Matt Tomor
2331 Brookhaven Pass,Vista, CA 92081
(760) 330-7232 mbtomor@gmail.com
_____________________________________________________________________________________
SUMMARY
Senior level Electronics Engineer with over ten years of experience in the field of hardware
design. Highly motivated self-starter, with excellent communication skills, and work well in
team environments. Creative problem solver with an ability to see the big picture of how a
system needs to operate, and the skills to work on the little details to make sure the project is
successful. Able to handle multiple projects simultaneously, and ensure they are completed
on time.
EXPERIENCE
Cummins-Allison Corporation. (San Diego Research Group) August 2005-Present
Senior Electronics Engineer Carlsbad, CA
ď‚· Project Manager for magnetic imaging sensor. started with a concept, designed
the electronics, tested the system, and moved it to production overseas.
ď‚· Develop sensor technologies (including, but not limited to optical, magnetic,
ultrasonic, capacitive, and mechanical-electrical) for use in denominating and
authenticating currencies around the world.
ď‚· Designed, assembled, and tested a high resolution scanner for banknotes. Federal
agencies were so impressed by this forensic tool, they purchased the system.
ď‚· Work with scientists to develop the sensors, design, test, and troubleshoot any
hardware required. Collaborate with mechanical engineers to ensure all space and
thermal requirements are met, and with software engineers to develop software
specs.
ď‚· Design, write, and modify software/firmware for embedded applications using C
programming language, and program devices. Created interfaces for data
acquisition systems to display data visually on a PC.
ď‚· Develop test fixtures for forensic experiments and extended testing of sensor
systems to ensure performance and reliability. This includes forensic equipment
that is used to detect the differences between authentic and counterfeit currencies.
ď‚· Train new employees with procedures and skills so they can be productive
members of the team.
ď‚· Design mixed signal circuits consisting of analog front ends coupled with ARM,
PIC, or Motorola microcontrollers, TI DSP’s, and/or Altera FPGA’s. Created
optical imaging system for obtaining banknote images at rates as high as 2000
notes per minute.
 Develop custom PCB’s using schematics following proper signal integrity rules.
Identify which rules are most important if rules conflict to ensure design works as
expected.
ď‚· Specify components for board level designs, and equipment required for testing
and successful completion of projects.
Matt Tomor
2331 Brookhaven Pass,Vista, CA 92081
(760) 330-7232 mbtomor@gmail.com
ď‚· Designed, developed, and implemented a custom database that merges E-CAD
libraries with physical inventory. This database streamlined parts ordering for
new designs, and saves hours on each design.
ď‚· Able to solder, assemble, and rework fine pitch surface mount components.
Capable of modifying circuits to change parameters, or for alternate applications.
ď‚· Write reports documenting progress, and present data to upper management. This
includes analyzing data, creating bill of materials, and comparing performance
against alternate approaches.
Inter-Tel (Consultant) September 2004-March 2005
Test Engineer Chandler, AZ
ď‚· Created and updated test cases for new products to ensure proper performance.
This involved coming up with unlikely scenarios and testing them. If the scenario
caused a problem with the system, a new test case was developed to make sure the
problem was not repeated in the future.
ď‚· Tested new hardware and software for advanced business telephone networking
systems. Equipment tested included call processing hardware, digital key sets,
and IP phones.
ď‚· Utilized custom database programming software in a Linux environment.
ď‚· Provided detailed reports reviewing any imperfections found during tests.
ď‚· Worked with Senior Developers to create solutions to problems.
SKILLS
Hardware
Oscilloscopes AC/DC Circuit Analysis Embedded Microprocessors
Function Generators Analog Signal Processing Analog Control Systems
Digital Multimeters Digital Signal Processing Digital Controls Systems
Spectrum Analyzers CPLD FPGA
Software
Windows XP/7 Microsoft Project PADS C / C++
Microsoft Office Multisim Matlab Java
Microsoft Visio Altium Designer Labview Assembly
Visual Basic SQL Linux
EDUCATION
Bachelor of Science in Computer Engineering Technology
DeVry University President's List October 2014
Bachelor of Science in Electronics Engineering Technology
DeVry University President's List June 2004

Resume SrEE

  • 1.
    Matt Tomor 2331 BrookhavenPass,Vista, CA 92081 (760) 330-7232 mbtomor@gmail.com _____________________________________________________________________________________ SUMMARY Senior level Electronics Engineer with over ten years of experience in the field of hardware design. Highly motivated self-starter, with excellent communication skills, and work well in team environments. Creative problem solver with an ability to see the big picture of how a system needs to operate, and the skills to work on the little details to make sure the project is successful. Able to handle multiple projects simultaneously, and ensure they are completed on time. EXPERIENCE Cummins-Allison Corporation. (San Diego Research Group) August 2005-Present Senior Electronics Engineer Carlsbad, CA  Project Manager for magnetic imaging sensor. started with a concept, designed the electronics, tested the system, and moved it to production overseas.  Develop sensor technologies (including, but not limited to optical, magnetic, ultrasonic, capacitive, and mechanical-electrical) for use in denominating and authenticating currencies around the world.  Designed, assembled, and tested a high resolution scanner for banknotes. Federal agencies were so impressed by this forensic tool, they purchased the system.  Work with scientists to develop the sensors, design, test, and troubleshoot any hardware required. Collaborate with mechanical engineers to ensure all space and thermal requirements are met, and with software engineers to develop software specs.  Design, write, and modify software/firmware for embedded applications using C programming language, and program devices. Created interfaces for data acquisition systems to display data visually on a PC.  Develop test fixtures for forensic experiments and extended testing of sensor systems to ensure performance and reliability. This includes forensic equipment that is used to detect the differences between authentic and counterfeit currencies.  Train new employees with procedures and skills so they can be productive members of the team.  Design mixed signal circuits consisting of analog front ends coupled with ARM, PIC, or Motorola microcontrollers, TI DSP’s, and/or Altera FPGA’s. Created optical imaging system for obtaining banknote images at rates as high as 2000 notes per minute.  Develop custom PCB’s using schematics following proper signal integrity rules. Identify which rules are most important if rules conflict to ensure design works as expected.  Specify components for board level designs, and equipment required for testing and successful completion of projects.
  • 2.
    Matt Tomor 2331 BrookhavenPass,Vista, CA 92081 (760) 330-7232 mbtomor@gmail.com ď‚· Designed, developed, and implemented a custom database that merges E-CAD libraries with physical inventory. This database streamlined parts ordering for new designs, and saves hours on each design. ď‚· Able to solder, assemble, and rework fine pitch surface mount components. Capable of modifying circuits to change parameters, or for alternate applications. ď‚· Write reports documenting progress, and present data to upper management. This includes analyzing data, creating bill of materials, and comparing performance against alternate approaches. Inter-Tel (Consultant) September 2004-March 2005 Test Engineer Chandler, AZ ď‚· Created and updated test cases for new products to ensure proper performance. This involved coming up with unlikely scenarios and testing them. If the scenario caused a problem with the system, a new test case was developed to make sure the problem was not repeated in the future. ď‚· Tested new hardware and software for advanced business telephone networking systems. Equipment tested included call processing hardware, digital key sets, and IP phones. ď‚· Utilized custom database programming software in a Linux environment. ď‚· Provided detailed reports reviewing any imperfections found during tests. ď‚· Worked with Senior Developers to create solutions to problems. SKILLS Hardware Oscilloscopes AC/DC Circuit Analysis Embedded Microprocessors Function Generators Analog Signal Processing Analog Control Systems Digital Multimeters Digital Signal Processing Digital Controls Systems Spectrum Analyzers CPLD FPGA Software Windows XP/7 Microsoft Project PADS C / C++ Microsoft Office Multisim Matlab Java Microsoft Visio Altium Designer Labview Assembly Visual Basic SQL Linux EDUCATION Bachelor of Science in Computer Engineering Technology DeVry University President's List October 2014 Bachelor of Science in Electronics Engineering Technology DeVry University President's List June 2004