This document provides a summary of Randall D. Hogue's qualifications and experience. He has over 30 years of experience in electrical and electronic engineering, design, and project management for facilities, ships, submarines, and aircraft. His experience includes developing integrated control systems, electrical designs, specifications, testing, and regulatory compliance. He is proficient in various computer applications such as AutoCAD, Microsoft Office, and programming.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
Distributech 2015 taking interoperability to the next levelSchneider Electric
Riel Substation is Manitoba Hydro’s newest DC Converter Station as well as a major 230/500kV transmission station. Riel covers approximately 40 hectares making it physically one of the largest
substations in North America. The project modifies the existing 500kV international transmission line running from Winnipeg, CA to Minnesota.
This paper presents the analysis of the technical issues encountered during project execution such as engineering design, multivendor integration, GOOSE implementation, network infrastructure and cyber security. It covers also the organizational issues such as customer involvement and standardization, among others, lessons learned and recommendations for future implementations.
This is one of the first complete protection and control automation solution using redundant IEC61850. The technology being implemented within Riel Station is not only one of the largest Digital Control Systems on the continent, but is one of the premier systems in the world today.
As a partner of the Riel initiative, Schneider Electric has completed the engineering, design and manufacturing of protection and control panels for the entire substation using state of the art technologies including but not limited to full redundant system, NERC CIP cyber security compliance, multivendor interoperability and reliability as a top priority with 6 independent fiber optic networks, redundant protections, HMI and networks.
The implemented design permits a cost effective solution using the Ethernet Redundant Networks to communicate with others devices and non-hardwire traditional solution. The protection scheme solution is based on IEC61850, providing the protection functions and logics inside the different relays to
share and capture information required protecting the electrical network and facilitating the monitoring from HMI. By the time this paper will be presented at DTECH 2015, the 230 kV portion of the project will have been commissioned and energized.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
Distributech 2015 taking interoperability to the next levelSchneider Electric
Riel Substation is Manitoba Hydro’s newest DC Converter Station as well as a major 230/500kV transmission station. Riel covers approximately 40 hectares making it physically one of the largest
substations in North America. The project modifies the existing 500kV international transmission line running from Winnipeg, CA to Minnesota.
This paper presents the analysis of the technical issues encountered during project execution such as engineering design, multivendor integration, GOOSE implementation, network infrastructure and cyber security. It covers also the organizational issues such as customer involvement and standardization, among others, lessons learned and recommendations for future implementations.
This is one of the first complete protection and control automation solution using redundant IEC61850. The technology being implemented within Riel Station is not only one of the largest Digital Control Systems on the continent, but is one of the premier systems in the world today.
As a partner of the Riel initiative, Schneider Electric has completed the engineering, design and manufacturing of protection and control panels for the entire substation using state of the art technologies including but not limited to full redundant system, NERC CIP cyber security compliance, multivendor interoperability and reliability as a top priority with 6 independent fiber optic networks, redundant protections, HMI and networks.
The implemented design permits a cost effective solution using the Ethernet Redundant Networks to communicate with others devices and non-hardwire traditional solution. The protection scheme solution is based on IEC61850, providing the protection functions and logics inside the different relays to
share and capture information required protecting the electrical network and facilitating the monitoring from HMI. By the time this paper will be presented at DTECH 2015, the 230 kV portion of the project will have been commissioned and energized.
• Cable joints up to 36kv.MV, LV, cables routing & termination, Earthling,
• Electrical Panels, control systems, low current
implementation,
• Installation, testing, commissioning and Servicing of U.P.S, (LEVER UPS, ITALY.
HBL, INDIA, DUBAS UPS, INDIA)
• Installation, testing, commissioning and Servicing of U.P.S, Stabilizer, Battery charger,
• Preparations of Sales Quotations and Preparations of Tenders, Meeting with Clients.
• Generating the New Customers and preparing the targets to sales Engineers and Follow up the payments and raising the invoices.
• Raising the Profit margin to the Department through the AMC and sailing of Products
Electrical and control engineer for hammond solutionBakhte Karam
An effective and meticulous engineering professional with key expertise in the, energy oil & gas and manufacturing industries, skills in design engineering and systems optimization, extensive fault analysis and troubleshooting skills and advanced technical abilities enable me to quickly solve problems at the root cause, recognized and winner of various awards for my ability to multi-task efficiently in demanding and sensitive situations, earned the respect and confidence of my peers and customers for continuous improvement.
In this webinar, learn about two municipal water districts that upgraded to SCADA systems with unlimited clients, tags, and connections, built on an innovative controls platform with deeply embedded cyber security. Don Pearson, chief strategy officer of Inductive Automation, and Albert Rooyakkers, CEO of Bedrock Automation, will have an informative discussion with Dee Brown, principal of Brown Engineers, the award-winning integration firm that implemented new systems combining Ignition and Bedrock Automation technologies for water districts in Clarksville, Ark., and Russellville, Ark. Since switching to new Ignition SCADA systems with secure Bedrock controllers, both water districts have experienced great results and plan to expand their use in the future.
Affordably Refreshing Your Water District’s Process Control
Randy Hogue resume 092316
1. Randall D. Hogue
Global.rhogue@gmail.com
(206) 679-9651
SUMMARY:
30 years contract or project engineering and design in electrical and electronic systems, including; Facilities,
Refineries, Shipboard, Submarine and Airplane systems, all associated machinery. Developed integrated control
systems from concept (design or purchase specification) to production controlling mechanical and electrical
machinery and tested. Developed electrical loads analysis, ac one-line, power distribution systems, Lighting and
associated calculations, magnetic controls, interface PLCs, Bonding and Grounding, Fire Detection and
Suppression, Security Systems, and other systems as required. Developed technical purchase specifications.
Involved and assisted in bid proposals and warranty. I have a Deep understanding of all machinery and
electrical systems. Applied regulatory body requirements of NEC, CFR46, ABS, SOLAS, IEEE, IEC and USN.
Competent in all necessary computer applications including Catia, WIRS, MS Office Applications, MS
Spreadsheets Excel, Microsoft Project, Visio, PowerPoint, Microsoft Project, Autocad (9-14, 2000-
2005),Windows 95/98, 2000, NT, ME, XP Vista, Windows 7, 8.1 and 10 operating systems. Recent Studies
include REVIT and PLC Programming. Hobbies include photography, golf, swimming and auto repair.
PROFESSIONAL EXPERIENCE:
Vigor Fab/Specialty Finishes 7/2016-Present
Electrical Planner, WSF 144 Car Ferries
Planned work for electricians in modular contruction
Washington State Ferries, New Construction.
Various Short-Term Contract Electrical Design 10/2014-7/2016
Belshaw Adamatic Bakery eqpt Auburn WA
Randy's Enterprises 1099
• Motors and Controls Design Motor Controls Corp
• Automated Bakery Eqpt. Belshaw Adamatic
• Autocad
• Equipment Testing prior to delivery.
• Revit
OMAX (Waterjets) Kent Washington 1/2014 – 10/2014
Designed solutions for enhancements to their abrasive waterjets
Currently On-Call for new work.
• Electrical Designer Autocad, Draftsight
• Programming, PCL Ladder Logic
• Autocad and Excel
• Designed solutions for enhancements to their waterjets
• Developed Prototypes at my bench and of course Testing
Eltech Electric Seattle Washington 9/2012-1/2014
Washington State Ferries Vigor
2. • Quality Control Manager new construction Washington State Ferry, 144 car project
• Engineering Liaison
• Fire detection and Suppression
• Security, Access control and Alert systems
• Tech Support for upper management and electricians
• Status Project to Vigor/US Fab Management Team
• Payroll electricians (55)
• Assist in Project Management.
• Writing test documents IAW WSF and standard Policy
• Tested electrical systems, assemblies, wire, and motor controllers
Siemens Beaverton Industry Control
• Control solutions for HVAC and Lighting for local industry 2/20012-8/20012
• Autocad and Office Suite, Acrobat
• HVAC, Controls,
• Fire Detection and Security
• Submittals
Leevac LLC Shipyard Jennings LA 7/2008 – 11/2010
Electrical Design and Engineering
• New Construction, OSV & Well Stimulation Vessel, (290'). ABS ACC DP.
• Shipcheck and liaison. Developed solutions for all things electrical for ship construction and warranty.
And Testing.
• Troubleshoot problems with existing designs including VFDs and integrated controls
• Fire Detection and Suppression
• Security Systems
• Attended class on Ship Constructor.
• Drafting and Design as needed Autocad
• Developed Prototypes and Tested
• Tested Wiring, Transformers and Motor Controls
Gibbs and Cox, Marine Design Agents in Hampton Virginia 4/2008-7/2008
Design Engineer, Grounding and Systems Integration
• Return to US Navy LCS Littoral Combat Ship that I started with Marinette Marine in 2003.
Drawing/Design Checking for incorporation of Hull one drawings to Hull two. Developed significant
understanding of the Bonding and Grounding Standards.
• Drafting and Design as needed, Autocaad
Anvil Corp Bellingham Washington. 9/2007 - 4/2008
Designer, Industrial
• Designing Electrical Systems for Petro/Chem industry. PLCs,
• Medium Voltage Power Distribution, Bonding and Grounding,
• Controls and VFDs VSDs.
• Windows Suite SW and Autcad 2006.
• Testing prior to delievery
3. • Fire Detection and Suppression
• Security
Boeing 787 Supplier Integration Project manager 6/2006-8/2007
Electrical Engineering Project Manager, Chihuahua Mexico S
• Maintained the status and compliance for the remote site in Chihuahua, Mexico Formboard. All statuses
thus far are meeting if not exceeding Boeing requirements.
• Currently wrapping up Project Management courses required for PMI Certification
• Studied Spanish Language.
JM Martinac Shipbuilders Tacoma Washington 12/2005-6/2006
Chief Electrical Engineer.
• Designed all the electrical systems, controlled budget, and developed specifications for electrical
systems.
• Fire Detection and Suppression
• Securituy
• Designed electrical systems for ABS Tug, 140' including reduced voltage starting control of large
motors needed for the tug and a variable frequency drives.
• Designed a power plant with two 99kw gensets.
• Developed Test procedures
• Testing Wiring, Machinery, Motor Controls and Electrical Systems
Weyerhaeuser Engineering Services Federal Way Wash 01/2005-12/2005
Design Engineer
• Designed Equipment arrangements including substations and mcc, Lighting, Grounding systems for the
new recovery boiler upgrades to the Grande Prairie Alberta mill.
• Lighting calculations, panel balancing, transformer and panel sizing.
• Ac One-lines, medium and low voltages. Autocad, Excel.
• Testing of equipment prior to delivery
Marinette Marine Marinette WI. 07/2003-01/2005
Project Manager, Integration Engineer
• Assignment: Navy LCS Project, integrated controls and monitoring system Great Lake Ice Breaker
USCG, WLB USCG,
• Staten Island Ferry, Improved Navy Lighterage System (INLS). Assigned various tasks involving
Project Management
• Design power and controls
• Fire Suppression and Detection
• Security systems
• Purchase Specs and Test Memos, corrective action. Traveled extensively. Developed and conducted test
for ship systems, fire systems, machinery and cabling
Glosten Associates Seattle Washington 04/2002-05/2003
Guidance Level Design for the lighting for a Boeing Semi-Submersible Platform
Design Engineer, Integration and Control, Lighting
• Assisted in the Contract Guidance Level Design of the SBX Semi-Submersible platform (Boeing) 4500+
Point Integrated Alarm and Monitoring system Design and Purchase specifications.
• Created lighting arrangement drawing, performed lighting calculations, specify materials.
4. • Write Technical and Purchase Specifications.
• Autocad 2002, MS Excel and MS Word Temp assignment to assist in the SOLAS upgrades for the
Alaska State Ferry LeConte.
• Designed Contract Guidance Level Drawings,
• Design and Purchase Specifications for PMC PLC Based Integrated Machinery Control and Monitoring
System, a Sperry Voyage Data Recorder System (The Black Box),
• Incorporated RS422, RS232, Digital and Analog signals from most of the safety, security and
monitoring systems on the vessel and interfaced with the IMACS.
• Designed an Automatic Identification System (AIS), a new Fiber optic Gryocompass System, revised
power, fire damper controls, lighting and various other electrical and electronic modifications incidental
to this modification project.
• Used Autocad 2002 and MS Excel and Word.
Art Anderson & Associates Marine Engineers Bremerton 1/2002- 4-2003
Design Engineer
• Wa.450vac 3ph & 120vac Power Distribution for the Navy to NOAA Conversion of YTT-12. Meeting
CFR46, ABS and other applicable regulatory bodies.
• Re-power main propulsion of two Washington State, Evergreen Class Ferries (Klahowya & Tillikum)
and unrelated refits, liaison, and design meeting all pertinent regulatory bodies.
Glosten and associates Marine Engineers Seattle. 10/2001-1/2002
Design Engineer
• SOLAS upgrades for the Washington State Ferry Chelan. Updated the General and Emergency Lighting,
Electrical/Hydraulic Watertight Doors, and Fire Door control system and accompanying purchase
specifications etc to meet SOLAS requirements.
Boeing Commercial Airplane Group, Puget Sound. 7/99-10/2001
Project Planner, Engineer and Integration
• Assigned to the Formboard section of electrical engineering to design tools to build wiring harnesses of
the 767.
• Used Catia cad system to draw and manipulate 2d and 3d datasets, and used the Boeing WIRS data base
and utilities to itemize and assign wiring cut lengths in a highly automated process.
NC Machinery (Caterpillar), Puget Sound. 1/99-7/99
Designer
• Assigned to power systems group.
• Designed with Autocad 14 for windows custom diesel electric generator and propulsion engine
configurations.
• Managed cad library, customer support and tested new software.
Boeing Commercial Airplane Group, Puget Sound. 10/97 11/98
Project Planner and Design Integration
• Assigned to the Formboard section of electrical engineering to design tools to build wiring harnesses of
the 747/767 and 737.
• Used Catia cad system to draw and manipulate 2d and 3d datasets, and used the Boeing WIRS data base
and utilities to itemize and assign wiring cut lengths in a highly automated process.
5. • Attended classes on Catia and WIRS along with a large list of other classes that would be considered
generally Boeing specific.
Elliot Bay Design Group, Seattle Wa. 4/97 - 10/97
Design Engineer
• Assisted in the development of the gaming vessel SWATH Electrical AC One Line Diagram, the
Cableways and the Navigation Lighting.
• Performed As-built ship checks, drawings and technical purchase specifications for the SOLAS
modifications to the Alaskan State Ferries.
• Modifications include the addition of an Emergency Generator, A Cyberus Fire Detection System,
expansion and upgrade of the Emergency Lighting and the General Alarm.
• Used Autocad 13, 14 and MS Office.
Nichols Brothers Boat Builders, Freeland Wa. 1/94 - 4/97
Chief Electrical Engineer
• Lead electrical design and liaison of the 120 foot Aluminum SWATH gaming vessel Cloud X.
Reviewed and developed Interfacing drawings for the AC Power, Gas Turbine, Reduction Gear, CPP
control and the PLC based integrated Machinery Control and Monitoring system.
• Developed an extensive 24vdc Power System, Fire Damper Control System, and Fire Door closing
System.
• Developed a PLC/relay actuated remote Motor Valve Control System with Inductive Proximity Sensor
Indicating.
• Developed miscellaneous Motor controllers and Motor Control Centers.
• Developed Cableway guidance drawings.
• Created Technical Purchase Specifications.
• Assisted in binding arbitration on behalf of NBBB.
• Assisted in the Washington State Ferries bid proposals (Jumbo and Passenger only).
• Assisted in the electrical design and development of a 85 foot steel Yacht and scientific research vessel.
• Used Autocad 11 thru 13, MS Works andOffice.
Avonadale Industries, New Orleans, La. 6/91 - 1/92
Project Engineering and Planning
• Assisted in the development of Zone Outfitting and Equipment Arrangements and Foundations for the
USN LSD project using Avondale Standards for material staging and Zone Outfitting.
Self employed, Puget Sound. 9/90 - 6/91
Engineer
• Clients include Glosten and Associates, Harris Electric, and Portlock. These clients were primarily
involved in Washington State Ferries projects including the Elwha.
• Developed Cableways, Switchboards, and Motor Control Centers.
• Used Autocad 10.
Tacoma Boat Building, Tacoma Wa. 12/89 - 9/90
Design Engineer
• Assisted in developing electrical systems and writing purchase specifications for the 270 foot Taiwanese
Customs vessel, the 166 foot Steel yacht Samatha Lee.
• General electrical design in the Conversion of the MSC Hayes and an Egyptian submarine.
Todd Pacific Shipyard, Seattle, Wa. 3/86 -12/89
6. • Assisted in the Fleet Renovation and Modernization of several classes of USCG 328 foot White High
Endurance Cutters.
• Developed Cableways and Equipment Arrangements. Assisted in various USN projects
CDI Marine, Renton, Wa. 8/83 - 8/86
• Development electrical systems of various USN Shipalts for the PSNS and SUPSHIP contracts.
Participated in the 1985 ESRA project of the USS Midway in Yokosuka Japan.
• Received Secret Clearance.
US Navy. Studied and Applied Electrical and Electronic 3/80 4/83
• Theory, Submarine Systems, Safety, Fire Fighting. Medical Discharge from Fractured Femur (Broken
Thigh Bone).
EDUCATION:
(Bi-Lingual English-Spanish)
Puyallup High Graduated 1979
Pierce College Math/English
Bates Voctech Medusa Cad System
USN BEE Basic Electricity/Electronics
USN BESS Basic Submarines
USN Sonar A School
Extension Course Institute. Electronic Fundamentals
Benefit Computers Autocad 13 and Softdesk Applications
Classes held at Boeing in IEEE and Project Management.
Numerous Classes online in Continuous Educational Credits, Primarily Engineering
Project Management Boeing on campus training various universities
Numerous classes Boeing Campus Microsoft suite including Excel, Word, Project,
7. • Assisted in the Fleet Renovation and Modernization of several classes of USCG 328 foot White High
Endurance Cutters.
• Developed Cableways and Equipment Arrangements. Assisted in various USN projects
CDI Marine, Renton, Wa. 8/83 - 8/86
• Development electrical systems of various USN Shipalts for the PSNS and SUPSHIP contracts.
Participated in the 1985 ESRA project of the USS Midway in Yokosuka Japan.
• Received Secret Clearance.
US Navy. Studied and Applied Electrical and Electronic 3/80 4/83
• Theory, Submarine Systems, Safety, Fire Fighting. Medical Discharge from Fractured Femur (Broken
Thigh Bone).
EDUCATION:
(Bi-Lingual English-Spanish)
Puyallup High Graduated 1979
Pierce College Math/English
Bates Voctech Medusa Cad System
USN BEE Basic Electricity/Electronics
USN BESS Basic Submarines
USN Sonar A School
Extension Course Institute. Electronic Fundamentals
Benefit Computers Autocad 13 and Softdesk Applications
Classes held at Boeing in IEEE and Project Management.
Numerous Classes online in Continuous Educational Credits, Primarily Engineering
Project Management Boeing on campus training various universities
Numerous classes Boeing Campus Microsoft suite including Excel, Word, Project,