume
Judy Stewart - Resume
 
Tracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation ProjectsTracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation Projects
 
Sandesh_Resume
Sandesh_ResumeSandesh_Resume
Sandesh_Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Resume_Abu_Sufian May 25 2016
Resume_Abu_Sufian May 25 2016Resume_Abu_Sufian May 25 2016
Resume_Abu_Sufian May 25 2016
 
ron_petrola_cv_27Sep2015
ron_petrola_cv_27Sep2015ron_petrola_cv_27Sep2015
ron_petrola_cv_27Sep2015
 
Noah Chiu Resume
Noah Chiu ResumeNoah Chiu Resume
Noah Chiu Resume
 
Carol Norman Resume 07-21-16
Carol Norman Resume 07-21-16Carol Norman Resume 07-21-16
Carol Norman Resume 07-21-16
 
The project plan
The project planThe project plan
The project plan
 
Gitanjali - SAP (MM)
Gitanjali - SAP (MM)Gitanjali - SAP (MM)
Gitanjali - SAP (MM)
 
Production and planning control
Production  and planning controlProduction  and planning control
Production and planning control
 
Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1
 
Logistics analyst
Logistics analystLogistics analyst
Logistics analyst
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinator
 
Kanchan_Chivate_Resume V3
Kanchan_Chivate_Resume V3Kanchan_Chivate_Resume V3
Kanchan_Chivate_Resume V3
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
Magendran New Resume
Magendran New ResumeMagendran New Resume
Magendran New Resume
 
Resouces.pdf
Resouces.pdfResouces.pdf
Resouces.pdf
 

Resume_Joe_Racutt

  • 1. - - - Planning / Scheduling - - Cost Management - - Materials Management - - - - - Lead Planner - - - - - - - - - - Software Designer, Developer and Administrator - - - - - - - Acted as Planning Lead for the Project Core Team(s). Planning and scheduling of new jobs and or added work. Daily updating and reporting. Managed 1 or more planners through all phases on the following activities: Job package development, review, buyoff and distribution. Assisted in the development of the project work lists. Materials and Equipment planning, review, buyoff and distribution. Schedule development, review, buyoff and distribution. Budget development and submittal. Planning Status Materials Management Cost Management Project Management Highly driven Project Management Professional with 15 years experience in the oil & gas industry. Software Developer June 2015 - February 2016 Private Fleet Backhaul Anderson, Indiana 46013 Performed monitoring and associated maintenance on existing software system. Designed, developed and rolled out new functionality per request. Performed maintenance per schedule to existing data back-ends. Data collection and reporting Designed, developed and managed local project management tools to include: Acted as the local admistrator for the Primavera Scheduling tool. Acted as a local administrator for Valero's corporate planning tool (VTEP). Designed, developed and maintained new software tool. Project Management Planning / Scheduling Database design, development and management MS SQL / Visual basic for applications System Development and implimentation Areas of Expertise: Professional Summary: Experience: January 2005 - November 2015 Benicia, Ca 94591 Led planning effort on multiple maintenance, turnaround and capital projects. Valero Refining Company Joseph Racutt 1518 Applecreek way Anderson, Indiana 46013 / 707-246-4227 / joe@projectservicesplus.com Turnaround Planning Group SuperNova Design, Development and Mainenance Nova Development and Maintenance
  • 2. Project Controls Lead - - - - Materials Manager (1Q11 Plantwide) - - - - Planner / Scheduler - - - - - Materials Buyer / Coordinator - - - - - - General Studies Project Management Certificate Program New Horizons Learning The Turnaround Management Company Microsoft Projects Turnaround Planning & Scheduling Certifications: Primavera 102 / 106P Primavera Seattle, Washington 98195 Oak Harbor, Washington 98277 Ensured timely accurate ordering, receiving and distribution of materials. University of Washington September 2016 Updated schedule and reported status per frequency requirements. Oak Harbor High School 1991 Ensured timely accurate ordering, receiving and distribution of materials. Acted as committee lead for materials process development team. Managed materials receiving and distribution yard(s). Received materials requests from project planning teams. Contacted vendors to source materials. Ordered materials using designated ordering tool (SAP). Provide other miscellaneous cost and schedule data as requested. Scheduled and managed deliveries based on specific requirements. Was responsible for timely ordering and accurate receipt of all required equipment. Built job packages for every job to be executed during project. This included original and added scope items. Built individual job as well as overall project schedules using designated scheduling tool (Primavera). Was responsible for timely ordering and accurate receipt of all required materials / consumables. Managed material ordering, receipt and distribution for the 2011 plantwide turnaround. Managed multiple offsite, onsite ordering, receiving and distribution teams / facilities. Assisted in the development and submittal of project budgets. Tracked and reported up to date project cost per frequency requirements. Managed project cost for all turnaround projects. Education: