1. START THE ENGINE BY IGNITION KEY.
2. RISE UP THE ENGINE AND MAKE THE RPM 1500.
GIVE A STROKE ( FORWARD/REVERSE ) AND STOP THE STROKE
WHEN PISTON ROD COME AN ONE END.
ROTATE THE DISTANCE PIECE BY OPEN WRENGE SO THAT THE
GROOVE SHOULD BE ON TOP.
RAM SIDE Open wrench 55mm Piston Rod Side Flange Groove
REMOVE THE FIXING FLANGE 4NOS. BOLTS
Fixing Flange Bolt
AFTER REMOVING THE BOLTS TAKE A LITTLE OF FARWARD AND
THEN REVERSE STROKE, SO THAT SOME GAP WILL DEVOLOPE
FOR REMOVING THE DISTANCE PIECE.
DISTANCE PIECE
GAP DEVOLOPED AFTER TAKEN LITTLE FARWARD AND REVERSE
STROKE AND AUTOMATICALLY EXTENTION PIECE COME DOWN.
REMOVE THE EXTENTION PIECE FROM WATER BOX.
AFTER REMOVING THE RAM MOVE THE PISTON SLOWLY BY FARWARD
OR, REVERSE STROKE SO THAT BOTH FLANGE SHOULD MATCH AS
SHOWN.
BOTH FLANGE MATCHING
PLEASE DO NOT MOVE THE PISTON AS FAST, OTHERWISE RAM WILL
GO INSIDE THE PUMPING CYLINDER.
HEX. BOLT M12*100
FIX A HEX. BOLT INSIDE THE GROOVE AS SHOWN IN PICTURE.
MOVE THE PISTON FARWARD OR, REVERSE SO THAT THE RAM WILL
COME INSIDE THE WATER BOX.
REMOVE THE BOLT AND THEN REMOVE THE RAM FROM INSIDE THE
WATER BOX.
CLEAN INSIDE THE WATER BOX AND PUMPING CYLINDER PROPERLY.
RAM DN200
SIDE VIEW OF RAM DN200
GREASE INSIDE THE PUMPING CYL. PROPERLY.
FIX THE NEW RAM WITH HEX. BOLT AS SHOWN.
PROPERLY GREASE THE RAM
MOVE THE PISTON BY FARWARD/ REVERSE STROKE SO THAT RAM
WILL GO INSIDE BUT FLANGE SHOULD SLIGHTLY OUTSIDE THE
CYLINDER AS SHOWN IN PICTURE.
REMOVE THE BOLT FROM THE FLANGE.
AFTER REMOVING THE BOLT MOVE THE PISTON BACKSIDE FOR A
CERTAIN DISTAINCE SO THAT DISTANCE PIECE FIX EASIELY.
TAKE THE DISTANCE PIECE INSIDE THE WATER BOX.
FIX FIRST RAM SIDE HEX. BOLT.
AFTER FIXING THE RAM SIDE BOLT IF OTHER SIDE GAP IS MORE THEN
MOVE THE PISTON SLOWLY SO THAT OTHER SIDE BOLT CAN FIX.
PICTURE SHOWN AS BELOW.
THEN CHECK ALL THE BOLTS TIGHTNESS AGAIN PROPERLY.
THANK YOU

More Related Content

Similar to RAM CHANGING PROCEDURE for Maintainance.ppt

Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualfjsqazkekdmme
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualfujsjejfkskemm
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualfjskkesmdmm
 
Hyster l177 (h40 ft) forklift service repair manual
Hyster l177 (h40 ft) forklift service repair manualHyster l177 (h40 ft) forklift service repair manual
Hyster l177 (h40 ft) forklift service repair manualfujdjffjkskemme
 
Hyster l177 (h70 ft) forklift service repair manual
Hyster l177 (h70 ft) forklift service repair manualHyster l177 (h70 ft) forklift service repair manual
Hyster l177 (h70 ft) forklift service repair manualufjjsjefkskekmme
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualfujsejfjksekkkm
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualufjjsjkfkmsem
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualufjjsejfjksekmem
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualfjsekkdmeik
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualufjjsjefkskekmme
 
Hyster b416 (j3.00 xm europe) forklift service repair manual
Hyster b416 (j3.00 xm europe) forklift service repair manualHyster b416 (j3.00 xm europe) forklift service repair manual
Hyster b416 (j3.00 xm europe) forklift service repair manualfjjkefkksem
 

Similar to RAM CHANGING PROCEDURE for Maintainance.ppt (11)

Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manual
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manual
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manual
 
Hyster l177 (h40 ft) forklift service repair manual
Hyster l177 (h40 ft) forklift service repair manualHyster l177 (h40 ft) forklift service repair manual
Hyster l177 (h40 ft) forklift service repair manual
 
Hyster l177 (h70 ft) forklift service repair manual
Hyster l177 (h70 ft) forklift service repair manualHyster l177 (h70 ft) forklift service repair manual
Hyster l177 (h70 ft) forklift service repair manual
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manual
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manual
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manual
 
Hyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manualHyster l177 (h50 ft) forklift service repair manual
Hyster l177 (h50 ft) forklift service repair manual
 
Hyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manualHyster l177 (h60 ft) forklift service repair manual
Hyster l177 (h60 ft) forklift service repair manual
 
Hyster b416 (j3.00 xm europe) forklift service repair manual
Hyster b416 (j3.00 xm europe) forklift service repair manualHyster b416 (j3.00 xm europe) forklift service repair manual
Hyster b416 (j3.00 xm europe) forklift service repair manual
 

Recently uploaded

Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New HorizonMorshed Ahmed Rahath
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological universityMohd Saifudeen
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 

Recently uploaded (20)

Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 

RAM CHANGING PROCEDURE for Maintainance.ppt

  • 1. RAM CHANGING PROCEDURE BP-1800 D/E, SP-1800 D/E, SP-1400 D/E KVM 32XL
  • 2. RPM METER IGNITION KEY HOURS METER HYD. TEM. GAUGE PROCEDURE 1. START THE ENGINE BY IGNITION KEY. 2. RISE UP THE ENGINE AND MAKE THE RPM 1500.
  • 3. GIVE A STROKE ( FORWARD/REVERSE ) AND STOP THE STROKE WHEN PISTON ROD COME AN ONE END.
  • 4. ROTATE THE DISTANCE PIECE BY OPEN WRENGE SO THAT THE GROOVE SHOULD BE ON TOP. RAM SIDE Open wrench 55mm Piston Rod Side Flange Groove
  • 5. REMOVE THE FIXING FLANGE 4NOS. BOLTS Fixing Flange Bolt
  • 6. AFTER REMOVING THE BOLTS TAKE A LITTLE OF FARWARD AND THEN REVERSE STROKE, SO THAT SOME GAP WILL DEVOLOPE FOR REMOVING THE DISTANCE PIECE. DISTANCE PIECE
  • 7. GAP DEVOLOPED AFTER TAKEN LITTLE FARWARD AND REVERSE STROKE AND AUTOMATICALLY EXTENTION PIECE COME DOWN.
  • 8. REMOVE THE EXTENTION PIECE FROM WATER BOX.
  • 9. AFTER REMOVING THE RAM MOVE THE PISTON SLOWLY BY FARWARD OR, REVERSE STROKE SO THAT BOTH FLANGE SHOULD MATCH AS SHOWN. BOTH FLANGE MATCHING PLEASE DO NOT MOVE THE PISTON AS FAST, OTHERWISE RAM WILL GO INSIDE THE PUMPING CYLINDER.
  • 10. HEX. BOLT M12*100 FIX A HEX. BOLT INSIDE THE GROOVE AS SHOWN IN PICTURE.
  • 11. MOVE THE PISTON FARWARD OR, REVERSE SO THAT THE RAM WILL COME INSIDE THE WATER BOX. REMOVE THE BOLT AND THEN REMOVE THE RAM FROM INSIDE THE WATER BOX.
  • 12. CLEAN INSIDE THE WATER BOX AND PUMPING CYLINDER PROPERLY.
  • 14. SIDE VIEW OF RAM DN200
  • 15. GREASE INSIDE THE PUMPING CYL. PROPERLY.
  • 16. FIX THE NEW RAM WITH HEX. BOLT AS SHOWN.
  • 18. MOVE THE PISTON BY FARWARD/ REVERSE STROKE SO THAT RAM WILL GO INSIDE BUT FLANGE SHOULD SLIGHTLY OUTSIDE THE CYLINDER AS SHOWN IN PICTURE. REMOVE THE BOLT FROM THE FLANGE.
  • 19. AFTER REMOVING THE BOLT MOVE THE PISTON BACKSIDE FOR A CERTAIN DISTAINCE SO THAT DISTANCE PIECE FIX EASIELY.
  • 20. TAKE THE DISTANCE PIECE INSIDE THE WATER BOX. FIX FIRST RAM SIDE HEX. BOLT.
  • 21. AFTER FIXING THE RAM SIDE BOLT IF OTHER SIDE GAP IS MORE THEN MOVE THE PISTON SLOWLY SO THAT OTHER SIDE BOLT CAN FIX. PICTURE SHOWN AS BELOW. THEN CHECK ALL THE BOLTS TIGHTNESS AGAIN PROPERLY.