Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Dimensions mm
ruler vernier
micrometer
each new roll QC-FR-02-12
Quality
inspector
±0.2 mm Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each new roll QC-FR-02-12
Quality
inspector
no damage,
surface
fluctuation,...
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler vernier
micrometer
each new width QC-FR-02-22
Quality
inspector
± 0.5 mm Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each new width QC-FR-02-22
Quality
inspector
free from rust
and burrs
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler
meter
each width QC-FR-02-28
Quality
inspector
₊ 1 mm modify
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non Each width QC-FR-02-28
Quality
inspector
Free from rust
and burrs
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Core
Insulation
Resistance
ohm Megger each Core QC-FR-02-28
Quality
inspector
> 0.5 MΩ modify
Quality
Engineer
Production
Engineer
QC-FR-03-01
Responsibilty
Core cutting
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Core slitting
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Core stacking
Page 2 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Dimensions mm
ruler
meter
each stage QC-FR-02-26
Quality
inspector
as design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Resistance
test
ohm
resistance
measuring
device
per coil QC-FR-02-26
Quality
inspector
as per design
Hold till design
feedback
Quality
Engineer
Production
technician
QC-FR-03-01
Visual
appearance
non non per coil QC-FR-02-26
Quality
inspector
free from dust
and strange
particles
to be cleaned
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler
meter
each stage QC-FR-02-25
Quality
inspector
as design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Resistance
test
ohm
resistance
measuring
device
per coil QC-FR-02-25
Quality
inspector
as per design
Hold till design
feedback
Quality
Engineer
Production
Engineer
QC-FR-03-01
Visual
appearance
non non per coil QC-FR-02-25
Quality
inspector
free from dust
and strange
particles
to be cleaned
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm Verner Each mold
QC-FR-02-25 QC-FR-
02-26
Quality
inspector
+3,-1 Reject
Quality
supervisor
Production
Engineer
QC-FR-03-01
procedures non non during process
QC-FR-02-25 QC-FR-
02-26
Quality
inspector
good handling of
coils
to be treated
Quality
supervisor
Production
technician
QC-FR-03-01
Ovens procedures non non
Starting of the
process
QC-FR-02-21 QC-FR-02-
23
Quality
inspector
as per QC
documetns QC-
FR-02-21 QC-FR-
02-23
to be adjusted
Quality
supervisor
Production or
maintenance
technician
QC-FR-03-01
LV win
HV win
Moulding & demoulding
Page 3 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
procedures non non End of process QC-FR-02-20
Quality
inspector
Cast Resin
covers windings
completely
to be adjusted
Quality
supervisor
Production or
maintenance
technician
QC-FR-03-01
Visual
appearance
non non End of process QC-FR-02-20
Quality
inspector
No cast leakage -
No damage
during handling
to be treated
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm meter each coil QC-FR-02-27
Quality
inspector
as per design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each coil QC-FR-02-27
Quality
inspector
as per design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Cutting & Cleaning
Casting
Page 4 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Dimensions mm meter each transformer QC-FR-02-27
Quality
inspector
±2 mm modify
Quality
supervisor
Production
technician
QC-FR-03-01
Insulation
Resistance
Test
Ohm Megger each transformer QC-FR-02-27
Quality
inspector
all values > 0.5
MΩ
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
Turns Ratio
Test
Non Ratiometer each transformer QC-FR-02-27
Quality
inspector
according to
TDS /IEC 60076-1
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
DC Resistance
Test
Ohm Ohmmeter each transformer QC-FR-02-27
Quality
inspector
according to
TDS /IEC 60076-1
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
Visual
appearance
non non each transformer QC-FR-02-27
Quality
inspector
no damage treat
Quality
supervisor
Production
technician
QC-FR-03-01
Accessories non non each transformer QC-FR-02-24
Quality
inspector
as per design To be installed
Quality
Engineer
Production
Engineer
QC-FR-03-01
Control Unit Non non each transformer QC-FR-02-24
Quality
inspector
Woking Properly Replace
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each transformer QC-FR-02-24
Quality
inspector
no damage and
good appearance
treat
Quality
supervisor
Production
technician
QC-FR-03-01
Initial Assembly
Final assembly & finishing

More Related Content

What's hot

What's hot (17)

Quality inspection presentation
Quality inspection presentationQuality inspection presentation
Quality inspection presentation
 
Instrument Calibration Management System
Instrument Calibration Management SystemInstrument Calibration Management System
Instrument Calibration Management System
 
ISO Clause No 7 Production Realization
ISO Clause No 7 Production RealizationISO Clause No 7 Production Realization
ISO Clause No 7 Production Realization
 
Pressure transducer white paper
Pressure transducer white paperPressure transducer white paper
Pressure transducer white paper
 
Self inspection and quality audits - WHO GMP training
Self inspection and quality audits - WHO GMP trainingSelf inspection and quality audits - WHO GMP training
Self inspection and quality audits - WHO GMP training
 
Calipers presentation mukesh
Calipers presentation mukeshCalipers presentation mukesh
Calipers presentation mukesh
 
Sqcm
SqcmSqcm
Sqcm
 
6Sigma
6Sigma6Sigma
6Sigma
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validation
 
6sigma
6sigma6sigma
6sigma
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.A
 
Ch 7 qm
Ch 7 qmCh 7 qm
Ch 7 qm
 
CASE STUDY ON CHANGE CONTROL
CASE STUDY ON CHANGE CONTROLCASE STUDY ON CHANGE CONTROL
CASE STUDY ON CHANGE CONTROL
 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control system
 
WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS
 
Presentation on-change-control
Presentation on-change-controlPresentation on-change-control
Presentation on-change-control
 

Viewers also liked

Av8jet - Sales, Acquisitions and Management of Private aircraft
Av8jet - Sales, Acquisitions and Management of Private aircraftAv8jet - Sales, Acquisitions and Management of Private aircraft
Av8jet - Sales, Acquisitions and Management of Private aircraftJohn Norris
 
Team Genesis Ascending Facebook Marketing Guidelines
Team Genesis Ascending Facebook Marketing GuidelinesTeam Genesis Ascending Facebook Marketing Guidelines
Team Genesis Ascending Facebook Marketing GuidelinesFelix Albutra
 
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...Red Emisora estudiantil de Antioquia
 
classroom management
classroom managementclassroom management
classroom managementFahad Lidasan
 
Things to remember before answering any mlm objections
Things to remember before answering any mlm objectionsThings to remember before answering any mlm objections
Things to remember before answering any mlm objectionsFelix Albutra
 
Educational technology
Educational technologyEducational technology
Educational technologyFahad Lidasan
 
Vitamin B-12 Chemistry and Mode of Action
Vitamin  B-12 Chemistry and Mode of Action Vitamin  B-12 Chemistry and Mode of Action
Vitamin B-12 Chemistry and Mode of Action Shalimar Shadeed
 

Viewers also liked (16)

Acuerdo fecode - Gobierno firmado
Acuerdo fecode - Gobierno  firmadoAcuerdo fecode - Gobierno  firmado
Acuerdo fecode - Gobierno firmado
 
Av8jet - Sales, Acquisitions and Management of Private aircraft
Av8jet - Sales, Acquisitions and Management of Private aircraftAv8jet - Sales, Acquisitions and Management of Private aircraft
Av8jet - Sales, Acquisitions and Management of Private aircraft
 
Decreto 4404 convocatoria proceso ordinario de traslado
Decreto 4404 convocatoria proceso ordinario de trasladoDecreto 4404 convocatoria proceso ordinario de traslado
Decreto 4404 convocatoria proceso ordinario de traslado
 
Ngh 15 user_guide
Ngh 15 user_guideNgh 15 user_guide
Ngh 15 user_guide
 
Team Genesis Ascending Facebook Marketing Guidelines
Team Genesis Ascending Facebook Marketing GuidelinesTeam Genesis Ascending Facebook Marketing Guidelines
Team Genesis Ascending Facebook Marketing Guidelines
 
Vacante proceso ordinario de traslado 2013
Vacante proceso ordinario de traslado 2013   Vacante proceso ordinario de traslado 2013
Vacante proceso ordinario de traslado 2013
 
Validitas reliabilitas
Validitas reliabilitasValiditas reliabilitas
Validitas reliabilitas
 
Your+english+teacher
Your+english+teacherYour+english+teacher
Your+english+teacher
 
Profile Preview
Profile PreviewProfile Preview
Profile Preview
 
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...
Circular semana institucional del 6 al 10 de octubre- Cumbre Nacional por la ...
 
classroom management
classroom managementclassroom management
classroom management
 
Things to remember before answering any mlm objections
Things to remember before answering any mlm objectionsThings to remember before answering any mlm objections
Things to remember before answering any mlm objections
 
Cambrand pland de marketing
Cambrand pland de marketingCambrand pland de marketing
Cambrand pland de marketing
 
Educational technology
Educational technologyEducational technology
Educational technology
 
Types of Cells
Types of CellsTypes of Cells
Types of Cells
 
Vitamin B-12 Chemistry and Mode of Action
Vitamin  B-12 Chemistry and Mode of Action Vitamin  B-12 Chemistry and Mode of Action
Vitamin B-12 Chemistry and Mode of Action
 

Similar to Qcp

Boiler Commissioning .pdf
Boiler Commissioning .pdfBoiler Commissioning .pdf
Boiler Commissioning .pdffrankvargas67
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdfhyperm2m
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guideSơn Trà
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineIEI GSC
 
Quality inspection-guide-abstract
Quality inspection-guide-abstractQuality inspection-guide-abstract
Quality inspection-guide-abstract98mlo
 
61508 Compliance of actuators and Life cycle considerations (Eng)
61508 Compliance of actuators and Life cycle considerations (Eng) 61508 Compliance of actuators and Life cycle considerations (Eng)
61508 Compliance of actuators and Life cycle considerations (Eng) ie-net ingenieursvereniging vzw
 
EPM In-Line Verification 24-04-2014
EPM In-Line Verification 24-04-2014EPM In-Line Verification 24-04-2014
EPM In-Line Verification 24-04-2014Bert Roos
 
First time quality
First time qualityFirst time quality
First time qualityEWI
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-listUsama Waly
 
Process planning and cost estimation unit ii
Process planning and cost estimation  unit   iiProcess planning and cost estimation  unit   ii
Process planning and cost estimation unit iis Kumaravel
 
Kranti power tiller quality control six week training ppt
Kranti power tiller quality control six week training pptKranti power tiller quality control six week training ppt
Kranti power tiller quality control six week training pptsucha soorma designs
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industriespaperpublications3
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industriespaperpublications3
 
QC_Material & Produksi.ppt
QC_Material & Produksi.pptQC_Material & Produksi.ppt
QC_Material & Produksi.pptSeptian558020
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan WeeratungaRoshan Sujeewa Weeratunga
 

Similar to Qcp (20)

Boiler Commissioning .pdf
Boiler Commissioning .pdfBoiler Commissioning .pdf
Boiler Commissioning .pdf
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdf
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guide
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
 
Process and product inspection
Process and product inspectionProcess and product inspection
Process and product inspection
 
Quality inspection-guide-abstract
Quality inspection-guide-abstractQuality inspection-guide-abstract
Quality inspection-guide-abstract
 
61508 Compliance of actuators and Life cycle considerations (Eng)
61508 Compliance of actuators and Life cycle considerations (Eng) 61508 Compliance of actuators and Life cycle considerations (Eng)
61508 Compliance of actuators and Life cycle considerations (Eng)
 
Instrumentation ppt original.pptx
Instrumentation ppt original.pptxInstrumentation ppt original.pptx
Instrumentation ppt original.pptx
 
EPM In-Line Verification 24-04-2014
EPM In-Line Verification 24-04-2014EPM In-Line Verification 24-04-2014
EPM In-Line Verification 24-04-2014
 
First time quality
First time qualityFirst time quality
First time quality
 
RSL new project
RSL new projectRSL new project
RSL new project
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
 
Process planning and cost estimation unit ii
Process planning and cost estimation  unit   iiProcess planning and cost estimation  unit   ii
Process planning and cost estimation unit ii
 
Kranti power tiller quality control six week training ppt
Kranti power tiller quality control six week training pptKranti power tiller quality control six week training ppt
Kranti power tiller quality control six week training ppt
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
QC_Material & Produksi.ppt
QC_Material & Produksi.pptQC_Material & Produksi.ppt
QC_Material & Produksi.ppt
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Qcp

  • 1. Page 1 of 4 Prepared By : Control Subject Parameters Unit of Measure Testing Equipments Frequency of Measurement Recording of Measurement Measured by Whom Acceptance Criteria What Actions to Take if Acceptance Criteria Not Achieved Who Decides Who Acts Record of Action Taken Dimensions mm ruler vernier micrometer each new roll QC-FR-02-12 Quality inspector ±0.2 mm Hold Quality supervisor Production technician QC-FR-03-01 Visual appearance non non each new roll QC-FR-02-12 Quality inspector no damage, surface fluctuation,... Hold Quality supervisor Production technician QC-FR-03-01 Dimensions mm ruler vernier micrometer each new width QC-FR-02-22 Quality inspector ± 0.5 mm Hold Quality supervisor Production technician QC-FR-03-01 Visual appearance non non each new width QC-FR-02-22 Quality inspector free from rust and burrs Hold Quality supervisor Production technician QC-FR-03-01 Dimensions mm ruler meter each width QC-FR-02-28 Quality inspector ₊ 1 mm modify Quality supervisor Production technician QC-FR-03-01 Visual appearance non non Each width QC-FR-02-28 Quality inspector Free from rust and burrs Hold Quality supervisor Production technician QC-FR-03-01 Core Insulation Resistance ohm Megger each Core QC-FR-02-28 Quality inspector > 0.5 MΩ modify Quality Engineer Production Engineer QC-FR-03-01 Responsibilty Core cutting Process Control Plan for: In process Issue no: 1 Eng.Ayman Sakr Core slitting Date:19/06/2014 Quality Control Plan DRY TRANSFORMER IN PROCESS Control Plan no: Core stacking
  • 2. Page 2 of 4 Prepared By : Control Subject Parameters Unit of Measure Testing Equipments Frequency of Measurement Recording of Measurement Measured by Whom Acceptance Criteria What Actions to Take if Acceptance Criteria Not Achieved Who Decides Who Acts Record of Action Taken Responsibilty Process Control Plan for: In process Issue no: 1 Eng.Ayman Sakr Date:19/06/2014 Quality Control Plan DRY TRANSFORMER IN PROCESS Control Plan no: Dimensions mm ruler meter each stage QC-FR-02-26 Quality inspector as design modify Quality supervisor Production technician QC-FR-03-01 Resistance test ohm resistance measuring device per coil QC-FR-02-26 Quality inspector as per design Hold till design feedback Quality Engineer Production technician QC-FR-03-01 Visual appearance non non per coil QC-FR-02-26 Quality inspector free from dust and strange particles to be cleaned Quality supervisor Production technician QC-FR-03-01 Dimensions mm ruler meter each stage QC-FR-02-25 Quality inspector as design modify Quality supervisor Production technician QC-FR-03-01 Resistance test ohm resistance measuring device per coil QC-FR-02-25 Quality inspector as per design Hold till design feedback Quality Engineer Production Engineer QC-FR-03-01 Visual appearance non non per coil QC-FR-02-25 Quality inspector free from dust and strange particles to be cleaned Quality supervisor Production technician QC-FR-03-01 Dimensions mm Verner Each mold QC-FR-02-25 QC-FR- 02-26 Quality inspector +3,-1 Reject Quality supervisor Production Engineer QC-FR-03-01 procedures non non during process QC-FR-02-25 QC-FR- 02-26 Quality inspector good handling of coils to be treated Quality supervisor Production technician QC-FR-03-01 Ovens procedures non non Starting of the process QC-FR-02-21 QC-FR-02- 23 Quality inspector as per QC documetns QC- FR-02-21 QC-FR- 02-23 to be adjusted Quality supervisor Production or maintenance technician QC-FR-03-01 LV win HV win Moulding & demoulding
  • 3. Page 3 of 4 Prepared By : Control Subject Parameters Unit of Measure Testing Equipments Frequency of Measurement Recording of Measurement Measured by Whom Acceptance Criteria What Actions to Take if Acceptance Criteria Not Achieved Who Decides Who Acts Record of Action Taken Responsibilty Process Control Plan for: In process Issue no: 1 Eng.Ayman Sakr Date:19/06/2014 Quality Control Plan DRY TRANSFORMER IN PROCESS Control Plan no: procedures non non End of process QC-FR-02-20 Quality inspector Cast Resin covers windings completely to be adjusted Quality supervisor Production or maintenance technician QC-FR-03-01 Visual appearance non non End of process QC-FR-02-20 Quality inspector No cast leakage - No damage during handling to be treated Quality supervisor Production technician QC-FR-03-01 Dimensions mm meter each coil QC-FR-02-27 Quality inspector as per design modify Quality supervisor Production technician QC-FR-03-01 Visual appearance non non each coil QC-FR-02-27 Quality inspector as per design modify Quality supervisor Production technician QC-FR-03-01 Cutting & Cleaning Casting
  • 4. Page 4 of 4 Prepared By : Control Subject Parameters Unit of Measure Testing Equipments Frequency of Measurement Recording of Measurement Measured by Whom Acceptance Criteria What Actions to Take if Acceptance Criteria Not Achieved Who Decides Who Acts Record of Action Taken Responsibilty Process Control Plan for: In process Issue no: 1 Eng.Ayman Sakr Date:19/06/2014 Quality Control Plan DRY TRANSFORMER IN PROCESS Control Plan no: Dimensions mm meter each transformer QC-FR-02-27 Quality inspector ±2 mm modify Quality supervisor Production technician QC-FR-03-01 Insulation Resistance Test Ohm Megger each transformer QC-FR-02-27 Quality inspector all values > 0.5 MΩ hold Quality Engineer Production Engineer QC-FR-03-01 Turns Ratio Test Non Ratiometer each transformer QC-FR-02-27 Quality inspector according to TDS /IEC 60076-1 hold Quality Engineer Production Engineer QC-FR-03-01 DC Resistance Test Ohm Ohmmeter each transformer QC-FR-02-27 Quality inspector according to TDS /IEC 60076-1 hold Quality Engineer Production Engineer QC-FR-03-01 Visual appearance non non each transformer QC-FR-02-27 Quality inspector no damage treat Quality supervisor Production technician QC-FR-03-01 Accessories non non each transformer QC-FR-02-24 Quality inspector as per design To be installed Quality Engineer Production Engineer QC-FR-03-01 Control Unit Non non each transformer QC-FR-02-24 Quality inspector Woking Properly Replace Quality supervisor Production technician QC-FR-03-01 Visual appearance non non each transformer QC-FR-02-24 Quality inspector no damage and good appearance treat Quality supervisor Production technician QC-FR-03-01 Initial Assembly Final assembly & finishing