Technical Knowledge: Over 7 years experience in the telecommunications industry. Specialized in testing and
commissioning of Alcatel-Lucent Wimax, Ibust Kyocera, RBS LTE,3.5G, 3G, 2.5G and 2G
equipments, installation & troubleshooting Single Phase & 3 Phase power consumption. Advanced
computer hardware and software skills
Competencies: Able to work effectively in multiracial and multi-cultural environment. Excellent organizational
skills. Able to manage workload effectively, confident, meticulous and multi-tasking. In depth
knowledge in telecommunication and IT industry/technical terms and processes. Ability to work
within strict time frames and resolute deadlines. Excellent communication skills. Proficient in
making logical and cost effective business recommendations. Able to integrate well and foster
positive and harmonious relationships with personnel within the department and the business.
Employment History
Oversea Assignment: Ericsson Singapore PTE LTD (Agent CommsResources)
Duration: January 2013 till Present
Position: LTE Project Planner
Job Description: SingTel LTE Project
- Planning, scheduling for new and upgrade sites
- Site assign and acknowledgement to local contractor.
- Meeting and discussion with customer on project progress.
1
- Weekly meeting with contractor on site progress and forecast.
- Report & update daily to manager and customer.
- Waiver and Embargo work permit application.
- Out Bond Delivery PO assignment based on site configuration.
- Scheduling on logistic before material issue to contractor
- Tracing on material shortage and provide solution to contractor.
- Fully support & troubleshoot to contractor.
- Site support & monitoring via during installation.
- Documentation control and reporting to Ericsson support teams.
- Site handler daily update and report generate.
- Conduct training and explanations on site installation.
- Documents control on Technical proposal and As-built.
Local Contract: Ericsson Malaysia Sdn Bhd (Agent Jalur Milenium Sdn Bhd)
Duration: May 2012 till November 2012
Position: Project Coordinator
Job Description: Celcom Project Sabah Region
- Planning, scheduling for new and upgrade sites
- Meeting and discussion with customer on project progress
- Report & update daily to manager and customer.
- Scheduling on logistic before material issue to contractor
- Fully support & troubleshoot to contractor.
- Site support & monitoring via during installation.
- Documentation control and reporting to Ericsson support teams.
- Perform acceptance and rectification with customer
2
- ATP document chasing and submit to Ericsson HQ.
- Single Ran SIU installation & troubleshooting.
- 3rd
Carrier upgrade on RBS 6601.
- W900 support & troubleshooting.
- Script analyzing on Datafill & CDD.
Oversea Assignment: LG Ericsson Seoul Korea (Agent Teletek LTD)
Duration: December 2011 till April 2012
Position: Project Troubleshoot Engineer
Job Description: KT Olleh LTE Project
- Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects
solutions on E-NodeB cell site.
- Commissioning & Integration on LTE E-NodeB Dul 6601
- Troubleshooting all kind alarm on equipment cell site
- Conduct training for local contractor
- Scheduling, documentation control and reporting to Ericsson.
- Software package upgrade for LTE E-NodeB Dul 6601
- DT installation using manual & Auto format
- License key file install via Oss & equipment cell site
- Troubleshoot alarm & monitor via Oss to equipment cell site
- Performance monitoring and report via Oss windows
- Parameter entering & checking on equipment cell site
Duration: May 2011 till Nov 2011
Position: Project Troubleshoot Team Leader
3
Job Description: KT Olleh Swap Project
- Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects
solutions on the new RBS cell site.
- Conduct training to local contractor and team member.
- Technical support and explanation to customer.
- Scheduling job function to team member and local contractor.
- Site acceptance and rectification with customer.
- Troubleshooting all kind of alarms at equipment cell site
- Technical support in site specification and equipment location
- Scheduling, documentation control and reporting to Project Manager.
- Cell site equipment and spare logistic control
- Installation and Testing about duo deck RBS 6601
- Sector additional and forth carrier upgrade
- Commissioning and integration on RBS 6601
- Analysis site installation and log file after equipment swap
- Software package upgrade for RBS 6601
- Prepare ESR for project manager
Out Source Contract With: Ericsson Malaysia Sdn Bhd
Duration: January 2010 till April 2011
Position: Operation & Maintenance Engineer
Job Description: Digi Communication (Ipoh) 3G Project
- Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects
solutions on the existing RBS cell site.
- Troubleshooting all kind of performance issues and site alarms on site
- Technical support in site specification and equipment location
4
- Scheduling, documentation control and reporting to Digi & Ericsson.
- Cell site equipment and spare logistic control
- Provide on job training to the Sod Digi for troubleshooting and maintenance
- Perform acceptance on field installation and thru-put test with Digi
- Installation and Testing PTMA and ARET Upgrade
- Commissioning and integration on RBS 6601, 3418 & 6201
- Nobe-B P6 to P7 software Upgrade
- Software package upgrade for RBS 6601, 3418 & 6201
- Recover equipment installation & feeder system after vandalism
Out Source Contract With: Alcatel-Lucent(M) Sdn Bhd
Duration: June 2008 to December 2009
Position: Project Engineer
Job Description: Packet One Wimax Project
- Installation, Commissioning, Testing, Integration and Troubleshooting of
(WBS)Wimax Base Station
- Troubleshooting all kind of performance issues and site alarms on site
- Provide Technical support in site specification and equipment location
- Team leadership and provide training to the local sub-contractor
- Conduct new site Acceptance Test with customers
- Manage SSO sites schedule, Documentation control and Reporting
- Cell site equipment and spare logistic control
- Equipment firmware & software upgrading
In House project With: Maxis Malaysia Sdn Bhd
5
Duration: January 2008 till June 2008
Position: Project Engineer
Job Description: Maxis 3G Upgrade Project.
- Installation, Testing and Troubleshooting in upgrading the HSDPA and Activate IMA for
MAXIS 3G sites.
- Installation and Testing 2nd
Carrier Upgrade and MCPA Upgrade.
- Installation and Testing TxHs, Rx6 and ETM4 Upgrade.
- Troubleshooting all kind of performance issue and alarm on site.
- Technical support in site specification and equipment location.
- Performance drive test with RNC.
- Manage sites schedule, documentation control and reporting
- Cell site equipment and spare logistic control.
Oversea Assignment: Ericsson Bangladesh Limited (Agent E-Com)
Duration: June 2007 till Dec 2007
Position: Project Engineer
Job Description: Ericsson, 2G Banglalink Swap Project (Dhaka, Bangladesh) (3 Month)
- Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx
in/outdoor
- Troubleshooting all kind of performance issues and site alarms on site
- Provide Technical support in site specification and equipment location
- Recommend & Design on new RBS cell site
- Team leadership and provide training to the local sub-contractor
- Conduct new site Acceptance Test with customers
- Manage SSO sites schedule, Documentation control and Reporting
- Cell site equipment and spare logistic control
6
Ericsson, 2G Warid Project (Dhaka, Bangladesh) (3 Month)
- Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx
in/outdoor
- Installation, Commissioning and Troubleshooting of antenna system, power supply equipment
- Troubleshooting all kind of performance issue and alarm on site
- Technical support on site specification and equipment location
- Recommend & Design on new RBS cell site
- Team leadership and provide training to the local sub-contractor
- Conduct new site Acceptance Test with customers
- Manage SSO sites schedule, documentation control and Reporting
- Cell site equipment and spare logistic control
Employer: Next Horizon Communication Sdn Bhd
In House project With: Maxis Malaysia Sdn Bhd
Duration: February 2007 to June 2007
Position: Project Engineer
Job Description: iZZinet , Wireless Broadband Project (formerly known as MoBif Wireless)
- “Site Hunting” and Site Survey for new site location.
- Conduct new site Acceptance Test with customer.
- Installation, Commissioning and Troubleshooting of antenna system, power supply
equipment.
- Installation, Commissioning and Troubleshooting of Kyocera equipment
- Technical support on site specification and equipment location.
- Conduct new site Acceptance Test with customers
- Cell site equipment and spare logistic control.
7
In House project With: Maxis Malaysia Sdn Bhd
Duration: October 2004 till February 2007
Position: Operation & Maintenance Engineer
Job Description: Ericsson, 2G & 3G Maxis Project
- Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx &
3xxx in/ outdoor.
- Installation, Commissioning and Troubleshooting of antenna system, power supply
equipment.
- Troubleshooting all kind of performance issue and alarm on site.
- Technical support in site specification and equipment location.
- Recommend & Design new RBS cell site.
- Team leadership and provide training to the local sub-contractor.
- Conduct new site Acceptance Test with customer.
- Manage new SSO sites schedule, documentation control and reporting
- Cell site equipment and spare logistic control.
- Conduct 2G & 3G site survey (new ,existing and future sites)
Ericsson Malaysia, 3.5G HSDPA Maxis Upgrade Project.
- Installation, Testing and Troubleshooting in upgrading the HSDPA and Activate IMA for
MAXIS 3G sites.
- Installation and Testing 2nd
Carrier Upgrade and MCPA Upgrade.
In House project With: Maxis Malaysia Sdn Bhd
Duration: June 2004 till October 2004
Position: Operation & Maintenance Engineer
Job Description: Preventive Maintenance Project
- Inspection structure and equipment at site.
8
- Report lost or damages site equipments at site.
- Scheduling, documentation control and reporting to Maxis.
- Cell site equipment and spare logistic control.
In House project With: Maxis Malaysia Sdn Bhd
Duration: January 2004 till June 2004
Position: Project Engineer
Job Description: Motorola, 2G Maxis Project
- Installation, Commissioning, Testing, Integration and Troubleshooting of Motorola
Horizonmacro in/outdoor, H2M MINI & H2M in/outdoor.
- Installation, Commissioning and Troubleshooting of antenna system, power supply
equipment.
- Troubleshooting all kind of performance issues and site alarms at site.
- Provide Technical support in site specification and equipment location.
- Recommend & Design on new BTS cell site.
- Team leadership and provide training to the local sub-contractor.
- Conduct new site Acceptance Test with customers.
- Manage new BTS sites schedule, documentation control and reporting.
- Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects
solutions on the existing BTS cell site.
- Cell site equipment and spare logistic control.
Previous Employer: Simnet Communication
Duration: Jun 2001 to Sept 2003
Position: TECHNICAL SUPPORT ENGINEER
Job Description: - Setting up technical department
9
- Heading the Technical Department and Managing staff activities
- Conduct training to staff.
- Indoor sales and servicing.
- Inventory, stock check and liaison with supplier.
Previous Employer: Shuttle Technology Sdn Bhd
Duration: Dec 2000 to April 2001
Position: Technical Supervisor
Job Description:
- Data entry and documentation control.
- Inventory and stock check at all parts.
- Repairing all kind of mobile phone (hardware & software).
Equipment worked on Alcatel-Lucent (M) Sdn Bhd
- Wireshark trace capture
- FTP downloader
- Wimax NemB configuration software
- Zyxel CPE
- Beceem CPE
- Procomm Plus
Ericsson
- Ericsson TEMs Cell Planner (TCP)
- TEMS Investigation 3.2, 4.0, 4.1, 5.0, 5.1
- TEMS Light
- TEMS Pocket
- 3G Node-B RBS 3101, 3202, 3206, 3418, 6201,6601
10
- Ericsson 2G GSM RBS, RBS 2xxx series
- Ericsson Element manager
- Ericsson Moshell
- Ericsson Oss windows
Motorola
- Spectrum Analyzer
- Motorola BTS Horizon I & II (indoor , outdoor)
- Horizonmini, Mcell6, Mcell Arena, Incell
- Motorola OMC
Test equipment used - Mapinfo
- Aircom ASSET Cellplanner
- Ericsson TEMS Investigator
- Anritsu S331D Site Master
- HP 8921A Cell Site Test Set
- HP 8948 Signal Generator
- HP Frequency Counter
- BIRD Thruline Power Meter
- R & S Digital Power Meter
- Sun Rise Handheld E1 tester
Training Courses
- Ericsson 2G – RBS 2xxx Testing & Commissioning
11
- Ericsson 3G – RBS 3xxx Testing & Commissioning
- Ericsson Node-B Commissioning
- iBurst – Testing & Commissioning
- Motorola SYS01 – GSM Interface
- Motorola CP02 – Introduction of Digital Cellular
- Motorola BSS01 – BSS Operation Theory
- Motorola BSS02 – BSS Operation and Maintenance
- WiMAX Testing & Commissioning
Certificate Attach
FI T Di pl oma
Cer t . JPG
References
John Baptist Asokan Low Leong Hua Gin See Wee
Swap Manager Ericsson Malaysia Implementation Manager Ericsson Malaysia Implementation Manager Ericsson Malaysia
Email: john.baptist.asokan@ericsson.com Email : leong-hua.low@ericsson.com Email: gin.see.wee@ericsson.com
Tel: +60123967320 Tel : +60193131530 Tel : +60122818558
12

More Related Content

What's hot

Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDSuvankar Roy
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
Cv Project manager & solution architect ftth
Cv Project manager & solution architect ftthCv Project manager & solution architect ftth
Cv Project manager & solution architect ftth
Taha. Ali.
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resumerksahoo14
 
Blocker cv 2012-12-15
Blocker cv 2012-12-15Blocker cv 2012-12-15
Blocker cv 2012-12-15efb112763
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
saryhasabadly
 
Scott Thorne Resume
Scott Thorne ResumeScott Thorne Resume
Scott Thorne ResumeScott Thorne
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016ABID KAMAL
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
CV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUARCV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUARNazrul Kocy
 

What's hot (20)

Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 
vishal DTS &OPTIMIZATION
vishal DTS &OPTIMIZATIONvishal DTS &OPTIMIZATION
vishal DTS &OPTIMIZATION
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATED
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
mohammed iftequar hussain Telecom
mohammed iftequar hussain Telecommohammed iftequar hussain Telecom
mohammed iftequar hussain Telecom
 
Cv Project manager & solution architect ftth
Cv Project manager & solution architect ftthCv Project manager & solution architect ftth
Cv Project manager & solution architect ftth
 
JAWAD AHMED CV
JAWAD AHMED CVJAWAD AHMED CV
JAWAD AHMED CV
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resume
 
Blocker cv 2012-12-15
Blocker cv 2012-12-15Blocker cv 2012-12-15
Blocker cv 2012-12-15
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
Resume
ResumeResume
Resume
 
n_aquino_CV
n_aquino_CVn_aquino_CV
n_aquino_CV
 
Scott Thorne Resume
Scott Thorne ResumeScott Thorne Resume
Scott Thorne Resume
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
CV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUARCV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUAR
 
Rakesh cv updated
Rakesh cv updatedRakesh cv updated
Rakesh cv updated
 

Viewers also liked

софія русова
софія русова софія русова
софія русова
BodnarSvitlana
 
Christmas throne
Christmas throneChristmas throne
Christmas throne
melsegal
 
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
Ashley Orndorff
 
Kostolac7
Kostolac7Kostolac7
Kostolac7
cecamilicev1
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropboxRichard Kolstad
 
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์ นางสาวสิริวิมล ตับใหว ชคพ 2 2 เลขที่22
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์  นางสาวสิริวิมล  ตับใหว  ชคพ  2 2  เลขที่22ขั้นตอนการประกอบเครื่องคอมพิวเตอร์  นางสาวสิริวิมล  ตับใหว  ชคพ  2 2  เลขที่22
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์ นางสาวสิริวิมล ตับใหว ชคพ 2 2 เลขที่22
Pim Siriwimon
 
Film poster conventions
Film poster conventionsFilm poster conventions
Film poster conventions
karinfalconerbailey
 
David Bowie is ....
David Bowie is .... David Bowie is ....
David Bowie is ....
melsegal
 
8 Hidden Secrets in Houseworks.
8 Hidden Secrets in Houseworks.8 Hidden Secrets in Houseworks.
8 Hidden Secrets in Houseworks.
ECA Extreme Clean Australia
 
Islamilaeabhivaadyam 140702050435-phpapp01
Islamilaeabhivaadyam 140702050435-phpapp01Islamilaeabhivaadyam 140702050435-phpapp01
Islamilaeabhivaadyam 140702050435-phpapp01Aneeb Arayilakath
 

Viewers also liked (12)

софія русова
софія русова софія русова
софія русова
 
Christmas throne
Christmas throneChristmas throne
Christmas throne
 
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
23 Powerful, Inspirational Quotes From Martin Luther King, Jr.
 
Kostolac7
Kostolac7Kostolac7
Kostolac7
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropbox
 
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์ นางสาวสิริวิมล ตับใหว ชคพ 2 2 เลขที่22
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์  นางสาวสิริวิมล  ตับใหว  ชคพ  2 2  เลขที่22ขั้นตอนการประกอบเครื่องคอมพิวเตอร์  นางสาวสิริวิมล  ตับใหว  ชคพ  2 2  เลขที่22
ขั้นตอนการประกอบเครื่องคอมพิวเตอร์ นางสาวสิริวิมล ตับใหว ชคพ 2 2 เลขที่22
 
Test
TestTest
Test
 
Film poster conventions
Film poster conventionsFilm poster conventions
Film poster conventions
 
David Bowie is ....
David Bowie is .... David Bowie is ....
David Bowie is ....
 
Interior (2012)
Interior (2012)Interior (2012)
Interior (2012)
 
8 Hidden Secrets in Houseworks.
8 Hidden Secrets in Houseworks.8 Hidden Secrets in Houseworks.
8 Hidden Secrets in Houseworks.
 
Islamilaeabhivaadyam 140702050435-phpapp01
Islamilaeabhivaadyam 140702050435-phpapp01Islamilaeabhivaadyam 140702050435-phpapp01
Islamilaeabhivaadyam 140702050435-phpapp01
 

Similar to Anthony_Fan_Curriculum_Vitae

Mohamed Ragab Mohamed
Mohamed Ragab Mohamed Mohamed Ragab Mohamed
Mohamed Ragab Mohamed Mohamed Ragab
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh
 
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015wan azri
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiswatantra tripathi
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWAapaa simon
 

Similar to Anthony_Fan_Curriculum_Vitae (20)

CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Alaba Adedayo CV
Alaba Adedayo CVAlaba Adedayo CV
Alaba Adedayo CV
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
 
Mohamed Ragab Mohamed
Mohamed Ragab Mohamed Mohamed Ragab Mohamed
Mohamed Ragab Mohamed
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
CV-Trivinder
CV-TrivinderCV-Trivinder
CV-Trivinder
 
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
My_C V
My_C VMy_C V
My_C V
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Suman-Bakshi
Suman-BakshiSuman-Bakshi
Suman-Bakshi
 
Tushar_Vaidya1
Tushar_Vaidya1Tushar_Vaidya1
Tushar_Vaidya1
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 

Anthony_Fan_Curriculum_Vitae

  • 1. Curriculum Vitae Name: ANTHONY FAN WAI WAH E-mail: anthony.wwf@gmail.com Contact no: +006016 290 2122 / +00603 91071115 Date of Birth: 25th August 1976 Language Spoken English, Malay, Mandarin and Cantonese Education: FEDERAL INSTITUTE OF TECHNOLOGY (Diploma in Electronic Engineering) Technical Knowledge: Over 7 years experience in the telecommunications industry. Specialized in testing and commissioning of Alcatel-Lucent Wimax, Ibust Kyocera, RBS LTE,3.5G, 3G, 2.5G and 2G equipments, installation & troubleshooting Single Phase & 3 Phase power consumption. Advanced computer hardware and software skills Competencies: Able to work effectively in multiracial and multi-cultural environment. Excellent organizational skills. Able to manage workload effectively, confident, meticulous and multi-tasking. In depth knowledge in telecommunication and IT industry/technical terms and processes. Ability to work within strict time frames and resolute deadlines. Excellent communication skills. Proficient in making logical and cost effective business recommendations. Able to integrate well and foster positive and harmonious relationships with personnel within the department and the business. Employment History Oversea Assignment: Ericsson Singapore PTE LTD (Agent CommsResources) Duration: January 2013 till Present Position: LTE Project Planner Job Description: SingTel LTE Project - Planning, scheduling for new and upgrade sites - Site assign and acknowledgement to local contractor. - Meeting and discussion with customer on project progress. 1
  • 2. - Weekly meeting with contractor on site progress and forecast. - Report & update daily to manager and customer. - Waiver and Embargo work permit application. - Out Bond Delivery PO assignment based on site configuration. - Scheduling on logistic before material issue to contractor - Tracing on material shortage and provide solution to contractor. - Fully support & troubleshoot to contractor. - Site support & monitoring via during installation. - Documentation control and reporting to Ericsson support teams. - Site handler daily update and report generate. - Conduct training and explanations on site installation. - Documents control on Technical proposal and As-built. Local Contract: Ericsson Malaysia Sdn Bhd (Agent Jalur Milenium Sdn Bhd) Duration: May 2012 till November 2012 Position: Project Coordinator Job Description: Celcom Project Sabah Region - Planning, scheduling for new and upgrade sites - Meeting and discussion with customer on project progress - Report & update daily to manager and customer. - Scheduling on logistic before material issue to contractor - Fully support & troubleshoot to contractor. - Site support & monitoring via during installation. - Documentation control and reporting to Ericsson support teams. - Perform acceptance and rectification with customer 2
  • 3. - ATP document chasing and submit to Ericsson HQ. - Single Ran SIU installation & troubleshooting. - 3rd Carrier upgrade on RBS 6601. - W900 support & troubleshooting. - Script analyzing on Datafill & CDD. Oversea Assignment: LG Ericsson Seoul Korea (Agent Teletek LTD) Duration: December 2011 till April 2012 Position: Project Troubleshoot Engineer Job Description: KT Olleh LTE Project - Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects solutions on E-NodeB cell site. - Commissioning & Integration on LTE E-NodeB Dul 6601 - Troubleshooting all kind alarm on equipment cell site - Conduct training for local contractor - Scheduling, documentation control and reporting to Ericsson. - Software package upgrade for LTE E-NodeB Dul 6601 - DT installation using manual & Auto format - License key file install via Oss & equipment cell site - Troubleshoot alarm & monitor via Oss to equipment cell site - Performance monitoring and report via Oss windows - Parameter entering & checking on equipment cell site Duration: May 2011 till Nov 2011 Position: Project Troubleshoot Team Leader 3
  • 4. Job Description: KT Olleh Swap Project - Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects solutions on the new RBS cell site. - Conduct training to local contractor and team member. - Technical support and explanation to customer. - Scheduling job function to team member and local contractor. - Site acceptance and rectification with customer. - Troubleshooting all kind of alarms at equipment cell site - Technical support in site specification and equipment location - Scheduling, documentation control and reporting to Project Manager. - Cell site equipment and spare logistic control - Installation and Testing about duo deck RBS 6601 - Sector additional and forth carrier upgrade - Commissioning and integration on RBS 6601 - Analysis site installation and log file after equipment swap - Software package upgrade for RBS 6601 - Prepare ESR for project manager Out Source Contract With: Ericsson Malaysia Sdn Bhd Duration: January 2010 till April 2011 Position: Operation & Maintenance Engineer Job Description: Digi Communication (Ipoh) 3G Project - Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects solutions on the existing RBS cell site. - Troubleshooting all kind of performance issues and site alarms on site - Technical support in site specification and equipment location 4
  • 5. - Scheduling, documentation control and reporting to Digi & Ericsson. - Cell site equipment and spare logistic control - Provide on job training to the Sod Digi for troubleshooting and maintenance - Perform acceptance on field installation and thru-put test with Digi - Installation and Testing PTMA and ARET Upgrade - Commissioning and integration on RBS 6601, 3418 & 6201 - Nobe-B P6 to P7 software Upgrade - Software package upgrade for RBS 6601, 3418 & 6201 - Recover equipment installation & feeder system after vandalism Out Source Contract With: Alcatel-Lucent(M) Sdn Bhd Duration: June 2008 to December 2009 Position: Project Engineer Job Description: Packet One Wimax Project - Installation, Commissioning, Testing, Integration and Troubleshooting of (WBS)Wimax Base Station - Troubleshooting all kind of performance issues and site alarms on site - Provide Technical support in site specification and equipment location - Team leadership and provide training to the local sub-contractor - Conduct new site Acceptance Test with customers - Manage SSO sites schedule, Documentation control and Reporting - Cell site equipment and spare logistic control - Equipment firmware & software upgrading In House project With: Maxis Malaysia Sdn Bhd 5
  • 6. Duration: January 2008 till June 2008 Position: Project Engineer Job Description: Maxis 3G Upgrade Project. - Installation, Testing and Troubleshooting in upgrading the HSDPA and Activate IMA for MAXIS 3G sites. - Installation and Testing 2nd Carrier Upgrade and MCPA Upgrade. - Installation and Testing TxHs, Rx6 and ETM4 Upgrade. - Troubleshooting all kind of performance issue and alarm on site. - Technical support in site specification and equipment location. - Performance drive test with RNC. - Manage sites schedule, documentation control and reporting - Cell site equipment and spare logistic control. Oversea Assignment: Ericsson Bangladesh Limited (Agent E-Com) Duration: June 2007 till Dec 2007 Position: Project Engineer Job Description: Ericsson, 2G Banglalink Swap Project (Dhaka, Bangladesh) (3 Month) - Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx in/outdoor - Troubleshooting all kind of performance issues and site alarms on site - Provide Technical support in site specification and equipment location - Recommend & Design on new RBS cell site - Team leadership and provide training to the local sub-contractor - Conduct new site Acceptance Test with customers - Manage SSO sites schedule, Documentation control and Reporting - Cell site equipment and spare logistic control 6
  • 7. Ericsson, 2G Warid Project (Dhaka, Bangladesh) (3 Month) - Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx in/outdoor - Installation, Commissioning and Troubleshooting of antenna system, power supply equipment - Troubleshooting all kind of performance issue and alarm on site - Technical support on site specification and equipment location - Recommend & Design on new RBS cell site - Team leadership and provide training to the local sub-contractor - Conduct new site Acceptance Test with customers - Manage SSO sites schedule, documentation control and Reporting - Cell site equipment and spare logistic control Employer: Next Horizon Communication Sdn Bhd In House project With: Maxis Malaysia Sdn Bhd Duration: February 2007 to June 2007 Position: Project Engineer Job Description: iZZinet , Wireless Broadband Project (formerly known as MoBif Wireless) - “Site Hunting” and Site Survey for new site location. - Conduct new site Acceptance Test with customer. - Installation, Commissioning and Troubleshooting of antenna system, power supply equipment. - Installation, Commissioning and Troubleshooting of Kyocera equipment - Technical support on site specification and equipment location. - Conduct new site Acceptance Test with customers - Cell site equipment and spare logistic control. 7
  • 8. In House project With: Maxis Malaysia Sdn Bhd Duration: October 2004 till February 2007 Position: Operation & Maintenance Engineer Job Description: Ericsson, 2G & 3G Maxis Project - Installation, Commissioning, Testing, Integration and Troubleshooting of Ericsson 2xxx & 3xxx in/ outdoor. - Installation, Commissioning and Troubleshooting of antenna system, power supply equipment. - Troubleshooting all kind of performance issue and alarm on site. - Technical support in site specification and equipment location. - Recommend & Design new RBS cell site. - Team leadership and provide training to the local sub-contractor. - Conduct new site Acceptance Test with customer. - Manage new SSO sites schedule, documentation control and reporting - Cell site equipment and spare logistic control. - Conduct 2G & 3G site survey (new ,existing and future sites) Ericsson Malaysia, 3.5G HSDPA Maxis Upgrade Project. - Installation, Testing and Troubleshooting in upgrading the HSDPA and Activate IMA for MAXIS 3G sites. - Installation and Testing 2nd Carrier Upgrade and MCPA Upgrade. In House project With: Maxis Malaysia Sdn Bhd Duration: June 2004 till October 2004 Position: Operation & Maintenance Engineer Job Description: Preventive Maintenance Project - Inspection structure and equipment at site. 8
  • 9. - Report lost or damages site equipments at site. - Scheduling, documentation control and reporting to Maxis. - Cell site equipment and spare logistic control. In House project With: Maxis Malaysia Sdn Bhd Duration: January 2004 till June 2004 Position: Project Engineer Job Description: Motorola, 2G Maxis Project - Installation, Commissioning, Testing, Integration and Troubleshooting of Motorola Horizonmacro in/outdoor, H2M MINI & H2M in/outdoor. - Installation, Commissioning and Troubleshooting of antenna system, power supply equipment. - Troubleshooting all kind of performance issues and site alarms at site. - Provide Technical support in site specification and equipment location. - Recommend & Design on new BTS cell site. - Team leadership and provide training to the local sub-contractor. - Conduct new site Acceptance Test with customers. - Manage new BTS sites schedule, documentation control and reporting. - Manage Cell site preventive/corrective maintenance schedule, Reporting and provide Defects solutions on the existing BTS cell site. - Cell site equipment and spare logistic control. Previous Employer: Simnet Communication Duration: Jun 2001 to Sept 2003 Position: TECHNICAL SUPPORT ENGINEER Job Description: - Setting up technical department 9
  • 10. - Heading the Technical Department and Managing staff activities - Conduct training to staff. - Indoor sales and servicing. - Inventory, stock check and liaison with supplier. Previous Employer: Shuttle Technology Sdn Bhd Duration: Dec 2000 to April 2001 Position: Technical Supervisor Job Description: - Data entry and documentation control. - Inventory and stock check at all parts. - Repairing all kind of mobile phone (hardware & software). Equipment worked on Alcatel-Lucent (M) Sdn Bhd - Wireshark trace capture - FTP downloader - Wimax NemB configuration software - Zyxel CPE - Beceem CPE - Procomm Plus Ericsson - Ericsson TEMs Cell Planner (TCP) - TEMS Investigation 3.2, 4.0, 4.1, 5.0, 5.1 - TEMS Light - TEMS Pocket - 3G Node-B RBS 3101, 3202, 3206, 3418, 6201,6601 10
  • 11. - Ericsson 2G GSM RBS, RBS 2xxx series - Ericsson Element manager - Ericsson Moshell - Ericsson Oss windows Motorola - Spectrum Analyzer - Motorola BTS Horizon I & II (indoor , outdoor) - Horizonmini, Mcell6, Mcell Arena, Incell - Motorola OMC Test equipment used - Mapinfo - Aircom ASSET Cellplanner - Ericsson TEMS Investigator - Anritsu S331D Site Master - HP 8921A Cell Site Test Set - HP 8948 Signal Generator - HP Frequency Counter - BIRD Thruline Power Meter - R & S Digital Power Meter - Sun Rise Handheld E1 tester Training Courses - Ericsson 2G – RBS 2xxx Testing & Commissioning 11
  • 12. - Ericsson 3G – RBS 3xxx Testing & Commissioning - Ericsson Node-B Commissioning - iBurst – Testing & Commissioning - Motorola SYS01 – GSM Interface - Motorola CP02 – Introduction of Digital Cellular - Motorola BSS01 – BSS Operation Theory - Motorola BSS02 – BSS Operation and Maintenance - WiMAX Testing & Commissioning Certificate Attach FI T Di pl oma Cer t . JPG References John Baptist Asokan Low Leong Hua Gin See Wee Swap Manager Ericsson Malaysia Implementation Manager Ericsson Malaysia Implementation Manager Ericsson Malaysia Email: john.baptist.asokan@ericsson.com Email : leong-hua.low@ericsson.com Email: gin.see.wee@ericsson.com Tel: +60123967320 Tel : +60193131530 Tel : +60122818558 12