Topic: Estimation of Road work (Earthwork)
Road at Cutting
Road at Banking
Sectional Area = Area of rectangular portion + Area of two triangular
portions
A = (B x dm)+ 2(0.5 x S dm x dm) = B x dm+ 2 (0.5xSdm 2)
Quantity = Area*Length
Quantity = B dm+ 2 (0.5xS dm 2)
Mean Depth = (d1+d2) / 2
d1
d2
Methods to Calculate The Quantity of
Earthwork
1. Mid – Sectional Area Method:
Sectional Area = Area of rectangular portion + Area of two triangular portions
A = (B x dm)+ 2(0.5 x S dm x dm) = B x dm+ 2 (0.5xSdm 2)
Quantity = Area*Length
Quantity = B dm+ 2 (0.5xS dm2)
Stations or
Chainage
Height
or
Depth
Mean
Height
or
Depth
“d”
Area of
Central
portion
Bd
Area of
sides
Sd2
Total
Sectional
Area
Bd+Sd2
Length
between
stations
“L”
Quantity
Embankment Cutting
Area of Side sloping surface:
The Mean Sloping Breadth = √(Sd2+d2)
Area of both side slopes = 2* d√(S+1)
2. Mean Sectional Area Method:
Sectional Area = Area of rectangular portion + Area of two triangular
portions
Sectional area at one end, A1 = B x d1 +S d1
2
Sectional area at other end, A2 = B x d2 +S d2
2
Mean Sectional Area = (A1+A2)/2
Quantity = (A1+A2)/2 * L
Stations
or
Chainage
Height
or Depth
“d”
Area of
Central
portion
Bd
Area
of
sides
Sd2
Total
Sectional
Area
Bd+Sd2
Mean
Sectional
Area
Length
between
stations
L
Quantity
Embankment Cutting
3. Prismoidal Formula Method:
Where, A1 = Area of Cross Section at one end, A1 = Bd1 +Sd1
2
A2 = Area of Cross Section at other end, A2 = Bd2 +Sd2
2
Am = Area of cross Section at Middle, Am = Bdm +Sdm
2
“Quantity or Volume = L/6 (A1+A2+4Am)”
Mean Depth, dm = (d1+d2) / 2
Calculate the quantity of earthwork for 200mtr length for a portion of
road in an uniform ground the heights of banks at the two ends being
1.00m and 1.60m. The formation width is 10mte and side slopes 2:1
(H:V). Assume that there is no transverse slope.
Calculate the area of the side slopes of portion of a bank for a length
of 200mtr and the heights of banks at the two ends being 2.50m and
3.50m and the ratio of the side slopes is 2:1
If the side slopes are to be provided with 15cm thick stone pitching,
calculate the cost of pitching at rate of Rs. 150/m3
Reduced Level (RL) of ground along the center line of a proposed road
from chainage 10 to chainage 20 are given below. The formation level
at the 10th chainage is 107 and the road is in downward gradient of 1
in 150 Upto the chainage 14 and then the gradient changes to 1 in 100
downward. Formation width of road is 10mtr and side slopes of
banking are 2:1 (H:V). Length of the chain is 30mtr.
i. Draw the longitudinal section of road and typical C/S and prepare
an estimation of earthwork at the rate of Rs. 275 per cu mtr.
ii. Find also the area of the side slopes and the cost of turfing the
side slopes at the rate of Rs. 60 per sq.mtr
Datum line 100
Depth of
Cutting
- - - - - - - - - - -
Height of
bank
2.00 1.2 1.16 0.5 0.78 1.60 0.6 1.20 0.38 0.7 1.10
RL of
formation
107.00
106.80
106.60
106.40
106.20
105.90
105.60
105.30
105.00
104.70
104.40
RL of
Ground
105.00
105.60
105.
44
105.
90
105.
42
104.
30
105.
00
104.
10
104.
62
104.
00
103.30
Distance in
mtrs
300 330 360 390 420 450 480 510 540 570 600
Chainage 10 11 12 13 14 15 16 17 18 19 20
Estimate the cost of earthwork for a portion of road for 400mtr length
from the following data:
Formation width of the road is 10meter . Side slopes are 2:1 in banking
1 ½ : 1 in cutting.
Station 25 26 27 28 29 30 31 32 33 34 35
Distance
1000
1040
1080
1120
1160
1200
1240
1280
1320
1360
1400
RL of
ground
51.00
50.90
50.50
50.80
50.60
50.70
51.20
51.40
51.30
51.00
50.60
RL of
formation
52.0
0
Downward gradient of 1 in 200
Depth of
Cutting
Height of
bank
1.00
RL of
formation
52.00
RL of
Ground
51.00
50.90
50.50
50.80
50.60
50.70
51.20
51.40
51.30
51.00
50.60
Distance in
mtrs
1000
1040
1080
1120
1160
1200
1240
1280
1320
1360
1400
Chainage 25 26 27 28 29 30 31 32 33 34 35
Stations or
Chainage
Height
or
Depth
Mean
Height
or
Depth
“d”
Area of
Central
portion
Bd
Area of
sides
Sd2
Total
Sectional
Area
Bd+Sd2
Length
between
stations
“L”
Quantity
Embankment Cutting
Estimate the cost of earthwork for a portion of road from the following
data. Formation width is 8m, side slope 2:1 in filling and 1.5:1 ion
cutting. Cost of filling is Rs. 180/m3 and cutting is 120/m3.
Station 0 40 80 120 160 200 240 280
RL of ground 100.60 100.20 99.80 100.20 100.80 101.90 102.40 102.50
RL of
formation
101.00 Rising gradient of 1 in 400

More Related Content

Similar to Quality Control PPT as per VTU Syallabus.pptx

Single storey building design English version
Single storey building design English versionSingle storey building design English version
Single storey building design English versionThien Nguyen
 
حلول مسائل قنوات مفتوحه 100 ص
حلول مسائل قنوات مفتوحه 100 صحلول مسائل قنوات مفتوحه 100 ص
حلول مسائل قنوات مفتوحه 100 صshaymaa17
 
Detailed Parameter road.pptx
Detailed Parameter road.pptxDetailed Parameter road.pptx
Detailed Parameter road.pptxSantoshKapse9
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rMUST,Mirpur AJK,Pakistan
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
DACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxDACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxAbhijeet Pabale
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Nafisa Nazneen Choudhury
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rCivil Zone
 
Transition.pptx
Transition.pptxTransition.pptx
Transition.pptx211Aqib
 
hydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialshydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialsbakhoyaagnes
 

Similar to Quality Control PPT as per VTU Syallabus.pptx (20)

Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
Single storey building design English version
Single storey building design English versionSingle storey building design English version
Single storey building design English version
 
حلول مسائل قنوات مفتوحه 100 ص
حلول مسائل قنوات مفتوحه 100 صحلول مسائل قنوات مفتوحه 100 ص
حلول مسائل قنوات مفتوحه 100 ص
 
Detailed Parameter road.pptx
Detailed Parameter road.pptxDetailed Parameter road.pptx
Detailed Parameter road.pptx
 
Detailed.pptx
Detailed.pptxDetailed.pptx
Detailed.pptx
 
Laminar flow
Laminar flowLaminar flow
Laminar flow
 
Footing design
Footing designFooting design
Footing design
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-r
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
DACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxDACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptx
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-r
 
Lec 13-14-15
Lec 13-14-15Lec 13-14-15
Lec 13-14-15
 
Transition.pptx
Transition.pptxTransition.pptx
Transition.pptx
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
Canales ( ingles) percy
Canales ( ingles) percyCanales ( ingles) percy
Canales ( ingles) percy
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
hydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialshydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorials
 
Highway Project
Highway ProjectHighway Project
Highway Project
 
design.pptx
design.pptxdesign.pptx
design.pptx
 

More from SupreethSP4

Module - 5 FP 18CV733 PPT as per VTU Syllabus
Module - 5 FP 18CV733 PPT as per VTU SyllabusModule - 5 FP 18CV733 PPT as per VTU Syllabus
Module - 5 FP 18CV733 PPT as per VTU SyllabusSupreethSP4
 
21CV385-M-3.pptx
21CV385-M-3.pptx21CV385-M-3.pptx
21CV385-M-3.pptxSupreethSP4
 
21CV385-M-1-A.pptx
21CV385-M-1-A.pptx21CV385-M-1-A.pptx
21CV385-M-1-A.pptxSupreethSP4
 
Intellegent Transportation System with Case Study
Intellegent Transportation System with Case StudyIntellegent Transportation System with Case Study
Intellegent Transportation System with Case StudySupreethSP4
 

More from SupreethSP4 (8)

Module - 5 FP 18CV733 PPT as per VTU Syllabus
Module - 5 FP 18CV733 PPT as per VTU SyllabusModule - 5 FP 18CV733 PPT as per VTU Syllabus
Module - 5 FP 18CV733 PPT as per VTU Syllabus
 
21CV385-M-3.pptx
21CV385-M-3.pptx21CV385-M-3.pptx
21CV385-M-3.pptx
 
21CV385-M-1-A.pptx
21CV385-M-1-A.pptx21CV385-M-1-A.pptx
21CV385-M-1-A.pptx
 
UHV M 2.pptx
UHV M 2.pptxUHV M 2.pptx
UHV M 2.pptx
 
M 1.pptx
M 1.pptxM 1.pptx
M 1.pptx
 
Joints.pptx
Joints.pptxJoints.pptx
Joints.pptx
 
ITS.pptx
ITS.pptxITS.pptx
ITS.pptx
 
Intellegent Transportation System with Case Study
Intellegent Transportation System with Case StudyIntellegent Transportation System with Case Study
Intellegent Transportation System with Case Study
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Quality Control PPT as per VTU Syallabus.pptx

  • 1. BAPUJI INSTITUTE OF ENGINEERING & TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING Topic: Estimation of Road work (Earthwork)
  • 2. Road at Cutting Road at Banking
  • 3. Sectional Area = Area of rectangular portion + Area of two triangular portions A = (B x dm)+ 2(0.5 x S dm x dm) = B x dm+ 2 (0.5xSdm 2) Quantity = Area*Length Quantity = B dm+ 2 (0.5xS dm 2)
  • 4. Mean Depth = (d1+d2) / 2 d1 d2
  • 5. Methods to Calculate The Quantity of Earthwork 1. Mid – Sectional Area Method: Sectional Area = Area of rectangular portion + Area of two triangular portions A = (B x dm)+ 2(0.5 x S dm x dm) = B x dm+ 2 (0.5xSdm 2) Quantity = Area*Length Quantity = B dm+ 2 (0.5xS dm2)
  • 6. Stations or Chainage Height or Depth Mean Height or Depth “d” Area of Central portion Bd Area of sides Sd2 Total Sectional Area Bd+Sd2 Length between stations “L” Quantity Embankment Cutting
  • 7. Area of Side sloping surface: The Mean Sloping Breadth = √(Sd2+d2) Area of both side slopes = 2* d√(S+1)
  • 8. 2. Mean Sectional Area Method: Sectional Area = Area of rectangular portion + Area of two triangular portions Sectional area at one end, A1 = B x d1 +S d1 2 Sectional area at other end, A2 = B x d2 +S d2 2 Mean Sectional Area = (A1+A2)/2 Quantity = (A1+A2)/2 * L Stations or Chainage Height or Depth “d” Area of Central portion Bd Area of sides Sd2 Total Sectional Area Bd+Sd2 Mean Sectional Area Length between stations L Quantity Embankment Cutting
  • 9. 3. Prismoidal Formula Method: Where, A1 = Area of Cross Section at one end, A1 = Bd1 +Sd1 2 A2 = Area of Cross Section at other end, A2 = Bd2 +Sd2 2 Am = Area of cross Section at Middle, Am = Bdm +Sdm 2 “Quantity or Volume = L/6 (A1+A2+4Am)” Mean Depth, dm = (d1+d2) / 2
  • 10. Calculate the quantity of earthwork for 200mtr length for a portion of road in an uniform ground the heights of banks at the two ends being 1.00m and 1.60m. The formation width is 10mte and side slopes 2:1 (H:V). Assume that there is no transverse slope.
  • 11. Calculate the area of the side slopes of portion of a bank for a length of 200mtr and the heights of banks at the two ends being 2.50m and 3.50m and the ratio of the side slopes is 2:1 If the side slopes are to be provided with 15cm thick stone pitching, calculate the cost of pitching at rate of Rs. 150/m3
  • 12. Reduced Level (RL) of ground along the center line of a proposed road from chainage 10 to chainage 20 are given below. The formation level at the 10th chainage is 107 and the road is in downward gradient of 1 in 150 Upto the chainage 14 and then the gradient changes to 1 in 100 downward. Formation width of road is 10mtr and side slopes of banking are 2:1 (H:V). Length of the chain is 30mtr. i. Draw the longitudinal section of road and typical C/S and prepare an estimation of earthwork at the rate of Rs. 275 per cu mtr. ii. Find also the area of the side slopes and the cost of turfing the side slopes at the rate of Rs. 60 per sq.mtr
  • 14.
  • 15.
  • 16. Depth of Cutting - - - - - - - - - - - Height of bank 2.00 1.2 1.16 0.5 0.78 1.60 0.6 1.20 0.38 0.7 1.10 RL of formation 107.00 106.80 106.60 106.40 106.20 105.90 105.60 105.30 105.00 104.70 104.40 RL of Ground 105.00 105.60 105. 44 105. 90 105. 42 104. 30 105. 00 104. 10 104. 62 104. 00 103.30 Distance in mtrs 300 330 360 390 420 450 480 510 540 570 600 Chainage 10 11 12 13 14 15 16 17 18 19 20
  • 17. Estimate the cost of earthwork for a portion of road for 400mtr length from the following data: Formation width of the road is 10meter . Side slopes are 2:1 in banking 1 ½ : 1 in cutting. Station 25 26 27 28 29 30 31 32 33 34 35 Distance 1000 1040 1080 1120 1160 1200 1240 1280 1320 1360 1400 RL of ground 51.00 50.90 50.50 50.80 50.60 50.70 51.20 51.40 51.30 51.00 50.60 RL of formation 52.0 0 Downward gradient of 1 in 200
  • 18.
  • 19.
  • 20. Depth of Cutting Height of bank 1.00 RL of formation 52.00 RL of Ground 51.00 50.90 50.50 50.80 50.60 50.70 51.20 51.40 51.30 51.00 50.60 Distance in mtrs 1000 1040 1080 1120 1160 1200 1240 1280 1320 1360 1400 Chainage 25 26 27 28 29 30 31 32 33 34 35
  • 21.
  • 22. Stations or Chainage Height or Depth Mean Height or Depth “d” Area of Central portion Bd Area of sides Sd2 Total Sectional Area Bd+Sd2 Length between stations “L” Quantity Embankment Cutting
  • 23. Estimate the cost of earthwork for a portion of road from the following data. Formation width is 8m, side slope 2:1 in filling and 1.5:1 ion cutting. Cost of filling is Rs. 180/m3 and cutting is 120/m3. Station 0 40 80 120 160 200 240 280 RL of ground 100.60 100.20 99.80 100.20 100.80 101.90 102.40 102.50 RL of formation 101.00 Rising gradient of 1 in 400