This document outlines an electrical specialist training program held in Bandung, Indonesia from April 16-28, 2012. It provides details on the training subjects and standards covered each day, including generators, protection systems, transformers, motors, drawings, hazardous area installations, and regulations. Trainers are electrical engineers from the Institute of Technology Bandung and representatives from the Ministry of Labour. Recommended maintenance procedures and standards for electrical equipment are also provided, including visual inspections, oil analysis, current and insulation resistance testing, and winding resistance measurements.
Producing PCB transformers since 1981, now Itacoil also provides support to SMPS designers and manufacturers for the design and pre-compliance of the converters equipped with Itacoil components.
The primary aim of the demo board optimization shown in this comparative test report was cost saving, maintaining the same general properties of the original NXP TEA2016DB1519v2 board, along with any possible efficiency improvement basically with no other action than the replacement of the LLC resonant transformer, PFC inductor, Common Mode and Differential noise mains filter.
No expensive materials such as nanocrystalline cores, costly alloy powders cores, etc. have been used.
This is a synthetic version of the full test report, that you can request by clicking on the dedicated link in the slides or by email to contatto@itacoilmail.it.
Producing PCB transformers since 1981, now Itacoil also provides support to SMPS designers and manufacturers for the design and pre-compliance of the converters equipped with Itacoil components.
The primary aim of the demo board optimization shown in this comparative test report was cost saving, maintaining the same general properties of the original NXP TEA2016DB1519v2 board, along with any possible efficiency improvement basically with no other action than the replacement of the LLC resonant transformer, PFC inductor, Common Mode and Differential noise mains filter.
No expensive materials such as nanocrystalline cores, costly alloy powders cores, etc. have been used.
This is a synthetic version of the full test report, that you can request by clicking on the dedicated link in the slides or by email to contatto@itacoilmail.it.
ST on 96Boards OpenHours - System level ESD protection96Boards
These are the presentation slides that are linked to the 96Boards OpenHours episode #36. This episode can be found on YouTube here:
https://youtu.be/pgK_JRJtBzY
Please join us every week: www.96Boards.org/OpenHours
PT. Siwali Swantika merupakan distributor resmi Fluke di Indonesia. Selain penjualan alat ukur Fluke, perusahaan kami juga menyediakan jasa kalibrasi dan jasa perbaikan untuk alat ukur Fluke. Informasi lebih detail hubungi PT. Siwali Swantika, Jakarta Office : 021-45850618 atau Surabaya Office : 031-8421264
The LayerZero Series 70: eRPP Remote Power Pane is a web-enabled RPP that is designed to maximize operator safety. Equipped with two 42-circuit panel boards, eRPP has an output of 84 circuits. Contact LayerZero to learn more about the eRPP.,
Inductive shielded superconducting fault current limiter: test results for sc...Franco Moriconi
Results of measurements with a downscaled model of a novel superconducting inductive Shielded Fault Current Limiter (iSFCL) based on 2nd generation HTS material are reported. Two different types of models were tested, one with an open iron core and one with a closed iron core. The operational characteristics of both systems with focus on the superconducting secondary modules in normal operation and in quenching mode with quench times of up to 500 ms are analyzed. The HTS modules are based on 40 mm wide YBCO coated conductors with a high-ohmic protection layer and an external shunt system. Further development/testing program includes a 3-phase-field trial, where a full scale technology demonstrator (15-MVA class) will be integrated in the distribution grid of the utility Stadtwerke Augsburg in Germany. This joint project of Schneider Electric, Bruker HTS, Bruker Advanced Supercon and Stadtwerke Augsburg is supported by the German Federal Ministry of Economics and Technology (BMWi)
ST on 96Boards OpenHours - System level ESD protection96Boards
These are the presentation slides that are linked to the 96Boards OpenHours episode #36. This episode can be found on YouTube here:
https://youtu.be/pgK_JRJtBzY
Please join us every week: www.96Boards.org/OpenHours
PT. Siwali Swantika merupakan distributor resmi Fluke di Indonesia. Selain penjualan alat ukur Fluke, perusahaan kami juga menyediakan jasa kalibrasi dan jasa perbaikan untuk alat ukur Fluke. Informasi lebih detail hubungi PT. Siwali Swantika, Jakarta Office : 021-45850618 atau Surabaya Office : 031-8421264
The LayerZero Series 70: eRPP Remote Power Pane is a web-enabled RPP that is designed to maximize operator safety. Equipped with two 42-circuit panel boards, eRPP has an output of 84 circuits. Contact LayerZero to learn more about the eRPP.,
Inductive shielded superconducting fault current limiter: test results for sc...Franco Moriconi
Results of measurements with a downscaled model of a novel superconducting inductive Shielded Fault Current Limiter (iSFCL) based on 2nd generation HTS material are reported. Two different types of models were tested, one with an open iron core and one with a closed iron core. The operational characteristics of both systems with focus on the superconducting secondary modules in normal operation and in quenching mode with quench times of up to 500 ms are analyzed. The HTS modules are based on 40 mm wide YBCO coated conductors with a high-ohmic protection layer and an external shunt system. Further development/testing program includes a 3-phase-field trial, where a full scale technology demonstrator (15-MVA class) will be integrated in the distribution grid of the utility Stadtwerke Augsburg in Germany. This joint project of Schneider Electric, Bruker HTS, Bruker Advanced Supercon and Stadtwerke Augsburg is supported by the German Federal Ministry of Economics and Technology (BMWi)
The Client (Mr.Nizam Hashwani) procured services of Zorays SMC Pvt Limted to get the preinstalled 42.2kW solar power system tied with the K-Electric grid. This pre-installed system required retrofit to meet compliance with AEDB & K-Electric net-metering regulations.
We are Manufacturer and Exporter of REAL A Grade Solar Panels in China . Prices are BEST and quality is APPROVED ! Please contact me for your inquiries... ( haldansumer@gmail.com )
To download head to http://solarreference.com/solar-pv-codes-brooks/
Also available on the Brook Solar website (they have some quality stuff)
This presentation from Brook Solar (Now Brooks Engineering LLC) is a wonderful compilation of the standards in place in the PV industry. But you do know that standards are like babies, they don't stop growing!
For more quality information visit http://solarreference.com/
Catalog thiết bị đóng cắt Fuji Electric - 07 - ELCB
*********************************************************************
CTY TNHH HẠO PHƯƠNG - Nhà phân phối chính thức các thiết bị điện công nghiệp và tự động hóa của hãng FUJI ELECTRIC JAPAN tại Việt Nam
Xem chi tiết các sản phẩm Fuji Electric tại
http://haophuong.com/b1033533/fuji-electric
Catalog Contactor FJ Series - Beeteco
Beeteco.com là trang mua sắm trực tuyến thiết bị điện - Tự động hóa uy tín tại Việt Nam.
Chuyên cung cấp các thiết bị: Đèn báo nút nhấn, Relay, Timer, Contactor, MCCB ELCB, Biến tần, Van, Thiết bị cảm biến, phụ kiện tủ điện, .... Từ các thương hiệu hàng đầu trên thế giới.
www.beeteco.com @ Công ty TNHH TM KT ASTER
Địa chỉ : Số 7/31 KDC Thương Mại Sóng Thần, KP. Nhị Đồng 1, P. Dĩ An, Tx. Dĩ An, Tỉnh Bình Dương
FB: www.facebook.com/beeteco
Email: contact@beeteco.com
Tel: 0650 3617 012
Hotline: 0909.41.61.43
CHUANGYIN split core is widely applied in many globally utilities, and government projects. Any questions please contact sales01@chuangy.com Mr. Eric Bin
Fuji thiet bi dien-elcbfuji-160413044256Thuan Kieu
Fuji thiet bi dien-elcbfuji-160413044256
Catalog Fuji,
Catalog Thiết Bị Điện Fuji,
Catalog Điện Công Nghiệp Fuji,
http://dienhathe.com,
Xem thêm các sản phẩm khác của Fuji tại https://dienhathe.com
Để nhận báo giá sản phẩm Fuji vui lòng gọi: 0907.764.966
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgDien Ha The
Khoa Học - Kỹ Thuật & Giải Trí: http://phongvan.org
Tài Liệu Khoa Học Kỹ Thuật: http://tailieukythuat.info
Thiết bị Điện Công Nghiệp - Điện Hạ Thế: http://dienhathe.vn
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
2. Training Subject on 1-st Week
Date Subject Reference
Standard
Trainer
Mon,16 Apr ’12
(08:00 – 17:00)
GENERATOR
(Theory, Basic Operation, System Protection,
Testing & safety inspection, maintenance )
• IEEE std C37.102-2005 Ir. Hasan Surya SE,MT
(from Institute Technology
Bandung (ITB))
Tue, 17 Apr ‘12
(08:00 – 17:00)
PROTECTION SYSTEM
(High Voltage (> 20 KV), medium voltage (415V –
20 KV), low voltage (415 V >)
• SNI 04-0225.3-2000
• IEEE std 242 – 2001
• IEEE std 1015 - 2006
Ir. Yudi Prana Hikmat MT
(from Institute Technology
Bandung (ITB))
Wed,18 Apr ‘12
(08:00 – 17:00)
• TRANSFORMATOR
(Theory, Basic Operation, System Protection,
Testing & safety inspection, Maintenance )
• LIGHTNING PROTECTION
(Theory, Basic calculation for protection system )
• IEEE std C57.106-2002
• IEEE std C37.91-2000
• NFPA-780 2004
• SNI IEC 62305-2 2008
• IEEE Std 998-1996
Ir. Hasan Surya SE,MT
(from Institute Technology
Bandung (ITB))
Thu,19 Apr ‘12
(08:00 – 17:00)
SYNCHRONOUS, INDUCTION & DC MOTOR
(Theory, Basic Operation, System Protection,
Testing & safety inspection, maintenance )
• IEEE Std C37.96-2000
• IEEE Std 43 – 2000
• IEEE Std 432-1992
• SNI 04-0225.5-2000
•NFPA 70B
Ir. Yudi Prana Hikmat MT
(from Institute Technology
Bandung (ITB))
Fri, 20 Apr ‘12
(08:00 – 17:00)
DESIGN DRAWING OF ELECTRICAL
INSTALLATION
(factory, building, hospital, Power house, Mining
Industries)
• SNI 04-0225.4-2000
• IEEE Std 315 – 1993
Ir. Robert A. Phillipus MT
(from Institute Technology
Bandung (ITB))
Sat, 21 Apr ‘12
(08:00 – 17:00)
SPECIAL ELECTRICAL INSTALLATION FOR
HAZARDOUS AREA
(Theory , System Protection, Testing & safety
inspection )
• SNI 04-0225.8-2000
• IEC 60364-7 2008
• NEC Article 500
DR. Ir. Toto Tohir MT
(from Ministry of Labour
and Transmigration
representative)
Note :
• IEEE : Institute of Electrical and Electronics Engineer
• NFPA : National Fire Protection Association
• IEC : International Electrotechnical Commission
• NEC : National Electric Code
• SNI : Standard National Indonesia
3. Training Subject on 2-nd Week
Date Subject Reference
Standard
Trainer
Mon, 23 Apr ’12
(08:00 – 17:00)
INDONESIAN REGULATION
(General, Electrical & Lightning Safety Roles)
Indonesian Government Regulation :
• UU No 1/1970
• Kep -75/MEN/2002
• Kep – 311/BW/2002
• Per-02/MEN/1989
• Per-05/MEN/1996
Ir. H. Ganjar Budiarto, Bc.
Eng
(from Ministry of Labour
and Transmigration
representative)
Tue, 24 Apr ‘12
(08:00 – 17:00)
SWITCHGEAR (LVMDP & MVMDP)
(Grounding system, Switchboard, Cable, Insulation
tester, Earth Tester, Multi Tester, LBS, DS, CB,
Arresters, etc)
• SNI 04-0225.7-2000
• IEC 60228
• IEC 60269
DR. Ir. Toto Tohir MT
(from Ministry of Labour
and Transmigration
representative)
Wed, 25 Apr ‘12
(08:00 – 17:00)
• INSPECTION TEST
(grounding system, insulation system, power
generator)
• SAFETY AUDIT ELECTRICAL INSTALLATION at
Polytechnic Institute Technology Bandung
• IEEE Std 515 – 1997
• SNI 04-0225.9 - 2000
Ir. Yoseph M.
Ir. Sutanto S.
Ir. Robert A. Phillipus MT
Thu, 26 Apr ‘12
(08:00 – 17:00)
DESIGN LIGHTING SYSTEM INSTALLATION
(lux, lumen, RGB factor, Design interior, lighting
intensity, etc)
• IEEE std 32 - 1972 Ir. Robert A. Phillipus MT
(from Institute Technology
Bandung (ITB))
Fri, 27 Apr ‘12
(08:00 – 17:00)
FINAL TEST
(Written test, Audit Presentation, Interview Test)
Ir. Robert A. Phillipus MT
Ir. Yudi Prana Hikmat MT
DR. Ir. Toto Tohir MT
Ir. Hasan Surya SE,MT
4. EmployeeEmployee
KarawangKarawang
regent officerregent officer
KarawangKarawang
regent officerregent officer
Governor
West of Java
Governor
West of Java
Directorate General of laborDirectorate General of labor
development supervisorydevelopment supervisory
Ministry of labour andMinistry of labour and
transmigrationtransmigration
Specialist HSWSpecialist HSWSpecialist HSWSpecialist HSW
Directors HSWDirectors HSW
Structure
Organization
Indonesia HSW
ILTIILTI
ManagementManagement
ILTIILTI
ManagementManagement
Staff HSWStaff HSWStaff HSWStaff HSW
HSW : Health Safety Work (K3)
KarawangKarawang
Safety OfficerSafety Officer
KarawangKarawang
Safety OfficerSafety Officer
DoctorDoctorDoctorDoctor
Electrical
specialist
5. SAFETY IN NUMBER
Occupational accidents (19 per cent)
Main contributing and preventable factors:
• lack of company/enterprise safety and health policy, structure,
worker/employer collaborative mechanism, lack of occupational safety and
health management system
• poor safety culture
• lack of knowledge, available solutions, awareness, information centres
• lack of or poor government policies, lack of or poor legal enforcement and
advisory system, lack of or poor tripartite cooperation
• lack of incentive-based compensation system (experience rating)
• lack of or poor occupational health services
• lack of research and proper statistics for priority setting
• lack of effective training and education system at all levels.
6. ELECTRICAL POTENTIAL HAZARD
1. Distortion Electrical Supply
1 Harmonic Distortion 5 Power Surges 9 Power Failure1 Harmonic Distortion 5 Power Surges 9 Power Failure
2 Switching Transients 6 Power Sags2 Switching Transients 6 Power Sags
3 Line Noise3 Line Noise 7 High Voltage Spikes7 High Voltage Spikes
4 Frequency Variations 8 Brownouts4 Frequency Variations 8 Brownouts
2. Direct Lightning Strike
Protect byProtect by
LIGHTNING CURRENTLIGHTNING CURRENT
ARESTERARESTER
HARMONIC PROTECTIO N DEVICESHARMONIC PROTECTIO N DEVICES
This equipment already install onThis equipment already install on
FB05,06,07,08,09 & DCS systemFB05,06,07,08,09 & DCS system
RECOMMENDED TO INSTALL ONRECOMMENDED TO INSTALL ON
ELECTRICAL PANEL SYSTEMELECTRICAL PANEL SYSTEM
(MCC & SDP to protect Motor, DCS &(MCC & SDP to protect Motor, DCS &
Filler machine)Filler machine)
3. Electrical Shock
UNINTERUPTUNINTERUPT
POWER SUPPLYPOWER SUPPLY
(UPS)(UPS)
Protect byProtect by
This equipment already install on FB08,09This equipment already install on FB08,09
Filler MC & DCS systemFiller MC & DCS system
Protect byProtect by
This equipment NOT YET Install on ILTI PlantThis equipment NOT YET Install on ILTI Plant
it should be install on electronic devicesit should be install on electronic devices
This equipment NOTThis equipment NOT
RECOMMENDED byRECOMMENDED by
std IEEE, NFPA & SNIstd IEEE, NFPA & SNI
Protect byProtect by
Protect byProtect by
Protect byProtect by
Ground systemGround system
INSULATION TRANSFORMERINSULATION TRANSFORMER
This equipment already install onThis equipment already install on
FB05,06,07,08, & 09FB05,06,07,08, & 09
Direct contactDirect contact Indirect contactIndirect contact
Earth Leak Circuit Breaker (ELCB)Earth Leak Circuit Breaker (ELCB)
This equipment NOT YET InstallThis equipment NOT YET Install
on ILTI Planton ILTI Plant
7. 1. All of ILTI Single line diagram should be revised follow
international standard (IEC, IEEE 315: 1975, SNI 04-0225.
2. Switchboard office , MVMDP & Transformer should be
maintenance for insulation cable test
: Drawing not standard
: It should be maintenance
ILTI sample drawing for single line diagram
: It should be install CB
8. ILTI Sample calculation (P-MCC7) for
protection system
Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge
Mo t o r Spe c if ic a t io n
1 Powe r P (kW) 1 1 1 1 1 1 1 1 1 1 7.5 7.5 1 1
2 Nominal Curre nt In (A) 22.8 22.8 22.8 22.8 22.8 1 5.8 1 5.8 22.8
Sys t e m Pro t e c t io n
1 Cable (1) s td ≤ Ac t (A) 28.5 35 OK 28.5 35 OK 28.5 35 OK 28.5 35 OK 28.5 35 OK 19.75 25 OK 19.75 25 OK 28.5 35 OK
s td ≤ Ac t (mm
2
) 4 6 OK 4 6 OK 4 6 OK 4 6 OK 4 6 OK 2.5 6 OK 2.5 6 OK 4 6 OK
2 Ove rload s e t s td ≥ Ac t (A) 23 19 OK 23 19 OK 23 19 OK 23 19 OK 23 19 OK 16 15 OK 16 15 OK 23 19 OK
3 Contac tor s td ≤ Ac t (KW) 11 11 OK 11 11 OK 11 11 OK 11 11 OK 11 11 OK 7.5 11 OK 7.5 11 OK 11 11 OK
4 MCCB (1) s td ≤ Ac t (A) 57 63 OK 57 63 OK 57 63 OK 57 63 OK 57 63 OK 39.5 50 OK 39.5 50 OK 57 OK
Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge Std Ac tual J udge
Mo t o r Spe c if ic a t io n
1 Powe r P (kW) 7.5 7.5 7.5 6.6 6.6 6.6
2 Nominal Curre nt In (A) 1 5.8 1 5.8 1 5.8 1 5.7 1 5.7 1 5.7
Sys t e m Pro t e c t io n
1 Cable (1) s td ≤ Ac t (A) 19.75 25 OK 19.75 25 OK 19.75 25 OK 19.63 25 OK 19.63 25 OK 19.63 25 OK
s td ≤ Ac t (mm
2
) 2.5 6 OK 2.5 6 OK 2.5 6 OK 2.5 6 OK 2.5 6 OK 2.5 6 OK
2 Ove rload s e t s td ≥ Ac t (A) 16 15 OK 16 15 OK 16 15 OK 16 15 OK 16 15 OK 16 15 OK
3 Contac tor s td ≤ Ac t (KW) 7.5 11 OK 7.5 11 OK 7.5 11 OK 6.6 11 OK 6.6 11 OK 6.6 11 OK
4 MCCB (1) s td ≤ Ac t (A) 39.5 50 OK 39.5 50 OK 39.5 50 OK 39.25 50 OK 39.25 50 OK 39.25 50 OK
Note : 1. minimum design Cable for Sequirel Cage motor should be increase 125% from nominal Current (In) (PUIL 2000 : 5.5.3.1)
2. minimum design CB for Sequirel Cage motor should be increase 250% from (nominal current (In) (PUIL 2000 : 5.5.5.23)
P- PT 067 P- PT 068
P- MT264 P- MT265 P- MT266 M- MT264 M- MT265 M- MT266
P- PT 061 P- PT 062 P- PT 063 P- PT 064 P- PT 065 P- PT 066
Un itSTDEqu ipm e n t
Equ ipm e n t STD Un it
1. Protection system for Switchboard MCC7 is already completed
follow minimum standard requirement from IEC 60228 ,SNI 04-
0225.5-2000, IEEE C37.96-2000
2. Need Calculation for others Switch board (MCC1 – 6, LP, PP, etc)
9. No Maintenance Activity Perform Characteristic Frequency Standard
1 Visual Inspection Minimum Inspection should look for:
• Evidence of damage caused by dirt, loose parts, or foreign objects.
• Verification that air inlets are not blocked
• Evidence of moisture and/or dirt build-up
• Unusual noises, leaking oil seals, or high v ibration
• Oil level gages (if present) should be checked
• Evidence of degradation of foundation, bed plates, anchor bolts
• Evidence of oil rings turning (if applicable)
• Evidence of leaking oil and piping and connections
6 month • NFPA 70B - 2006
• IEEE std 43-2000
2 Oil analysis Sample and analyze.
• Look at overall conditions and check for foreign matter, additive depletion,
varnish precursors and metallic elements.
12 month • NFPA 70B - 2006
• IEEE std 43-2000
3 Running Current • Record and trend all three phase currents and verify the currents are balanced
and do not exceed nameplate rating.
• Each phase should be within +/- 5% of the average of all three phase
12 month • NFPA 70B - 2006
• IEEE std 43-2000
4 Insulation Resistance • Perform IR check between motor leads and ground. This determines condition of
the ground insulation with acceptable reading > 5MΩ
24 month • NFPA 70B - 2006
• IEEE std 43-2000
• SNI 04.0225-2000
5 Polarization index (PI) • Ratio of the 10 minute IR to the 1 minute IR. (10 min IR / 1 min IR)
• Determines condition of ground insulation
• Test voltages similar to the IR test voltages Acceptance criteria ratio > 2
24 month • NFPA 70B - 2006
• IEEE std 43-2000
• SNI 04.0225-2000
6 Winding resistance • A comparison of the line to line resistances of the motor’s winding. This test
should be done at the motor terminals using a meter capable of measuring low
resistance (milliohms). A typical ohm meter does not have adequate accuracy.
Record, temperate correct and trend. Each phase should be within +/- (3% - 5%)
of the average of all three phases
24 month • NFPA 70B - 2006
• IEEE std 43-2000
• SNI 04.0225-2000
7 Stator visual Inspection Inspection should look for:
• coil movement , plugged vent holes , soft or degraded insulation
• coil bracing adequate and intact , lamination damage
• partial discharge activity , tightness of wedges
60 month • NFPA 70B - 2006
• IEEE std 43-2000
8 Rotor visual Inspection Inspection should look for:
• cracks in rotor bars , balance weights properly secured
• signs of bar movement , signs of rotor/stator rub or lamination damage
• cooling ducts clear , rubbing marks on shaft
•keyway distortion
60 month • NFPA 70B - 2006
• IEEE std 43-2000
Motor Maintenance as NFPA & IEEE Std Recommendation
10. ILTI Grounding System
1. ILTI Grounding facility
Earth Resistance Test
(Instrument)
3 point Method
(NFPA 780)
No Maintenance
Activity
Perform Characteristic Freque
ncy
Standard
1 Visual Inspection Minimum Inspection should look for:
(1) The system is in good repair.
(2) There are no loose connections that might result in high-resistance joints.
(3) No part of the system has been weakened by corrosion or vibration.
(4) All down conductors and ground terminals are intact (non severed).
(5) All conductors and system components are fastened securely to their mounting surfaces and are
protected against accidental mechanical displacement as required.
(6) There have not been additions or alterations to the protected structure that would require
additional protection.
(7) There is no visual indication of damage to surge suppression (overvoltage) devices.
(8) The system complies in all respects with the current edition of this
standard.
6
month
• NFPA 780 :2004
• SNI IEC 62305-2 2008
2 Earth Resistance
Test
•The instrument used in earth resistance testing should be capable of measuring 0 ohm to 5 ohms
•The instrument used to measure bonding resistance should be capable of measuring 0 ohm to 1
ohm ± 10 percent.
12
month
• NFPA 780 :2004
• SNI IEC 62305-2 2008
1. Need Instrument Earth Resistance Test to full fill Indonesia Safety
Regulation no SNI IEC 62305-2 2008 or sub cont to 3-rd parties
2. Need Instrument Insulation Tester SNI 04-0225.3-2000 or sub cont
to 3-rd parties
Insulation Tester
11. ILTI Lightning Protection System (LPS)
NFPA 780 as Standard for the Installation of Lightning Protection Systems 2004 Edition,
determine the lightning risk assessment to provide the safeguarding of persons and property from hazards
arising from exposure to lightning.
Based on data from BMG website, thunderstorm day (Value (number) of thunderstorms
measured daily (Td/yr.)) defined as isoceraunic level (translated to Bhs. Indonesia as IKL) for Karawang
region is considered high with value (Ng) = 0.1x 31 km2
/years =3.1 km2
/years . (see figure 1)
The yearly lightning strike frequency (Nd) to a structure is determined by the following equation:
Nd = Ng . Ae . C1. 10-6
And the yearly lightning strike frequency for idemitsu plant are : 1.7 x 10-2
figure 1 :isoceraunic level
• The equivalent collective area of the structure (Ae)
on ILTI plant could be determine by formula :
Ae : Π.9.H2
m2
With H = 20 m. Then Ae : 11,304 m2
• others factor we should be determine are
environment coefficient (C1). Base on NFPA 780 table
L.4.3 ILTI plant Structure located within a space
containing structures or trees of the same height or
taller within a distance of 3H with index point : 0.5
•The yearly lightning strike frequency
12. Lightning Protection
To determine the tolerable of lightning frequency base on NFPA 780, we can be follow the formula below :
Nc = 1.5 x 10-3
/ C = 3 x 10-4
with C = C2.C3.C4.C5
•Tolerable lightning frequency & lightning protection
level
• C2 : Determination of structural from metal Roof : 0.5
• C3 : Standard value and non flammable : 1.0
• C4 : Normal occupied : 1.0
• C5 : Consequences to the environment : 10
1. ILTI plant should be install Lightning
Protection System (LPS) with Class IV.
2. Type of Lightning Protection on ILTI plant is
NOT RECOMENDED as STD IEEE 998:1996,
NFPA 780 & SNI 62305-2:2008
Nd > Nc : Lightning Protection System should be install
1-Nc/Nd = 83% Class of Lightning Protection System (LPS)
for ILTI plant : Level IV (Low level)
Type of lightning protection on ILTI Plant :
Early Streamer Emission (ESM) lightning rods type (Active lightning Terminal)
1. Article 6 : Active lightning Terminal :
It should be noted that IEEE does not recommend or endorse commercial offerings for
early streamer emission system. (IEEE 998 : 1996)
2. Chapter 1 : Administration
1.1.3 This document shall not cover lightning protection system installation requirements
for early streamer emission systems or charge dissipation systems..(NFPA 780: 2004)
ILTI Lightning Protection System (LPS)
13. Lightning Protection
•Traditional LPS Recommendation for ILTI
ILTI Lightning Protection System (LPS)
1. ILTI plant should be install Traditional
Lightning Protection System (LPS) with Class
IV as recommendation STD IEEE 998:1996,
NFPA 780 & SNI 62305-2:2008
14. Conclusion
Review Drawing as Standard (One line diagram, Layout, Detail
drawing, etc)
Review HIRADC (Hazard Identification Risk Assessment
Determine Control) documentation
Review protection system on MCC panel, DCS system,
Packaging machine, lightning protection & Office Equipment
Grounding, switchboard, MCC, lighting system inspection
Review Annual & Mid term preventive Maintenance Schedule
Training Electrical potential hazard on workplace for all
employee minimum 1 times/month
Strong Recommended to add the Lightning Protection System
(LPS) follow Indonesia (SNI) or International Standard (NFPA,
IEEE)
Plan Activity for ILTI Plant :
15. Work Activity (Bandung, 16 – 27 April 2012)
1. Sharing information of electrical
trouble shooting on each of company
2. Education, share knowledge, post
Test & pre test
3. Test & analyze synchronous
generator
4. Test & analyze Switchboard
5. Test & analyze Lightning
protection
6. Test & Analyze Grounding
system
7. Presentation safety audit
8. Final test (written test & interview)
16. RESULT FINAL TEST
N
o
Name Company Knowledge Skill Attitude Total Status
1 SANDY DAARIAAT, ST PT. IDEMITSU LUBE
TECHNO INDONESIA
79.17 80 80 79.589 PASS
2 RONY AFANDI RAHMAN, ST PT. KALTIM PRIMA
COAL (KPC)
72.33 66.5 80 72.115 PASS
3 HARMAWAN WITARNO, ST PT. KALTIM PARNA
INDUSTRI (KPI)
72.5 80 80 76.25 PASS
4 ZULKIFLI, ST PT. TRANSPORTASI
GAS INDONESIA (TGI)
73.5 77.5 80 76 PASS
5 LUTFI NUL HAKIM, ST PT. INDONESIA POWER 78 80 80 79 PASS
6 NOFRI NALDI, ST PT. PLN PJB II 76.92 78.5 80 78.01 PASS
Knowledge : 50%
Skill : 30%
Attitude : 20%
PASS : 65-80
NOT PASS : <65