This document provides background information and outlines the objectives and methodology for a study on factors affecting the academic performance of postgraduate students at Uganda Management Institute's Gulu Center. Specifically, the study aims to examine the relationship between academic performance and three factors: students' admission points, their parents' socioeconomic status, and their former school background. The literature review discusses previous research supporting the hypothesized relationships between these factors and academic performance. The proposed methodology is a qualitative design utilizing questionnaires distributed to current and past postgraduate students and their facilitators at UMI Gulu Center. The responses will be analyzed to determine the influence of the three independent variables on students' academic performance.