SlideShare a Scribd company logo
Anmol Rattan Singh Shergill
4500 Cass Ave, Apt 1115, Detroit, MI 48201
M: +1 (313) 412-0607 Email: anmolshergill9400@gmail.com
OBJECTIVE
To work in a challenging and a fast paced environment and contribute to the success of the business goals of the
organization by leveraging my knowledge and to grow with the organization.
PROFESSIONAL SUMMARY
 Verification and validation experience for component level, sub-system, bench level as well as vehicle level testing
 Test execution over CAN tool Vehicle Spy3.2 (Neovi) & MOST tools
 On Board Diagnostics services and DTC, PID/DID verification.
 Diagnostic of HMI’s and head unit.
 Process used DFMEA,FMEA Bug Life Cycle, Bill Of Material and DOORS.
 Black Box testing, Test case analysis and writing test cases.
 Wiring harness design and development to create and work with electrical schematics.
 Automotive electrical testing,diagnostic , debugging and wiring installation.
 Battery testing for automotives and Hybrid automotives. Rotating devices using Dynamometers.
 In-depth knowledge of wiring interconnects inside automotives and schematics
 Designed, Developed and implemented in electric distribution system
EXPERIENCE
Infotainment Test Engineer(Trainee) Pi Square Tech, Farmington Hills May 2016- present
 Verification and validation experience for component level, sub-system, bench level as well as vehicle level testing.
 Requirement analysis, Test plan creation, script writing, updating Test cases, logging defects and re-verification
 Test execution over CAN tool Vehicle Spy3.2 (Neovi) & MOST tools
 On Board Diagnostics services and DTC, PID/DID verification.
 “Effective Root cause analysis” expertise with analytical ability to solve complex problems.
 Black Box testing for infotainment modules.
 Test Case Analysis and Diagnostic for in vehicle infotainment system.
 Testing Navigation, Bluetooth, Wi-fi using different testing techniques.
 Diagnostic of HMI’s and head unit.
 Diagnostic of vehicle communication systems using protocols CAN/LIN and MOST
 Identify software bugs during software execution and reporting to software development team by using bug life
cycle tools like JIRA
 Process used DFMEA, FMEA Bug Life Cycle And Bill Of Material.
 Requirements management tool such as IBM DOORS.
Assistant Electric Engineer Harpal Auto Electric, Ludhiana, PB May 2013 – Nov 2013
 Wiring harness design and development to create and work with electrical schematics.
 Perform responsibilities of testing automotive electrical power system components by using standard software and
test tools.
 Extensive electrical testing,diagnostic ,debugging and wiring installation experience for Hyundai, Ford, Toyota,
Honda and Maruti Suzuki models. Responsibilities of analyzing wiring and component parts of vehicle
 Establish statistical confidence by identifying sample size and acceptable error; determining levels of confidence.
 In-depth knowledge of wiring interconnects inside automotives and schematics..
Electrical Maintenance Engineer Bright Industries Mar 2011- Mar 2013
 Responsible for installation, maintenance, repairs and testing for manufacturer and supplier unit
 Assisted in upgrading and installation of various machines.
 Testing of power produced by motors (1/2 horse power -16 horse power) and other rotating devices using
Dynamometers.
 Responsible for components performance and functioning.
 Developed sampling plans by applying attribute, variable, and sequential sampling methods.
 Prepared reports by collecting, analyzing, and summarizing data; making recommendations.
Assistant Junior Engineer(Intern) Electrical Hardware Jun 2008 – Aug 2008 & Jan 2010 – Jun 2010
 Led testing of Electrical Hardware by performing insulation, pressure test,ratio test,continuity and corrosion tests;
prepared documentation and submitted reports for senior management.
 Designed, Developed and implemented in electric distribution system.
 Designed and implemented tests for electrical parts that included abuse testing, mechanical testing and maintenance
testing
 Validated electrical batteries for qualification, environment and safety requirements
Intern Futuronix Automation, NewDelhi, India Jul 01, 2009 – Aug 08,2009
 Designed and developed a working prototype for conveyor belt control for beverage bottling plant using PLC and
SCADA programming; Implemented PID controller and developed fault injection tests for the system; prototype was
successfully demonstrated to senior leadership
 Root caused faults related to communication with HMI & SCADA
GRADUATE PROJECTS
Working Projects
Smart Sensors & Integrated Micro-Systems Lab Wayne State University, Detroit, MI Aug 2014 - Apr 2015
 Designed and fabricated pressure and temperature biomedical sensor for application in robotic surgery using
chemical wafer cleaning, dry-wet oxidation, LPCVD, Ultra-violet lithography, Sputtering and RIE processing to
create diaphragm for pressure sensing and Iron Copper thermocouple for temperature sensing.
Embedded System Lab Wayne State University, Detroit, MI Aug 2015 - Dec 2015
 Developed algorithm for color sorting with help of robotic arm using Mplab and Matlab/Simulink , Algortihm, Web
Camera and image processing for color sorting of objects. The movement of robotic arm was controlled using Mplab
program & the color sorting was done using web-camera and Matlab color detecting code.
UNDERGRADUATE PROJECTS
 Conveyor belt bottle filling plant “Conceptual designs development and demonstrations of a conveyor belt” using
PLC’s – Programming of PLCs to control the rotor responsible for rotation of conveyor belt.
EDUCATION
Master ofScience in Electrical Engineering
Wayne State University, MI
Bachelors ofEngineering in Electrical Engineering.
Rayat Institute of Engineering and Information Technology, Punjab, India
CERTIFICATION
Electrical automation PLC and SCADA
Vehicle Spy
TECHNICAL SKILLS
1.PLC and SCADA 2.Simulinks 3.Design and fabrication (sensors) 4.HMI’s Diagnostic and testing 5.Electrical
components Wiring and Diagnostic 6. Matlab 7.Powerpoint 8. Mplab 9. MSoffice 10.CAN/Lin 11.Test Writing
12.PCB’s Design 13.Battery Testing 14.Material Requirement planning 15.Electrical hardware design 16 PSpice

More Related Content

What's hot

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 
Electronics engineer resume
Electronics engineer resumeElectronics engineer resume
Electronics engineer resume
Mohammed Irshad S K
 
Updated Resume for Electronics Work
Updated Resume for Electronics WorkUpdated Resume for Electronics Work
Updated Resume for Electronics WorkNathan Davis
 
Frank Modica Resume
Frank Modica ResumeFrank Modica Resume
Frank Modica Resume
Frank Modica
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham
 
Electronics Engineer
Electronics EngineerElectronics Engineer
Electronics Engineer
Mohammed Irshad S K
 
Resume2
Resume2Resume2
BMS ENGINEER CV
BMS ENGINEER CVBMS ENGINEER CV
BMS ENGINEER CVRAJEES NP
 
Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)
Rnny Mthew
 
Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)
Rnny Mthew
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
Rnny Mthew
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
Rnny Mthew
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 

What's hot (18)

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 
Electronics engineer resume
Electronics engineer resumeElectronics engineer resume
Electronics engineer resume
 
Updated Resume for Electronics Work
Updated Resume for Electronics WorkUpdated Resume for Electronics Work
Updated Resume for Electronics Work
 
Frank Modica Resume
Frank Modica ResumeFrank Modica Resume
Frank Modica Resume
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_Continental
 
Electronics Engineer
Electronics EngineerElectronics Engineer
Electronics Engineer
 
Resume2
Resume2Resume2
Resume2
 
BMS ENGINEER CV
BMS ENGINEER CVBMS ENGINEER CV
BMS ENGINEER CV
 
CV_PANKAJ
CV_PANKAJCV_PANKAJ
CV_PANKAJ
 
Bhagyesh's NIULAB
Bhagyesh's NIULABBhagyesh's NIULAB
Bhagyesh's NIULAB
 
Resume (S.Saravanan)
Resume (S.Saravanan)Resume (S.Saravanan)
Resume (S.Saravanan)
 
Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)
 
Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
ELV ENGINEER RESUME
ELV ENGINEER RESUMEELV ENGINEER RESUME
ELV ENGINEER RESUME
 
Resume
ResumeResume
Resume
 

Similar to Anmol rattan shergill info resume m.s.electrical engineering

Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineering
Anmol Rattan Shergill
 
Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineering
Anmol Rattan Shergill
 
Ling resume
Ling resumeLing resume
Ling resume
Robert Ling III
 
B.tech electronics 4.5 years of experince
B.tech electronics 4.5 years of experinceB.tech electronics 4.5 years of experince
B.tech electronics 4.5 years of experince
Ravneet Sodhi
 
Jayadeep cv latest
Jayadeep cv latestJayadeep cv latest
Jayadeep cv latest
Jayadeep Kumar
 
kirusanthan_Automotive_validation_engineer_4Year_experince
kirusanthan_Automotive_validation_engineer_4Year_experincekirusanthan_Automotive_validation_engineer_4Year_experince
kirusanthan_Automotive_validation_engineer_4Year_experinceGiri Kirush
 
Schleyer Resume 012316 PTC
Schleyer Resume 012316 PTCSchleyer Resume 012316 PTC
Schleyer Resume 012316 PTCVernon Schleyer
 
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - Copy
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - CopyRahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - Copy
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - CopyRahul Auti
 
Meganathan_Profile
Meganathan_ProfileMeganathan_Profile
Meganathan_ProfileMeganathan B
 

Similar to Anmol rattan shergill info resume m.s.electrical engineering (20)

Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineering
 
Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineering
 
My Resume0111
My Resume0111My Resume0111
My Resume0111
 
CV Rohith
CV RohithCV Rohith
CV Rohith
 
Ling resume
Ling resumeLing resume
Ling resume
 
Profile (1)
Profile (1)Profile (1)
Profile (1)
 
B.tech electronics 4.5 years of experince
B.tech electronics 4.5 years of experinceB.tech electronics 4.5 years of experince
B.tech electronics 4.5 years of experince
 
Jayadeep cv latest
Jayadeep cv latestJayadeep cv latest
Jayadeep cv latest
 
R Vedhantam
R VedhantamR Vedhantam
R Vedhantam
 
Kirit RF CV
Kirit RF CVKirit RF CV
Kirit RF CV
 
kirusanthan_Automotive_validation_engineer_4Year_experince
kirusanthan_Automotive_validation_engineer_4Year_experincekirusanthan_Automotive_validation_engineer_4Year_experince
kirusanthan_Automotive_validation_engineer_4Year_experince
 
Guru_Resume EEE
Guru_Resume EEEGuru_Resume EEE
Guru_Resume EEE
 
CV_JANA
CV_JANACV_JANA
CV_JANA
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Mustaque_CV_mar
Mustaque_CV_marMustaque_CV_mar
Mustaque_CV_mar
 
Schleyer Resume 012316 PTC
Schleyer Resume 012316 PTCSchleyer Resume 012316 PTC
Schleyer Resume 012316 PTC
 
resume_Ravi Kumar_
resume_Ravi Kumar_resume_Ravi Kumar_
resume_Ravi Kumar_
 
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - Copy
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - CopyRahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - Copy
Rahul_Auti_Sr. Test Engineer_Manual & Automation_Testing_6_Yrs - Copy
 
Meganathan_Profile
Meganathan_ProfileMeganathan_Profile
Meganathan_Profile
 
Resume_mohan
Resume_mohanResume_mohan
Resume_mohan
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 

Anmol rattan shergill info resume m.s.electrical engineering

  • 1. Anmol Rattan Singh Shergill 4500 Cass Ave, Apt 1115, Detroit, MI 48201 M: +1 (313) 412-0607 Email: anmolshergill9400@gmail.com OBJECTIVE To work in a challenging and a fast paced environment and contribute to the success of the business goals of the organization by leveraging my knowledge and to grow with the organization. PROFESSIONAL SUMMARY  Verification and validation experience for component level, sub-system, bench level as well as vehicle level testing  Test execution over CAN tool Vehicle Spy3.2 (Neovi) & MOST tools  On Board Diagnostics services and DTC, PID/DID verification.  Diagnostic of HMI’s and head unit.  Process used DFMEA,FMEA Bug Life Cycle, Bill Of Material and DOORS.  Black Box testing, Test case analysis and writing test cases.  Wiring harness design and development to create and work with electrical schematics.  Automotive electrical testing,diagnostic , debugging and wiring installation.  Battery testing for automotives and Hybrid automotives. Rotating devices using Dynamometers.  In-depth knowledge of wiring interconnects inside automotives and schematics  Designed, Developed and implemented in electric distribution system EXPERIENCE Infotainment Test Engineer(Trainee) Pi Square Tech, Farmington Hills May 2016- present  Verification and validation experience for component level, sub-system, bench level as well as vehicle level testing.  Requirement analysis, Test plan creation, script writing, updating Test cases, logging defects and re-verification  Test execution over CAN tool Vehicle Spy3.2 (Neovi) & MOST tools  On Board Diagnostics services and DTC, PID/DID verification.  “Effective Root cause analysis” expertise with analytical ability to solve complex problems.  Black Box testing for infotainment modules.  Test Case Analysis and Diagnostic for in vehicle infotainment system.  Testing Navigation, Bluetooth, Wi-fi using different testing techniques.  Diagnostic of HMI’s and head unit.  Diagnostic of vehicle communication systems using protocols CAN/LIN and MOST  Identify software bugs during software execution and reporting to software development team by using bug life cycle tools like JIRA  Process used DFMEA, FMEA Bug Life Cycle And Bill Of Material.  Requirements management tool such as IBM DOORS. Assistant Electric Engineer Harpal Auto Electric, Ludhiana, PB May 2013 – Nov 2013  Wiring harness design and development to create and work with electrical schematics.  Perform responsibilities of testing automotive electrical power system components by using standard software and test tools.  Extensive electrical testing,diagnostic ,debugging and wiring installation experience for Hyundai, Ford, Toyota, Honda and Maruti Suzuki models. Responsibilities of analyzing wiring and component parts of vehicle  Establish statistical confidence by identifying sample size and acceptable error; determining levels of confidence.  In-depth knowledge of wiring interconnects inside automotives and schematics..
  • 2. Electrical Maintenance Engineer Bright Industries Mar 2011- Mar 2013  Responsible for installation, maintenance, repairs and testing for manufacturer and supplier unit  Assisted in upgrading and installation of various machines.  Testing of power produced by motors (1/2 horse power -16 horse power) and other rotating devices using Dynamometers.  Responsible for components performance and functioning.  Developed sampling plans by applying attribute, variable, and sequential sampling methods.  Prepared reports by collecting, analyzing, and summarizing data; making recommendations. Assistant Junior Engineer(Intern) Electrical Hardware Jun 2008 – Aug 2008 & Jan 2010 – Jun 2010  Led testing of Electrical Hardware by performing insulation, pressure test,ratio test,continuity and corrosion tests; prepared documentation and submitted reports for senior management.  Designed, Developed and implemented in electric distribution system.  Designed and implemented tests for electrical parts that included abuse testing, mechanical testing and maintenance testing  Validated electrical batteries for qualification, environment and safety requirements Intern Futuronix Automation, NewDelhi, India Jul 01, 2009 – Aug 08,2009  Designed and developed a working prototype for conveyor belt control for beverage bottling plant using PLC and SCADA programming; Implemented PID controller and developed fault injection tests for the system; prototype was successfully demonstrated to senior leadership  Root caused faults related to communication with HMI & SCADA GRADUATE PROJECTS Working Projects Smart Sensors & Integrated Micro-Systems Lab Wayne State University, Detroit, MI Aug 2014 - Apr 2015  Designed and fabricated pressure and temperature biomedical sensor for application in robotic surgery using chemical wafer cleaning, dry-wet oxidation, LPCVD, Ultra-violet lithography, Sputtering and RIE processing to create diaphragm for pressure sensing and Iron Copper thermocouple for temperature sensing. Embedded System Lab Wayne State University, Detroit, MI Aug 2015 - Dec 2015  Developed algorithm for color sorting with help of robotic arm using Mplab and Matlab/Simulink , Algortihm, Web Camera and image processing for color sorting of objects. The movement of robotic arm was controlled using Mplab program & the color sorting was done using web-camera and Matlab color detecting code. UNDERGRADUATE PROJECTS  Conveyor belt bottle filling plant “Conceptual designs development and demonstrations of a conveyor belt” using PLC’s – Programming of PLCs to control the rotor responsible for rotation of conveyor belt. EDUCATION Master ofScience in Electrical Engineering Wayne State University, MI Bachelors ofEngineering in Electrical Engineering. Rayat Institute of Engineering and Information Technology, Punjab, India CERTIFICATION Electrical automation PLC and SCADA Vehicle Spy TECHNICAL SKILLS 1.PLC and SCADA 2.Simulinks 3.Design and fabrication (sensors) 4.HMI’s Diagnostic and testing 5.Electrical components Wiring and Diagnostic 6. Matlab 7.Powerpoint 8. Mplab 9. MSoffice 10.CAN/Lin 11.Test Writing 12.PCB’s Design 13.Battery Testing 14.Material Requirement planning 15.Electrical hardware design 16 PSpice