Objective


Website Design       Strengthen
• Add UI/UX          Digital Presence
  elements           •   Search Optimization
• Design to drive    •   Paid Search
  bookings
                     •   Social Media
• A new domain for
                     •   Online Reputation
  the Hyderabad
  Property
Index
•   Industry Overview
     – Online Facts
     – Design Benchmarks
•   Radisson Blu Plaza Hotel Hyderabad
     – Digital Audit
     – Areas of Improvement
•   Our Strategy
     – Website
     – Social Media
     – SEO
     – PPC
     – ORM
Industry Overview
           Online Fact
Online Fact
Purpose of visiting a hospitality website according to
        site visitors worldwide, (% of total):


      Make reservation: 26%

      Find hotel info: 20%

      Compare rates: 20%

      View / cancel reservation: 7%

      Other: 27%

                                                Source -Nooz, November 2011
Booking Trend




                Source – Google Search Report,2012
Industry Overview
  Design Benchmarks
Hilton Hotels & Resorts

                       Synchronized design
                 theme, extension panels, dynamic
                   layout, Proper highlights and
                          perfect images.
Social Media Integration – Focusing mainly on FB & Twitter
Screening all its awards on the home page
Booking Engine and all other sections aligned in a very
simple and interesting way.
Special offers and newsletter subscription section
aligned in center in a beautiful and simple way.
Facebook Profile in Sync with the main website




                                                 All tabs in sync
                                                 with the theme
                                                 of the hotel i.e.
                                                 in blue color.
Twitter channel in sync with the same theme i.e. on the website and on Facebook as
it makes more sense and uniformity.
Other hotels across the world with their websites and
social media channels




                                           Marriott International
Marriott Hotels and Resorts
Marriott Hotels &
Resorts’

Facebook Page
Marriott Hotels &
Resorts’

Twitter Page
Radisson Blu Plaza Hyderabad

                  Website Audit
The look and feel of the website is very dull and it is not
conveying the vibrant, contemporary and engaging image
of the brand.




                            So many links and back
                            links are making the
                            website cluttered and
                            congested.
No proper use of the background. The black
background is giving a dull feel to the website.
India’s First Dilmah T-bar
                                        is not properly
                                        highlighted/promoted
                                        on the home page.


                                        This section should be
                                        promoted properly on
                                        the home page.




The deals or its brief description should be
visible on the homepage itself.
So many navigation creates confusion. The primary and
secondary navigation should be in a proper hierarchy.
The inner pages of
the website also
includes a plenty of
steps to check the
basic
Information like rate
and images.
The current statistic summary of the RadissonBlu website.
Website Analysis            Status                         Suggestion
                                              Page rank is fine. Google Page Rank is largely based
                                       5      upon the number and quality of backlinks a
Google Page Rank (PR)                         webpage has.
                                              Need to increase Cached Pages, the more pages
                                      21      cached for the website is an important factor for
Total Cached Pages in Site                    determining your site's rank in the search results.
Total Back Link                       12      Need to increase & build more Back Links
Canonical Issue                   Not Present Fine
                                              The domain is old; Domain age is an important
                                  2008-06-11
Web Site Age                                  factor for search engine.
                                              The keyword density needs to improve by targeting
                                   Average
Keyword Density                               relevant keywords.
                                              Need to improve H Tags, for eg: - dining page -
                                              http://www.radissonblu.com/hotel-
                                    Present hyderabad/dining
                                              Here, “Fine Hotel Restaurants in Hyderabad” should
H1, H2 Tag Optimization                       be H2
                                              Need to implement relevant Meta Tags for all web
                                    Present
Title and Meta Tag Optimization               pages
                                              Need to add user friendly content and use of
                                   Average Keywords(BOLD) in content body and inter link the
Content Optimization                          pages through keywords
Need to optimize all images through Alt tag.
                                  Not Present
Alt tag Optimization
                                                There is a scope of improvement in Alexa ranking
                                    21,219
Alexa Traffic Rank
Flash Based Website                  Used       The Flash object is fine.
                                                Need to optimize Google Local Listing with major
                                   Present
Google Local Business Listing                   keywords
                                                Need a proper optimization strategy for site
                                   Average      promotion including Content Optimization, On Page
Overall Website Optimization                    and Off Page for SERP
Internal Link Structure            Average      Need to Inter Link Pages through Keywords
Search Engine and User Friendly                 Require Content optimization to make the site
                                   Average
Website                                         search engine and user friendly.
                                                http://www.radissonblu.com/sitemap.xml need to
                                   Present      update it on regular basis, it was last updated in
Sitemap.XML                                     March, 2012.
                                                http://www.radissonblu.com/sitemap, It is an actual
                                   Present      page of your website that outlines the complete
HTML sitemap                                    structure of your site.
More Suggestions:-

• Need to implement “Online Chat” function. Adding live chat options (where a
visitor can talk directly and instantly) to your website will help increase sales &
conversions and improve customer satisfaction.

• We recommended to have approx. 50-100 words content on home page
(www.radissonblu.com/hotel-hyderabad) and the phone no. should appear at the
right top of the page for better conversion.
• Video testimonials of satisfied customers play an important role for new visitor
to acquire the service from the site.

• “Why choose us” section which emphasizes on the benefits of taking services
from you.
• Testimonial page should be available on the website; it will impact on the new
visitor to acquire the services from the website.

• Need to improve call to action, special discount banners should be highlighted on
the home page.

• “Free call back” facility wherein a person can mention a phone number and a call is
made to them.

• We would suggest you the new website on domain radissionbluhyderabad.com

• We would also recommend you to build the mobile websites as most of the users
now browse sites through their mobiles and no mobile compatible website means
you are losing those customers.
Radisson Blu Plaza Hyderabad
                  Website Design
Purpose

                          Visitor
         SEO
                          Needs




               Website         Maintena
Design
               Redesign          nce




         CSS              URL’s

                 KISS
Design Approach

• Brand enforcement
       Using brand colors
       Brand Logo and signs
       Tag line
• Web 3.0 based clean design
       Interactive
       Dynamic layout
       Customized view
       Search enabled layout
• End user centric
       Eased navigation
       User friendly/ self help centric
• Call to Action
       Lead generation
       User friendly - Contact Us
Proposed Design
    A
                              B



                                  C




D                                     E




        F                 G
Proposed Design


A. Logo of Radission Blu would be placed on the top of the website either left or
   right.
B. Primary links would be clearly visible on the home page promoting the services
   and offerings of the Hotel.
C. Images would cover the maximum part of the website as images are the most
   important component of a Hotel Website. The images would be high resolution.
D. Latest packages and latest happening /news of the hotel would pop-up in this
   section. The Sunday Brunch section would be promoted here.
E. The testimonial videos of the pleased customers would be placed here in this
   section.
F. The text testimonials of some VIPs and VVIPs would be shared on this section.
G. Social Media channels’ link and Tripadvisor/Expedia links would be shared in
   this section.
Clean and
                                           simple
                                           secondary
                                           navigation



                                        Add a weather
                                        Plug-in so as to
                                        engage and
                                        inform people
                                        of best seasons
                                        to visit a
                                        country/
                                        destination.
                                        This acts as an
                                        added feature



Address and contact number on the home page. Free
call no. would also be there on the home page.
Clean and simple internal pages with all most all relevant
information
Digital Media Marketing
Digital Media Marketing

Social Media Plan
• A revamped social media plan
• Plan to promote Sunday Brunch
• Offline integration with social media


        Search Engine Optimization
        • Optimized Google search results
        • Optimized website pages


              Pay Per Click
              • Paid Facebook, Google, TripAdvisor ads to generate leads
              • Ads to promote Sunday Brunch
              • Strategic ads which are target focused


                        Online Reputation Management
                        • Manage review
                        • Content optimization through PR Channels
Social Media Plan
Completely
optimized social
media channels
We are doing good on social media but now we need a
campaign, a story. Story that your customers would
share(WOM).




So, here we are coming up with a brand new story, a fresh campaign.
• We know that Customer Stories is the ace in the marketing.

• Our story would create plenty of other stories that your
customers would share with his/her friends and family.

• So let’s start with a story….
Meet Mr. Rohn and Miss Riya
Who is Mr. Rohn?


• Rohn is 35 year old chef from Goa. His father is a
Portuguese and his mother is from Panji.

• He is married to a South Indian girl based in Hyderabad.

• He is master-chef at Radission Blu Plaza Hyderabad and
has got a Hotel Management degree from IHM, Mumbai.

• You can catch him at Radission Blu Plaza Hyderabad
anytime.

Rohn is known for his delicious continental and sea foods.
Other chef call him Harry Potter. Yes, he do have a magic
wand for sure 
Who is Riya?



• Riya is a 23 year old girl born and bought up in
Hyderabad.

• She is a waitress at Radission Blu Plaza Hyderabad.

• She is been known for her hospitality and service.
She is very caring and fun frolic.


• If you are curious about Hyderabad, she is the
right person to contact because she knows almost
everything about the city.
Why Rohn and Riya?

• Rohn and Riya would be our tone of voice for the whole campaign.

• When we would be talking about the hotel facilities, hospitality and the
sightseeing then we would use Riya as our communication medium on Social
Media.

• When we would talk about F&B then Rohn would be our tone of voice.

• This would break the monotonous way of promoting the hotel amenities and
F&B.
Sample cover image on Social
Media


        This dummy cover image is just for illustration purpose.
Sample Content
What else apart from such regular posts and
tweets?




      Online Engagement                 Online + Offline Engagement
Online Engagement


 On Facebook:       360 Degree Treasure Hunt Contest

Objective: To promote hotel properties and dining in an interesting way and to engage
with fans.

Idea: The idea is to create a 360 Degree video of the hotel interior and using that
video we would ask some questions to our fans. Rohn and Riya would give them hints
in between the contest.

Eg: Tell us the color of the saree the lady has wore in the painting on the left wall of
the dining hall.

Where we would run the contest?: On a Facebook tab and fans would answer it
through the comment plug-in.
Sample screenshot of the
app
Sunday Brunch Contest




Objective: To promote Sunday Brunch among the new and existing fans.

Idea: The idea is to ask fans to share the pic of their Lunch/Dinner with an interesting
caption. Every week the most interesting entry would WIN a couple entry pass of the
Sunday Brunch. The winner would be chosen by Rohn and Riya from Radisson Blu
Plaza Hotel.

Where we would run the contest?: On a Facebook app where fans would upload
their pictures with the caption.
A sample of picture upload contest
On Twitter:

                               Follow and RT
                                  Contest

On Twitter we would start with the Follow and RT contest in which we would ask
people to follow us and RT a particular tweet.

That particular tweet will include the message about the Sunday Brunch and the link
to the website.

Eg: Follow us & RT this tweet to WIN a couple entry pass of the Sunday Brunch at
Radisson Blu Plaza #Hyderabad. [Link of Sunday Brunch]
Hashtag based
                       contests
Hashtags are the best way to make your brand visible on Twitter.

Some of the hashtags that we can use are:

#myfavouriteSundayBrunch
#foodformeislike
#foodicantresist
#SundayBrunchatRadisson
#thingstodoinhyderabad
#wheniwasinhyderabad
#ilovehyderabadcoz

These all hashtags have potential to engage our target audience and create word of
mouth and more visibility on Twitter.
On Instagram:



• Instagram is widely used to click vintage photographs of foods and objects.

• We can have a contest in which we would ask our fans to click images of dishes
through Instagram and share it on Instagram with hashtag #ShootTheFood and the
most interesting image would be selected as the winner.

•The contest would be promoted through Facebook and other social media channels.
We would also develop a micro-portal where we will fetch all the images with the
description #ShootTheFood from Instagram.
Online + Offline Engagement


  On Facebook:


                        Smile with Rohn and Riya Contest



• This is an interesting way of creating user generated content. In this contest we
would keep dummies of our character Rohn and Riya at the hotel.

• We would ask our visitors to click their smiling image with Rohn or Riya and they
would have to upload that picture on our Facebook page. The best entry would
WIN awesome goodies from Radisson Blu Plaza Hyderabad.
Do you ‘Like’ us?


•This is an interesting way of integrating online and offline marketing.

• Here we would build a kiosk with 2-3 iPads and we would ask our visitors to like
the Radissson Blu Plaza Hyderabad on Facebook and they would get a flat 10%
discount on their total bill.

• This would help us in adding our right TG on our Facebook page.
Sample kiosk
that we will
set-up at the
entrance of the
Hotel.
BBM QR code Contest




• QR Code of drawing online interaction with the guests
• Most of the business class people have BlackBerry with them so this campaign is to
target that niche audience.
• We would ask our guests to add us on their BBM list and on doing this they would get a
5% off on their total bill.
• We can use these BBM database to broadcast interesting offers on their mobiles.
E-Menu – Tablet/iPad




• Self Descriptive E – Menu application, which works on Tablet computers
• Ask for a Waiter/ Place an Order/ Request Cheque features
• Menu Rating feature
• Lead generation through login and feedback mechanism
• Share to Facebook, twitter
• Facebook/ Foursquare check-ins and rewards
• We would develop an iPad/Tablet app for taking orders at the restaurant. The
user will have to login through Facebook/Twitter or Foursquare and once he will
login it will automatically share the check-in and the user will be rewarded 10%
discount on his/her order.

• This app would give a pleasant experience to the user and will help us in
becoming viral on Social Media.
Search Engine Optimization
Search Engine Optimization




Keywords                   Onsite SEO            Offsite SEO
• Relevant                 • Page Titles         • Builds image and
  combination              • Meta Descriptions     popularity for
• Site & Industry          • Copy & Content        website
  related                  • 250 words/page      • Increase keyword
• Drives traffic to                                ranking in results
                           • 2-5 % keyword
  website                    density             • Affiliates with other
• Competition                                      sites
                           • Bullet Lists
  consideration
Search Engine Optimization Phases

Phase 1 – Web Research and Analysis
• Monitoring site traffic through analytics and webmaster tool
• Monitor site configuration and detecting malware or crawl error etc
  and fix them
• URL canonicallization optimization
• Robots.txt Optimization
• Extending (increasing number of pages) site by a deep web research
  for site
• Tracking index and non-index pages in major search engines
  (Google, Yahoo and Bing)

Phase 2 – On Page Optimization
• Website Analysis and Competitor Analysis
• Keywords Analysis for individual pages
• Title and meta tag composition for site
• Changing the website structure, navigation as per search engine
  algorithm
• Alt Tag creation for all images
• Web page content optimization
• Checking the keyword density, proximity, prominence and semanticist
  of your keywords
• Creating sitemap.xml for sites & update in google webmaster
Search Engine Optimization Phases


Phase 3 – Off Page Optimization



• Directory submission
• Article submission
• Blog and Forums posting
• Classified submission
• RSS Create & Updating
• Social bookmarking for sites
• Forum submission


Phase 4 – Report Traffic Analysis & Monitoring


• Web analytics traffic report (google analytics)
• Generate monthly search engine ranking reports
• Alexa ranking report
• Website progress report
• Monthly new suggestion
SEO Activity


• Target to increase the relevant
• Target group analysis
    – Search Trends
•   Meta Tags Creation
•   Navigation updates
•   Analytics code generation and
•    implementation
•   Article submission
•   Link exchange campaign
•   Content optimization
SEO Plan
Activities- SEO Packages                                15 Pages
Review and analysis                                     Quantity
Website analysis                                           1
Competitor Research                                        3
keyword Research                                        16 - 20
On-Page Optimization                                    Quantity
URL Mapping                                               Yes

Title Tag, Keyword, Description, Alt optimization       15 Pages

Internal linking                                        15 Pages
H1 ,H2 Optimization                                     15 Pages
Create Robot.txt                                          Yes
Html Site-Map                                             Yes
Xml Site-Map                                              Yes
Check Duplicate Content                                 15 Pages
Submit Site-Map in search Engines                         Yes
Canonical Issue resolve                                   Yes
Broken Link check                                         Yes

Outbound link check and implement no follow attribute     Yes

URL Rewriting (Optional)                                15 Pages
SEO Plan

Off Page Optimization                       Quantity

Article Writing                                6

Press Release Writing                          1

Article Submissions                           30

Press Release Submissions                     10

Directory Submissions                         300

Social Bookmarking submissions                200

Blog Creation                                  1

Blog Writing                                   4

Blog Posting                                   4

Blog Directory Submissions                    20

Approved Article Link Sharing                 60

Blog Link Sharing                             20

Classified Ad Creation                         2

Classified Submissions                        20

Forum Postings                                 5

Search Engine Submissions                     Yes
Google Local Business listing     Yes

SEO Reports                     Quantity

Google Analytics                  Yes

Monthly Seo work Report           Yes

Keyword Report                    Yes

Achievement Report                Yes
Pay Per Click

     Google PPC
   Facebook PPC
Google PPC
                                         A general search by a
                                           prospective user




                                                                 Google PPC




Your website can be here with
an effective PPC campaign
Facebook PPC




• Promoted Ads on Facebook
   – Website
   – Facebook Page
Online Reputation Management
Online Reputation Management


Good Online Reputation Management involves participating in the right social
media networks, interacting with industry bloggers & answering reviews
ORM Approach

• Our Initiatives in Online Reputation Management Include:
   – Closely monitor online chatter.
   – Built out extensive web site and link building networks that facilitate
     our ability to shape search results.
   – Monitor your feedback on leading review channels and manage user
     generated content.
   – Monitor and manage your listing on leading review sites. Optimize
     listing with pictures and keywords.

• For our Clients
   – For our clients belonging to the verticals of travel and hospitality, we
     cater to leading review sites like TripAdvisor, Expedia.com and
     Hotels.com.
   – We post management responses and focus not only on building your
     reputation but also branding your services as we focus on increasing
     your visibility on various review channels.
PR Newsletter/ Blog




• Newsletter initiatives once a month to promote your property
• A Public Relations oriented blog that will be included with your
  sub-domain will increase reach of your brand name in the virtual
  world

Radission Blu Hyderabad

  • 2.
    Radisson Blu Hyderabad Website Design and Digital Plan
  • 3.
    Objective Website Design Strengthen • Add UI/UX Digital Presence elements • Search Optimization • Design to drive • Paid Search bookings • Social Media • A new domain for • Online Reputation the Hyderabad Property
  • 4.
    Index • Industry Overview – Online Facts – Design Benchmarks • Radisson Blu Plaza Hotel Hyderabad – Digital Audit – Areas of Improvement • Our Strategy – Website – Social Media – SEO – PPC – ORM
  • 5.
    Industry Overview Online Fact
  • 6.
    Online Fact Purpose ofvisiting a hospitality website according to site visitors worldwide, (% of total): Make reservation: 26% Find hotel info: 20% Compare rates: 20% View / cancel reservation: 7% Other: 27% Source -Nooz, November 2011
  • 7.
    Booking Trend Source – Google Search Report,2012
  • 8.
    Industry Overview Design Benchmarks
  • 9.
    Hilton Hotels &Resorts Synchronized design theme, extension panels, dynamic layout, Proper highlights and perfect images.
  • 10.
    Social Media Integration– Focusing mainly on FB & Twitter
  • 11.
    Screening all itsawards on the home page
  • 12.
    Booking Engine andall other sections aligned in a very simple and interesting way.
  • 13.
    Special offers andnewsletter subscription section aligned in center in a beautiful and simple way.
  • 14.
    Facebook Profile inSync with the main website All tabs in sync with the theme of the hotel i.e. in blue color.
  • 15.
    Twitter channel insync with the same theme i.e. on the website and on Facebook as it makes more sense and uniformity.
  • 16.
    Other hotels acrossthe world with their websites and social media channels Marriott International
  • 17.
  • 18.
  • 19.
  • 20.
    Radisson Blu PlazaHyderabad Website Audit
  • 21.
    The look andfeel of the website is very dull and it is not conveying the vibrant, contemporary and engaging image of the brand. So many links and back links are making the website cluttered and congested.
  • 22.
    No proper useof the background. The black background is giving a dull feel to the website.
  • 23.
    India’s First DilmahT-bar is not properly highlighted/promoted on the home page. This section should be promoted properly on the home page. The deals or its brief description should be visible on the homepage itself.
  • 24.
    So many navigationcreates confusion. The primary and secondary navigation should be in a proper hierarchy.
  • 25.
    The inner pagesof the website also includes a plenty of steps to check the basic Information like rate and images.
  • 26.
    The current statisticsummary of the RadissonBlu website.
  • 27.
    Website Analysis Status Suggestion Page rank is fine. Google Page Rank is largely based 5 upon the number and quality of backlinks a Google Page Rank (PR) webpage has. Need to increase Cached Pages, the more pages 21 cached for the website is an important factor for Total Cached Pages in Site determining your site's rank in the search results. Total Back Link 12 Need to increase & build more Back Links Canonical Issue Not Present Fine The domain is old; Domain age is an important 2008-06-11 Web Site Age factor for search engine. The keyword density needs to improve by targeting Average Keyword Density relevant keywords. Need to improve H Tags, for eg: - dining page - http://www.radissonblu.com/hotel- Present hyderabad/dining Here, “Fine Hotel Restaurants in Hyderabad” should H1, H2 Tag Optimization be H2 Need to implement relevant Meta Tags for all web Present Title and Meta Tag Optimization pages Need to add user friendly content and use of Average Keywords(BOLD) in content body and inter link the Content Optimization pages through keywords
  • 28.
    Need to optimizeall images through Alt tag. Not Present Alt tag Optimization There is a scope of improvement in Alexa ranking 21,219 Alexa Traffic Rank Flash Based Website Used The Flash object is fine. Need to optimize Google Local Listing with major Present Google Local Business Listing keywords Need a proper optimization strategy for site Average promotion including Content Optimization, On Page Overall Website Optimization and Off Page for SERP Internal Link Structure Average Need to Inter Link Pages through Keywords Search Engine and User Friendly Require Content optimization to make the site Average Website search engine and user friendly. http://www.radissonblu.com/sitemap.xml need to Present update it on regular basis, it was last updated in Sitemap.XML March, 2012. http://www.radissonblu.com/sitemap, It is an actual Present page of your website that outlines the complete HTML sitemap structure of your site.
  • 29.
    More Suggestions:- • Needto implement “Online Chat” function. Adding live chat options (where a visitor can talk directly and instantly) to your website will help increase sales & conversions and improve customer satisfaction. • We recommended to have approx. 50-100 words content on home page (www.radissonblu.com/hotel-hyderabad) and the phone no. should appear at the right top of the page for better conversion. • Video testimonials of satisfied customers play an important role for new visitor to acquire the service from the site. • “Why choose us” section which emphasizes on the benefits of taking services from you.
  • 30.
    • Testimonial pageshould be available on the website; it will impact on the new visitor to acquire the services from the website. • Need to improve call to action, special discount banners should be highlighted on the home page. • “Free call back” facility wherein a person can mention a phone number and a call is made to them. • We would suggest you the new website on domain radissionbluhyderabad.com • We would also recommend you to build the mobile websites as most of the users now browse sites through their mobiles and no mobile compatible website means you are losing those customers.
  • 31.
    Radisson Blu PlazaHyderabad Website Design
  • 32.
    Purpose Visitor SEO Needs Website Maintena Design Redesign nce CSS URL’s KISS
  • 33.
    Design Approach • Brandenforcement  Using brand colors  Brand Logo and signs  Tag line • Web 3.0 based clean design  Interactive  Dynamic layout  Customized view  Search enabled layout • End user centric  Eased navigation  User friendly/ self help centric • Call to Action  Lead generation  User friendly - Contact Us
  • 34.
    Proposed Design A B C D E F G
  • 35.
    Proposed Design A. Logoof Radission Blu would be placed on the top of the website either left or right. B. Primary links would be clearly visible on the home page promoting the services and offerings of the Hotel. C. Images would cover the maximum part of the website as images are the most important component of a Hotel Website. The images would be high resolution. D. Latest packages and latest happening /news of the hotel would pop-up in this section. The Sunday Brunch section would be promoted here. E. The testimonial videos of the pleased customers would be placed here in this section. F. The text testimonials of some VIPs and VVIPs would be shared on this section. G. Social Media channels’ link and Tripadvisor/Expedia links would be shared in this section.
  • 36.
    Clean and simple secondary navigation Add a weather Plug-in so as to engage and inform people of best seasons to visit a country/ destination. This acts as an added feature Address and contact number on the home page. Free call no. would also be there on the home page.
  • 37.
    Clean and simpleinternal pages with all most all relevant information
  • 38.
  • 39.
    Digital Media Marketing SocialMedia Plan • A revamped social media plan • Plan to promote Sunday Brunch • Offline integration with social media Search Engine Optimization • Optimized Google search results • Optimized website pages Pay Per Click • Paid Facebook, Google, TripAdvisor ads to generate leads • Ads to promote Sunday Brunch • Strategic ads which are target focused Online Reputation Management • Manage review • Content optimization through PR Channels
  • 40.
  • 41.
  • 42.
    We are doinggood on social media but now we need a campaign, a story. Story that your customers would share(WOM). So, here we are coming up with a brand new story, a fresh campaign.
  • 43.
    • We knowthat Customer Stories is the ace in the marketing. • Our story would create plenty of other stories that your customers would share with his/her friends and family. • So let’s start with a story….
  • 44.
    Meet Mr. Rohnand Miss Riya
  • 45.
    Who is Mr.Rohn? • Rohn is 35 year old chef from Goa. His father is a Portuguese and his mother is from Panji. • He is married to a South Indian girl based in Hyderabad. • He is master-chef at Radission Blu Plaza Hyderabad and has got a Hotel Management degree from IHM, Mumbai. • You can catch him at Radission Blu Plaza Hyderabad anytime. Rohn is known for his delicious continental and sea foods. Other chef call him Harry Potter. Yes, he do have a magic wand for sure 
  • 46.
    Who is Riya? •Riya is a 23 year old girl born and bought up in Hyderabad. • She is a waitress at Radission Blu Plaza Hyderabad. • She is been known for her hospitality and service. She is very caring and fun frolic. • If you are curious about Hyderabad, she is the right person to contact because she knows almost everything about the city.
  • 47.
    Why Rohn andRiya? • Rohn and Riya would be our tone of voice for the whole campaign. • When we would be talking about the hotel facilities, hospitality and the sightseeing then we would use Riya as our communication medium on Social Media. • When we would talk about F&B then Rohn would be our tone of voice. • This would break the monotonous way of promoting the hotel amenities and F&B.
  • 48.
    Sample cover imageon Social Media This dummy cover image is just for illustration purpose.
  • 49.
  • 50.
    What else apartfrom such regular posts and tweets? Online Engagement Online + Offline Engagement
  • 51.
    Online Engagement OnFacebook: 360 Degree Treasure Hunt Contest Objective: To promote hotel properties and dining in an interesting way and to engage with fans. Idea: The idea is to create a 360 Degree video of the hotel interior and using that video we would ask some questions to our fans. Rohn and Riya would give them hints in between the contest. Eg: Tell us the color of the saree the lady has wore in the painting on the left wall of the dining hall. Where we would run the contest?: On a Facebook tab and fans would answer it through the comment plug-in.
  • 52.
  • 53.
    Sunday Brunch Contest Objective:To promote Sunday Brunch among the new and existing fans. Idea: The idea is to ask fans to share the pic of their Lunch/Dinner with an interesting caption. Every week the most interesting entry would WIN a couple entry pass of the Sunday Brunch. The winner would be chosen by Rohn and Riya from Radisson Blu Plaza Hotel. Where we would run the contest?: On a Facebook app where fans would upload their pictures with the caption.
  • 54.
    A sample ofpicture upload contest
  • 55.
    On Twitter: Follow and RT Contest On Twitter we would start with the Follow and RT contest in which we would ask people to follow us and RT a particular tweet. That particular tweet will include the message about the Sunday Brunch and the link to the website. Eg: Follow us & RT this tweet to WIN a couple entry pass of the Sunday Brunch at Radisson Blu Plaza #Hyderabad. [Link of Sunday Brunch]
  • 56.
    Hashtag based contests Hashtags are the best way to make your brand visible on Twitter. Some of the hashtags that we can use are: #myfavouriteSundayBrunch #foodformeislike #foodicantresist #SundayBrunchatRadisson #thingstodoinhyderabad #wheniwasinhyderabad #ilovehyderabadcoz These all hashtags have potential to engage our target audience and create word of mouth and more visibility on Twitter.
  • 57.
    On Instagram: • Instagramis widely used to click vintage photographs of foods and objects. • We can have a contest in which we would ask our fans to click images of dishes through Instagram and share it on Instagram with hashtag #ShootTheFood and the most interesting image would be selected as the winner. •The contest would be promoted through Facebook and other social media channels.
  • 58.
    We would alsodevelop a micro-portal where we will fetch all the images with the description #ShootTheFood from Instagram.
  • 59.
    Online + OfflineEngagement On Facebook: Smile with Rohn and Riya Contest • This is an interesting way of creating user generated content. In this contest we would keep dummies of our character Rohn and Riya at the hotel. • We would ask our visitors to click their smiling image with Rohn or Riya and they would have to upload that picture on our Facebook page. The best entry would WIN awesome goodies from Radisson Blu Plaza Hyderabad.
  • 60.
    Do you ‘Like’us? •This is an interesting way of integrating online and offline marketing. • Here we would build a kiosk with 2-3 iPads and we would ask our visitors to like the Radissson Blu Plaza Hyderabad on Facebook and they would get a flat 10% discount on their total bill. • This would help us in adding our right TG on our Facebook page.
  • 61.
    Sample kiosk that wewill set-up at the entrance of the Hotel.
  • 62.
    BBM QR codeContest • QR Code of drawing online interaction with the guests • Most of the business class people have BlackBerry with them so this campaign is to target that niche audience. • We would ask our guests to add us on their BBM list and on doing this they would get a 5% off on their total bill. • We can use these BBM database to broadcast interesting offers on their mobiles.
  • 63.
    E-Menu – Tablet/iPad •Self Descriptive E – Menu application, which works on Tablet computers • Ask for a Waiter/ Place an Order/ Request Cheque features • Menu Rating feature • Lead generation through login and feedback mechanism • Share to Facebook, twitter • Facebook/ Foursquare check-ins and rewards
  • 64.
    • We woulddevelop an iPad/Tablet app for taking orders at the restaurant. The user will have to login through Facebook/Twitter or Foursquare and once he will login it will automatically share the check-in and the user will be rewarded 10% discount on his/her order. • This app would give a pleasant experience to the user and will help us in becoming viral on Social Media.
  • 65.
  • 66.
    Search Engine Optimization Keywords Onsite SEO Offsite SEO • Relevant • Page Titles • Builds image and combination • Meta Descriptions popularity for • Site & Industry • Copy & Content website related • 250 words/page • Increase keyword • Drives traffic to ranking in results • 2-5 % keyword website density • Affiliates with other • Competition sites • Bullet Lists consideration
  • 67.
    Search Engine OptimizationPhases Phase 1 – Web Research and Analysis • Monitoring site traffic through analytics and webmaster tool • Monitor site configuration and detecting malware or crawl error etc and fix them • URL canonicallization optimization • Robots.txt Optimization • Extending (increasing number of pages) site by a deep web research for site • Tracking index and non-index pages in major search engines (Google, Yahoo and Bing) Phase 2 – On Page Optimization • Website Analysis and Competitor Analysis • Keywords Analysis for individual pages • Title and meta tag composition for site • Changing the website structure, navigation as per search engine algorithm • Alt Tag creation for all images • Web page content optimization • Checking the keyword density, proximity, prominence and semanticist of your keywords • Creating sitemap.xml for sites & update in google webmaster
  • 68.
    Search Engine OptimizationPhases Phase 3 – Off Page Optimization • Directory submission • Article submission • Blog and Forums posting • Classified submission • RSS Create & Updating • Social bookmarking for sites • Forum submission Phase 4 – Report Traffic Analysis & Monitoring • Web analytics traffic report (google analytics) • Generate monthly search engine ranking reports • Alexa ranking report • Website progress report • Monthly new suggestion
  • 69.
    SEO Activity • Targetto increase the relevant • Target group analysis – Search Trends • Meta Tags Creation • Navigation updates • Analytics code generation and • implementation • Article submission • Link exchange campaign • Content optimization
  • 70.
    SEO Plan Activities- SEOPackages 15 Pages Review and analysis Quantity Website analysis 1 Competitor Research 3 keyword Research 16 - 20 On-Page Optimization Quantity URL Mapping Yes Title Tag, Keyword, Description, Alt optimization 15 Pages Internal linking 15 Pages H1 ,H2 Optimization 15 Pages Create Robot.txt Yes Html Site-Map Yes Xml Site-Map Yes Check Duplicate Content 15 Pages Submit Site-Map in search Engines Yes Canonical Issue resolve Yes Broken Link check Yes Outbound link check and implement no follow attribute Yes URL Rewriting (Optional) 15 Pages
  • 71.
    SEO Plan Off PageOptimization Quantity Article Writing 6 Press Release Writing 1 Article Submissions 30 Press Release Submissions 10 Directory Submissions 300 Social Bookmarking submissions 200 Blog Creation 1 Blog Writing 4 Blog Posting 4 Blog Directory Submissions 20 Approved Article Link Sharing 60 Blog Link Sharing 20 Classified Ad Creation 2 Classified Submissions 20 Forum Postings 5 Search Engine Submissions Yes
  • 72.
    Google Local Businesslisting Yes SEO Reports Quantity Google Analytics Yes Monthly Seo work Report Yes Keyword Report Yes Achievement Report Yes
  • 73.
    Pay Per Click Google PPC Facebook PPC
  • 74.
    Google PPC A general search by a prospective user Google PPC Your website can be here with an effective PPC campaign
  • 75.
    Facebook PPC • PromotedAds on Facebook – Website – Facebook Page
  • 76.
  • 77.
    Online Reputation Management GoodOnline Reputation Management involves participating in the right social media networks, interacting with industry bloggers & answering reviews
  • 78.
    ORM Approach • OurInitiatives in Online Reputation Management Include: – Closely monitor online chatter. – Built out extensive web site and link building networks that facilitate our ability to shape search results. – Monitor your feedback on leading review channels and manage user generated content. – Monitor and manage your listing on leading review sites. Optimize listing with pictures and keywords. • For our Clients – For our clients belonging to the verticals of travel and hospitality, we cater to leading review sites like TripAdvisor, Expedia.com and Hotels.com. – We post management responses and focus not only on building your reputation but also branding your services as we focus on increasing your visibility on various review channels.
  • 79.
    PR Newsletter/ Blog •Newsletter initiatives once a month to promote your property • A Public Relations oriented blog that will be included with your sub-domain will increase reach of your brand name in the virtual world