Ref. NoACC/RMC/GN/REC

Dated:- Wednesday, August 01, 2007

RE Capitol

New Delhi

 Kind Attn.-Mr Adarsh Jain

 Sub: Quotation for Sale of RMC / Additional Services of Transportation & Pumping .

As per discussion we had with you, we are quoting our best possible rates as below for supply of ACC Ready
Mix Concrete as per details given below –


RMC          Description       Basic Price       Transportation   Pumping            Total Price per
GRADE                          inclusive of      Charges Per      charges per        cum. Inclusive of
                               taxes per         Cum.             Cum. From          taxes
                               Cum.                               basement to 4th    ,transportation &
                                                                  floor              pumping

 M-10        ACC Design Mix       2025/-             700/-              50/-                2775/-

 M-20        ACC Design Mix       2200/-             700/-              50/-                2950/-

 M-25        ACC Design Mix       2350/-             700/-              50/-                3100/-
    1. Payment terms - 100% Advance or against Bank Guarantee

2. Delivery Schedule - 3 or 4 days in Advance.

                                        3. Rate validity - The above rate is valid for 3 months only & subjected
                                        to clause no.-20 in terms & conditions.

For ACC Limited

Pradeep Lamba

Dy. Manager- Marketing

9810366334

Enclosed:- terms and conditions

TERMS AND CONDITIONS OF THIS CONTRACT:

Every load of RMC will be accompanied with a delivery challan indicating the quantity of RMC supplied. An
accredited representative of the Customer should acknowledge the same and this will form the basis of payment.

A confirmed requirement schedule should be communicated to ACC at least 7 days in advance indicating the
date and start time, quantity required, schedule of pouring, manpower deployed etc.

Adequate fixed staging / scaffolding shall be available at the site for fixing the concrete pump assembly to the
desired height.
Force Majeure: ACC will not be liable for any delay, partial dispatch or failure to supply RMC which may be
caused by reasons of or on account of or be contingent upon the act of God, or the states enemies, Earth
quakes or fires, storms or floods, other natural calamities, government restrictions, emergency, mutiny, riots or
other disturbances, strike or lockout of workmen, breakdown of machinery / Transit mixers and other equipment,
traffic restrictions by authorities, stoppage in supplies of Raw material and Diesel for whatever reason or any
other circumstance beyond the control of ACC.

Charges quoted here are for ACC’s standard mix. In case of specific mix design the charges will differ from that
applicable to the standard mix.

Exclusion: ACCs scope of work unless agreed does not involve spreading, vibrating, finishing or any
other allied civil work.

Additional services of Pumping from delivery point to the place of laying will be charged as quoted.

The supply of RMC is subject to availability of clear approach road for the movement of our vehicles and also
adequate space for placement of our pump in case the client uses our pumping services.

      9. ACC shall guarantee the 28-day strength of concrete supplied by us. For this purpose, only the test
      results of cubes taken by us and tested at our laboratory in the presence of your representative, if
      available, shall be taken as final and binding. The sampling and testing of RMC will be as per the Bureau
      of Indian Standards.

      10. ACC is not responsible for any cracks in concrete arising out of drying shrinkage, buckling of supports
      etc., ACC will also not be held responsible in case the shuttering and/or centering suffers any problem
      during concreting.

      11. Method of payment – Payment will be made by a Demand Draft drawn in favor of “ The Associated
      Cement Companies Limited”.

Consequences of delay in payment: Any delay in payments beyond the due date will attract an interest of 24%
p.a. ACC reserves the right to stop supplies in case the credit limit is exceeded and they will not be held
responsible for any losses that the Client may suffer due to non-receipt of RMC under these circumstances.

The RMC rates quoted are for a minimum quantity of 7cum of RMC per trip where ACC’s transit mixers are
used.

ACC’s transit mixer carrying RMC will be released within 45 minutes of its arrival at site. In case of detention of
the Transit Mixers beyond 45 minutes, a detention charge of Rs. 500/- will be charged per hour or part thereof.

The Transportation and Pumping service offered by ACC is optional.

The risk & property in the Ready Mixed Concrete will pass on the client at the company’s batching plant the
moment it is loaded in the transport vehicles.

Once the requisition for RMC is placed on ACC and the Transit Mixer leaves the RMC plant property in RMC will
be deemed to have been transferred. In case if for whatever reason the Client is not in a position to take delivery
of the RMC or takes only partial delivery of RMC, the Client will pay for the total consignment of RMC dispatched
from the plant.

ACC reserves the right to discharge the concrete at any other location and recover the price from the Client in
case the Client is not in a position to take delivery and the RMC is likely to set in the Transit Mixer drum.

All disputes or differences for what ever reason arise between ACC and the Client relating to the construction,
meaning, operation or effect of this contract or breach thereof shall be settled by Arbitration in accordance to the
rules of arbitration of the Indian Council of Arbitration and the award made in pursuance thereof shall be binding
on the parties. The venue of the arbitration shall be Mumbai.

Escalation: The price quoted here are applicable for a period of 3 months only from the date of this offer. During
this period, escalation in the price will be made on account of increase in the price of Cement, Aggregates, Sand
and Admixtures. However, any Statutory increases in taxes, duties and other levies or introduction of any new
levies on RMC or Raw materials including Cement will be reimbursed by the Clients at actual. Increase in Diesel
prices will also be reimbursed as per this formula - Every 5 % increase in the price of Diesel, will entail an
increase in the RMC price by Rs. 15/- per cum. Every 5% increase in aggregate price will entail an increase of
Rs.50/cum. Every 3.5% increase in Cement price will entail an increase of Rs.25/cum.

More Related Content

What's hot

PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
Rising Sher
 
Jacketing
JacketingJacketing
Jacketing
SHAIKH ARSHAD
 
Highway Project Schedule
Highway Project Schedule Highway Project Schedule
Highway Project Schedule
Akram Suleiman
 
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh GhuraiyaPrestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Mukesh Singh Ghuraiya
 
Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
Aglaia Connect
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
Gaurang Kakadiya
 
Internship Report on Bridge Construction & Dam Construction
Internship Report on Bridge Construction & Dam ConstructionInternship Report on Bridge Construction & Dam Construction
Internship Report on Bridge Construction & Dam Construction
Khaliqur Rahman
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
jay Rathod
 
Tabs ppt
Tabs pptTabs ppt
Tabs ppt
TAB-DINAH
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concrete
Sanjipta Behera
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial
VIKAS4210607
 
metro system and engineering.pptx
metro system and engineering.pptxmetro system and engineering.pptx
metro system and engineering.pptx
BalpreetSingh47890
 
Pile foundation
Pile foundationPile foundation
Pile foundation
aranjalisp
 
Case study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresCase study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structures
Lahmeyer International, UAE
 
Construction disputes
Construction disputesConstruction disputes
Construction disputes
gayathrysatheesan1
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
RAMPRASAD KUMAWAT
 
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTUREWATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
chintandomadiya
 
Tender
TenderTender
Retaining walls
Retaining walls Retaining walls
Retaining walls
Rohan Narvekar
 
Techniques for repair and protection methods - Repair and rehabilitation of s...
Techniques for repair and protection methods - Repair and rehabilitation of s...Techniques for repair and protection methods - Repair and rehabilitation of s...
Techniques for repair and protection methods - Repair and rehabilitation of s...
Shanmugasundaram N
 

What's hot (20)

PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
 
Jacketing
JacketingJacketing
Jacketing
 
Highway Project Schedule
Highway Project Schedule Highway Project Schedule
Highway Project Schedule
 
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh GhuraiyaPrestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
 
Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Internship Report on Bridge Construction & Dam Construction
Internship Report on Bridge Construction & Dam ConstructionInternship Report on Bridge Construction & Dam Construction
Internship Report on Bridge Construction & Dam Construction
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
 
Tabs ppt
Tabs pptTabs ppt
Tabs ppt
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concrete
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial
 
metro system and engineering.pptx
metro system and engineering.pptxmetro system and engineering.pptx
metro system and engineering.pptx
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Case study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresCase study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structures
 
Construction disputes
Construction disputesConstruction disputes
Construction disputes
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTUREWATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
WATER LEAKEGE REMEDIES AND PRECAUTIONS IN RCC STRUCTURE
 
Tender
TenderTender
Tender
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
Techniques for repair and protection methods - Repair and rehabilitation of s...
Techniques for repair and protection methods - Repair and rehabilitation of s...Techniques for repair and protection methods - Repair and rehabilitation of s...
Techniques for repair and protection methods - Repair and rehabilitation of s...
 

Similar to re_capitol

Lease brief
Lease briefLease brief
Lease brief
Yagnesh Iyer
 
Railway sidings 017
Railway sidings 017Railway sidings 017
Railway sidings 017
Mohd Bakhsh
 
INFRA_PPP_FewControl points for growth.ppt
INFRA_PPP_FewControl points for growth.pptINFRA_PPP_FewControl points for growth.ppt
INFRA_PPP_FewControl points for growth.ppt
Govind Raj
 
Final tender chp
Final tender chpFinal tender chp
Final tender chp
PRABIR DATTA
 
Textile Revitalization Credits
Textile Revitalization CreditsTextile Revitalization Credits
Textile Revitalization Credits
Nexsen Pruet
 
W2W County Durham specification for quotes may 2016
W2W County Durham specification for quotes  may 2016W2W County Durham specification for quotes  may 2016
W2W County Durham specification for quotes may 2016
Wheels 2 Work Association
 
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project InformationMountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
Marcellus Drilling News
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
 
1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt
GeorgeKGeorge3
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Harish Sharma
 
Sir
SirSir
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Harish Sharma
 
Rfp 250 mw fy16 17
Rfp 250 mw fy16 17Rfp 250 mw fy16 17
Rfp 250 mw fy16 17
Pinkesh Kumar
 
TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
ChandaraniVardikar
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
Avinash Kumar Gupta
 
Reluctance
ReluctanceReluctance
Reluctance
Nikhil Verma
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
Chirag Jain
 
GCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptxGCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptx
DebendraNathmohanta
 
Item # 10 - 2024 Ambulance Chassis Purchase
Item # 10 - 2024 Ambulance Chassis PurchaseItem # 10 - 2024 Ambulance Chassis Purchase
Item # 10 - 2024 Ambulance Chassis Purchase
ahcitycouncil
 
Item # 7 - 2024 Ambulance Chassis & Purchase
Item # 7 - 2024 Ambulance Chassis & PurchaseItem # 7 - 2024 Ambulance Chassis & Purchase
Item # 7 - 2024 Ambulance Chassis & Purchase
ahcitycouncil
 

Similar to re_capitol (20)

Lease brief
Lease briefLease brief
Lease brief
 
Railway sidings 017
Railway sidings 017Railway sidings 017
Railway sidings 017
 
INFRA_PPP_FewControl points for growth.ppt
INFRA_PPP_FewControl points for growth.pptINFRA_PPP_FewControl points for growth.ppt
INFRA_PPP_FewControl points for growth.ppt
 
Final tender chp
Final tender chpFinal tender chp
Final tender chp
 
Textile Revitalization Credits
Textile Revitalization CreditsTextile Revitalization Credits
Textile Revitalization Credits
 
W2W County Durham specification for quotes may 2016
W2W County Durham specification for quotes  may 2016W2W County Durham specification for quotes  may 2016
W2W County Durham specification for quotes may 2016
 
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project InformationMountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
Sir
SirSir
Sir
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Rfp 250 mw fy16 17
Rfp 250 mw fy16 17Rfp 250 mw fy16 17
Rfp 250 mw fy16 17
 
TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
 
Reluctance
ReluctanceReluctance
Reluctance
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
GCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptxGCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptx
 
Item # 10 - 2024 Ambulance Chassis Purchase
Item # 10 - 2024 Ambulance Chassis PurchaseItem # 10 - 2024 Ambulance Chassis Purchase
Item # 10 - 2024 Ambulance Chassis Purchase
 
Item # 7 - 2024 Ambulance Chassis & Purchase
Item # 7 - 2024 Ambulance Chassis & PurchaseItem # 7 - 2024 Ambulance Chassis & Purchase
Item # 7 - 2024 Ambulance Chassis & Purchase
 

More from Adarsh K. Jain

Pan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar JainPan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar Jain
Adarsh K. Jain
 
Glass of drink on over head
Glass of drink on over headGlass of drink on over head
Glass of drink on over headAdarsh K. Jain
 
Climate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at CopClimate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at Cop
Adarsh K. Jain
 
incoming
incomingincoming
incoming
Adarsh K. Jain
 
R.E.Capital ramesh
R.E.Capital rameshR.E.Capital ramesh
R.E.Capital ramesh
Adarsh K. Jain
 
Resume
ResumeResume
QUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANYQUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANY
Adarsh K. Jain
 
IDs
IDsIDs
Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009
Adarsh K. Jain
 
Copy of Scrapbook Album
Copy of Scrapbook AlbumCopy of Scrapbook Album
Copy of Scrapbook Album
Adarsh K. Jain
 
party at suraj kund.jpeg 2
party at suraj kund.jpeg 2party at suraj kund.jpeg 2
party at suraj kund.jpeg 2Adarsh K. Jain
 
Copy of Circles Resume
Copy of Circles ResumeCopy of Circles Resume
Copy of Circles Resume
Adarsh K. Jain
 
Luncheon at suraj kund
Luncheon at suraj kundLuncheon at suraj kund
Luncheon at suraj kundAdarsh K. Jain
 
cv_1
cv_1cv_1
New App format
New App formatNew App format
New App format
Adarsh K. Jain
 

More from Adarsh K. Jain (20)

Pan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar JainPan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar Jain
 
2
22
2
 
Glass of drink on over head
Glass of drink on over headGlass of drink on over head
Glass of drink on over head
 
Climate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at CopClimate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at Cop
 
flag 4 indian pride
flag 4 indian prideflag 4 indian pride
flag 4 indian pride
 
incoming
incomingincoming
incoming
 
R.E.Capital ramesh
R.E.Capital rameshR.E.Capital ramesh
R.E.Capital ramesh
 
Resume
ResumeResume
Resume
 
QUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANYQUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANY
 
Resting
RestingResting
Resting
 
IDs
IDsIDs
IDs
 
Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009
 
Copy of Scrapbook Album
Copy of Scrapbook AlbumCopy of Scrapbook Album
Copy of Scrapbook Album
 
party at suraj kund.jpeg 2
party at suraj kund.jpeg 2party at suraj kund.jpeg 2
party at suraj kund.jpeg 2
 
Copy of Circles Resume
Copy of Circles ResumeCopy of Circles Resume
Copy of Circles Resume
 
Luncheon at suraj kund
Luncheon at suraj kundLuncheon at suraj kund
Luncheon at suraj kund
 
cv_1
cv_1cv_1
cv_1
 
ADARSH KUMAR JAIN,
ADARSH KUMAR JAIN,ADARSH KUMAR JAIN,
ADARSH KUMAR JAIN,
 
Untitled
UntitledUntitled
Untitled
 
New App format
New App formatNew App format
New App format
 

Recently uploaded

The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 

Recently uploaded (20)

The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 

re_capitol

  • 1. Ref. NoACC/RMC/GN/REC Dated:- Wednesday, August 01, 2007 RE Capitol New Delhi Kind Attn.-Mr Adarsh Jain Sub: Quotation for Sale of RMC / Additional Services of Transportation & Pumping . As per discussion we had with you, we are quoting our best possible rates as below for supply of ACC Ready Mix Concrete as per details given below – RMC Description Basic Price Transportation Pumping Total Price per GRADE inclusive of Charges Per charges per cum. Inclusive of taxes per Cum. Cum. From taxes Cum. basement to 4th ,transportation & floor pumping M-10 ACC Design Mix 2025/- 700/- 50/- 2775/- M-20 ACC Design Mix 2200/- 700/- 50/- 2950/- M-25 ACC Design Mix 2350/- 700/- 50/- 3100/- 1. Payment terms - 100% Advance or against Bank Guarantee 2. Delivery Schedule - 3 or 4 days in Advance. 3. Rate validity - The above rate is valid for 3 months only & subjected to clause no.-20 in terms & conditions. For ACC Limited Pradeep Lamba Dy. Manager- Marketing 9810366334 Enclosed:- terms and conditions TERMS AND CONDITIONS OF THIS CONTRACT: Every load of RMC will be accompanied with a delivery challan indicating the quantity of RMC supplied. An accredited representative of the Customer should acknowledge the same and this will form the basis of payment. A confirmed requirement schedule should be communicated to ACC at least 7 days in advance indicating the date and start time, quantity required, schedule of pouring, manpower deployed etc. Adequate fixed staging / scaffolding shall be available at the site for fixing the concrete pump assembly to the desired height.
  • 2. Force Majeure: ACC will not be liable for any delay, partial dispatch or failure to supply RMC which may be caused by reasons of or on account of or be contingent upon the act of God, or the states enemies, Earth quakes or fires, storms or floods, other natural calamities, government restrictions, emergency, mutiny, riots or other disturbances, strike or lockout of workmen, breakdown of machinery / Transit mixers and other equipment, traffic restrictions by authorities, stoppage in supplies of Raw material and Diesel for whatever reason or any other circumstance beyond the control of ACC. Charges quoted here are for ACC’s standard mix. In case of specific mix design the charges will differ from that applicable to the standard mix. Exclusion: ACCs scope of work unless agreed does not involve spreading, vibrating, finishing or any other allied civil work. Additional services of Pumping from delivery point to the place of laying will be charged as quoted. The supply of RMC is subject to availability of clear approach road for the movement of our vehicles and also adequate space for placement of our pump in case the client uses our pumping services. 9. ACC shall guarantee the 28-day strength of concrete supplied by us. For this purpose, only the test results of cubes taken by us and tested at our laboratory in the presence of your representative, if available, shall be taken as final and binding. The sampling and testing of RMC will be as per the Bureau of Indian Standards. 10. ACC is not responsible for any cracks in concrete arising out of drying shrinkage, buckling of supports etc., ACC will also not be held responsible in case the shuttering and/or centering suffers any problem during concreting. 11. Method of payment – Payment will be made by a Demand Draft drawn in favor of “ The Associated Cement Companies Limited”. Consequences of delay in payment: Any delay in payments beyond the due date will attract an interest of 24% p.a. ACC reserves the right to stop supplies in case the credit limit is exceeded and they will not be held responsible for any losses that the Client may suffer due to non-receipt of RMC under these circumstances. The RMC rates quoted are for a minimum quantity of 7cum of RMC per trip where ACC’s transit mixers are used. ACC’s transit mixer carrying RMC will be released within 45 minutes of its arrival at site. In case of detention of the Transit Mixers beyond 45 minutes, a detention charge of Rs. 500/- will be charged per hour or part thereof. The Transportation and Pumping service offered by ACC is optional. The risk & property in the Ready Mixed Concrete will pass on the client at the company’s batching plant the moment it is loaded in the transport vehicles. Once the requisition for RMC is placed on ACC and the Transit Mixer leaves the RMC plant property in RMC will be deemed to have been transferred. In case if for whatever reason the Client is not in a position to take delivery of the RMC or takes only partial delivery of RMC, the Client will pay for the total consignment of RMC dispatched from the plant. ACC reserves the right to discharge the concrete at any other location and recover the price from the Client in case the Client is not in a position to take delivery and the RMC is likely to set in the Transit Mixer drum. All disputes or differences for what ever reason arise between ACC and the Client relating to the construction, meaning, operation or effect of this contract or breach thereof shall be settled by Arbitration in accordance to the
  • 3. rules of arbitration of the Indian Council of Arbitration and the award made in pursuance thereof shall be binding on the parties. The venue of the arbitration shall be Mumbai. Escalation: The price quoted here are applicable for a period of 3 months only from the date of this offer. During this period, escalation in the price will be made on account of increase in the price of Cement, Aggregates, Sand and Admixtures. However, any Statutory increases in taxes, duties and other levies or introduction of any new levies on RMC or Raw materials including Cement will be reimbursed by the Clients at actual. Increase in Diesel prices will also be reimbursed as per this formula - Every 5 % increase in the price of Diesel, will entail an increase in the RMC price by Rs. 15/- per cum. Every 5% increase in aggregate price will entail an increase of Rs.50/cum. Every 3.5% increase in Cement price will entail an increase of Rs.25/cum.