SlideShare a Scribd company logo
戚志揚 Male
Current Company: Huawei Tech
Current Title: Contract
Coordinator
Year to work: 9 Years
Personal Information
Age: 35 Marital Status: Married
Mobile: 18680309132 Email: walktedium@gmail.com
Nationality: China Hukou:
Work Experience
2015.12-Now HUAWEI TECH INVESTMENT CO LIMITED
Industry: Communications (Equipment/Sales/Value-Added)
Contract coordinator 2015.12-Now
Company Locations: SHENZHEN
Subordinate: 2
Responsibilities: 1. North Africa contract end-to-end management
a. deliver equipment to over 20 countries in North African
b. OTD (on-time deliver) rate over 90%
2. Develop material forecast model for all oversea countries
a. Improve accuracy rate from 86% to 95%
3. Build an overall material and equipment mapping and pre-alarm system to
make sure delivery
4. Overall north Africa revenue increased 45%
2013.01-2015.11 foxconn
Industry: Computer Hardware/Network Equipment
Production & Planning section manager 2013.01-2015.11
Company Locations: SHENZHEN
Department: Planning Dept.
Subordinate: 29
Responsibilities: 2013.01 ~ 2013.12 : Production control supervisor in Shenzhen.
2013.12 ~ 2014.12 : Planning section manager in Shenzhen.
(Including production control, material control, delivery control,
logistic)
2014.12 ~ Now : System integration and material control section manager in
NanNing.
1. Lean production integration ( minimize production and material
leading time)
a. build up a integrated system to monitor material flow, material full-kit and
production schedule.
b. build up a dispatching system for SMT (26 lines in ShenZhen and 20 lines in
NanNing)
c. set up a pre-alarm system to check the production system
d. push Turnkey material project ( 60% material from consignment to Turnkey)
to minimize the material leading time
2. Production control for on time delivery (OTD) -- Keep 95%
a. Working orders scheduling for order fulfillment
b. build an overall capacity model in 4 sites
c. build mechanism for outsourcing and balance the factory loading between 6
sites
3. Material control -- full kits rate keeps 96% in 6 months.
a. review material status (consign, buy-sell, turnkey) for working orders full kit
b. set up a pre-alarm mechanism for consign material
c. co-work with buyer and PM/PC to commit the material status
d. review S/D report and waterfall report to confirm the long-term material
status
4. Logistic – reduce 15% logistic cost
a. Build the optimized logistic network between Shenzen, Nanning and
Hangzhou
b. Reduced 16% logistic cost in Shenzen
c. Optimize the logistic flow in Nanning
5. Cycle time reduction – reduced 29% ( 7 days to 5 days, )
a. adjust the line balance ( SMT, PTH, Assembly)
b. set-up a reasonable WIP buffer
c. Change the material plan model
2011.02-2012.12 Youthought
Industry: Professional Services (Consult/Accounting/Legal/Translate)
Project manager 2011.02-2012.12
Company Locations: TAIWAN
Subordinate: 2
Responsibilities: 1. Develop data mining algorithms to deal with big data issue
2. Implement lean production in 2 fabs in Singapore
3. Consulted for one 300 nm fab in Taiwan to reduce 13% cycle time in 3
months (2012)
4. Consulted for hot lot turn rate improvement project in one 300 nm fab in
Taiwan (2012)
5. Build WPH model for all machine type in one 300 nm fab in Taiwan (2012)
6. Consulted for a 8” fab in Singapore to reduce 13% cycle time (2011)
7. Consulted for demand forecasting for selling of a PCB company in Taiwan
(2011)
8. Consulted for a 8” fab in Taiwan to build hot lot impact and WIP segment
system (2011)
2007.08-2011.01 tsmc
Industry: Electronics/Microelectronics
Manufacturing supervisor 2007.08-2011.01
Company Locations: TAIWAN
Subordinate: 70
Responsibilities: 1. Analysis the scanner tool operations to reduce 25% machine loss in a 8” fab
in Taiwan (2010)
2. Build a specific tool monitor team in a 8” fab in Taiwan to increase 10%
people productivity (2009)
3. Daily operations
3.1 Monitor and set WIP profile in a 8” fab in Taiwan
3.2 Monthly cross fabs capacity model
3.3 Tool PM arrangement
Educational Experience
National Tsing Hua University (2004.09 - 2006.07)
Major: Industrial Engineering Degree: Master Full-time school: Yes
National Cheng Kung University (2000.09 - 2004.07)
Major: Industrial Engineering Degree: Bachelor Full-time school: Yes
Language Ability
English、Mandarin

More Related Content

Viewers also liked

Los números naturales
Los números naturalesLos números naturales
Los números naturales
eliatencio
 
Smartphone mas vendidos en 2012
Smartphone mas vendidos en 2012Smartphone mas vendidos en 2012
Smartphone mas vendidos en 2012
alexismartinezg95
 
Seguridad en las redes sociales en el escenario
Seguridad en las redes sociales en el escenarioSeguridad en las redes sociales en el escenario
Seguridad en las redes sociales en el escenario
Turvovictor
 
Autoestima 1
Autoestima 1Autoestima 1
Autoestima 1
jackysosa
 
Drivermax
DrivermaxDrivermax
Drivermax
Charal Remuraxy
 
Grupo 11 Localización 1 trabajo.
Grupo 11 Localización 1 trabajo.Grupo 11 Localización 1 trabajo.
Grupo 11 Localización 1 trabajo.Ian Vila Jofré
 
La gran cierva.
La gran cierva.La gran cierva.
La gran cierva.
Paky Delgado
 
Parcial 2 000107748 000323422
Parcial 2 000107748 000323422Parcial 2 000107748 000323422
Parcial 2 000107748 000323422
Manu Giraldo
 
Aprendizaje colaborativo
Aprendizaje colaborativoAprendizaje colaborativo
Aprendizaje colaborativo
Dey Jara
 
Trabajo 2 periodo
Trabajo 2 periodoTrabajo 2 periodo
Trabajo 2 periodo
lacatorce
 
Interconectados (1)
Interconectados (1)Interconectados (1)
Interconectados (1)
Mica Bustamante
 
TIPOS DE REDES
TIPOS DE REDESTIPOS DE REDES
TIPOS DE REDES
I.E.S.T.P. "TRUJILLO"
 
Ejemplo prueba 1
Ejemplo prueba 1Ejemplo prueba 1
Ejemplo prueba 1
adilenerique
 
Trabajo final_diseno_proyectos
Trabajo final_diseno_proyectosTrabajo final_diseno_proyectos
Trabajo final_diseno_proyectos
ariasf2000
 
Sismos
SismosSismos
Sismos
dansab200
 
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
OpinionWay
 
Resultados encuesta
Resultados encuestaResultados encuesta
Resultados encuesta
angelmancasa
 
Mendoza angelo presentacion informatica
Mendoza angelo presentacion informaticaMendoza angelo presentacion informatica
Mendoza angelo presentacion informatica
AngeloMendoza3
 
E book-modif baja-reso
E book-modif baja-resoE book-modif baja-reso
E book-modif baja-reso
paulinho87
 
Abel cortese enciclopedia de-desarrollo_personal_parte1
Abel cortese   enciclopedia de-desarrollo_personal_parte1Abel cortese   enciclopedia de-desarrollo_personal_parte1
Abel cortese enciclopedia de-desarrollo_personal_parte1
mlagos01
 

Viewers also liked (20)

Los números naturales
Los números naturalesLos números naturales
Los números naturales
 
Smartphone mas vendidos en 2012
Smartphone mas vendidos en 2012Smartphone mas vendidos en 2012
Smartphone mas vendidos en 2012
 
Seguridad en las redes sociales en el escenario
Seguridad en las redes sociales en el escenarioSeguridad en las redes sociales en el escenario
Seguridad en las redes sociales en el escenario
 
Autoestima 1
Autoestima 1Autoestima 1
Autoestima 1
 
Drivermax
DrivermaxDrivermax
Drivermax
 
Grupo 11 Localización 1 trabajo.
Grupo 11 Localización 1 trabajo.Grupo 11 Localización 1 trabajo.
Grupo 11 Localización 1 trabajo.
 
La gran cierva.
La gran cierva.La gran cierva.
La gran cierva.
 
Parcial 2 000107748 000323422
Parcial 2 000107748 000323422Parcial 2 000107748 000323422
Parcial 2 000107748 000323422
 
Aprendizaje colaborativo
Aprendizaje colaborativoAprendizaje colaborativo
Aprendizaje colaborativo
 
Trabajo 2 periodo
Trabajo 2 periodoTrabajo 2 periodo
Trabajo 2 periodo
 
Interconectados (1)
Interconectados (1)Interconectados (1)
Interconectados (1)
 
TIPOS DE REDES
TIPOS DE REDESTIPOS DE REDES
TIPOS DE REDES
 
Ejemplo prueba 1
Ejemplo prueba 1Ejemplo prueba 1
Ejemplo prueba 1
 
Trabajo final_diseno_proyectos
Trabajo final_diseno_proyectosTrabajo final_diseno_proyectos
Trabajo final_diseno_proyectos
 
Sismos
SismosSismos
Sismos
 
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
Keyneosoft - Tous commerçants, les Français se rêvent directeurs de magasins ...
 
Resultados encuesta
Resultados encuestaResultados encuesta
Resultados encuesta
 
Mendoza angelo presentacion informatica
Mendoza angelo presentacion informaticaMendoza angelo presentacion informatica
Mendoza angelo presentacion informatica
 
E book-modif baja-reso
E book-modif baja-resoE book-modif baja-reso
E book-modif baja-reso
 
Abel cortese enciclopedia de-desarrollo_personal_parte1
Abel cortese   enciclopedia de-desarrollo_personal_parte1Abel cortese   enciclopedia de-desarrollo_personal_parte1
Abel cortese enciclopedia de-desarrollo_personal_parte1
 

Similar to Resume_戚志揚20160926

Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
mattinsonjanel
 
Hakkache mohamed 202111
Hakkache mohamed 202111Hakkache mohamed 202111
Hakkache mohamed 202111
HAKKACHE Mohamed
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
5Asdfghjkl
 
LinggamResume2015M
LinggamResume2015MLinggamResume2015M
LinggamResume2015M
Linggam Narayanasamy
 
Resume_Damian
Resume_DamianResume_Damian
Resume_Damian
Damian Denis
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
Sagar Sangam Sahu
 
CURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latestCURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latest
Sreetharan Govindan
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
Nantha Kumaran
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
Byron Pang
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
petemail2k
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
Krishnan Virachami
 
Tolling group leader Positions
Tolling group leader PositionsTolling group leader Positions
Tolling group leader Positions
Weidong Ping
 
GB-DMAIC One-Pager Summary
GB-DMAIC One-Pager  SummaryGB-DMAIC One-Pager  Summary
GB-DMAIC One-Pager Summary
Mo'ath Thwapiah
 
Bader Al-Kaabi C.V
Bader Al-Kaabi C.VBader Al-Kaabi C.V
Bader Al-Kaabi C.V
Bader Al-Kaabi
 
REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015
Michel Reynaud, PMP
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
Sean Hedden
 
CV-EugeneChan-Jul2015
CV-EugeneChan-Jul2015CV-EugeneChan-Jul2015
CV-EugeneChan-Jul2015
Eugene Chan
 
CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
S.M. Jakir Hossain
 
CV_Tushar Bari__Aug 2015.txt
CV_Tushar Bari__Aug  2015.txtCV_Tushar Bari__Aug  2015.txt
CV_Tushar Bari__Aug 2015.txt
Tushar Bari
 
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by WeboniseInside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
Webonise Lab
 

Similar to Resume_戚志揚20160926 (20)

Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
 
Hakkache mohamed 202111
Hakkache mohamed 202111Hakkache mohamed 202111
Hakkache mohamed 202111
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
LinggamResume2015M
LinggamResume2015MLinggamResume2015M
LinggamResume2015M
 
Resume_Damian
Resume_DamianResume_Damian
Resume_Damian
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
CURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latestCURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latest
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Tolling group leader Positions
Tolling group leader PositionsTolling group leader Positions
Tolling group leader Positions
 
GB-DMAIC One-Pager Summary
GB-DMAIC One-Pager  SummaryGB-DMAIC One-Pager  Summary
GB-DMAIC One-Pager Summary
 
Bader Al-Kaabi C.V
Bader Al-Kaabi C.VBader Al-Kaabi C.V
Bader Al-Kaabi C.V
 
REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
CV-EugeneChan-Jul2015
CV-EugeneChan-Jul2015CV-EugeneChan-Jul2015
CV-EugeneChan-Jul2015
 
CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
 
CV_Tushar Bari__Aug 2015.txt
CV_Tushar Bari__Aug  2015.txtCV_Tushar Bari__Aug  2015.txt
CV_Tushar Bari__Aug 2015.txt
 
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by WeboniseInside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
Inside 6 Dimensional Model for Industry 4.0 Smart Factory by Webonise
 

Resume_戚志揚20160926

  • 1. 戚志揚 Male Current Company: Huawei Tech Current Title: Contract Coordinator Year to work: 9 Years Personal Information Age: 35 Marital Status: Married Mobile: 18680309132 Email: walktedium@gmail.com Nationality: China Hukou: Work Experience 2015.12-Now HUAWEI TECH INVESTMENT CO LIMITED Industry: Communications (Equipment/Sales/Value-Added) Contract coordinator 2015.12-Now Company Locations: SHENZHEN Subordinate: 2 Responsibilities: 1. North Africa contract end-to-end management a. deliver equipment to over 20 countries in North African b. OTD (on-time deliver) rate over 90% 2. Develop material forecast model for all oversea countries a. Improve accuracy rate from 86% to 95% 3. Build an overall material and equipment mapping and pre-alarm system to make sure delivery 4. Overall north Africa revenue increased 45% 2013.01-2015.11 foxconn Industry: Computer Hardware/Network Equipment Production & Planning section manager 2013.01-2015.11 Company Locations: SHENZHEN Department: Planning Dept. Subordinate: 29 Responsibilities: 2013.01 ~ 2013.12 : Production control supervisor in Shenzhen. 2013.12 ~ 2014.12 : Planning section manager in Shenzhen. (Including production control, material control, delivery control, logistic)
  • 2. 2014.12 ~ Now : System integration and material control section manager in NanNing. 1. Lean production integration ( minimize production and material leading time) a. build up a integrated system to monitor material flow, material full-kit and production schedule. b. build up a dispatching system for SMT (26 lines in ShenZhen and 20 lines in NanNing) c. set up a pre-alarm system to check the production system d. push Turnkey material project ( 60% material from consignment to Turnkey) to minimize the material leading time 2. Production control for on time delivery (OTD) -- Keep 95% a. Working orders scheduling for order fulfillment b. build an overall capacity model in 4 sites c. build mechanism for outsourcing and balance the factory loading between 6 sites 3. Material control -- full kits rate keeps 96% in 6 months. a. review material status (consign, buy-sell, turnkey) for working orders full kit b. set up a pre-alarm mechanism for consign material c. co-work with buyer and PM/PC to commit the material status d. review S/D report and waterfall report to confirm the long-term material status 4. Logistic – reduce 15% logistic cost a. Build the optimized logistic network between Shenzen, Nanning and Hangzhou b. Reduced 16% logistic cost in Shenzen c. Optimize the logistic flow in Nanning 5. Cycle time reduction – reduced 29% ( 7 days to 5 days, ) a. adjust the line balance ( SMT, PTH, Assembly) b. set-up a reasonable WIP buffer c. Change the material plan model 2011.02-2012.12 Youthought Industry: Professional Services (Consult/Accounting/Legal/Translate) Project manager 2011.02-2012.12 Company Locations: TAIWAN Subordinate: 2 Responsibilities: 1. Develop data mining algorithms to deal with big data issue 2. Implement lean production in 2 fabs in Singapore 3. Consulted for one 300 nm fab in Taiwan to reduce 13% cycle time in 3 months (2012) 4. Consulted for hot lot turn rate improvement project in one 300 nm fab in Taiwan (2012) 5. Build WPH model for all machine type in one 300 nm fab in Taiwan (2012)
  • 3. 6. Consulted for a 8” fab in Singapore to reduce 13% cycle time (2011) 7. Consulted for demand forecasting for selling of a PCB company in Taiwan (2011) 8. Consulted for a 8” fab in Taiwan to build hot lot impact and WIP segment system (2011) 2007.08-2011.01 tsmc Industry: Electronics/Microelectronics Manufacturing supervisor 2007.08-2011.01 Company Locations: TAIWAN Subordinate: 70 Responsibilities: 1. Analysis the scanner tool operations to reduce 25% machine loss in a 8” fab in Taiwan (2010) 2. Build a specific tool monitor team in a 8” fab in Taiwan to increase 10% people productivity (2009) 3. Daily operations 3.1 Monitor and set WIP profile in a 8” fab in Taiwan 3.2 Monthly cross fabs capacity model 3.3 Tool PM arrangement Educational Experience National Tsing Hua University (2004.09 - 2006.07) Major: Industrial Engineering Degree: Master Full-time school: Yes National Cheng Kung University (2000.09 - 2004.07) Major: Industrial Engineering Degree: Bachelor Full-time school: Yes Language Ability English、Mandarin