1. Page 1 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Dimensions mm
ruler vernier
micrometer
each new roll QC-FR-02-12
Quality
inspector
±0.2 mm Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each new roll QC-FR-02-12
Quality
inspector
no damage,
surface
fluctuation,...
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler vernier
micrometer
each new width QC-FR-02-22
Quality
inspector
± 0.5 mm Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each new width QC-FR-02-22
Quality
inspector
free from rust
and burrs
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler
meter
each width QC-FR-02-28
Quality
inspector
₊ 1 mm modify
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non Each width QC-FR-02-28
Quality
inspector
Free from rust
and burrs
Hold
Quality
supervisor
Production
technician
QC-FR-03-01
Core
Insulation
Resistance
ohm Megger each Core QC-FR-02-28
Quality
inspector
> 0.5 MΩ modify
Quality
Engineer
Production
Engineer
QC-FR-03-01
Responsibilty
Core cutting
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Core slitting
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Core stacking
2. Page 2 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Dimensions mm
ruler
meter
each stage QC-FR-02-26
Quality
inspector
as design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Resistance
test
ohm
resistance
measuring
device
per coil QC-FR-02-26
Quality
inspector
as per design
Hold till design
feedback
Quality
Engineer
Production
technician
QC-FR-03-01
Visual
appearance
non non per coil QC-FR-02-26
Quality
inspector
free from dust
and strange
particles
to be cleaned
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm
ruler
meter
each stage QC-FR-02-25
Quality
inspector
as design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Resistance
test
ohm
resistance
measuring
device
per coil QC-FR-02-25
Quality
inspector
as per design
Hold till design
feedback
Quality
Engineer
Production
Engineer
QC-FR-03-01
Visual
appearance
non non per coil QC-FR-02-25
Quality
inspector
free from dust
and strange
particles
to be cleaned
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm Verner Each mold
QC-FR-02-25 QC-FR-
02-26
Quality
inspector
+3,-1 Reject
Quality
supervisor
Production
Engineer
QC-FR-03-01
procedures non non during process
QC-FR-02-25 QC-FR-
02-26
Quality
inspector
good handling of
coils
to be treated
Quality
supervisor
Production
technician
QC-FR-03-01
Ovens procedures non non
Starting of the
process
QC-FR-02-21 QC-FR-02-
23
Quality
inspector
as per QC
documetns QC-
FR-02-21 QC-FR-
02-23
to be adjusted
Quality
supervisor
Production or
maintenance
technician
QC-FR-03-01
LV win
HV win
Moulding & demoulding
3. Page 3 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
procedures non non End of process QC-FR-02-20
Quality
inspector
Cast Resin
covers windings
completely
to be adjusted
Quality
supervisor
Production or
maintenance
technician
QC-FR-03-01
Visual
appearance
non non End of process QC-FR-02-20
Quality
inspector
No cast leakage -
No damage
during handling
to be treated
Quality
supervisor
Production
technician
QC-FR-03-01
Dimensions mm meter each coil QC-FR-02-27
Quality
inspector
as per design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each coil QC-FR-02-27
Quality
inspector
as per design modify
Quality
supervisor
Production
technician
QC-FR-03-01
Cutting & Cleaning
Casting
4. Page 4 of 4
Prepared By :
Control Subject Parameters Unit of Measure
Testing
Equipments
Frequency of
Measurement
Recording of Measurement
Measured
by Whom
Acceptance
Criteria
What Actions
to Take if
Acceptance
Criteria Not
Achieved
Who Decides Who Acts Record of Action Taken
Responsibilty
Process Control Plan for: In process
Issue no: 1 Eng.Ayman Sakr
Date:19/06/2014
Quality Control Plan DRY TRANSFORMER
IN PROCESS
Control Plan no:
Dimensions mm meter each transformer QC-FR-02-27
Quality
inspector
±2 mm modify
Quality
supervisor
Production
technician
QC-FR-03-01
Insulation
Resistance
Test
Ohm Megger each transformer QC-FR-02-27
Quality
inspector
all values > 0.5
MΩ
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
Turns Ratio
Test
Non Ratiometer each transformer QC-FR-02-27
Quality
inspector
according to
TDS /IEC 60076-1
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
DC Resistance
Test
Ohm Ohmmeter each transformer QC-FR-02-27
Quality
inspector
according to
TDS /IEC 60076-1
hold
Quality
Engineer
Production
Engineer
QC-FR-03-01
Visual
appearance
non non each transformer QC-FR-02-27
Quality
inspector
no damage treat
Quality
supervisor
Production
technician
QC-FR-03-01
Accessories non non each transformer QC-FR-02-24
Quality
inspector
as per design To be installed
Quality
Engineer
Production
Engineer
QC-FR-03-01
Control Unit Non non each transformer QC-FR-02-24
Quality
inspector
Woking Properly Replace
Quality
supervisor
Production
technician
QC-FR-03-01
Visual
appearance
non non each transformer QC-FR-02-24
Quality
inspector
no damage and
good appearance
treat
Quality
supervisor
Production
technician
QC-FR-03-01
Initial Assembly
Final assembly & finishing