SlideShare a Scribd company logo
Rama Rao Kota
Mobile No.:0553758017 E-Mail: Ramarao202@gmail.com
Integrated Facility Management System with an organization of high repute.
Synopsis
Career of over 9 years in the electrical field has Facility Management System a strong background in all aspects of
Electrical engineering; conversant with Site Management, Erection, Commissioning, Maintenance as well as
Integrated Facility Management. Presently with United Entraco Contracting LLC at Al Ain (UAE) as a
General Electrical Engineer. Handled the functions pertaining to the day-to-day Technical & Admin and new
Site development Project work. Possess a flair for adopting modern construction methodologies in compliance with
quality standards.
Academics
 Graduation in Electrical & Electronics Engineering from Nishitha Engineering , Hyderabad affiliated to
JNTU Hyderabad in 2008 with attested by India and UAE.
 Diploma in Electrical & Electronics Engineering From Col.D.S Raju Polytechnic College, Poduru in 2003
 SSC from MMKNM High School, Palakol in 2000
Knowledge of Electrical Equipments
Switchgear and Breakers
Switchgear up to 33K.V, Vacuum Circuit Breakers, Air Circuit Breaker, SF6 Circuit Breakers, Vacuum Contactors,
Moulded Case Circuit Breakers. Made by ABB, Siemens and L&T.
Protective Relays
Over Current and Earth Fault Relays (Electromechanical, Static, Numerical), Differentials Relay, Under/over Voltage
Relays, Different type of Supervision and Auxiliary Relays, A.C/D.C Monitoring Relays, Trip Relay.
Made By: ABB, Siemens, Areva, Alsthom, English Electric and Easun Reyrolle .
Transformers
Power Transformers, Distribution Transformers, Current Transformers, Voltage Transformers and Control
Transformers.& UPS upto 400kva.
Safety System
Fire Hydrant System, Main Pump, Jockey Pump ,Booster Pump and Diesel Generator Pump,FM200,All class Fire
Extinguishers, CCTV & Access control System.
Core Competencies
Erection, Commissioning & Maintenance
 Anchoring and planning all the erection, commissioning & Maintenance activities for equipments as well as
machinery.
 Carrying out erection, commissioning & maintenance, conducting tests & inspections to ensure operational
effectiveness of plant & utilities; planning maintenance schedules in the Plants.
 Ensure safety in all the activities performed.
Site Management
 Inspecting Field Sites to observe and evaluate condition and operability of facilities and structures, and to collect
field survey data and measurements.
 Planning as well as executing material testing and reporting; allocating shift duties of trainee Engineer, Forman’s,
Labours, etc.
Team Supervision
 Leading & monitoring the performance of team members to ensure efficiency in operations and meeting of
individual & group targets.
 Identifying and implementing strategies for building team effectiveness by promoting a spirit of cooperation
between team members.
 Recognizing areas of improvements and organizing training programs for the same.
Career Contour
From April’15 to Till
United Entraco Contracting LLC –UAE Al Ain as a General Electrical Engineer (Operation and
Maintenance )in UAE
Engineering Job Role
 Approved by Al Ain Municipality As a Electrical Engineer.
 Leading with 20 no Technical Staff .
 Controlling 10 location in Al Ain Municipality (Costumer Services, Wedding hall & Municipality)
 Day to day Technical complaints, Coordinate with Client .
 Finalizing AMC vendor for UPS, Transformer, Fire fighting system, DG, Fire Panel & Access control and CCTV.
 Preparing BOQ,SOW for AMC
 Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.
 Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of
carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.
 Conducting in monthly staff meetings and Implementing safety and technical training sessions.
 Preparing the documents and test report; coordinating with the Engineers.
 Implementing energy Savings interval.
 Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.
 Implementation of Environment Management System at our location.
 Conducting Fire and Safety Audits in the site.
 Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipment’s.
 Prepared and retagged asset lists every 6 months.
 Coordinating with vendors for statutory documents and Compliance documents.
 Preparing Snag point, Plumbing, Carpentry Coordinate with vendor for completion of Snag point
 Achieved appreciation mails from Client for
From Jun’12 to Sep’14
WNS Global Service Pvt ltd - GPS Location, Visakhapatnam as a Assistant Manager (Technical )in
INDIA
Engineering Job Role
 Leading with 13 no Technical Staff and 20 Nos Housekeeping Staff
 Finalizing AMC vendor for UPS, Transformer, Fire fighting system, DG, Fire Panel & Access control and CCTV.
 Preparing BOQ,SOW for AMC
 Validating monthly Energy bill & Monthly vendor invoice.
 Creating new Access card & ID card for new employees.
 Handling all technical, Housekeeping & Security issue
 Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.
 Maintenance of 3*120KVA and 1*40KVA UPS , Fire Hydrant system and 2* 250KVA Diesel Generator.
 Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of
carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.
 Conducting in monthly staff meetings and Implementing safety and technical training sessions.
 Preparing the documents and test report; coordinating with the Engineers.
 Implementing energy Savings interval.
 Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.
 Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.
 Implementation of Environment Management System at our location.
 Conducting Fire and Safety Audits in the site.
 Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.
 Prepared and retagged asset lists every 6 months.
 Coordinating with vendors for statutory documents and Compliance documents.
 Proactively prepared Budget Fall Plan for the year and prepare the quarterly budget forecast for Opex and Capex.
 Preparing Snag point, Plumbing, Carpentry & Housekeeping & Co ordinate with vendor for completion of Snag
point
 Achieved appreciation mails from RESO Head for vendor follow up activities.
Admin Job Role
 Leading with 20 no Security Staff and 20 No’s Housekeeping Staff
 Collecting Monthly vendor invoices and validation as per employee muster & issuing SRN no for WNS vendor
 Issued Stationary items as per the user request and did a vendor follow up for delivery of the stationary items
 Conducting monthly vendor meeting (Housekeeping, Security & Engineering team).
 . Handling Housekeeping, Security & Engineering issue.
 Prepared Fixed asset register (FAR) list & Asset sticker has been done.
 Initiated a replacement for service vendors (Housekeeping and Engineering services) and reduced the cost
compared to previous year
 Client visit arrangement.
 Prepared all floor Excel drawings with MAC Request Id.
 . Budget preparation for upcoming years
 Corporate Communication branding arrangements at all common areas, as per corporate team intimation
 Coordinated with finance dept. for releasing outstanding payments to Vendors
 Raised monthly indents for Housekeeping & Vending machine.
 Handling key issue (Locker, Pedestal).
 Handling Transport for employees (Pickup & drop) whenever the BCP situation occurred
 Optimization of using costing for all admin aspects
 Coordinated with courier vendor for couriers dispatch
 Conducted global impact day activities (save paper, tree samples).
Audit
 Infrastructure Risk audit: Submitted all infrastructure records (Ups, Access control, CCTV, floor drawings,
Maintenance records, Fire Extinguishers, Fire hydrant system test, and Fire alarm test), All minor and major risk
audit points were closed.
 Info sec Internal audit: Submitted all access card details, physical security maintenance records (Gate pass,
inward, outward, Visitor management system).
 USAA audit for AIS Process: Prepared all necessary documents and client arrangements
 DOT Inspection audit: Prepared all necessary documents (Ups, Server rack labeling & Hub room
 PCI DSS & ISO 27001 audit: Submitted all necessary documents (Access control, Physical security, Visitor
Management system, Access activation, deactivation and CCTV Recording as per WNS standard
 HDFC Life audit: Prepared all necessary documents & arrangements
 WNS Enterprise and Aviva audit: Submitted all necessary documents
Statutory Compliance Documents
 Conducted AAQ, DG set Air and Noise level Test
 Conducted Transformer BDV, Earth Pit test
 Conducted HT Meter calibration test
 Conducted DG set B & C check
 Conducted Electrical Inspection Report
 Fire NOC Renewal
 Lift Safety NOC certificate from OEM Vendor
 DG CEIG Report for DG set
CSR Activities:

 Identified the School (Govt Primary and Secondary school).
 Drawing competition for children’s on Global Impact day
 Christmas celebration for children’s at Govt primary and secondary school.
 Conducted floor walk.
From Nov’2008 to Jun’2012
Randstad India Pvt Ltd through JLL at IBM - GPS Location, Visakhapatnam as a Sr.Technical
Executive Engineer in INDIA
Job Role
 Leading with 15 no Technical Staff and 25 Nos Housekeeping Staff
 Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.
 Maintenance of 3*60KVA and 1*40KVA UPS , Fire Hydrant system and 2* 250KVA Diesel Generator.
 Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of
carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.
 Participated in monthly staff meetings and coordinate safety and technical training sessions.
 Preparing the documents and test report; coordinating with the Engineers.
 Implementing energy Savings interval.
 Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.
 Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.
 Implementation of Environment Management System at our location.
 Conducting Fire and Safety Audits in the site.
 Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.
 Prepared and retagged asset lists every 6 months.
 Coordinating with vendors for statutory documents and Compliance documents.
 Proactively prepared Budget Fall Plan for the year and prepare the quarterly budget forecast for Opex and Capex.
 Received appreciation from RESO for Closing of all horizontal and vertical gaps in the electrical rooms with Fire
Motor Bags.
 Achieved appreciation mails from RESO for vendor follow up activities.
 Site Lead of the Housekeeping Team as well as Technical Team.
From Oct’2007 to Nov’2008
IL & FS India Pvt Ltd at Karvy - At Hyderabad as a Technical Executive Engineer in INDIA
Job Role
 Leading with 25 no Technical Staff and 40 Nos Housekeeping Staff.
 Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.
 Maintenance of 10*120KVA and 5*80KVA UPS , Fire Hydrant system and 6* 250KVA Diesel Generator.
 Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of
carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.
 Participated in monthly staff meetings and coordinate safety and technical training sessions.
 Preparing the documents and test report; coordinating with the Engineers.
 Implementing energy Savings interval.
 Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.
 Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.
 Implementation of Environment Management System at our location.
 Conducting Fire and Safety Audits in the site.
 Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.
 Prepared and retagged asset lists every 6 months.
 Coordinating with vendors for statutory documents and Compliance documents.
 Received appreciation from RESO for Closing of all horizontal and vertical gaps in the electrical rooms with Fire
Motor Bags.
 Achieved appreciation mails from RESO for vendor follow up activities.
 Site Lead of the Housekeeping Team as well as Technical Team.
From Sep’05 to Oct’2007
220KV/132KV Sub Station As a Shift Engineer ,Hyderabad in INDIA
Job Role
 Maintenance of 220KV/132KV Sub Station (Distribution & Transmission).
 Preparing daily all feeder consumption, Maintain the Battery check voltage.
 Conducting the battery test with hydro meter for Specific gravity.
 Issuing the LC (Line Clarence)for any line breakdown issue with proper approval.
 Participating with MRT Dept for all meter calibration and Relay testing.
 Preparing Monthly feeder wise consumption for HT & LT.
 Control all switchgear protection 220KV/132KV.
 Checking the Power Transformer cooling system
 Checking the all HT & LT Breaker proper function, if any faulty found inform to ADE.
 Maintain the HT & LT Earthling protection system.
 Taking Hourly reading & observe the all operation relay flag.
From May ’03 to May’04
33KV/11KV/440V Distribution Line Erection As a Site Engineer in INDIA
Job Role
 Preparing the Industrial load details
 Preparing the LT/HT distribution line drawing.
 Preparing the new HT distributing line drawing (Pole distance, No of Transformer required).
 Erection the HT and LT Distribution line.
 Erection for Transformer (up to 100KVA).
 Preparing all HT & LT Drawing submitted to Govt Dept for approval.
 Preparing the indent for all erection material (Poles, conductor, Transformer )
 Co ordination with vendor for Erection HT & LT conductor (AAA)..
 Follow the as per safety precaution.
 Maintain the HT & LT Earthling protection system.
 Taking Hourly reading & observe the all operation relay flag.
Trainings Completed
 Industry oriented mini project held at Sri Vijayarama Gajapathi Coop. Cable Manufacturing ,Hyderabad
 ISO9001 Quality Management System.
 ISO14001 EMS Management System.
 ERP & DRP
IT Forte
Applications : Microsoft Office, Internet
Awards and Recognition
 Best Employee Award from IBM & JLL
 Shining Star Award for best performer
 Orion Award (Facilities Award)
Streng th
 Positive thinking, hard working and Dedicated to achieve goals. I will be most pleased to be at any services
Personnel Dossier
Date of birth : 12th Jun 1982
Languages Known : English, Telugu and Hindi.
Present Address : Rama Rao Kota
S/o. Yesupadam
D.No: 1-85
Minimimchilipadu Post ,
Poduru Mandalam
West Godavari District
Andhrapradesh, India -534327
PAN Card Number : BICPK5431N
Passport Number : H0678825
Place of Issue : Hyderabad, Andhra Pradesh, India
Date of Issue : 16.09.2008
Date of Expiry : 15.09.2018
Nationality : Indian
Marital Status : Married
No. of Dependents : Four
Declaration
 I hereby declare that the above information is correct and true to the best of my knowledge and belief.
Date: 06.04.2015
Place: UAE.
(Rama Rao Kota)
 Industry oriented mini project held at Sri Vijayarama Gajapathi Coop. Cable Manufacturing ,Hyderabad
 ISO9001 Quality Management System.
 ISO14001 EMS Management System.
 ERP & DRP
IT Forte
Applications : Microsoft Office, Internet
Awards and Recognition
 Best Employee Award from IBM & JLL
 Shining Star Award for best performer
 Orion Award (Facilities Award)
Streng th
 Positive thinking, hard working and Dedicated to achieve goals. I will be most pleased to be at any services
Personnel Dossier
Date of birth : 12th Jun 1982
Languages Known : English, Telugu and Hindi.
Present Address : Rama Rao Kota
S/o. Yesupadam
D.No: 1-85
Minimimchilipadu Post ,
Poduru Mandalam
West Godavari District
Andhrapradesh, India -534327
PAN Card Number : BICPK5431N
Passport Number : H0678825
Place of Issue : Hyderabad, Andhra Pradesh, India
Date of Issue : 16.09.2008
Date of Expiry : 15.09.2018
Nationality : Indian
Marital Status : Married
No. of Dependents : Four
Declaration
 I hereby declare that the above information is correct and true to the best of my knowledge and belief.
Date: 06.04.2015
Place: UAE.
(Rama Rao Kota)

More Related Content

What's hot

Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPIMatthew Turner
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASUAmit Basu
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EEwaseem odeh
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
Arun Das
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1Farhan Morai
 
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2Zafar Bokhari
 
Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
MANNANNATARAJAN
 

What's hot (19)

Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Mithun Kumar Electrical
Mithun Kumar ElectricalMithun Kumar Electrical
Mithun Kumar Electrical
 
Resume
ResumeResume
Resume
 
ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
SteveResumeLinked
SteveResumeLinkedSteveResumeLinked
SteveResumeLinked
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
 
2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
 
Resume
ResumeResume
Resume
 
Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 

Viewers also liked

адра ерназар+энергосберегающие устройства+создания загрузка презентации
адра ерназар+энергосберегающие устройства+создания загрузка презентацииадра ерназар+энергосберегающие устройства+создания загрузка презентации
адра ерназар+энергосберегающие устройства+создания загрузка презентации
Yernazar Adra
 
งานซิกแพคเวิด
งานซิกแพคเวิดงานซิกแพคเวิด
งานซิกแพคเวิด
kornkawi Sunggakaroon
 
Full Stack Design - SXSW 2016
Full Stack Design - SXSW 2016Full Stack Design - SXSW 2016
Full Stack Design - SXSW 2016
Robert Tuttle
 
The history of the horror genre
The history of the horror genreThe history of the horror genre
The history of the horror genre
Joelf99
 
aprender a respetar nuestro medio ambiente
aprender a respetar nuestro medio ambienteaprender a respetar nuestro medio ambiente
aprender a respetar nuestro medio ambiente
itzel moreno gomez
 
E trgovina u Srbiji - problemi u praksi
E trgovina u Srbiji - problemi u praksiE trgovina u Srbiji - problemi u praksi
E trgovina u Srbiji - problemi u praksi
Slobodan Marković
 
JavaFX Real-World Apps
JavaFX Real-World AppsJavaFX Real-World Apps
JavaFX Real-World Apps
Alexander Casall
 
The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
 The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
Search Engine Journal
 

Viewers also liked (13)

адра ерназар+энергосберегающие устройства+создания загрузка презентации
адра ерназар+энергосберегающие устройства+создания загрузка презентацииадра ерназар+энергосберегающие устройства+создания загрузка презентации
адра ерназар+энергосберегающие устройства+создания загрузка презентации
 
งานซิกแพคเวิด
งานซิกแพคเวิดงานซิกแพคเวิด
งานซิกแพคเวิด
 
Full Stack Design - SXSW 2016
Full Stack Design - SXSW 2016Full Stack Design - SXSW 2016
Full Stack Design - SXSW 2016
 
The history of the horror genre
The history of the horror genreThe history of the horror genre
The history of the horror genre
 
Julius Alfred Silva CV1
Julius Alfred Silva CV1Julius Alfred Silva CV1
Julius Alfred Silva CV1
 
aprender a respetar nuestro medio ambiente
aprender a respetar nuestro medio ambienteaprender a respetar nuestro medio ambiente
aprender a respetar nuestro medio ambiente
 
Arjay Lyn C.Tolentino_CV_2016
Arjay Lyn C.Tolentino_CV_2016Arjay Lyn C.Tolentino_CV_2016
Arjay Lyn C.Tolentino_CV_2016
 
bigdata_pig
bigdata_pigbigdata_pig
bigdata_pig
 
E trgovina u Srbiji - problemi u praksi
E trgovina u Srbiji - problemi u praksiE trgovina u Srbiji - problemi u praksi
E trgovina u Srbiji - problemi u praksi
 
JavaFX Real-World Apps
JavaFX Real-World AppsJavaFX Real-World Apps
JavaFX Real-World Apps
 
it resume
it resumeit resume
it resume
 
Laura Resume Feb, 2017
Laura Resume Feb, 2017Laura Resume Feb, 2017
Laura Resume Feb, 2017
 
The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
 The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
The Top Backlink Profiles of 2017 & How They Were Built with Rowe Digital
 

Similar to Rama_Rao_0553758017

Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra MouliCHANDRA MOULI
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016Sreeram N
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CVSyed Raza
 
Euggine atinda.cv.2018
Euggine atinda.cv.2018Euggine atinda.cv.2018
Euggine atinda.cv.2018
ATINDA EUGGINE
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
My updated cv
My updated cvMy updated cv
My updated cv
AdnanNoor10
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
Balamurugan chandramohan
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarcoKeith DiMarco
 

Similar to Rama_Rao_0553758017 (20)

Pramod Chand Chaturvedi
Pramod Chand ChaturvediPramod Chand Chaturvedi
Pramod Chand Chaturvedi
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
SHAFFEE CV
SHAFFEE CVSHAFFEE CV
SHAFFEE CV
 
curriculum_vitae (1)
curriculum_vitae (1)curriculum_vitae (1)
curriculum_vitae (1)
 
Euggine atinda.cv.2018
Euggine atinda.cv.2018Euggine atinda.cv.2018
Euggine atinda.cv.2018
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
cv new
cv newcv new
cv new
 
Siva Resume
Siva ResumeSiva Resume
Siva Resume
 
My updated cv
My updated cvMy updated cv
My updated cv
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 

Rama_Rao_0553758017

  • 1. Rama Rao Kota Mobile No.:0553758017 E-Mail: Ramarao202@gmail.com Integrated Facility Management System with an organization of high repute. Synopsis Career of over 9 years in the electrical field has Facility Management System a strong background in all aspects of Electrical engineering; conversant with Site Management, Erection, Commissioning, Maintenance as well as Integrated Facility Management. Presently with United Entraco Contracting LLC at Al Ain (UAE) as a General Electrical Engineer. Handled the functions pertaining to the day-to-day Technical & Admin and new Site development Project work. Possess a flair for adopting modern construction methodologies in compliance with quality standards. Academics  Graduation in Electrical & Electronics Engineering from Nishitha Engineering , Hyderabad affiliated to JNTU Hyderabad in 2008 with attested by India and UAE.  Diploma in Electrical & Electronics Engineering From Col.D.S Raju Polytechnic College, Poduru in 2003  SSC from MMKNM High School, Palakol in 2000 Knowledge of Electrical Equipments Switchgear and Breakers Switchgear up to 33K.V, Vacuum Circuit Breakers, Air Circuit Breaker, SF6 Circuit Breakers, Vacuum Contactors, Moulded Case Circuit Breakers. Made by ABB, Siemens and L&T. Protective Relays Over Current and Earth Fault Relays (Electromechanical, Static, Numerical), Differentials Relay, Under/over Voltage Relays, Different type of Supervision and Auxiliary Relays, A.C/D.C Monitoring Relays, Trip Relay. Made By: ABB, Siemens, Areva, Alsthom, English Electric and Easun Reyrolle . Transformers Power Transformers, Distribution Transformers, Current Transformers, Voltage Transformers and Control Transformers.& UPS upto 400kva. Safety System Fire Hydrant System, Main Pump, Jockey Pump ,Booster Pump and Diesel Generator Pump,FM200,All class Fire Extinguishers, CCTV & Access control System. Core Competencies Erection, Commissioning & Maintenance  Anchoring and planning all the erection, commissioning & Maintenance activities for equipments as well as machinery.  Carrying out erection, commissioning & maintenance, conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning maintenance schedules in the Plants.  Ensure safety in all the activities performed. Site Management  Inspecting Field Sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.  Planning as well as executing material testing and reporting; allocating shift duties of trainee Engineer, Forman’s, Labours, etc. Team Supervision  Leading & monitoring the performance of team members to ensure efficiency in operations and meeting of individual & group targets.  Identifying and implementing strategies for building team effectiveness by promoting a spirit of cooperation between team members.  Recognizing areas of improvements and organizing training programs for the same.
  • 2. Career Contour From April’15 to Till United Entraco Contracting LLC –UAE Al Ain as a General Electrical Engineer (Operation and Maintenance )in UAE Engineering Job Role  Approved by Al Ain Municipality As a Electrical Engineer.  Leading with 20 no Technical Staff .  Controlling 10 location in Al Ain Municipality (Costumer Services, Wedding hall & Municipality)  Day to day Technical complaints, Coordinate with Client .  Finalizing AMC vendor for UPS, Transformer, Fire fighting system, DG, Fire Panel & Access control and CCTV.  Preparing BOQ,SOW for AMC  Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.  Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.  Conducting in monthly staff meetings and Implementing safety and technical training sessions.  Preparing the documents and test report; coordinating with the Engineers.  Implementing energy Savings interval.  Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.  Implementation of Environment Management System at our location.  Conducting Fire and Safety Audits in the site.  Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipment’s.  Prepared and retagged asset lists every 6 months.  Coordinating with vendors for statutory documents and Compliance documents.  Preparing Snag point, Plumbing, Carpentry Coordinate with vendor for completion of Snag point  Achieved appreciation mails from Client for From Jun’12 to Sep’14 WNS Global Service Pvt ltd - GPS Location, Visakhapatnam as a Assistant Manager (Technical )in INDIA Engineering Job Role  Leading with 13 no Technical Staff and 20 Nos Housekeeping Staff  Finalizing AMC vendor for UPS, Transformer, Fire fighting system, DG, Fire Panel & Access control and CCTV.  Preparing BOQ,SOW for AMC  Validating monthly Energy bill & Monthly vendor invoice.  Creating new Access card & ID card for new employees.  Handling all technical, Housekeeping & Security issue  Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.  Maintenance of 3*120KVA and 1*40KVA UPS , Fire Hydrant system and 2* 250KVA Diesel Generator.  Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.  Conducting in monthly staff meetings and Implementing safety and technical training sessions.  Preparing the documents and test report; coordinating with the Engineers.  Implementing energy Savings interval.  Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.  Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.  Implementation of Environment Management System at our location.  Conducting Fire and Safety Audits in the site.  Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.  Prepared and retagged asset lists every 6 months.  Coordinating with vendors for statutory documents and Compliance documents.  Proactively prepared Budget Fall Plan for the year and prepare the quarterly budget forecast for Opex and Capex.  Preparing Snag point, Plumbing, Carpentry & Housekeeping & Co ordinate with vendor for completion of Snag point  Achieved appreciation mails from RESO Head for vendor follow up activities. Admin Job Role  Leading with 20 no Security Staff and 20 No’s Housekeeping Staff  Collecting Monthly vendor invoices and validation as per employee muster & issuing SRN no for WNS vendor  Issued Stationary items as per the user request and did a vendor follow up for delivery of the stationary items  Conducting monthly vendor meeting (Housekeeping, Security & Engineering team).  . Handling Housekeeping, Security & Engineering issue.
  • 3.  Prepared Fixed asset register (FAR) list & Asset sticker has been done.  Initiated a replacement for service vendors (Housekeeping and Engineering services) and reduced the cost compared to previous year  Client visit arrangement.  Prepared all floor Excel drawings with MAC Request Id.  . Budget preparation for upcoming years  Corporate Communication branding arrangements at all common areas, as per corporate team intimation  Coordinated with finance dept. for releasing outstanding payments to Vendors  Raised monthly indents for Housekeeping & Vending machine.  Handling key issue (Locker, Pedestal).  Handling Transport for employees (Pickup & drop) whenever the BCP situation occurred  Optimization of using costing for all admin aspects  Coordinated with courier vendor for couriers dispatch  Conducted global impact day activities (save paper, tree samples). Audit  Infrastructure Risk audit: Submitted all infrastructure records (Ups, Access control, CCTV, floor drawings, Maintenance records, Fire Extinguishers, Fire hydrant system test, and Fire alarm test), All minor and major risk audit points were closed.  Info sec Internal audit: Submitted all access card details, physical security maintenance records (Gate pass, inward, outward, Visitor management system).  USAA audit for AIS Process: Prepared all necessary documents and client arrangements  DOT Inspection audit: Prepared all necessary documents (Ups, Server rack labeling & Hub room  PCI DSS & ISO 27001 audit: Submitted all necessary documents (Access control, Physical security, Visitor Management system, Access activation, deactivation and CCTV Recording as per WNS standard  HDFC Life audit: Prepared all necessary documents & arrangements  WNS Enterprise and Aviva audit: Submitted all necessary documents Statutory Compliance Documents  Conducted AAQ, DG set Air and Noise level Test  Conducted Transformer BDV, Earth Pit test  Conducted HT Meter calibration test  Conducted DG set B & C check  Conducted Electrical Inspection Report  Fire NOC Renewal  Lift Safety NOC certificate from OEM Vendor  DG CEIG Report for DG set CSR Activities:   Identified the School (Govt Primary and Secondary school).  Drawing competition for children’s on Global Impact day  Christmas celebration for children’s at Govt primary and secondary school.  Conducted floor walk. From Nov’2008 to Jun’2012 Randstad India Pvt Ltd through JLL at IBM - GPS Location, Visakhapatnam as a Sr.Technical Executive Engineer in INDIA Job Role  Leading with 15 no Technical Staff and 25 Nos Housekeeping Staff  Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.  Maintenance of 3*60KVA and 1*40KVA UPS , Fire Hydrant system and 2* 250KVA Diesel Generator.  Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.  Participated in monthly staff meetings and coordinate safety and technical training sessions.  Preparing the documents and test report; coordinating with the Engineers.  Implementing energy Savings interval.  Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.  Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.  Implementation of Environment Management System at our location.  Conducting Fire and Safety Audits in the site.  Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.  Prepared and retagged asset lists every 6 months.  Coordinating with vendors for statutory documents and Compliance documents.  Proactively prepared Budget Fall Plan for the year and prepare the quarterly budget forecast for Opex and Capex.
  • 4.  Received appreciation from RESO for Closing of all horizontal and vertical gaps in the electrical rooms with Fire Motor Bags.  Achieved appreciation mails from RESO for vendor follow up activities.  Site Lead of the Housekeeping Team as well as Technical Team. From Oct’2007 to Nov’2008 IL & FS India Pvt Ltd at Karvy - At Hyderabad as a Technical Executive Engineer in INDIA Job Role  Leading with 25 no Technical Staff and 40 Nos Housekeeping Staff.  Maintenance of 11 KV Switchgears, Transformers, HT Breakers and all LT Panels.  Maintenance of 10*120KVA and 5*80KVA UPS , Fire Hydrant system and 6* 250KVA Diesel Generator.  Managing, coordinating and monitoring the maintenance, repair, construction and administrative activities of carpentry, electrical, plumbing, painting, general maintenance, and Air Conditioning (HVAC) trades.  Participated in monthly staff meetings and coordinate safety and technical training sessions.  Preparing the documents and test report; coordinating with the Engineers.  Implementing energy Savings interval.  Coordinating with the team and vendor for Purchase orders, work completion and Invoice submission.  Proactively Maintained stock of Disposal Cups, water and daily usage people related consumables.  Implementation of Environment Management System at our location.  Conducting Fire and Safety Audits in the site.  Planning and conducting of 52 Week calendar and Annual shut activity as per process for all equipments.  Prepared and retagged asset lists every 6 months.  Coordinating with vendors for statutory documents and Compliance documents.  Received appreciation from RESO for Closing of all horizontal and vertical gaps in the electrical rooms with Fire Motor Bags.  Achieved appreciation mails from RESO for vendor follow up activities.  Site Lead of the Housekeeping Team as well as Technical Team. From Sep’05 to Oct’2007 220KV/132KV Sub Station As a Shift Engineer ,Hyderabad in INDIA Job Role  Maintenance of 220KV/132KV Sub Station (Distribution & Transmission).  Preparing daily all feeder consumption, Maintain the Battery check voltage.  Conducting the battery test with hydro meter for Specific gravity.  Issuing the LC (Line Clarence)for any line breakdown issue with proper approval.  Participating with MRT Dept for all meter calibration and Relay testing.  Preparing Monthly feeder wise consumption for HT & LT.  Control all switchgear protection 220KV/132KV.  Checking the Power Transformer cooling system  Checking the all HT & LT Breaker proper function, if any faulty found inform to ADE.  Maintain the HT & LT Earthling protection system.  Taking Hourly reading & observe the all operation relay flag. From May ’03 to May’04 33KV/11KV/440V Distribution Line Erection As a Site Engineer in INDIA Job Role  Preparing the Industrial load details  Preparing the LT/HT distribution line drawing.  Preparing the new HT distributing line drawing (Pole distance, No of Transformer required).  Erection the HT and LT Distribution line.  Erection for Transformer (up to 100KVA).  Preparing all HT & LT Drawing submitted to Govt Dept for approval.  Preparing the indent for all erection material (Poles, conductor, Transformer )  Co ordination with vendor for Erection HT & LT conductor (AAA)..  Follow the as per safety precaution.  Maintain the HT & LT Earthling protection system.  Taking Hourly reading & observe the all operation relay flag. Trainings Completed
  • 5.  Industry oriented mini project held at Sri Vijayarama Gajapathi Coop. Cable Manufacturing ,Hyderabad  ISO9001 Quality Management System.  ISO14001 EMS Management System.  ERP & DRP IT Forte Applications : Microsoft Office, Internet Awards and Recognition  Best Employee Award from IBM & JLL  Shining Star Award for best performer  Orion Award (Facilities Award) Streng th  Positive thinking, hard working and Dedicated to achieve goals. I will be most pleased to be at any services Personnel Dossier Date of birth : 12th Jun 1982 Languages Known : English, Telugu and Hindi. Present Address : Rama Rao Kota S/o. Yesupadam D.No: 1-85 Minimimchilipadu Post , Poduru Mandalam West Godavari District Andhrapradesh, India -534327 PAN Card Number : BICPK5431N Passport Number : H0678825 Place of Issue : Hyderabad, Andhra Pradesh, India Date of Issue : 16.09.2008 Date of Expiry : 15.09.2018 Nationality : Indian Marital Status : Married No. of Dependents : Four Declaration  I hereby declare that the above information is correct and true to the best of my knowledge and belief. Date: 06.04.2015 Place: UAE. (Rama Rao Kota)
  • 6.  Industry oriented mini project held at Sri Vijayarama Gajapathi Coop. Cable Manufacturing ,Hyderabad  ISO9001 Quality Management System.  ISO14001 EMS Management System.  ERP & DRP IT Forte Applications : Microsoft Office, Internet Awards and Recognition  Best Employee Award from IBM & JLL  Shining Star Award for best performer  Orion Award (Facilities Award) Streng th  Positive thinking, hard working and Dedicated to achieve goals. I will be most pleased to be at any services Personnel Dossier Date of birth : 12th Jun 1982 Languages Known : English, Telugu and Hindi. Present Address : Rama Rao Kota S/o. Yesupadam D.No: 1-85 Minimimchilipadu Post , Poduru Mandalam West Godavari District Andhrapradesh, India -534327 PAN Card Number : BICPK5431N Passport Number : H0678825 Place of Issue : Hyderabad, Andhra Pradesh, India Date of Issue : 16.09.2008 Date of Expiry : 15.09.2018 Nationality : Indian Marital Status : Married No. of Dependents : Four Declaration  I hereby declare that the above information is correct and true to the best of my knowledge and belief. Date: 06.04.2015 Place: UAE. (Rama Rao Kota)