Organization Profile
info@reancloud.com | www.reancloud.com
Established: 2013
Presence: USA, India, Israel
Number of Employees: 240+
AWS Certifications: 150+ (Including
10+ Professional Certifications)
Industry Focus:
Regulated Markets and ISVs.
Management team consisting of executives formerly from
Fortune 500 Enterprises (AWS, Amdocs, BMC, Merck
and Cognizant) and with a deep AWS Cloud Computing
experience.
Recognized by TechTarget as the top AWS Partner
providing innovative DevSecOps services.
24x7 follow the sun model with offices around the world
and continuous operations in multiple time zones - EST,
PST and IST.
AWS Accreditations
info@reancloud.com | www.reancloud.com
End-2-End Enterprise Service Offering
info@reancloud.com | www.reancloud.com
Managed Cloud Services
Migration
Native AWS
Application
Development
DevOps (CI | CD)
Implementation
Billing as a Service
Secure
Infrastructure
Setup
Cloud Adoption Strategy Cloud Architecture Account Management
Governance &
Compliance
ROI & Business Case Justification Security & Risk Assessment
DR & Business Continuity
Planning (BCP)
REAN Business
Consulting
REAN
Implementation
Services
REAN Managed
Cloud Services
BizDevOps DataDevOps CloudSecOps
Industries Served
info@reancloud.com | www.reancloud.com
Education Healthcare /
Life Sciences
Financial
Services
Government /
Public Sector
ISV
Our end-to-end portfolio of services ensure security and compliance for the
most demanding of industries.
info@reancloud.com | www.reancloud.com
Test Driven
Development
Automated
Deployments
Automated
Operations
(Self-Healing)
Metrics
Focused
Platform
Continuous
Security and
Compliance
6
DevOps - Key Principles
info@reancloud.com | www.reancloud.com
7
REAN Cloud DevOps Accelerators
DevOps Accelerators
info@reancloud.com | www.reancloud.com
1. Discover
2. Move Images
1. Provisioning
2. Update
1. Functional
2. Performance
3. Security
1. Architecture
2. Assessment
3. Compliance
1. Patch
2. Backup
3. Monitor
4. Exception
(DevOps Pipeline)
Accelerating the App Lifecycle
REAN Assess
Assess your application and/or system against the relevant security and compliance requirements such as:
HIPAA, HiTRUST, FedRAMP, CIS, PCI, etc.
How we do it?
1. Assessments done the right way.
2. Automated Microservices for repeatable
error-free assessments.
3. Consistent assessments and reports
across multiple environments /
infrastructures.
4. Baseline reports for environment /
infrastructure changes.
5. We provide with a DevOps Maturity
Assessment tailored to your organization
requirements.
info@reancloud.com | www.reancloud.com
What do you get?
1. Get a comprehensive Cloud Readiness
Assessment Report
2. Full audit of your current security challenges
and potential vulnerabilities going forward.
3. Best Practices for Cloud Infrastructures and
DevOps Implementations.
9
● Security & Risk Assessment
● ROI & Business Case Justification
● Cloud Adoption Strategy
● Disaster Recovery & Business
Continuity Planning
● Cloud Architecture
● DevOps Strategy
● Account Management
● Cloud Operations Strategy
● Governance & Compliance
info@reancloud.com | www.reancloud.com
Be Prepared Improved Cloud
Why REAN Cloud?
1. Reduced Time for Assessments.
2. Reduced Risk for Assessments.
3. Reduced Cost for Assessments.
4. Consistency across
environments and over time.
5. Standardized and automated
templates for quickness.
6. Custom templates based on
your environment / infrastructure
needs.
10
REAN Assess
Assess your application and/or system against the relevant security and compliance requirements such as:
HIPAA, HiTRUST, FedRAMP, CIS, PCI, etc.
How we do it?
1. Plan: Select Apps, Test Platform,
Plan Migration
2. Deploy: Migrate Data, Migrate
Components.
3. Manage / Optimize: Embrace new
services, Re-factor
4. Automated framework to securely
migrate your workloads between
environments.
5. Auto-Discovery and Image Creations
supported by infrastructure code for
consistent and secure migrations.
info@reancloud.com | www.reancloud.com
What do you get?
1. Lift and Shift Migrations
2. DevOps based Migrations
3. Secure Data Migrations
4. Direct Connect Implementations
5. New Setup Implementations
6. Rebuild Existing Applications
7. Secure Infrastructure Setup
11
REAN Migrate
Migrate applications and/or systems to and between multiple Cloud Service Providers and op-prem data
centers.
Why REAN Cloud?
1. Platform agnostic migrations and
processes keeps you in charge,
always.
2. Automation reduces costs and risk.
3. Leverage our Assessment and Proof of
Concept Programs.
4. Seamless transition without
compromising productivity, security,
customer service or budget.
5. Empower innovation.
info@reancloud.com | www.reancloud.com
Migrate across any environment
12
REAN Migrate
Migrate applications and/or systems to and between multiple Cloud Service Providers and op-prem data
centers.
What do you get?
1. Deploy multi-tier applications across
various infrastructure providers.
2. Consistent deployments across
different environments.
3. The ability to deploy more frequently.
4. Support of many different
provisioners / CM Tools.
5. Support Docker Containers.
6. Remove / Reduce environment
dependency errors and configuration
issues.
7. Lower change failure rate, faster
recovery from failures and shorter
lead times.
info@reancloud.com | www.reancloud.com
How we do it?
1. Choose from many different
infrastructure providers, Cloud and
On-Prem.
2. A simple platform with a canvas like
capability to easily add, delete or modify
your resources.
3. Quicker and consistent deployments,
without the need of a SME.
4. Use existing Package Templates or
Custom Packages to suit your
application needs.
13
REAN Deploy
Install Cloud Computing solutions. It helps define the environment once and deploys it as many times as
needed. It enables you to "Deploy your application or application stack ANYWHERE, ANYTIME, on any Cloud,
in minutes!".
info@reancloud.com | www.reancloud.com
Why REAN Cloud?
1. Reduce your deploy and test times
from days to minutes.
2. Improve your productivity multiple
times.
3. Democratize your deployments:
Extend the ability to carry
deployments to a larger group of
workers.
4. Parallel deployments in multiple
environments.
5. Partners can use us to empower their
clients / partners for faster and
consistent multi-tier application
deployments.
6. One click deployments with an easy
to use interface.
7. Integrates easily with your existing
DevOps toolchain and pipelines.
Web, App, and DB
Servers
Multi-Tier
Application
Deployments
Deploy to
Multiple Cloud
Providers
Infrastructure
Code
Images
Application
Binaries
Templated / Custom Packages
Consistent
Deployment
across
multiple
environments
14
REAN Deploy
Install Cloud Computing solutions. It helps define the environment once and deploys it as many times as
needed. It enables you to "Deploy your application or application stack ANYWHERE, ANYTIME, on any Cloud,
in minutes!".
info@reancloud.com | www.reancloud.com
REAN Test > Single DevOps Testing Framework
A Cloud-based DevOps centric automation accelerator, which creates dynamic infrastructure on the fly to perform rapid
in-parallel cross-browser, functional, performance, load and scale testing with analytics to fail fast. It is a solution that
gives you the ability to test your web application with a wide range of browsers to select from, run tests (either URL,
Functional or Manual) and provides state-of-the-art test result data analytics.
How we do it?
1. Automated creation of test-bed
infrastructure. Saves your testing
team valuable hours.
2. Parallel testing, not Sequential, for
faster results.
3. Consistent test results across Multiple
environments / infrastructures.
4. No simulated environments. Get test
results in real time on the actual
application / data.
5. Integrates easily with your existing
DevOps toolchain and pipelines.
What do you get?
1. A Simple Cross-Browser and Scale Testing
Platform.
2. Single tool for your Unit, Integration,
Functional, Performance, Mobile, Security
and Load Test needs.
3. A powerful automation platform to replace
or append your manual testing process.
4. Simplify your Manual Testing process.
5. Option for Incremental Load Tests.
6. Breakpoint Analysis of your applications.
7. Out-of-the-box integration with Selenium and
Cucumber.
8. Load test scripts from an SCM Repository or
a Zip file.
15
info@reancloud.com | www.reancloud.com
REAN Test
A Cloud-based DevOps centric automation accelerator, which creates dynamic infrastructure on the fly to perform rapid
in-parallel cross-browser, functional, performance, load and scale testing with analytics to fail fast. It is a solution that
gives you the ability to test your web application with a wide range of browsers to select from, run tests (either URL,
Functional or Manual) and provides state-of-the-art test result data analytics.
Why REAN Cloud?
1. End the Speed vs Quality debate.
2. Consistent results across
platforms.
3. If you have the test case, we can
test it.
4. If not, we can build the test cases
for you.
5. Make Performance Tests part of
your sprints.
6. Simplifying your Manual Testing
needs.
7. Complete Solution for all your
testing needs.
8. Get a live view of your test results.
Test Cases
Automated
test-bed
infrastructure
creation using
APIs
Parallel
Cross-Browser
Testing with
ScaleNow
Perform Consistent and Quality Tests, Faster.
Fail Faster using REAN Test
16
info@reancloud.com | www.reancloud.com
REAN Docs
Document your Technical (includes design, architecture, configuration, test results) and Process Controls to support
audit and compliance.
How we do it?
1. Automated creation of various
documentation.
2. Documentation tailored to your needs.
3. Automation provides consistency in
documentation for easy comparison
between baseline documents and
updated copies.
4. Compliance reports / documents for
HIPAA, FedRamp, SOC, HiTrust, etc
Compliance based on the right
standards.
5. Automations reduces the risk of faulty
documentation.
What do you get?
1. Technical documentation.
2. Process Controls documentation.
3. Audit reports / Golden Document.
4. Compliance reports.
17
info@reancloud.com | www.reancloud.com
REAN Docs
Document your Technical (includes design, architecture, configuration, test results) and Process Controls to support
audit and compliance.
Why REAN Cloud?
1. Quality documents faster.
2. Consistent documents across
all your environments /
projects / compliance needs.
3. Document all changes - Never
miss anything.
4. Best Practices and Guidance
on various Compliance
requirements.
5. Make documentation a part of
your project lifecycle without
the need for added effort.
6. Customized documentation
based on your requirements.
Documentation Engine Experts
Reads / Scans your
environment
Generate documentation based on the desired requirements
18
info@reancloud.com | www.reancloud.com
REAN Ops
Manage and Govern your infrastructure and environments (Development, Test, Staging, Pre-Production, Production, DR,
etc) and leverages REAN Deploy, REAN RADAR, REAN Test, REAN Heal and REAN DevOps.
How we do it?
1. 24x7 Enterprise Level Support.
2. Three-Tier Model tailored to your
needs.
3. Automated scripts scan your
environments for issues.
4. Self-Healing scripts for fixing issues
without manual intervention.
5. Dashboard for monitoring your
entire environment.
What do you get?
1. Proactive monitoring, automation, patching,
logging, alerting and back-up management of
the your Cloud environment.
2. Operational process and procedures based on
industry standards such as ITIL.
○ Infrastructure Maintenance
○ Problem Management
○ Change Management
○ Performance Management
○ System Monitoring
○ Service Reporting
○ Security Management
○ Remote Infrastructure Monitoring
○ Data Backup
○ Access Management
○ Network Management
19
info@reancloud.com | www.reancloud.com
REAN Ops
Manage and Govern your infrastructure and environments (Development, Test, Staging, Pre-Production, Production, DR,
etc) and leverages REAN Deploy, REAN RADAR, REAN Test, REAN Heal and REAN DevOps.
Why REAN Cloud?
1. 24x7 Support
2. Reduced Cloud spends
on infrastructure.
3. We optimize and tune
your environment for
costs, security and
performance.
4. Access to an integrated
dashboard for all your
worry-free monitoring
requirements.
Experts Self-Heal Engine
24x7
Operations
Automated Monitoring
Scripts
Cloud Environments -
Fine Tuned, Secured, and Optimized
for Cost and Performance
Dashboards
20
REAN RADAR
Dashboards with DevOps centric metric to measure and track the various tenants of DevOps, starting from time to
release, security, cost and finance, operations, utilization and more.
info@reancloud.com | www.reancloud.com
How we do it?
1. Single utility to visualize metrics
from various data-points and across
different domains.
2. CISO dashboard based on the
guidelines from Center for internet
Security (CIS).
3. People, Process and Infrastructure
costs.
4. Varied data sources verify for
accurate visualizations. Get near to
real metrics for cost and
performance.
What do you get?
1. A combination of dashboards to
visualize your environments.
2. Ability to visualize and infer from
cost, performance, development
and security based metrics.
3. CEO, CFO, CTO, CISO and COO
dashboards.
4. Compliance reporting and
visualization.
21
REAN RADAR
Dashboards with DevOps centric metric to measure and track the various tenants of DevOps, starting from time to
release, security, cost and finance, operations, utilization and more.
info@reancloud.com | www.reancloud.com
Why REAN Cloud?
1. 24x7 Support
2. Access to an integrated
dashboard for all your
worry-free monitoring
requirements.
3. Optimize your processes
and infrastructure for cost
and performance.
4. Gain complete end-to-end
visibility.
5. Single utility for cost,
security, performance and
development based
metrics.
Dashboards
Collects metrics
from varied data
sources
Visualize on one
Dashboard
22
info@reancloud.com | www.reancloud.com
REAN DevOps
A suite of software that bundles integrated set of products that are designed and tested to work with each other.
Products such as REAN Migrate, REAN Deploy, REAN Test, REAN Radar and more form a part of the REAN DevOps
product suite.
How we do it?
1. Team of experts build your DevOps
CI|CD pipelines.
2. Ability to choose from various tools
based on the application and
environment requirements.
3. Constantly update your pipelines with
new cookbooks and test cases.
4. Separate Dev / Test / Pre-Prod / Prod
environments increase your
efficiency.
5. Document all the steps in the
implementation pipeline.
What do you get?
1. A suite of products tailored to your
DevOps requirements.
2. Migrate your workloads the CI|CD
way.
3. DevOps toolchain based on your
application stack requirements.
4. Automated deployments and tests
build into the pipelines.
5. Ability to visualize your
environment using dashboards.
23
info@reancloud.com | www.reancloud.com
REAN DevOps
A suite of software that bundles integrated set of products that are designed and tested to work with each other.
Products such as REAN Migrate, REAN Deploy, REAN Test, REAN Radar and more form a part of the REAN DevOps
product suite.
Why REAN Cloud?
1. 24x7 Support
2. Access to an integrated
dashboard for all your
worry-free monitoring
requirements.
3. Reduced costs and
optimized performance
and security.
4. Custom cookbooks and
templates for your
requirements.
5. Faster deployments.
Infrastructure
Code
Images
Application
Binaries
Migrate across any environments / Build CI|CD Pipelines
24
How we do it?
1. Event rule engine, to help write custom
rules.
2. Decision making on which healing
scripts to run, when and where.
3. REAN Heal’s server provides the scripts
from a Git repository.
4. Asynchronous communication between
REAN Heal server and the host to be
healed - provides the scale and
performance needed for the solution.
5. Monitored host fetches and executes
the healing script.
info@reancloud.com | www.reancloud.com
REAN Heal
REAN Heal is REAN Cloud's state-of-the-art technology for auto-remediation. It auto-fixes 20%+ alerts with zero human
intervention.
What do you get?
1. Automated Modular REAN Heal
solution.
2. Automatically heal your servers.
3. Automated fixed alerts on
thousands of servers.
4. Maintains audit.
25
info@reancloud.com | www.reancloud.com
REAN Heal
REAN Heal is REAN Cloud's state-of-the-art technology for auto-remediation. It auto-fixes 20%+ alerts with
zero human intervention.
Why REAN Cloud?
1. Very low MTTR (Mean time
to Repair).
2. High stability.
3. High availability.
4. Not doing the same SOPs
over and over again for
years.
5. Attrition free knowledge
base that is being constantly
used.
6. Very low cost of L1
operations with high speed.
Decision
Making
Collect
Run
Results
Connect
and
Authentic
ate
Running
Scripts
Queuing
Requests
Windows
Scripts
Linux
Scripts
Security
Scripts
Nagios
Server
Ubuntu Critical Alert
Windows Normal Alert
SUSE Proactive Alert
Alerts
26
Thank You
REAN Cloud LLC
2201 Cooperative Way, Suite 302
Herndon, VA 20171
+1(844) 377-REAN (7326)
info@reancloud.com | www.reancloud.com
27

REAN Cloud DevOps Accelerators

  • 1.
    REAN Cloud DevOpsAccelerators Accelerating Enterprise Cloud Adoption Securely www.reancloud.com USA Herndon / Philadelphia / Los Angeles India Hyderabad / Pune / Udaipur Israel Tel Aviv
  • 2.
    Organization Profile info@reancloud.com |www.reancloud.com Established: 2013 Presence: USA, India, Israel Number of Employees: 240+ AWS Certifications: 150+ (Including 10+ Professional Certifications) Industry Focus: Regulated Markets and ISVs. Management team consisting of executives formerly from Fortune 500 Enterprises (AWS, Amdocs, BMC, Merck and Cognizant) and with a deep AWS Cloud Computing experience. Recognized by TechTarget as the top AWS Partner providing innovative DevSecOps services. 24x7 follow the sun model with offices around the world and continuous operations in multiple time zones - EST, PST and IST.
  • 3.
  • 4.
    End-2-End Enterprise ServiceOffering info@reancloud.com | www.reancloud.com Managed Cloud Services Migration Native AWS Application Development DevOps (CI | CD) Implementation Billing as a Service Secure Infrastructure Setup Cloud Adoption Strategy Cloud Architecture Account Management Governance & Compliance ROI & Business Case Justification Security & Risk Assessment DR & Business Continuity Planning (BCP) REAN Business Consulting REAN Implementation Services REAN Managed Cloud Services BizDevOps DataDevOps CloudSecOps
  • 5.
    Industries Served info@reancloud.com |www.reancloud.com Education Healthcare / Life Sciences Financial Services Government / Public Sector ISV Our end-to-end portfolio of services ensure security and compliance for the most demanding of industries.
  • 6.
    info@reancloud.com | www.reancloud.com TestDriven Development Automated Deployments Automated Operations (Self-Healing) Metrics Focused Platform Continuous Security and Compliance 6 DevOps - Key Principles
  • 7.
  • 8.
    DevOps Accelerators info@reancloud.com |www.reancloud.com 1. Discover 2. Move Images 1. Provisioning 2. Update 1. Functional 2. Performance 3. Security 1. Architecture 2. Assessment 3. Compliance 1. Patch 2. Backup 3. Monitor 4. Exception (DevOps Pipeline) Accelerating the App Lifecycle
  • 9.
    REAN Assess Assess yourapplication and/or system against the relevant security and compliance requirements such as: HIPAA, HiTRUST, FedRAMP, CIS, PCI, etc. How we do it? 1. Assessments done the right way. 2. Automated Microservices for repeatable error-free assessments. 3. Consistent assessments and reports across multiple environments / infrastructures. 4. Baseline reports for environment / infrastructure changes. 5. We provide with a DevOps Maturity Assessment tailored to your organization requirements. info@reancloud.com | www.reancloud.com What do you get? 1. Get a comprehensive Cloud Readiness Assessment Report 2. Full audit of your current security challenges and potential vulnerabilities going forward. 3. Best Practices for Cloud Infrastructures and DevOps Implementations. 9 ● Security & Risk Assessment ● ROI & Business Case Justification ● Cloud Adoption Strategy ● Disaster Recovery & Business Continuity Planning ● Cloud Architecture ● DevOps Strategy ● Account Management ● Cloud Operations Strategy ● Governance & Compliance
  • 10.
    info@reancloud.com | www.reancloud.com BePrepared Improved Cloud Why REAN Cloud? 1. Reduced Time for Assessments. 2. Reduced Risk for Assessments. 3. Reduced Cost for Assessments. 4. Consistency across environments and over time. 5. Standardized and automated templates for quickness. 6. Custom templates based on your environment / infrastructure needs. 10 REAN Assess Assess your application and/or system against the relevant security and compliance requirements such as: HIPAA, HiTRUST, FedRAMP, CIS, PCI, etc.
  • 11.
    How we doit? 1. Plan: Select Apps, Test Platform, Plan Migration 2. Deploy: Migrate Data, Migrate Components. 3. Manage / Optimize: Embrace new services, Re-factor 4. Automated framework to securely migrate your workloads between environments. 5. Auto-Discovery and Image Creations supported by infrastructure code for consistent and secure migrations. info@reancloud.com | www.reancloud.com What do you get? 1. Lift and Shift Migrations 2. DevOps based Migrations 3. Secure Data Migrations 4. Direct Connect Implementations 5. New Setup Implementations 6. Rebuild Existing Applications 7. Secure Infrastructure Setup 11 REAN Migrate Migrate applications and/or systems to and between multiple Cloud Service Providers and op-prem data centers.
  • 12.
    Why REAN Cloud? 1.Platform agnostic migrations and processes keeps you in charge, always. 2. Automation reduces costs and risk. 3. Leverage our Assessment and Proof of Concept Programs. 4. Seamless transition without compromising productivity, security, customer service or budget. 5. Empower innovation. info@reancloud.com | www.reancloud.com Migrate across any environment 12 REAN Migrate Migrate applications and/or systems to and between multiple Cloud Service Providers and op-prem data centers.
  • 13.
    What do youget? 1. Deploy multi-tier applications across various infrastructure providers. 2. Consistent deployments across different environments. 3. The ability to deploy more frequently. 4. Support of many different provisioners / CM Tools. 5. Support Docker Containers. 6. Remove / Reduce environment dependency errors and configuration issues. 7. Lower change failure rate, faster recovery from failures and shorter lead times. info@reancloud.com | www.reancloud.com How we do it? 1. Choose from many different infrastructure providers, Cloud and On-Prem. 2. A simple platform with a canvas like capability to easily add, delete or modify your resources. 3. Quicker and consistent deployments, without the need of a SME. 4. Use existing Package Templates or Custom Packages to suit your application needs. 13 REAN Deploy Install Cloud Computing solutions. It helps define the environment once and deploys it as many times as needed. It enables you to "Deploy your application or application stack ANYWHERE, ANYTIME, on any Cloud, in minutes!".
  • 14.
    info@reancloud.com | www.reancloud.com WhyREAN Cloud? 1. Reduce your deploy and test times from days to minutes. 2. Improve your productivity multiple times. 3. Democratize your deployments: Extend the ability to carry deployments to a larger group of workers. 4. Parallel deployments in multiple environments. 5. Partners can use us to empower their clients / partners for faster and consistent multi-tier application deployments. 6. One click deployments with an easy to use interface. 7. Integrates easily with your existing DevOps toolchain and pipelines. Web, App, and DB Servers Multi-Tier Application Deployments Deploy to Multiple Cloud Providers Infrastructure Code Images Application Binaries Templated / Custom Packages Consistent Deployment across multiple environments 14 REAN Deploy Install Cloud Computing solutions. It helps define the environment once and deploys it as many times as needed. It enables you to "Deploy your application or application stack ANYWHERE, ANYTIME, on any Cloud, in minutes!".
  • 15.
    info@reancloud.com | www.reancloud.com REANTest > Single DevOps Testing Framework A Cloud-based DevOps centric automation accelerator, which creates dynamic infrastructure on the fly to perform rapid in-parallel cross-browser, functional, performance, load and scale testing with analytics to fail fast. It is a solution that gives you the ability to test your web application with a wide range of browsers to select from, run tests (either URL, Functional or Manual) and provides state-of-the-art test result data analytics. How we do it? 1. Automated creation of test-bed infrastructure. Saves your testing team valuable hours. 2. Parallel testing, not Sequential, for faster results. 3. Consistent test results across Multiple environments / infrastructures. 4. No simulated environments. Get test results in real time on the actual application / data. 5. Integrates easily with your existing DevOps toolchain and pipelines. What do you get? 1. A Simple Cross-Browser and Scale Testing Platform. 2. Single tool for your Unit, Integration, Functional, Performance, Mobile, Security and Load Test needs. 3. A powerful automation platform to replace or append your manual testing process. 4. Simplify your Manual Testing process. 5. Option for Incremental Load Tests. 6. Breakpoint Analysis of your applications. 7. Out-of-the-box integration with Selenium and Cucumber. 8. Load test scripts from an SCM Repository or a Zip file. 15
  • 16.
    info@reancloud.com | www.reancloud.com REANTest A Cloud-based DevOps centric automation accelerator, which creates dynamic infrastructure on the fly to perform rapid in-parallel cross-browser, functional, performance, load and scale testing with analytics to fail fast. It is a solution that gives you the ability to test your web application with a wide range of browsers to select from, run tests (either URL, Functional or Manual) and provides state-of-the-art test result data analytics. Why REAN Cloud? 1. End the Speed vs Quality debate. 2. Consistent results across platforms. 3. If you have the test case, we can test it. 4. If not, we can build the test cases for you. 5. Make Performance Tests part of your sprints. 6. Simplifying your Manual Testing needs. 7. Complete Solution for all your testing needs. 8. Get a live view of your test results. Test Cases Automated test-bed infrastructure creation using APIs Parallel Cross-Browser Testing with ScaleNow Perform Consistent and Quality Tests, Faster. Fail Faster using REAN Test 16
  • 17.
    info@reancloud.com | www.reancloud.com REANDocs Document your Technical (includes design, architecture, configuration, test results) and Process Controls to support audit and compliance. How we do it? 1. Automated creation of various documentation. 2. Documentation tailored to your needs. 3. Automation provides consistency in documentation for easy comparison between baseline documents and updated copies. 4. Compliance reports / documents for HIPAA, FedRamp, SOC, HiTrust, etc Compliance based on the right standards. 5. Automations reduces the risk of faulty documentation. What do you get? 1. Technical documentation. 2. Process Controls documentation. 3. Audit reports / Golden Document. 4. Compliance reports. 17
  • 18.
    info@reancloud.com | www.reancloud.com REANDocs Document your Technical (includes design, architecture, configuration, test results) and Process Controls to support audit and compliance. Why REAN Cloud? 1. Quality documents faster. 2. Consistent documents across all your environments / projects / compliance needs. 3. Document all changes - Never miss anything. 4. Best Practices and Guidance on various Compliance requirements. 5. Make documentation a part of your project lifecycle without the need for added effort. 6. Customized documentation based on your requirements. Documentation Engine Experts Reads / Scans your environment Generate documentation based on the desired requirements 18
  • 19.
    info@reancloud.com | www.reancloud.com REANOps Manage and Govern your infrastructure and environments (Development, Test, Staging, Pre-Production, Production, DR, etc) and leverages REAN Deploy, REAN RADAR, REAN Test, REAN Heal and REAN DevOps. How we do it? 1. 24x7 Enterprise Level Support. 2. Three-Tier Model tailored to your needs. 3. Automated scripts scan your environments for issues. 4. Self-Healing scripts for fixing issues without manual intervention. 5. Dashboard for monitoring your entire environment. What do you get? 1. Proactive monitoring, automation, patching, logging, alerting and back-up management of the your Cloud environment. 2. Operational process and procedures based on industry standards such as ITIL. ○ Infrastructure Maintenance ○ Problem Management ○ Change Management ○ Performance Management ○ System Monitoring ○ Service Reporting ○ Security Management ○ Remote Infrastructure Monitoring ○ Data Backup ○ Access Management ○ Network Management 19
  • 20.
    info@reancloud.com | www.reancloud.com REANOps Manage and Govern your infrastructure and environments (Development, Test, Staging, Pre-Production, Production, DR, etc) and leverages REAN Deploy, REAN RADAR, REAN Test, REAN Heal and REAN DevOps. Why REAN Cloud? 1. 24x7 Support 2. Reduced Cloud spends on infrastructure. 3. We optimize and tune your environment for costs, security and performance. 4. Access to an integrated dashboard for all your worry-free monitoring requirements. Experts Self-Heal Engine 24x7 Operations Automated Monitoring Scripts Cloud Environments - Fine Tuned, Secured, and Optimized for Cost and Performance Dashboards 20
  • 21.
    REAN RADAR Dashboards withDevOps centric metric to measure and track the various tenants of DevOps, starting from time to release, security, cost and finance, operations, utilization and more. info@reancloud.com | www.reancloud.com How we do it? 1. Single utility to visualize metrics from various data-points and across different domains. 2. CISO dashboard based on the guidelines from Center for internet Security (CIS). 3. People, Process and Infrastructure costs. 4. Varied data sources verify for accurate visualizations. Get near to real metrics for cost and performance. What do you get? 1. A combination of dashboards to visualize your environments. 2. Ability to visualize and infer from cost, performance, development and security based metrics. 3. CEO, CFO, CTO, CISO and COO dashboards. 4. Compliance reporting and visualization. 21
  • 22.
    REAN RADAR Dashboards withDevOps centric metric to measure and track the various tenants of DevOps, starting from time to release, security, cost and finance, operations, utilization and more. info@reancloud.com | www.reancloud.com Why REAN Cloud? 1. 24x7 Support 2. Access to an integrated dashboard for all your worry-free monitoring requirements. 3. Optimize your processes and infrastructure for cost and performance. 4. Gain complete end-to-end visibility. 5. Single utility for cost, security, performance and development based metrics. Dashboards Collects metrics from varied data sources Visualize on one Dashboard 22
  • 23.
    info@reancloud.com | www.reancloud.com REANDevOps A suite of software that bundles integrated set of products that are designed and tested to work with each other. Products such as REAN Migrate, REAN Deploy, REAN Test, REAN Radar and more form a part of the REAN DevOps product suite. How we do it? 1. Team of experts build your DevOps CI|CD pipelines. 2. Ability to choose from various tools based on the application and environment requirements. 3. Constantly update your pipelines with new cookbooks and test cases. 4. Separate Dev / Test / Pre-Prod / Prod environments increase your efficiency. 5. Document all the steps in the implementation pipeline. What do you get? 1. A suite of products tailored to your DevOps requirements. 2. Migrate your workloads the CI|CD way. 3. DevOps toolchain based on your application stack requirements. 4. Automated deployments and tests build into the pipelines. 5. Ability to visualize your environment using dashboards. 23
  • 24.
    info@reancloud.com | www.reancloud.com REANDevOps A suite of software that bundles integrated set of products that are designed and tested to work with each other. Products such as REAN Migrate, REAN Deploy, REAN Test, REAN Radar and more form a part of the REAN DevOps product suite. Why REAN Cloud? 1. 24x7 Support 2. Access to an integrated dashboard for all your worry-free monitoring requirements. 3. Reduced costs and optimized performance and security. 4. Custom cookbooks and templates for your requirements. 5. Faster deployments. Infrastructure Code Images Application Binaries Migrate across any environments / Build CI|CD Pipelines 24
  • 25.
    How we doit? 1. Event rule engine, to help write custom rules. 2. Decision making on which healing scripts to run, when and where. 3. REAN Heal’s server provides the scripts from a Git repository. 4. Asynchronous communication between REAN Heal server and the host to be healed - provides the scale and performance needed for the solution. 5. Monitored host fetches and executes the healing script. info@reancloud.com | www.reancloud.com REAN Heal REAN Heal is REAN Cloud's state-of-the-art technology for auto-remediation. It auto-fixes 20%+ alerts with zero human intervention. What do you get? 1. Automated Modular REAN Heal solution. 2. Automatically heal your servers. 3. Automated fixed alerts on thousands of servers. 4. Maintains audit. 25
  • 26.
    info@reancloud.com | www.reancloud.com REANHeal REAN Heal is REAN Cloud's state-of-the-art technology for auto-remediation. It auto-fixes 20%+ alerts with zero human intervention. Why REAN Cloud? 1. Very low MTTR (Mean time to Repair). 2. High stability. 3. High availability. 4. Not doing the same SOPs over and over again for years. 5. Attrition free knowledge base that is being constantly used. 6. Very low cost of L1 operations with high speed. Decision Making Collect Run Results Connect and Authentic ate Running Scripts Queuing Requests Windows Scripts Linux Scripts Security Scripts Nagios Server Ubuntu Critical Alert Windows Normal Alert SUSE Proactive Alert Alerts 26
  • 27.
    Thank You REAN CloudLLC 2201 Cooperative Way, Suite 302 Herndon, VA 20171 +1(844) 377-REAN (7326) info@reancloud.com | www.reancloud.com 27