IMPROVEMENT OF POWER SYSTEM
PROTECTION BY WIDE AREA
MONITORING NETWORK
Presented By UNDERTHE GUIDANCEOF
KOLLI MANOGNA G. UJWALA
INTRODUCTION TO POWER SYSTEMS
PROTECTIUON
 Power system protection is defined as the
method of protecting the power systems from
the faults and clearing the abnormalities in
power systems to restore the operation.
 This uses some special hardware which is used
for the both primary and backup protection
 The main philosophy about protection is that no
protection of power system can prevent the flow
of fault current through the system, it only can
prevent the continuation of flowing of fault
current by quickly disconnect the short circuit
path from the system.
WIDE AREA MONITORING SYSTEMS
 TheWide Area Monitoring System (WAMS) consists of geographically
dispersed Phasor Measurement Units (PMUs) delivering
Synchrophasors, i.e., time-tagged data samples of a power system’s
sinusoidal voltage or current using a standard time signal as the
reference, to Phasor Data Concentrators (PDCs).
 These PDCs perform the desired signal handling and assembly of
synchronized Phasor measurements into snapshots.They may also
facilitate long term storage in high-resolution historical archives.The
data in each PMU are time Synchronized to Universal CoordinatedTime
(UTC), for example via Global -2- Positioning System (GPS) receivers
with an accuracy of one microsecond and stored in PDCs.The Phasors
measured simultaneously provide snapshots of the state of the
monitored nodes.
 By comparing these snapshots, not only during steady state, also the
dynamic state of critical nodes in transmission, sub-transmission and
distribution networks can be observed.
Failures in power systems
 CASCADE FAILURES
 INAPPROPRIATE OPERATION OF RELAYS
 HIDDEN FAILURES
NEED FOR WAMS IN BACKUP
PROTECTION
 The need for wide area measurements as part of
primary protection is limited, as it protects a
specific element of the power system.
 However, aspects of power system protection
that have lower requirements in terms of the
speed of response (e.g. backup protection) and
are less selective can be improved by using wide
area measurements to supervise their behavior.
 These mal operations can be attributed to either
poor relay settings or hidden failures in the
protection system.
 Novel system integrity protection schemes (SIPS)
that can deploy a wide range of far reaching actions
to prevent a cascading failure, adaptive system
protection (e.g. adaptive under frequency load
shedding), supervisory schemes that improve the
security of existing backup protection, and methods
that do not change the behavior of system
protection but do enhance our understanding of it
(e.g. alarming system operators to the risk of false
penetration of relay characteristics).
 Recent work has begun to focus not only on
developing new concepts but also on the practical
realization of these.
OBJECTIVES OF WIDE AREA
PROTECTION SCHEMES
 Avoiding inappropriate relay settings for the
prevailing system conditions.
 Managing wide area disturbances.
 Mitigating the impact of hidden failures.
 Ensuring a suitable balance between the
security and dependability of protection.
WIDE AREA PROTECTION SCHEMES
(WAPS)
 ENHANCING PROTECTIONWITHWIDEAREA
MONITORING
 ALARMINGAGAINSTTHE RISK OF RELAY
CHARACTERISTIC PENETRATION
 PREVENTING LOAD ENCROACHMENT
 ADJUSTINGTHE BALANCE BETWEENTHE SECURITYAND
DEPENDABILITYOF PROTECTION
 SUPERVISIONOF BACK-UP ZONES
 INTELLIGENT UNDER FREQUENCY LOAD SHEDDING
 ADAPTIVEOUT-OF-STEP RELAYING
 SYSTEM INTEGRITY PROTECTION SCHEMES (SIPS)
 MICROGRID PROTECTION
ENHANCING PROTECTION WITH WIDE
AREA MONITORING
 The goal of protection is to protect individual elements of
the power system from damage and to protect the security
of the power system itself. In the case of primary
equipment protection there is very little role for the use of
wide area monitoring.This is because primary protection
must reliably deliver a very fast response for any fault on
the element that it protects.
 However, the slower speed of response required for backup
protection and the fact that it protects a zone of the system
means that wide area monitoring can be a useful tool for
improving its performance.The most effective means for
ensuring that the system will survive extreme conditions
and wide area disturbances is a high degree of built in
redundancy and strength
Wide area measurements offer the potential to create supervisory
schemes for backup protection, more advanced forms of system
protection and entirely new protection concepts. Some of them are:
1. Adaptive relays that update their settings as the system state
changes.
2. Improved protection of multi terminal lines.
3. Adaptive end of line protection that monitors the remote
breaker, if it is open the under reaching Zone 1 is replaced with
an instantaneous characteristic.
4. Temporarily adapt relay settings to prevent mal operation
during cold load pickup.
5. Use the ability of digital relays to self-monitor to identify
hidden failures and use the hot swap functionality offered by
International Electro technical Commission to remove them.
6. Intelligent controlled islanding that preempts an uncontrolled
system separation by implementing an adaptive controlled
separation
ALARMING AGAINST THE RISK OF RELAY
CHARACTERISTIC PENETRATION
 The objective of this application is to detect
when the impedance observed by a relay
approaches the relay characteristic under
non-faulty conditions.This information is
then used to alarm protection engineers to a
relay setting that is potentially unsuitable.
PREVENTING LOAD ENCROACHMENT
 Heavily loaded lines may encroach on the
settings of relays and cause an incorrect and
inappropriate tripping operation during
stressed conditions and power swings.
 With the computational power of digital
relays this can be overcome by using real
time measurements of the load to prevent
load encroachment by compensating the
relay input of load current.
ADJUSTING THE BALANCE BETWEEN THE
SECURITY AND DEPENDABILITY OF PROTECTION
 Balancing the demands of dependability and security is one
of the greatest challenges during the design of protection.
 During a wide area disturbance, this preference for
dependability can result in incorrect and inappropriate
tripping operations.
 It would attractive to shift the balance of this compromise
toward security during stressed conditions, i.e. when the
conditions encountered (e.g. power swings) can increase
the likelihood of mal operations and reveal hidden failures.
 Wide area measurements could be used to detect that the
system has entered a stressed condition and then adjust
the protection philosophy to shift the balance away from
dependability and toward security.
USE OF WAM TO VARY THE BALANCEBETWEEN
DEPANDABILITY AND SECURITY
SUPERVISION OF BACK-UP ZONES
SUPERVISION OF BACK-UP ZONES
 The mal operation of zone 3 relays was identified as a significant
contributing factor to recent blackouts.The unusual load currents and
power swings observed during wide area disturbances can cause these
relays to operate undesirably. Examples of the system behavior that can
cause mal operation of a relay are shown in Fig. 3.
 The remote PMUs are installed within the protection zone of the backup
relay and monitor the current at these remote locations.
 These devices implement a simple pickup characteristic and
communicate a binary pick up signal to the backup relay.
 If the backup relay characteristic is violated but none of the remote
devices have picked up, then it can be concluded that no fault has
occurred and the backup relay operation can be blocked.
 This prevents load swings during extreme conditions from being
misinterpreted as faults and helps prevent the mal operation of backup
relays from allowing a wide area disturbance to spread through the
system.
INTELLIGENT UNDER FREQUENCY LOAD
SHEDDING
 Load shedding is the traditional last line of defense
against extreme under frequency conditions.
 Current practice is mostly for this shedding to be
delivered using a sequence of stages of shedding
that are triggered when a certain frequency
threshold is violated.
 Shedding load more quickly after a loss of in feed is
recognized as an effective means for limiting the
frequency deviation with a reduced amount of load
shedding.
 However, balancing the benefits of an increased
speed of response against the risk of unnecessary
shedding is a challenge.
Extensive research has been undertaken to create more advanced load
shedding schemes that use wide area measurements to reduce the
amount of load shed by:
1. Adapting the amount of load shed to the prevailing system conditions,
e.g. inertia.
2. Initiating the load shedding more quickly.
 Initiating the load shedding more quickly can be achieved by using
event based signals (e.g. the loss of a major interconnector or
generator) or by using more complex triggering signals (e.g. triggering
based on rate of change of frequency).
 Furthermore, the amount of load shed can be adapted to the size of
the disturbance and system inertia using wide area measurements.
 Examples of this work include the adaption of shedding based on
measurements of rate of change of frequency (RoCoF) immediately
after the disturbance.
 Quick measuring of RoCoF is very challenging. But it is easily
measured by PMUs which are adopted inWAPS.
ADAPTIVE OUT-OF-STEP RELAYING
 Out of step conditions and system separation
are key precursors to system collapse and
blackouts. As the formation of an electrical
center approaches the system will experience
extreme power swings that will further
exacerbate stressed conditions and drive the
system closer to collapse.Therefore, it is
imperative that any potential out of step
condition is quickly recognized and
prevented; this is the role of out of step relays
 A wide area protection scheme could be developed that
monitors the positive sequence voltages across the system.
These synchronized real time measurements can be used to
predict if regions of the system are approaching an out of
step condition.
 This prediction could be used to initiate a controlled
separation of the areas that are losing synchronism or, if
the prediction is available sufficiently in advance, actions
could be taken to prevent the out of step condition from
occurring and avoid system separation entirely.
 The challenge faced when developing such a scheme would
be selecting the measurement locations and developing
the algorithms for achieving robust real time coherency
determination when the coherent generator groups are
variable.
SYSTEM INTEGRITY PROTECTION
SCHEMES (SIPS)
 SIPS protect power system security from extreme contingencies or wide
area disturbances that are beyond the scope of traditional protection.
 The stages involved in the execution of a SIPS are:
1. Identification and prediction of stressed conditions,`
2. Classification of the threat to system security, ́
3. Decisions and actions,
4. Coordination, and
5. Correction.
 Examples of SIPS include: generator rejection, load rejection, under
frequency and voltage load shedding , system separation, dynamic
braking, and turbine valve control.
 SIPS is used of their ability, such as availability of real time wide area
measurements, to identify complex emerging threats to the power
system and respond to them quickly .
MICRO GRID PROTECTION
 The changes faced by distribution networks include the
connection of energy storage, electric vehicles, smart meters,
demand side participation and the connection of distributed
generation (DG).
 The protection schemes of DG is very similar to the infrastructure
of the transmission lines.
 However, the smaller angular separation across a distribution
network means that measurement of angles on the distribution
network is more demanding than it is at the transmission level.
 A particularly important enabler for these new protection
principles are microprocessor relays that can vary their settings
easily.
 WAP delivers the protection needs of future distribution systems.
CONCLUSION
 WAM offers a wide variety of opportunities for enhancing
the backup protection and system protection of modern
power systems.These enhancements can contribute to
reducing the likelihood of the mal operation of backup
relays, limiting the impact of hidden failures and creating
new tools for managing wide area disturbances.These
benefits indicate that the main role of wide area monitoring
as part of protection is improving the resilience of power
systems against stressed conditions and wide area
disturbances, not the isolation of individual faults.The well-
considered deployment of these new concepts should
reduce the frequency and intensity of blackouts and enable
more rapid service restoration
REFERENCES
[1] Phadke AG,Thorp JS, Adamiak MG (1983) A new measurement
technique for tracking voltage phasors, local system frequency,
and rate of change of frequency. IEEETrans Power Appar Syst
102(5):1025–1038.
[2] TerzijaV,Valerde G, Cai DY et al (2011)Wide-area monitoring,
protection, and control of future electric power networks. Proc
IEEE 99(1):80–93.
[3] Phadke AG (2002) Synchronized phasor measurements-a
historical overview. In: Proceedings of the IEEE PES transmission
and distribution conference and exhibition 2002: Asia Pacific, vol
1,Yokohama, Japan, 6–10 Oct 2002, pp 476–479.
[4] Phadke AG (2008)The wide world of wide-area measurement.
IEEE Power Energy Mag 6(5):52–65.
[5] Horowitz SH, Phadke AG (2006)Third zone revisited. IEEETrans
Power Deliv 21(1):23–29.
WIDE AREA PROTECTION IN POWER SYSTEMS

More Related Content

What's hot

Phasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptPhasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptKhurshid Parwez
 
Circuit breaker arc interruption.pptx
Circuit breaker arc interruption.pptxCircuit breaker arc interruption.pptx
Circuit breaker arc interruption.pptxAnshulShekhar3
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3Md Irshad Ahmad
 
WIDE AREA MANAGEMENT SYSTEM
WIDE AREA MANAGEMENT SYSTEMWIDE AREA MANAGEMENT SYSTEM
WIDE AREA MANAGEMENT SYSTEMDivya Yennam
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...vishalgohel12195
 
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1Dr. Rohit Babu
 
3 reactive power and voltage control
3 reactive power and voltage control3 reactive power and voltage control
3 reactive power and voltage control8141245710
 
Basic types of facts controllers
Basic types of facts controllersBasic types of facts controllers
Basic types of facts controllersAyyarao T S L V
 
Simplified analysis of graetz circuit copy - copy
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copyVert Wheeler
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch centerddxdharmesh
 
Small signal stability analysis
Small signal stability analysisSmall signal stability analysis
Small signal stability analysisbhupendra kumar
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factorViren Pandya
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers PremanandDesai
 
WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)Vikram Purohit
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgridAmarjeet S Pandey
 

What's hot (20)

Phasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptPhasor measurement unit and it's application ppt
Phasor measurement unit and it's application ppt
 
Circuit breaker arc interruption.pptx
Circuit breaker arc interruption.pptxCircuit breaker arc interruption.pptx
Circuit breaker arc interruption.pptx
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3
 
Power system security
Power system security Power system security
Power system security
 
POWER SYSTEM OSCILLATIONS
POWER SYSTEM OSCILLATIONSPOWER SYSTEM OSCILLATIONS
POWER SYSTEM OSCILLATIONS
 
statcom
statcomstatcom
statcom
 
Phasor Measurement Unit (PMU)
 Phasor Measurement Unit (PMU) Phasor Measurement Unit (PMU)
Phasor Measurement Unit (PMU)
 
WIDE AREA MANAGEMENT SYSTEM
WIDE AREA MANAGEMENT SYSTEMWIDE AREA MANAGEMENT SYSTEM
WIDE AREA MANAGEMENT SYSTEM
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...
 
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING Part 1
 
3 reactive power and voltage control
3 reactive power and voltage control3 reactive power and voltage control
3 reactive power and voltage control
 
Basic types of facts controllers
Basic types of facts controllersBasic types of facts controllers
Basic types of facts controllers
 
Simplified analysis of graetz circuit copy - copy
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copy
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
Small signal stability analysis
Small signal stability analysisSmall signal stability analysis
Small signal stability analysis
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factor
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
 
WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgrid
 

Similar to WIDE AREA PROTECTION IN POWER SYSTEMS

A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...
A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...
A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...Power System Operation
 
Technical paper 6_2
Technical paper 6_2Technical paper 6_2
Technical paper 6_2Alaa Eladl
 
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...Backpropagation Neural Network Modeling for Fault Location in Transmission Li...
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...ijeei-iaes
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfEMERSON EDUARDO RODRIGUES
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectioAminu Bugaje
 
Contigency analysis and security system taking different cases
Contigency analysis  and security system taking different casesContigency analysis  and security system taking different cases
Contigency analysis and security system taking different casesfekadewalle
 
Wide area protection-research_in_the_smart_grid
Wide area protection-research_in_the_smart_gridWide area protection-research_in_the_smart_grid
Wide area protection-research_in_the_smart_gridAlaa Eladl
 
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Kashif Mehmood
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Oktay Yaman
 
FUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONFUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONPower System Operation
 
عرض تقديمي1.pptx
عرض تقديمي1.pptxعرض تقديمي1.pptx
عرض تقديمي1.pptxssuserf314411
 
A transient current based micro grid connected power system protection scheme...
A transient current based micro grid connected power system protection scheme...A transient current based micro grid connected power system protection scheme...
A transient current based micro grid connected power system protection scheme...IJECEIAES
 
Power System Protection
Power System ProtectionPower System Protection
Power System ProtectionRahul Mehra
 

Similar to WIDE AREA PROTECTION IN POWER SYSTEMS (20)

A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...
A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...
A Novel Back Up Wide Area Protection Technique for Power Transmission Grids U...
 
Technical paper 6_2
Technical paper 6_2Technical paper 6_2
Technical paper 6_2
 
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...Backpropagation Neural Network Modeling for Fault Location in Transmission Li...
Backpropagation Neural Network Modeling for Fault Location in Transmission Li...
 
E011123541
E011123541E011123541
E011123541
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
 
Protective relaying
Protective relayingProtective relaying
Protective relaying
 
Sistem Tenaga Listrik
Sistem Tenaga Listrik Sistem Tenaga Listrik
Sistem Tenaga Listrik
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectio
 
Contigency analysis and security system taking different cases
Contigency analysis  and security system taking different casesContigency analysis  and security system taking different cases
Contigency analysis and security system taking different cases
 
Elwerfelli2008
Elwerfelli2008Elwerfelli2008
Elwerfelli2008
 
Wide area protection-research_in_the_smart_grid
Wide area protection-research_in_the_smart_gridWide area protection-research_in_the_smart_grid
Wide area protection-research_in_the_smart_grid
 
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
 
FUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONFUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTION
 
عرض تقديمي1.pptx
عرض تقديمي1.pptxعرض تقديمي1.pptx
عرض تقديمي1.pptx
 
A transient current based micro grid connected power system protection scheme...
A transient current based micro grid connected power system protection scheme...A transient current based micro grid connected power system protection scheme...
A transient current based micro grid connected power system protection scheme...
 
ASHUTOSH BHATT DT19EEJ008 RPC JUNE22.ppt
ASHUTOSH BHATT DT19EEJ008 RPC JUNE22.pptASHUTOSH BHATT DT19EEJ008 RPC JUNE22.ppt
ASHUTOSH BHATT DT19EEJ008 RPC JUNE22.ppt
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 

More from manogna gwen

Emitter turn off_thyristor(ETO)
Emitter turn off_thyristor(ETO)Emitter turn off_thyristor(ETO)
Emitter turn off_thyristor(ETO)manogna gwen
 
d-q axis model for DOL starter
d-q axis model for DOL starterd-q axis model for DOL starter
d-q axis model for DOL startermanogna gwen
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAmanogna gwen
 
Dual axis solar tracking systems with thermal refrigeration
Dual axis solar tracking systems with thermal refrigerationDual axis solar tracking systems with thermal refrigeration
Dual axis solar tracking systems with thermal refrigerationmanogna gwen
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisationmanogna gwen
 
Artificial Intelligence in Power Systems
Artificial Intelligence in Power SystemsArtificial Intelligence in Power Systems
Artificial Intelligence in Power Systemsmanogna gwen
 

More from manogna gwen (6)

Emitter turn off_thyristor(ETO)
Emitter turn off_thyristor(ETO)Emitter turn off_thyristor(ETO)
Emitter turn off_thyristor(ETO)
 
d-q axis model for DOL starter
d-q axis model for DOL starterd-q axis model for DOL starter
d-q axis model for DOL starter
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADA
 
Dual axis solar tracking systems with thermal refrigeration
Dual axis solar tracking systems with thermal refrigerationDual axis solar tracking systems with thermal refrigeration
Dual axis solar tracking systems with thermal refrigeration
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
 
Artificial Intelligence in Power Systems
Artificial Intelligence in Power SystemsArtificial Intelligence in Power Systems
Artificial Intelligence in Power Systems
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 

WIDE AREA PROTECTION IN POWER SYSTEMS

  • 1. IMPROVEMENT OF POWER SYSTEM PROTECTION BY WIDE AREA MONITORING NETWORK Presented By UNDERTHE GUIDANCEOF KOLLI MANOGNA G. UJWALA
  • 2. INTRODUCTION TO POWER SYSTEMS PROTECTIUON  Power system protection is defined as the method of protecting the power systems from the faults and clearing the abnormalities in power systems to restore the operation.  This uses some special hardware which is used for the both primary and backup protection  The main philosophy about protection is that no protection of power system can prevent the flow of fault current through the system, it only can prevent the continuation of flowing of fault current by quickly disconnect the short circuit path from the system.
  • 3. WIDE AREA MONITORING SYSTEMS  TheWide Area Monitoring System (WAMS) consists of geographically dispersed Phasor Measurement Units (PMUs) delivering Synchrophasors, i.e., time-tagged data samples of a power system’s sinusoidal voltage or current using a standard time signal as the reference, to Phasor Data Concentrators (PDCs).  These PDCs perform the desired signal handling and assembly of synchronized Phasor measurements into snapshots.They may also facilitate long term storage in high-resolution historical archives.The data in each PMU are time Synchronized to Universal CoordinatedTime (UTC), for example via Global -2- Positioning System (GPS) receivers with an accuracy of one microsecond and stored in PDCs.The Phasors measured simultaneously provide snapshots of the state of the monitored nodes.  By comparing these snapshots, not only during steady state, also the dynamic state of critical nodes in transmission, sub-transmission and distribution networks can be observed.
  • 4. Failures in power systems  CASCADE FAILURES  INAPPROPRIATE OPERATION OF RELAYS  HIDDEN FAILURES
  • 5. NEED FOR WAMS IN BACKUP PROTECTION  The need for wide area measurements as part of primary protection is limited, as it protects a specific element of the power system.  However, aspects of power system protection that have lower requirements in terms of the speed of response (e.g. backup protection) and are less selective can be improved by using wide area measurements to supervise their behavior.  These mal operations can be attributed to either poor relay settings or hidden failures in the protection system.
  • 6.  Novel system integrity protection schemes (SIPS) that can deploy a wide range of far reaching actions to prevent a cascading failure, adaptive system protection (e.g. adaptive under frequency load shedding), supervisory schemes that improve the security of existing backup protection, and methods that do not change the behavior of system protection but do enhance our understanding of it (e.g. alarming system operators to the risk of false penetration of relay characteristics).  Recent work has begun to focus not only on developing new concepts but also on the practical realization of these.
  • 7. OBJECTIVES OF WIDE AREA PROTECTION SCHEMES  Avoiding inappropriate relay settings for the prevailing system conditions.  Managing wide area disturbances.  Mitigating the impact of hidden failures.  Ensuring a suitable balance between the security and dependability of protection.
  • 8. WIDE AREA PROTECTION SCHEMES (WAPS)  ENHANCING PROTECTIONWITHWIDEAREA MONITORING  ALARMINGAGAINSTTHE RISK OF RELAY CHARACTERISTIC PENETRATION  PREVENTING LOAD ENCROACHMENT  ADJUSTINGTHE BALANCE BETWEENTHE SECURITYAND DEPENDABILITYOF PROTECTION  SUPERVISIONOF BACK-UP ZONES  INTELLIGENT UNDER FREQUENCY LOAD SHEDDING  ADAPTIVEOUT-OF-STEP RELAYING  SYSTEM INTEGRITY PROTECTION SCHEMES (SIPS)  MICROGRID PROTECTION
  • 9. ENHANCING PROTECTION WITH WIDE AREA MONITORING  The goal of protection is to protect individual elements of the power system from damage and to protect the security of the power system itself. In the case of primary equipment protection there is very little role for the use of wide area monitoring.This is because primary protection must reliably deliver a very fast response for any fault on the element that it protects.  However, the slower speed of response required for backup protection and the fact that it protects a zone of the system means that wide area monitoring can be a useful tool for improving its performance.The most effective means for ensuring that the system will survive extreme conditions and wide area disturbances is a high degree of built in redundancy and strength
  • 10. Wide area measurements offer the potential to create supervisory schemes for backup protection, more advanced forms of system protection and entirely new protection concepts. Some of them are: 1. Adaptive relays that update their settings as the system state changes. 2. Improved protection of multi terminal lines. 3. Adaptive end of line protection that monitors the remote breaker, if it is open the under reaching Zone 1 is replaced with an instantaneous characteristic. 4. Temporarily adapt relay settings to prevent mal operation during cold load pickup. 5. Use the ability of digital relays to self-monitor to identify hidden failures and use the hot swap functionality offered by International Electro technical Commission to remove them. 6. Intelligent controlled islanding that preempts an uncontrolled system separation by implementing an adaptive controlled separation
  • 11. ALARMING AGAINST THE RISK OF RELAY CHARACTERISTIC PENETRATION  The objective of this application is to detect when the impedance observed by a relay approaches the relay characteristic under non-faulty conditions.This information is then used to alarm protection engineers to a relay setting that is potentially unsuitable.
  • 12. PREVENTING LOAD ENCROACHMENT  Heavily loaded lines may encroach on the settings of relays and cause an incorrect and inappropriate tripping operation during stressed conditions and power swings.  With the computational power of digital relays this can be overcome by using real time measurements of the load to prevent load encroachment by compensating the relay input of load current.
  • 13. ADJUSTING THE BALANCE BETWEEN THE SECURITY AND DEPENDABILITY OF PROTECTION  Balancing the demands of dependability and security is one of the greatest challenges during the design of protection.  During a wide area disturbance, this preference for dependability can result in incorrect and inappropriate tripping operations.  It would attractive to shift the balance of this compromise toward security during stressed conditions, i.e. when the conditions encountered (e.g. power swings) can increase the likelihood of mal operations and reveal hidden failures.  Wide area measurements could be used to detect that the system has entered a stressed condition and then adjust the protection philosophy to shift the balance away from dependability and toward security.
  • 14. USE OF WAM TO VARY THE BALANCEBETWEEN DEPANDABILITY AND SECURITY
  • 16. SUPERVISION OF BACK-UP ZONES  The mal operation of zone 3 relays was identified as a significant contributing factor to recent blackouts.The unusual load currents and power swings observed during wide area disturbances can cause these relays to operate undesirably. Examples of the system behavior that can cause mal operation of a relay are shown in Fig. 3.  The remote PMUs are installed within the protection zone of the backup relay and monitor the current at these remote locations.  These devices implement a simple pickup characteristic and communicate a binary pick up signal to the backup relay.  If the backup relay characteristic is violated but none of the remote devices have picked up, then it can be concluded that no fault has occurred and the backup relay operation can be blocked.  This prevents load swings during extreme conditions from being misinterpreted as faults and helps prevent the mal operation of backup relays from allowing a wide area disturbance to spread through the system.
  • 17.
  • 18. INTELLIGENT UNDER FREQUENCY LOAD SHEDDING  Load shedding is the traditional last line of defense against extreme under frequency conditions.  Current practice is mostly for this shedding to be delivered using a sequence of stages of shedding that are triggered when a certain frequency threshold is violated.  Shedding load more quickly after a loss of in feed is recognized as an effective means for limiting the frequency deviation with a reduced amount of load shedding.  However, balancing the benefits of an increased speed of response against the risk of unnecessary shedding is a challenge.
  • 19. Extensive research has been undertaken to create more advanced load shedding schemes that use wide area measurements to reduce the amount of load shed by: 1. Adapting the amount of load shed to the prevailing system conditions, e.g. inertia. 2. Initiating the load shedding more quickly.  Initiating the load shedding more quickly can be achieved by using event based signals (e.g. the loss of a major interconnector or generator) or by using more complex triggering signals (e.g. triggering based on rate of change of frequency).  Furthermore, the amount of load shed can be adapted to the size of the disturbance and system inertia using wide area measurements.  Examples of this work include the adaption of shedding based on measurements of rate of change of frequency (RoCoF) immediately after the disturbance.  Quick measuring of RoCoF is very challenging. But it is easily measured by PMUs which are adopted inWAPS.
  • 20. ADAPTIVE OUT-OF-STEP RELAYING  Out of step conditions and system separation are key precursors to system collapse and blackouts. As the formation of an electrical center approaches the system will experience extreme power swings that will further exacerbate stressed conditions and drive the system closer to collapse.Therefore, it is imperative that any potential out of step condition is quickly recognized and prevented; this is the role of out of step relays
  • 21.  A wide area protection scheme could be developed that monitors the positive sequence voltages across the system. These synchronized real time measurements can be used to predict if regions of the system are approaching an out of step condition.  This prediction could be used to initiate a controlled separation of the areas that are losing synchronism or, if the prediction is available sufficiently in advance, actions could be taken to prevent the out of step condition from occurring and avoid system separation entirely.  The challenge faced when developing such a scheme would be selecting the measurement locations and developing the algorithms for achieving robust real time coherency determination when the coherent generator groups are variable.
  • 22. SYSTEM INTEGRITY PROTECTION SCHEMES (SIPS)  SIPS protect power system security from extreme contingencies or wide area disturbances that are beyond the scope of traditional protection.  The stages involved in the execution of a SIPS are: 1. Identification and prediction of stressed conditions,` 2. Classification of the threat to system security, ́ 3. Decisions and actions, 4. Coordination, and 5. Correction.  Examples of SIPS include: generator rejection, load rejection, under frequency and voltage load shedding , system separation, dynamic braking, and turbine valve control.  SIPS is used of their ability, such as availability of real time wide area measurements, to identify complex emerging threats to the power system and respond to them quickly .
  • 23. MICRO GRID PROTECTION  The changes faced by distribution networks include the connection of energy storage, electric vehicles, smart meters, demand side participation and the connection of distributed generation (DG).  The protection schemes of DG is very similar to the infrastructure of the transmission lines.  However, the smaller angular separation across a distribution network means that measurement of angles on the distribution network is more demanding than it is at the transmission level.  A particularly important enabler for these new protection principles are microprocessor relays that can vary their settings easily.  WAP delivers the protection needs of future distribution systems.
  • 24.
  • 25.
  • 26. CONCLUSION  WAM offers a wide variety of opportunities for enhancing the backup protection and system protection of modern power systems.These enhancements can contribute to reducing the likelihood of the mal operation of backup relays, limiting the impact of hidden failures and creating new tools for managing wide area disturbances.These benefits indicate that the main role of wide area monitoring as part of protection is improving the resilience of power systems against stressed conditions and wide area disturbances, not the isolation of individual faults.The well- considered deployment of these new concepts should reduce the frequency and intensity of blackouts and enable more rapid service restoration
  • 27. REFERENCES [1] Phadke AG,Thorp JS, Adamiak MG (1983) A new measurement technique for tracking voltage phasors, local system frequency, and rate of change of frequency. IEEETrans Power Appar Syst 102(5):1025–1038. [2] TerzijaV,Valerde G, Cai DY et al (2011)Wide-area monitoring, protection, and control of future electric power networks. Proc IEEE 99(1):80–93. [3] Phadke AG (2002) Synchronized phasor measurements-a historical overview. In: Proceedings of the IEEE PES transmission and distribution conference and exhibition 2002: Asia Pacific, vol 1,Yokohama, Japan, 6–10 Oct 2002, pp 476–479. [4] Phadke AG (2008)The wide world of wide-area measurement. IEEE Power Energy Mag 6(5):52–65. [5] Horowitz SH, Phadke AG (2006)Third zone revisited. IEEETrans Power Deliv 21(1):23–29.