Ves GORECKI MIEAust. CPEng Civil, NPER, RPEng
19/39 Bronte St, East Perth, WA 6004
Mobile: 0457 566 785
E-mail: ves.gorecki@aapt.net.au
Website: http://www.civilengineer-australia.com/
SUMMARY
Experiencedprojectengineerindesign, construction andmaintenance of heavyminingrailways,highways,coastal
and residential infrastructure,withsolidbackgroundinprojectandcontractmanagement. Managedall stagesof
projectlife cycle including identifyingdevelopment opportunities,feasibilitystudies,design,constructionand
maintenance usingcompany workforce,consultantsand contractors.Oriented tothe deliveryof projects’scope with
a strong focuson the HSEQ, time andbudget.Accomplishedleaderof youngengineersinprofessionaldevelopment
and successionplanning.
QUALIFICATIONS
CharteredProfessional EngineerMemberof the Institutionof EngineersAustralia; Graduate of Warsaw Universityof
Technology (Poland) Departmentof Civil Engineeringwiththe MagisterEngineerDegree andspecialisationinthe
transportationinfrastructure. Enrolledinthe National PractisingEngineersRegister(Australia),activeinprofessional
developmentwithanumberof credentialsandcertificationsinprojectandcontract management,designand
technology,computerapplications,OSHE,GIS,etc.
PROFESSIONAL EXPERIENCE
Civil Engineer Rail and Road Services Australia Sep.2013 – To date
Consultingservicesin civil projectsof assetsinspectionandremedial works
Managing EngineerProprietor
 Developedand managedcivil engineeringservicesenterprise including:establishingof pool of customers,
implementingof quotation/tendering/worksorders/projectcontrols/quality/OSHE/riskmanagementand
administrationsystems.
 Providedlogistics andcontrol of the works, acquiredequipmentandmaterials hiredandsupervised
personnel.
 Interfaced andmaintainedworkingrelationshipswith customersand sub-contractors.
 Monitoredtrendsandopeningsinbusiness,implementedchangestotake advantage of risingbusiness
opportunities,aswell astoidentifyandmitigaterisks.
Rio Tinto Iron Ore, Perth, WA Jun. 2010 – Aug.2013
Railway Division of a global mining company
SpecialistCivil Engineer
Supervisedthe civil infrastructure of 1400 km longheavyrailwayinPilbaraWA.Developedand ledthe civil
engineeringunitof the Railway Divisionwith“Zero”HSEQand technical incidents.
 Supervisedconditionmonitoring andmanagementof maintenance worksof civil infrastructure on:bridges,
culverts,formation,rockcuttings,railwaycrossings, accessroads andotherrailwaystructures.
 Supervised engineeringandtechnical personnel,consultantsandcontractors inthe designanddeliveryof
improvementsprojects of the railwayandroadinfrastructure.
 Interfacedcustomers,stakeholders,authorities,projectmembers,industryandthe public.
 Developedthe Civil EngineeringSectionof RTIORailwayDivisioninc.recruiting,trainingof new personnel,
developingof workpractices,processes,procedures,technical standardsandspecifications.
 Mentoredjuniorsandgraduate engineersforsuccession managementprogramme.
 Reviewedtechnical standards,specifications anddesignsincludingthe RailwayCapacityExpansion353
(MTpa) Project.
 Providedroutine technical supportincivil speciality tootherrailway projectmanagers.
VesGorecki
ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 2 of 4
Main Roads Western Australia, Perth,WA Feb.2009 – Jun. 2010
State highwaysagencyof WesternAustralia.
Civil Engineer– Highways, Project and Contract Manager
Infrastructure DeliveryDirectorate(MajorProjects)
Providedtechnical assistance incontractand projectmanagement.
 Produced the Guide forSettingupof Alliance ProjectsandEarlyContractorInvolvementProjects(for
contracts inexcessof $100M managedby MRWA / private sectoralliances).
Road ServicesDirectorate
Providedassistance inbusinessimprovement.
 Investigatedandmapped core functionsof the Directorate.
 Identifiedopportunitiesforprocessimprovementandprovidedsolutions.
Calibre - Engenium Joint Venture (CEJV), Perth, WA Feb.2008 – Feb.2009
Consultancyfordesignof duplication of 400 km longheavyhaulage railway forBHP BillitonIronOre inPilbara
WesternAustralia- RGP5.
SeniorCivil Engineer
 Managed the Company engineeringanddraftingstaff inthe designof earthworksanddrainage.
 Managed consultants,evaluatedrecommendationsfromspecialistreportsforinclusionintothe design.
 Assessedcondition of existingaccessroads andprovidedrecommendations forimprovements.
 Carriedoutfeasibility studyforanew20 km long accessroad (preliminarycorridorselection andsurvey).
 Managed railway videosurvey forareference inthe design, inquiresduringconstruction tenderandforthe
postconstruction site dilapidation assessment.
 Developed treatmentstomitigate deficienciesincoverof culvertsto preserve theircapacityand meet
AustralianStandards’requirements;producedareport.
Cardno BSD, Perth, WA Aug. 2007 – Feb.2008
Civil engineeringconsultancy - TrafficandTransportSection
SeniorEngineerRoads
 Managed engineeringanddraftingpersonnel incivil designprojectsincluding:
o 4.5 km of newVeritaRoadinGeraldton – Greenough WA;
o WestCoast HighwayandParkinginTrigg Beach;
o WA; Carine WetlandBoardwalk;
o Reconstructionof 4 km of Dual Use Path alongWestCoast Drive inJoondalup,WA;
o Duplicationof 2 kmof RanfordRd inGosnells,WA;
o EarthworksexcavationdesignforAlkimosSewage TreatmentPlant,Alkimos,WA.
 Managed preparingof submissionsof tenders.
 Maintainedrelationshipswithcustomers,researchedbusinessdevelopmentopportunities,monitored
tenderadvertisements.
Main Roads Western Australia, Perth,WA 2007
State highwaysagencyof WesternAustralia.
Civil Engineer- Road Data Policy& Standards Coordinator (Acting)
AssetNetworkInformationBranch (½Yr)
 Managed roaddata collection projects forthe Integrated RoadInformationSystem(IRIS).
Department for Planning and Infrastructure, Marine House, Fremantle, WA 2006
State Transport Agencyof WesternAustralia
Project Manager – Civil / Coastal (Secondmentfrom Main RoadsWA)
Maritime FacilityEngineering Branch(1 Yr)
VesGorecki
ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 3 of 4
 Managed the deliveryof coastal infrastructure projects of aggregate valueof $19M on the WA coast such as
jettiesin:Kalbarri,Geraldton,Busselton,Coral Bay;refurbishmentof HillarysBoatHarbourand reviewed
miscellaneouscivil designs.
Main Roads Western Australia, Perth,WA 1996 - 2006
State highwaysagencyof WesternAustralia.
Civil Engineer– Highways (Road& TrafficDesignEngineer,ConstructionProject/ContractManager)
SUMMARY:
Road NetworkOperationBranch(RoadNetworkPerformance Officer&Contract Manager, 2 ½ Yrs)
 Analysedtrafficdata,assessedroadperformance andinvestigatedoptionsforimprovementsforPerth
MetropolitanArea’shighways,intersectionsandcyclingfacilities.
ProjectDevelopmentBranch (PedestrianandCyclistsCoordinator–Acting2 Mths)
 Managed projects forthe planningandinstallationof bicycle facilitieson the roadnetworkwithuse of GIS
technologyandDPImappingresources (byMainRoads,Bike West and DPI).
Program Delivery PerthMetropolitanRegion(Project/ContractManager, 1 ½ Yr)
 Managed a varietyof designandconstructprojectsforimprovementof roadsandintersectionsinthe Perth
Metropolitan Areaof intersections,trafficsignals,streetlighting,pavementworks,roadsigns andother
trafficfacilities.
Term Network Contract7, PerthMetropolitanRegionSouth (SeniorContractCoordinator2 Yrs)
 Supervised ContractWorksof installationof signs,roadmarking, pavementandverge maintenance.
Term Maintenance Contract192/95, PerthMetropolitanRegion OperationsCentre Carlisle (EngineerConstruction&
Maintenance ServicesSuperintendent’sRepresentative,1½ Yrs)
 Supervised ContractWorksof installationof signs,roadmarking,pavementandverge maintenance;
Road & TrafficDesignBranch (EngineerRoad&TrafficDesign, 2 Yrs)
 Designedroadgeometryandroaddrainage systemssuchas40 km of new alignmentof Eyre Hwy.
 Preparedcontractdocumentationforroadconstructionsuchas for realignmentof BrooktonHwy.
 Managed trafficengineeringandroaddesignprojectsby draftingpersonnel and consultants.
 and other;
 DevelopedMRWA guidelinesfordisabledpedestrianfacilitiessuchaskerbramps andgrab rails.
 Carriedoutseveral Safety Auditsof roadsandintersectionsinMetropolitan andRegional areas;;
 Wrote Main Roads WA SpeedZoningGuidelinesandtechnical reportsonProvisionof FreewayRamps,Ramp
Meteringandof HOV Lanes.
Roads & Traffic Authority of NSW 1991 - 1995
State HighwaysAgencyof NewSouthWales
PavementsDesignEngineer– Contractor (3½ Yrs)
RigidPavementsSection,RoseberyNSW
 Designedconcrete pavements;
 Produceda catalogue of standardconcrete pavementsthicknesses;.
 Analysedthe sensitivityof AUSTROADS’92designmethodforchangesinthe designcriteria
PavementDataSection,Milson'sPointNSW(1Yr)
 Managed automatedsurveysof pavementconditionof NSWroadnetworkwithuse of computerised,high-
speedequipmentas:Scrim,Deflectograph,RoughnessCarandLaserProfilometer.
VesGorecki
ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 4 of 4
Excerpt of Professional Development Courses
Attendedanumberof formal professional developmentcoursesincluding:
2010-2013 RTIO internal andexternal traininginbroadrange of competenciesinc.HSEQ
2009 ProjectManagement Practitioners’course - AIPM
2008 BHBPIOWAIO andGRI training
2006 Basic andadvancedCoursesinProjectManagementinaccordance withUK methodPRINCE2
Publications
Producedabouta dozenof publicationsandtraining mediawiththe followinghighlights:
2010 “The Guide forSettingupof Alliance ProjectsandEarlyContractorInvolvementProjects”;
2005 “DrivingMetronome”compactdiskutilityfortrainingof drivers;
1998 “Multivariable Technique of DesigningConcrete Pavements”DesignWorkshop;
1997 “Provisionof Rampson Urban Freeways,FreewayRampControl byMetering,HighOccupancyVehicle
Lanes”;
1997 “SpeedZoningGuidelines”;
1997 “Provisionof PedestrianFacilitiesonUrbanRoads”;
1996 "ExpertWay to DesigningRigidPavementThickness"
Languages
English,Polish,SpanishandRussian.

Ves GORECKI MIEAust Resume 2015-01-06

  • 1.
    Ves GORECKI MIEAust.CPEng Civil, NPER, RPEng 19/39 Bronte St, East Perth, WA 6004 Mobile: 0457 566 785 E-mail: ves.gorecki@aapt.net.au Website: http://www.civilengineer-australia.com/ SUMMARY Experiencedprojectengineerindesign, construction andmaintenance of heavyminingrailways,highways,coastal and residential infrastructure,withsolidbackgroundinprojectandcontractmanagement. Managedall stagesof projectlife cycle including identifyingdevelopment opportunities,feasibilitystudies,design,constructionand maintenance usingcompany workforce,consultantsand contractors.Oriented tothe deliveryof projects’scope with a strong focuson the HSEQ, time andbudget.Accomplishedleaderof youngengineersinprofessionaldevelopment and successionplanning. QUALIFICATIONS CharteredProfessional EngineerMemberof the Institutionof EngineersAustralia; Graduate of Warsaw Universityof Technology (Poland) Departmentof Civil Engineeringwiththe MagisterEngineerDegree andspecialisationinthe transportationinfrastructure. Enrolledinthe National PractisingEngineersRegister(Australia),activeinprofessional developmentwithanumberof credentialsandcertificationsinprojectandcontract management,designand technology,computerapplications,OSHE,GIS,etc. PROFESSIONAL EXPERIENCE Civil Engineer Rail and Road Services Australia Sep.2013 – To date Consultingservicesin civil projectsof assetsinspectionandremedial works Managing EngineerProprietor  Developedand managedcivil engineeringservicesenterprise including:establishingof pool of customers, implementingof quotation/tendering/worksorders/projectcontrols/quality/OSHE/riskmanagementand administrationsystems.  Providedlogistics andcontrol of the works, acquiredequipmentandmaterials hiredandsupervised personnel.  Interfaced andmaintainedworkingrelationshipswith customersand sub-contractors.  Monitoredtrendsandopeningsinbusiness,implementedchangestotake advantage of risingbusiness opportunities,aswell astoidentifyandmitigaterisks. Rio Tinto Iron Ore, Perth, WA Jun. 2010 – Aug.2013 Railway Division of a global mining company SpecialistCivil Engineer Supervisedthe civil infrastructure of 1400 km longheavyrailwayinPilbaraWA.Developedand ledthe civil engineeringunitof the Railway Divisionwith“Zero”HSEQand technical incidents.  Supervisedconditionmonitoring andmanagementof maintenance worksof civil infrastructure on:bridges, culverts,formation,rockcuttings,railwaycrossings, accessroads andotherrailwaystructures.  Supervised engineeringandtechnical personnel,consultantsandcontractors inthe designanddeliveryof improvementsprojects of the railwayandroadinfrastructure.  Interfacedcustomers,stakeholders,authorities,projectmembers,industryandthe public.  Developedthe Civil EngineeringSectionof RTIORailwayDivisioninc.recruiting,trainingof new personnel, developingof workpractices,processes,procedures,technical standardsandspecifications.  Mentoredjuniorsandgraduate engineersforsuccession managementprogramme.  Reviewedtechnical standards,specifications anddesignsincludingthe RailwayCapacityExpansion353 (MTpa) Project.  Providedroutine technical supportincivil speciality tootherrailway projectmanagers.
  • 2.
    VesGorecki ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 2of 4 Main Roads Western Australia, Perth,WA Feb.2009 – Jun. 2010 State highwaysagencyof WesternAustralia. Civil Engineer– Highways, Project and Contract Manager Infrastructure DeliveryDirectorate(MajorProjects) Providedtechnical assistance incontractand projectmanagement.  Produced the Guide forSettingupof Alliance ProjectsandEarlyContractorInvolvementProjects(for contracts inexcessof $100M managedby MRWA / private sectoralliances). Road ServicesDirectorate Providedassistance inbusinessimprovement.  Investigatedandmapped core functionsof the Directorate.  Identifiedopportunitiesforprocessimprovementandprovidedsolutions. Calibre - Engenium Joint Venture (CEJV), Perth, WA Feb.2008 – Feb.2009 Consultancyfordesignof duplication of 400 km longheavyhaulage railway forBHP BillitonIronOre inPilbara WesternAustralia- RGP5. SeniorCivil Engineer  Managed the Company engineeringanddraftingstaff inthe designof earthworksanddrainage.  Managed consultants,evaluatedrecommendationsfromspecialistreportsforinclusionintothe design.  Assessedcondition of existingaccessroads andprovidedrecommendations forimprovements.  Carriedoutfeasibility studyforanew20 km long accessroad (preliminarycorridorselection andsurvey).  Managed railway videosurvey forareference inthe design, inquiresduringconstruction tenderandforthe postconstruction site dilapidation assessment.  Developed treatmentstomitigate deficienciesincoverof culvertsto preserve theircapacityand meet AustralianStandards’requirements;producedareport. Cardno BSD, Perth, WA Aug. 2007 – Feb.2008 Civil engineeringconsultancy - TrafficandTransportSection SeniorEngineerRoads  Managed engineeringanddraftingpersonnel incivil designprojectsincluding: o 4.5 km of newVeritaRoadinGeraldton – Greenough WA; o WestCoast HighwayandParkinginTrigg Beach; o WA; Carine WetlandBoardwalk; o Reconstructionof 4 km of Dual Use Path alongWestCoast Drive inJoondalup,WA; o Duplicationof 2 kmof RanfordRd inGosnells,WA; o EarthworksexcavationdesignforAlkimosSewage TreatmentPlant,Alkimos,WA.  Managed preparingof submissionsof tenders.  Maintainedrelationshipswithcustomers,researchedbusinessdevelopmentopportunities,monitored tenderadvertisements. Main Roads Western Australia, Perth,WA 2007 State highwaysagencyof WesternAustralia. Civil Engineer- Road Data Policy& Standards Coordinator (Acting) AssetNetworkInformationBranch (½Yr)  Managed roaddata collection projects forthe Integrated RoadInformationSystem(IRIS). Department for Planning and Infrastructure, Marine House, Fremantle, WA 2006 State Transport Agencyof WesternAustralia Project Manager – Civil / Coastal (Secondmentfrom Main RoadsWA) Maritime FacilityEngineering Branch(1 Yr)
  • 3.
    VesGorecki ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 3of 4  Managed the deliveryof coastal infrastructure projects of aggregate valueof $19M on the WA coast such as jettiesin:Kalbarri,Geraldton,Busselton,Coral Bay;refurbishmentof HillarysBoatHarbourand reviewed miscellaneouscivil designs. Main Roads Western Australia, Perth,WA 1996 - 2006 State highwaysagencyof WesternAustralia. Civil Engineer– Highways (Road& TrafficDesignEngineer,ConstructionProject/ContractManager) SUMMARY: Road NetworkOperationBranch(RoadNetworkPerformance Officer&Contract Manager, 2 ½ Yrs)  Analysedtrafficdata,assessedroadperformance andinvestigatedoptionsforimprovementsforPerth MetropolitanArea’shighways,intersectionsandcyclingfacilities. ProjectDevelopmentBranch (PedestrianandCyclistsCoordinator–Acting2 Mths)  Managed projects forthe planningandinstallationof bicycle facilitieson the roadnetworkwithuse of GIS technologyandDPImappingresources (byMainRoads,Bike West and DPI). Program Delivery PerthMetropolitanRegion(Project/ContractManager, 1 ½ Yr)  Managed a varietyof designandconstructprojectsforimprovementof roadsandintersectionsinthe Perth Metropolitan Areaof intersections,trafficsignals,streetlighting,pavementworks,roadsigns andother trafficfacilities. Term Network Contract7, PerthMetropolitanRegionSouth (SeniorContractCoordinator2 Yrs)  Supervised ContractWorksof installationof signs,roadmarking, pavementandverge maintenance. Term Maintenance Contract192/95, PerthMetropolitanRegion OperationsCentre Carlisle (EngineerConstruction& Maintenance ServicesSuperintendent’sRepresentative,1½ Yrs)  Supervised ContractWorksof installationof signs,roadmarking,pavementandverge maintenance; Road & TrafficDesignBranch (EngineerRoad&TrafficDesign, 2 Yrs)  Designedroadgeometryandroaddrainage systemssuchas40 km of new alignmentof Eyre Hwy.  Preparedcontractdocumentationforroadconstructionsuchas for realignmentof BrooktonHwy.  Managed trafficengineeringandroaddesignprojectsby draftingpersonnel and consultants.  and other;  DevelopedMRWA guidelinesfordisabledpedestrianfacilitiessuchaskerbramps andgrab rails.  Carriedoutseveral Safety Auditsof roadsandintersectionsinMetropolitan andRegional areas;;  Wrote Main Roads WA SpeedZoningGuidelinesandtechnical reportsonProvisionof FreewayRamps,Ramp Meteringandof HOV Lanes. Roads & Traffic Authority of NSW 1991 - 1995 State HighwaysAgencyof NewSouthWales PavementsDesignEngineer– Contractor (3½ Yrs) RigidPavementsSection,RoseberyNSW  Designedconcrete pavements;  Produceda catalogue of standardconcrete pavementsthicknesses;.  Analysedthe sensitivityof AUSTROADS’92designmethodforchangesinthe designcriteria PavementDataSection,Milson'sPointNSW(1Yr)  Managed automatedsurveysof pavementconditionof NSWroadnetworkwithuse of computerised,high- speedequipmentas:Scrim,Deflectograph,RoughnessCarandLaserProfilometer.
  • 4.
    VesGorecki ca3cf60f-164e-4184-9492-02bc474d8c30-150626074924-lva1-app6892 Page 4of 4 Excerpt of Professional Development Courses Attendedanumberof formal professional developmentcoursesincluding: 2010-2013 RTIO internal andexternal traininginbroadrange of competenciesinc.HSEQ 2009 ProjectManagement Practitioners’course - AIPM 2008 BHBPIOWAIO andGRI training 2006 Basic andadvancedCoursesinProjectManagementinaccordance withUK methodPRINCE2 Publications Producedabouta dozenof publicationsandtraining mediawiththe followinghighlights: 2010 “The Guide forSettingupof Alliance ProjectsandEarlyContractorInvolvementProjects”; 2005 “DrivingMetronome”compactdiskutilityfortrainingof drivers; 1998 “Multivariable Technique of DesigningConcrete Pavements”DesignWorkshop; 1997 “Provisionof Rampson Urban Freeways,FreewayRampControl byMetering,HighOccupancyVehicle Lanes”; 1997 “SpeedZoningGuidelines”; 1997 “Provisionof PedestrianFacilitiesonUrbanRoads”; 1996 "ExpertWay to DesigningRigidPavementThickness" Languages English,Polish,SpanishandRussian.