Chesapeake Bay Bridge and Tunnel District
Wallops Island
Regional Alliance
January 17, 2017
The Ferry Days
• In 1956, the CBBT Commission
was enabled to build the fixed
crossing.
• The Revenue Bonds were
issued in August 1960
• Construction commenced in
September 1960
• Construction complete and
opened to traffic on April 15,
1964
A New Era…
Financing the Project
The Sale of Revenue Bonds
CBBT Commission Overview
• Eleven member Commission appointed by the Governor of
the Commonwealth of Virginia
– One member is a representative of the Commonwealth Transportation Board
– Ten members represent the six cities and two Eastern Shore counties that
make up the District
• Appointed with varied occupational disciplines & technical
experience
– Attorneys, Real Estate Developer, MIS Manager, Large Business Owners,
Controller, Freight Logistics, College President, Congressional Office Manager,
Military & Commercial Pilot
• Set the policies of the District
• Responsible for overall Project Approvals/Awards
Bayshore
Concrete Plant
Cape Charles, VA
Original Crossing
• 42 months to construct
• $137 million cost
• 9 survey towers
• Marvelous Monsters
The
Big D
Miles of Piles
2,598 piles
Two-Headed
Monster
The Slab-Setter
The Bridges…
North Channel
Bridge:
75’ vertical clearance
for commercial fishing
boats and pleasure
craft
Fisherman Inlet
Bridge:
40’ vertical clearance
With access to the
Intracoastal Waterway
Trench-type tunnels:
• Thimble Shoal Channel Tunnel: 5,734 ft.
• Chesapeake Channel Tunnel: 5,423 ft.
• Tunnel Clearance – 13’ 6”; 24’ horizontal
…and Tunnels
• Each island approx. 5 acres in surface
• 30 feet above sea level
• 1.2 million tons of rock armor around
islands
Man-Made Islands
Opening Day – April 15, 1964
Awards and Achievements
• One of the Seven Engineering Wonders of the
Modern World
• Outstanding Civil Engineering Achievement
from American Society of Civil Engineers
• Named the Lucius J. Kellam, Jr. Bridge-Tunnel
• The CBBT Commission was
enabled by the General Assembly
and Governor to build the Parallel
Crossing in 1990.
• Phase I (Parallel Bridges)
construction began in July 1995
• Phase I was fully completed in July
1999.
Parallel Crossing – Phase I
Parallel Crossing – Phase I
• 46 months to construct
• $250 million
• 2,591 piles
• GPS used for placement
January 1, 2014 Toll Rate Revision
Cars and Trucks = $13 one way or $18 round trip in 24 hours (Off Peak)
Cars and Trucks = $15 one way or $18 round trip in 24 hours (Peak)
Commuters = $5 each way with 30 trips / 30 days
No Federal, State or Local Tax Monies Used to Construct or Support the CBBT
Toll Benchmark
Toll Rate per Mile
Vehicle Type
Roundtrip
w/ 24-hour
discount MD E-Zpass Apr-Oct PEAK
Class 1 Vehicle 0.57$ 0.39$ 2.72$ 2.04$ 0.93$ 1.96$ 1.59$ 2.17$ 2.64$
Two-axle, four-tire vehicle:
i.e. Cars, pick-ups, station
wagons, minivans, motorcycles
Class 75 (Commuter making 30
one-way trips in last 30 days) $ - 0.22$
Class 12 Vehicle: 1.70$ N/A 16.33$ N/A 5.58$ 12.25$ 2.76$ 3.53$ 4.24$
5-axle Tractor Trailer 3.47$ 4.29$ 5.18$
Facility Identifiers ∙ ∙ River Crossing ∙ Bay Crossing ∙ River Crossing ∙ Bay Crossing
∙ ∙ High-Level Bridges ∙ High-level ∙ 85-minute ride
∙ ∙ Tolled in one Suspension Bridges ∙ Reservations Required
∙ direction only ∙
*This toll benchmark does not include comparisons to facilities in the NorthEast which have an even greater disparity as compared to tolls on the CBBT.
FACILITIES
1.47 miles 4.3 miles 2.04 miles 17 miles
CBBT
23 miles
Ocean/Bay
Extreme Maritime
Conditions
Additional fee for passengers of
up to $10/person
Baltimore
Harbor Tunnel
MD Bay
Bridge
DE River
Bridge
Cape May-Lewes
Ferry
One-way
crossing Cash Nov-Mar
2 Tunnels
High Level Bridges
HISTORY OF TOLL RATE SCHEDULE
EFFECTIVE DATE
CLASS TYPE OF VEHICLE 4/15/64 01/01/65 01/01/71 01/01/75 01/01/78 04/01/80 04/01/82 10/01/91 10/11/00 03/01/02 06/01/04 03/13/13 01/01/14
1 CARS $4.00 $4.00
LIGHT TRUCKS $5.00 $5.00 $5.25 $6.00 $7.00 $8.00 $9.00 $10.00 $10.00 $10.00 $12.00 $12.00
(Two axle, four tire vehicle; two-axle, six-tire vehicle less than 8' in height) (OFF-PEAK) $13.00
(**PEAK) $15.00
65 24 HOUR ROUND TRIP FOR CLASS 1 - - - - - - - - - $4.00 $5.00 $5.00
*Return trip within 24 hours requires the use of EZPass (OFF-PEAK) $5.00
(**PEAK) $3.00
75 CLASS 1 (making 30 or more 1-way trips in 30 days) $5.00
*Return Trip within 24 hours (requires the use of EZPass)
2 CLASS 1 W/1 AXLE TRAILER $5.00 $5.00 $7.75 $8.50 $9.50 $11.00 $12.00 $13.00 $13.00 $13.00 $16.00 $16.00 $18.00
*Return Trip within 24 hours (requires the use of EZPass) $10.00
3 CLASS 1 W/2 AXLE TRAILER $6.00 $6.00 $10.25 $11.00 $12.00 $14.00 $15.00 $16.00 $16.00 $16.00 $20.00 $20.00 $22.00
*Return Trip within 24 hours (requires the use of EZPass) $14.00
4 CLASS 1 W/3 AXLE TRAILER - - $12.75 $13.50 $14.50 $17.00 $18.00 $19.00 $19.00 $19.00 $24.00 $24.00 $26.00
*Return Trip within 24 hours (requires the use of EZPass) $18.00
9 2 AXLE 6 TIRE TRUCK $7.00 $7.00 $8.00 $9.00 $10.00 $11.50 $12.00 $14.00 $14.00 $14.00 $17.00 $17.00 $19.00
(over 8' in height)
10 3 AXLE VEH & TRACTOR/TRAILER $10.00 $10.00 $10.50 $11.50 $12.50 $14.50 $15.00 $18.00 $18.00 $18.00 $21.00 $21.00 $23.00
11 4 AXLE VEH & TRACTOR/TRAILER $13.00 $12.00 $13.00 $14.00 $15.00 $17.50 $20.00 $24.00 $24.00 $24.00 $28.00 $28.00 $31.00
12 5 AXLE VEH & TRACTOR/TRAILER $16.00 $13.00 $15.50 $16.50 $17.50 $20.00 $25.00 $30.00 $30.00 $30.00 $35.00 $35.00 $39.00
13 6 AXLE VEH & TRACTOR/TRAILER - - $18.00 $19.00 $20.00 $23.00 $30.00 $36.00 $36.00 $36.00 $42.00 $42.00 $47.00
16 OVER-DIMENSION VEHICLE $22.00 $22.00 $35.00 $50.00 $50.00 $60.00 $60.00 $60.00 $60.00 $60.00 $60.00 $60.00 $66.00
17 7 AXLE VEH & TRACTOR/TRAILER - - - - - - $35.00 - - - - -
ESCORT FEE - - $10.00 $25.00 $40.00 $50.00 $50.00 $60.00 $60.00 $60.00 $140.00 $140.00 $154.00
8 SCHOOL BUS - - - - - - - - $10.00 $10.00 $10.00 $1.00 $1.00
14 2 AXLE BUS $9.00 $9.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $30.00 $30.00 $33.00
15 3 AXLE BUS $10.00 $10.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $30.00 $30.00 $33.00
EXTRA PASSENGERS $0.85 $0.85 NC NC NC NC NC NC NC NC NC NC NC
BUSES
PASSENGER CARS & LIGHT TRUCKS
HEAVY TRUCKS & RV'S
1982
$9 one way
$18 round trip
Today
$13 one way
$18 round trip (24 hours)
•No Right of Way
Acquisition
•No Large-Scale
Utility Relocation
We want a tunnel from Point A
to Point B. Design-Build
Contractor Teams determine
how to build it in accordance
with Performance Based
Specifications.
Parallel Thimble Shoal Tunnel Project
• Route 13 Corridor is a Corridor of Statewide Significance
• Lack of viable alternative route
• Lane closures for oversized escort loads
• Lane closures for ordinary maintenance work
• Age of existing tunnels
• Improvement in levels of service and safety
• 20-25% of VB tourists utilize the Coastal Corridor
o VB exit surveys
• Tunnel depth to increase to 70 ft. to accommodate future
ship traffic
Project Significance
Parallel Thimble Shoal Tunnel Project
PROJECT TIMELINE
Parallel Thimble Shoal Tunnel Project
RESULTS OF DB PROCUREMENT
Design-Build Teams Tunnel Method
Qualification
Proposed Tunnel
Construction
Method
April 29
Proposal Price
July 15
Proposal Price
Archer Western – Vinci
Construction
TunnelBuilders (AWVC)
ITT and Bored Bored $1,071,683,000 $785,883,000
Bouygues
TP/Traylor/Manson (BTM
JV)
ITT and Bored Bored $1,016,046,800 $848,452,987
Dragados Team:
Dragados USA and
Schiavone Construction
Company, LLC
Bored Bored $1,092,000,000 $755,987,318
SKW Tunnel Builders ITT --- No Proposal ---
Island #1 Expansion
to include Full Public Access with Restaurant/Gift Shop
April 29, 2016 Phase I Procurement Rendering
Restaurant, Gift Shop, Visitor
Center – 15,000 square feet New
Tunnel
Existing
Ventilation Building
New
Ventilation
Building
• Required Island Expansion
of approx. 3.25 acres
• 338 Parking Spaces
Island #1 - No Restaurant
July 12, 2016 Revised Rendering
No Island
Expansion New
Vent
Building
New
Tunnel
Existing
Ventilation Building
The Dragados Team:
Dragados USA and Schiavone Construction Co. LLC
Tunnel Boring Machine
Rotating
cutter head
The machine is operated from the control room
Pressure is maintained
in the cutting chamber
Rotating arm adds pre-cast concrete
Tunnel segments to form a ring
Pre-cast concrete segments
delivered to rotating arm
Excavated earth removed
by conveyor belt
Hydraulic rams push against
newly-placed concrete
segments to drive machine
forward
Approximate TBM diameter is 42’
Parallel Thimble Shoal Tunnel Project
PROJECT FUNDING
Design-Build Technical Timeline
Activity Schedule
Limited Notice to Proceed (LNTP) August 2016 – December 2016
Notice to Proceed 1 (NTP1) January 2017 – September 2017
Notice to Proceed 2 (NTP2) Construction Begins – October 1, 2017
PARALLEL THIMBLE SHOAL CHANNEL TUNNEL
For up-to-date information, news releases, project documents, and more as it pertains
to the Parallel Thimble Shoal Channel Tunnel Project, please visit the CBBT’s website at
www.cbbt.com/parallelthimbleshoaltunnel/
Tunnel Retrofit
Total Project Cost (3 Phases): $13,799,417
Pavement in Tunnels
Painting of Tunnel
Ventilation Systems
Saffo Contractors - $4,796,500
Twitter
@FollowTheGulls
for up-to-date traffic and weather conditions
• Follow the CBBT on Twitter @FollowTheGulls
• Activate Mobile Alerts to receive text messages
for every tweet
TWITTER users:
Non-TWITTER users:
• FAST FOLLOW by texting “follow followthegulls” to
40404
• Text messages will be sent directly to your phone each
time we tweet
Standard text messaging rates do apply.
Stay Linked to the CBBT
@FollowTheGulls | www.cbbt.com

More Related Content

Similar to Q1 2017 WIRA CBBT Presentation Tom Anderson

Royalty for transport, p p on profit
Royalty for  transport, p p on  profitRoyalty for  transport, p p on  profit
Royalty for transport, p p on profit
google
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax Measures
SCVTA
 
Ocean City capital plan presentation summary 2015
Ocean City capital plan presentation summary 2015Ocean City capital plan presentation summary 2015
Ocean City capital plan presentation summary 2015
OceanCityGazette
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
2014 Florida Public Works Expo
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
Jill Reeves
 
Frito lay inc. the backhaul decision
Frito lay inc. the backhaul decisionFrito lay inc. the backhaul decision
Frito lay inc. the backhaul decision
Sahil Dara
 
Innovative transport
Innovative  transportInnovative  transport
Innovative transport
google
 
Columbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST UpdateColumbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST Update
columbusgachamber
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21
Franklin Matters
 
Mr ahamedul karim choudhury
Mr ahamedul karim choudhuryMr ahamedul karim choudhury
Mr ahamedul karim choudhury
Madhukar P R
 
FinalForrealThirdAve
FinalForrealThirdAveFinalForrealThirdAve
FinalForrealThirdAve
Travis Conner
 
Laboratorio 4
Laboratorio 4Laboratorio 4
Laboratorio 4
camilarocio
 
Item #5 bond proposal 2016
Item #5  bond proposal 2016Item #5  bond proposal 2016
Item #5 bond proposal 2016
Marian Vargas Mendoza
 
Item #5 bond proposal 2016
Item #5   bond proposal 2016Item #5   bond proposal 2016
Item #5 bond proposal 2016
Marian Vargas Mendoza
 
2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown
jmathews91
 
Ppt solar e-cycles pitch valeo 2018 im edits v6
Ppt solar e-cycles pitch valeo 2018 im edits v6Ppt solar e-cycles pitch valeo 2018 im edits v6
Ppt solar e-cycles pitch valeo 2018 im edits v6
SolarECycles
 
OR126/ Tom McCall (Prineville) Budget / Layout
OR126/ Tom McCall (Prineville) Budget / Layout OR126/ Tom McCall (Prineville) Budget / Layout
OR126/ Tom McCall (Prineville) Budget / Layout
cityofprineville
 
oia_cip
oia_cipoia_cip
oia_cip
Mark Nardo
 
Intermodal
IntermodalIntermodal
Intermodal
MaryJane Westphal
 
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
Forth
 

Similar to Q1 2017 WIRA CBBT Presentation Tom Anderson (20)

Royalty for transport, p p on profit
Royalty for  transport, p p on  profitRoyalty for  transport, p p on  profit
Royalty for transport, p p on profit
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax Measures
 
Ocean City capital plan presentation summary 2015
Ocean City capital plan presentation summary 2015Ocean City capital plan presentation summary 2015
Ocean City capital plan presentation summary 2015
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
Frito lay inc. the backhaul decision
Frito lay inc. the backhaul decisionFrito lay inc. the backhaul decision
Frito lay inc. the backhaul decision
 
Innovative transport
Innovative  transportInnovative  transport
Innovative transport
 
Columbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST UpdateColumbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST Update
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21
 
Mr ahamedul karim choudhury
Mr ahamedul karim choudhuryMr ahamedul karim choudhury
Mr ahamedul karim choudhury
 
FinalForrealThirdAve
FinalForrealThirdAveFinalForrealThirdAve
FinalForrealThirdAve
 
Laboratorio 4
Laboratorio 4Laboratorio 4
Laboratorio 4
 
Item #5 bond proposal 2016
Item #5  bond proposal 2016Item #5  bond proposal 2016
Item #5 bond proposal 2016
 
Item #5 bond proposal 2016
Item #5   bond proposal 2016Item #5   bond proposal 2016
Item #5 bond proposal 2016
 
2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown
 
Ppt solar e-cycles pitch valeo 2018 im edits v6
Ppt solar e-cycles pitch valeo 2018 im edits v6Ppt solar e-cycles pitch valeo 2018 im edits v6
Ppt solar e-cycles pitch valeo 2018 im edits v6
 
OR126/ Tom McCall (Prineville) Budget / Layout
OR126/ Tom McCall (Prineville) Budget / Layout OR126/ Tom McCall (Prineville) Budget / Layout
OR126/ Tom McCall (Prineville) Budget / Layout
 
oia_cip
oia_cipoia_cip
oia_cip
 
Intermodal
IntermodalIntermodal
Intermodal
 
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
Intro to Clean Cities and MD/HD Fleet Electrification by Michael Graham
 

More from WallopsIslandRegionalAlliance

Q2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff LockQ2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff Lock
WallopsIslandRegionalAlliance
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
WallopsIslandRegionalAlliance
 
WIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares UpdateWIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares Update
WallopsIslandRegionalAlliance
 
WIRA Update Q2 2016
WIRA Update Q2 2016WIRA Update Q2 2016
WIRA Update Q2 2016
WallopsIslandRegionalAlliance
 
Orbital ATK Update WIRA Q2 April 12 2016
Orbital ATK Update WIRA Q2 April 12 2016Orbital ATK Update WIRA Q2 April 12 2016
Orbital ATK Update WIRA Q2 April 12 2016
WallopsIslandRegionalAlliance
 
NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016
WallopsIslandRegionalAlliance
 
VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016
WallopsIslandRegionalAlliance
 
NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016
WallopsIslandRegionalAlliance
 
NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce Underwood
WallopsIslandRegionalAlliance
 
Antares Status, Presented by Dan Givens
Antares Status, Presented by Dan GivensAntares Status, Presented by Dan Givens
Antares Status, Presented by Dan Givens
WallopsIslandRegionalAlliance
 
MARS Update, Presented by Dale Nash
MARS Update, Presented by Dale NashMARS Update, Presented by Dale Nash
MARS Update, Presented by Dale Nash
WallopsIslandRegionalAlliance
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
WallopsIslandRegionalAlliance
 
Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15
WallopsIslandRegionalAlliance
 
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
WallopsIslandRegionalAlliance
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris Scolese
WallopsIslandRegionalAlliance
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
WallopsIslandRegionalAlliance
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
WallopsIslandRegionalAlliance
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
WallopsIslandRegionalAlliance
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
WallopsIslandRegionalAlliance
 

More from WallopsIslandRegionalAlliance (19)

Q2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff LockQ2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff Lock
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
 
WIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares UpdateWIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares Update
 
WIRA Update Q2 2016
WIRA Update Q2 2016WIRA Update Q2 2016
WIRA Update Q2 2016
 
Orbital ATK Update WIRA Q2 April 12 2016
Orbital ATK Update WIRA Q2 April 12 2016Orbital ATK Update WIRA Q2 April 12 2016
Orbital ATK Update WIRA Q2 April 12 2016
 
NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016
 
VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016
 
NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016
 
NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce Underwood
 
Antares Status, Presented by Dan Givens
Antares Status, Presented by Dan GivensAntares Status, Presented by Dan Givens
Antares Status, Presented by Dan Givens
 
MARS Update, Presented by Dale Nash
MARS Update, Presented by Dale NashMARS Update, Presented by Dale Nash
MARS Update, Presented by Dale Nash
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
 
Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15
 
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris Scolese
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
 

Recently uploaded

快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
hozt8xgk
 
Bob Reedy - Nitrate in Texas Groundwater.pdf
Bob Reedy - Nitrate in Texas Groundwater.pdfBob Reedy - Nitrate in Texas Groundwater.pdf
Bob Reedy - Nitrate in Texas Groundwater.pdf
Texas Alliance of Groundwater Districts
 
Micronuclei test.M.sc.zoology.fisheries.
Micronuclei test.M.sc.zoology.fisheries.Micronuclei test.M.sc.zoology.fisheries.
Micronuclei test.M.sc.zoology.fisheries.
Aditi Bajpai
 
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
University of Maribor
 
SAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdfSAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdf
KrushnaDarade1
 
Immersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths ForwardImmersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths Forward
Leonel Morgado
 
Direct Seeded Rice - Climate Smart Agriculture
Direct Seeded Rice - Climate Smart AgricultureDirect Seeded Rice - Climate Smart Agriculture
Direct Seeded Rice - Climate Smart Agriculture
International Food Policy Research Institute- South Asia Office
 
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốtmô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
HongcNguyn6
 
Shallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptxShallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptx
Gokturk Mehmet Dilci
 
Thornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdfThornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdf
European Sustainable Phosphorus Platform
 
Oedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptxOedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptx
muralinath2
 
molar-distalization in orthodontics-seminar.pptx
molar-distalization in orthodontics-seminar.pptxmolar-distalization in orthodontics-seminar.pptx
molar-distalization in orthodontics-seminar.pptx
Anagha Prasad
 
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
vluwdy49
 
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
AbdullaAlAsif1
 
The debris of the ‘last major merger’ is dynamically young
The debris of the ‘last major merger’ is dynamically youngThe debris of the ‘last major merger’ is dynamically young
The debris of the ‘last major merger’ is dynamically young
Sérgio Sacani
 
Authoring a personal GPT for your research and practice: How we created the Q...
Authoring a personal GPT for your research and practice: How we created the Q...Authoring a personal GPT for your research and practice: How we created the Q...
Authoring a personal GPT for your research and practice: How we created the Q...
Leonel Morgado
 
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
Leonel Morgado
 
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdfwaterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
LengamoLAppostilic
 
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdfTopic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
TinyAnderson
 
aziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobelaziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobel
İsa Badur
 

Recently uploaded (20)

快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
快速办理(UAM毕业证书)马德里自治大学毕业证学位证一模一样
 
Bob Reedy - Nitrate in Texas Groundwater.pdf
Bob Reedy - Nitrate in Texas Groundwater.pdfBob Reedy - Nitrate in Texas Groundwater.pdf
Bob Reedy - Nitrate in Texas Groundwater.pdf
 
Micronuclei test.M.sc.zoology.fisheries.
Micronuclei test.M.sc.zoology.fisheries.Micronuclei test.M.sc.zoology.fisheries.
Micronuclei test.M.sc.zoology.fisheries.
 
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
Remote Sensing and Computational, Evolutionary, Supercomputing, and Intellige...
 
SAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdfSAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdf
 
Immersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths ForwardImmersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths Forward
 
Direct Seeded Rice - Climate Smart Agriculture
Direct Seeded Rice - Climate Smart AgricultureDirect Seeded Rice - Climate Smart Agriculture
Direct Seeded Rice - Climate Smart Agriculture
 
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốtmô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
 
Shallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptxShallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptx
 
Thornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdfThornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdf
 
Oedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptxOedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptx
 
molar-distalization in orthodontics-seminar.pptx
molar-distalization in orthodontics-seminar.pptxmolar-distalization in orthodontics-seminar.pptx
molar-distalization in orthodontics-seminar.pptx
 
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
 
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
Unlocking the mysteries of reproduction: Exploring fecundity and gonadosomati...
 
The debris of the ‘last major merger’ is dynamically young
The debris of the ‘last major merger’ is dynamically youngThe debris of the ‘last major merger’ is dynamically young
The debris of the ‘last major merger’ is dynamically young
 
Authoring a personal GPT for your research and practice: How we created the Q...
Authoring a personal GPT for your research and practice: How we created the Q...Authoring a personal GPT for your research and practice: How we created the Q...
Authoring a personal GPT for your research and practice: How we created the Q...
 
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
Describing and Interpreting an Immersive Learning Case with the Immersion Cub...
 
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdfwaterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
 
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdfTopic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
Topic: SICKLE CELL DISEASE IN CHILDREN-3.pdf
 
aziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobelaziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobel
 

Q1 2017 WIRA CBBT Presentation Tom Anderson

  • 1. Chesapeake Bay Bridge and Tunnel District Wallops Island Regional Alliance January 17, 2017
  • 3. • In 1956, the CBBT Commission was enabled to build the fixed crossing. • The Revenue Bonds were issued in August 1960 • Construction commenced in September 1960 • Construction complete and opened to traffic on April 15, 1964 A New Era…
  • 4. Financing the Project The Sale of Revenue Bonds
  • 5. CBBT Commission Overview • Eleven member Commission appointed by the Governor of the Commonwealth of Virginia – One member is a representative of the Commonwealth Transportation Board – Ten members represent the six cities and two Eastern Shore counties that make up the District • Appointed with varied occupational disciplines & technical experience – Attorneys, Real Estate Developer, MIS Manager, Large Business Owners, Controller, Freight Logistics, College President, Congressional Office Manager, Military & Commercial Pilot • Set the policies of the District • Responsible for overall Project Approvals/Awards
  • 7. Original Crossing • 42 months to construct • $137 million cost • 9 survey towers • Marvelous Monsters
  • 8. The Big D Miles of Piles 2,598 piles
  • 11. The Bridges… North Channel Bridge: 75’ vertical clearance for commercial fishing boats and pleasure craft Fisherman Inlet Bridge: 40’ vertical clearance With access to the Intracoastal Waterway
  • 12. Trench-type tunnels: • Thimble Shoal Channel Tunnel: 5,734 ft. • Chesapeake Channel Tunnel: 5,423 ft. • Tunnel Clearance – 13’ 6”; 24’ horizontal …and Tunnels
  • 13. • Each island approx. 5 acres in surface • 30 feet above sea level • 1.2 million tons of rock armor around islands Man-Made Islands
  • 14. Opening Day – April 15, 1964
  • 15. Awards and Achievements • One of the Seven Engineering Wonders of the Modern World • Outstanding Civil Engineering Achievement from American Society of Civil Engineers • Named the Lucius J. Kellam, Jr. Bridge-Tunnel
  • 16. • The CBBT Commission was enabled by the General Assembly and Governor to build the Parallel Crossing in 1990. • Phase I (Parallel Bridges) construction began in July 1995 • Phase I was fully completed in July 1999. Parallel Crossing – Phase I
  • 17. Parallel Crossing – Phase I • 46 months to construct • $250 million • 2,591 piles • GPS used for placement
  • 18. January 1, 2014 Toll Rate Revision Cars and Trucks = $13 one way or $18 round trip in 24 hours (Off Peak) Cars and Trucks = $15 one way or $18 round trip in 24 hours (Peak) Commuters = $5 each way with 30 trips / 30 days
  • 19. No Federal, State or Local Tax Monies Used to Construct or Support the CBBT Toll Benchmark Toll Rate per Mile Vehicle Type Roundtrip w/ 24-hour discount MD E-Zpass Apr-Oct PEAK Class 1 Vehicle 0.57$ 0.39$ 2.72$ 2.04$ 0.93$ 1.96$ 1.59$ 2.17$ 2.64$ Two-axle, four-tire vehicle: i.e. Cars, pick-ups, station wagons, minivans, motorcycles Class 75 (Commuter making 30 one-way trips in last 30 days) $ - 0.22$ Class 12 Vehicle: 1.70$ N/A 16.33$ N/A 5.58$ 12.25$ 2.76$ 3.53$ 4.24$ 5-axle Tractor Trailer 3.47$ 4.29$ 5.18$ Facility Identifiers ∙ ∙ River Crossing ∙ Bay Crossing ∙ River Crossing ∙ Bay Crossing ∙ ∙ High-Level Bridges ∙ High-level ∙ 85-minute ride ∙ ∙ Tolled in one Suspension Bridges ∙ Reservations Required ∙ direction only ∙ *This toll benchmark does not include comparisons to facilities in the NorthEast which have an even greater disparity as compared to tolls on the CBBT. FACILITIES 1.47 miles 4.3 miles 2.04 miles 17 miles CBBT 23 miles Ocean/Bay Extreme Maritime Conditions Additional fee for passengers of up to $10/person Baltimore Harbor Tunnel MD Bay Bridge DE River Bridge Cape May-Lewes Ferry One-way crossing Cash Nov-Mar 2 Tunnels High Level Bridges
  • 20. HISTORY OF TOLL RATE SCHEDULE EFFECTIVE DATE CLASS TYPE OF VEHICLE 4/15/64 01/01/65 01/01/71 01/01/75 01/01/78 04/01/80 04/01/82 10/01/91 10/11/00 03/01/02 06/01/04 03/13/13 01/01/14 1 CARS $4.00 $4.00 LIGHT TRUCKS $5.00 $5.00 $5.25 $6.00 $7.00 $8.00 $9.00 $10.00 $10.00 $10.00 $12.00 $12.00 (Two axle, four tire vehicle; two-axle, six-tire vehicle less than 8' in height) (OFF-PEAK) $13.00 (**PEAK) $15.00 65 24 HOUR ROUND TRIP FOR CLASS 1 - - - - - - - - - $4.00 $5.00 $5.00 *Return trip within 24 hours requires the use of EZPass (OFF-PEAK) $5.00 (**PEAK) $3.00 75 CLASS 1 (making 30 or more 1-way trips in 30 days) $5.00 *Return Trip within 24 hours (requires the use of EZPass) 2 CLASS 1 W/1 AXLE TRAILER $5.00 $5.00 $7.75 $8.50 $9.50 $11.00 $12.00 $13.00 $13.00 $13.00 $16.00 $16.00 $18.00 *Return Trip within 24 hours (requires the use of EZPass) $10.00 3 CLASS 1 W/2 AXLE TRAILER $6.00 $6.00 $10.25 $11.00 $12.00 $14.00 $15.00 $16.00 $16.00 $16.00 $20.00 $20.00 $22.00 *Return Trip within 24 hours (requires the use of EZPass) $14.00 4 CLASS 1 W/3 AXLE TRAILER - - $12.75 $13.50 $14.50 $17.00 $18.00 $19.00 $19.00 $19.00 $24.00 $24.00 $26.00 *Return Trip within 24 hours (requires the use of EZPass) $18.00 9 2 AXLE 6 TIRE TRUCK $7.00 $7.00 $8.00 $9.00 $10.00 $11.50 $12.00 $14.00 $14.00 $14.00 $17.00 $17.00 $19.00 (over 8' in height) 10 3 AXLE VEH & TRACTOR/TRAILER $10.00 $10.00 $10.50 $11.50 $12.50 $14.50 $15.00 $18.00 $18.00 $18.00 $21.00 $21.00 $23.00 11 4 AXLE VEH & TRACTOR/TRAILER $13.00 $12.00 $13.00 $14.00 $15.00 $17.50 $20.00 $24.00 $24.00 $24.00 $28.00 $28.00 $31.00 12 5 AXLE VEH & TRACTOR/TRAILER $16.00 $13.00 $15.50 $16.50 $17.50 $20.00 $25.00 $30.00 $30.00 $30.00 $35.00 $35.00 $39.00 13 6 AXLE VEH & TRACTOR/TRAILER - - $18.00 $19.00 $20.00 $23.00 $30.00 $36.00 $36.00 $36.00 $42.00 $42.00 $47.00 16 OVER-DIMENSION VEHICLE $22.00 $22.00 $35.00 $50.00 $50.00 $60.00 $60.00 $60.00 $60.00 $60.00 $60.00 $60.00 $66.00 17 7 AXLE VEH & TRACTOR/TRAILER - - - - - - $35.00 - - - - - ESCORT FEE - - $10.00 $25.00 $40.00 $50.00 $50.00 $60.00 $60.00 $60.00 $140.00 $140.00 $154.00 8 SCHOOL BUS - - - - - - - - $10.00 $10.00 $10.00 $1.00 $1.00 14 2 AXLE BUS $9.00 $9.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $25.00 $30.00 $30.00 $33.00 15 3 AXLE BUS $10.00 $10.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $26.00 $30.00 $30.00 $33.00 EXTRA PASSENGERS $0.85 $0.85 NC NC NC NC NC NC NC NC NC NC NC BUSES PASSENGER CARS & LIGHT TRUCKS HEAVY TRUCKS & RV'S 1982 $9 one way $18 round trip Today $13 one way $18 round trip (24 hours)
  • 21. •No Right of Way Acquisition •No Large-Scale Utility Relocation We want a tunnel from Point A to Point B. Design-Build Contractor Teams determine how to build it in accordance with Performance Based Specifications. Parallel Thimble Shoal Tunnel Project
  • 22. • Route 13 Corridor is a Corridor of Statewide Significance • Lack of viable alternative route • Lane closures for oversized escort loads • Lane closures for ordinary maintenance work • Age of existing tunnels • Improvement in levels of service and safety • 20-25% of VB tourists utilize the Coastal Corridor o VB exit surveys • Tunnel depth to increase to 70 ft. to accommodate future ship traffic Project Significance
  • 23. Parallel Thimble Shoal Tunnel Project PROJECT TIMELINE
  • 24. Parallel Thimble Shoal Tunnel Project RESULTS OF DB PROCUREMENT Design-Build Teams Tunnel Method Qualification Proposed Tunnel Construction Method April 29 Proposal Price July 15 Proposal Price Archer Western – Vinci Construction TunnelBuilders (AWVC) ITT and Bored Bored $1,071,683,000 $785,883,000 Bouygues TP/Traylor/Manson (BTM JV) ITT and Bored Bored $1,016,046,800 $848,452,987 Dragados Team: Dragados USA and Schiavone Construction Company, LLC Bored Bored $1,092,000,000 $755,987,318 SKW Tunnel Builders ITT --- No Proposal ---
  • 25. Island #1 Expansion to include Full Public Access with Restaurant/Gift Shop April 29, 2016 Phase I Procurement Rendering Restaurant, Gift Shop, Visitor Center – 15,000 square feet New Tunnel Existing Ventilation Building New Ventilation Building • Required Island Expansion of approx. 3.25 acres • 338 Parking Spaces
  • 26. Island #1 - No Restaurant July 12, 2016 Revised Rendering No Island Expansion New Vent Building New Tunnel Existing Ventilation Building
  • 27. The Dragados Team: Dragados USA and Schiavone Construction Co. LLC
  • 28.
  • 29. Tunnel Boring Machine Rotating cutter head The machine is operated from the control room Pressure is maintained in the cutting chamber Rotating arm adds pre-cast concrete Tunnel segments to form a ring Pre-cast concrete segments delivered to rotating arm Excavated earth removed by conveyor belt Hydraulic rams push against newly-placed concrete segments to drive machine forward Approximate TBM diameter is 42’
  • 30. Parallel Thimble Shoal Tunnel Project PROJECT FUNDING
  • 31. Design-Build Technical Timeline Activity Schedule Limited Notice to Proceed (LNTP) August 2016 – December 2016 Notice to Proceed 1 (NTP1) January 2017 – September 2017 Notice to Proceed 2 (NTP2) Construction Begins – October 1, 2017
  • 32. PARALLEL THIMBLE SHOAL CHANNEL TUNNEL For up-to-date information, news releases, project documents, and more as it pertains to the Parallel Thimble Shoal Channel Tunnel Project, please visit the CBBT’s website at www.cbbt.com/parallelthimbleshoaltunnel/
  • 33.
  • 34. Tunnel Retrofit Total Project Cost (3 Phases): $13,799,417
  • 36. Painting of Tunnel Ventilation Systems Saffo Contractors - $4,796,500
  • 37. Twitter @FollowTheGulls for up-to-date traffic and weather conditions • Follow the CBBT on Twitter @FollowTheGulls • Activate Mobile Alerts to receive text messages for every tweet TWITTER users: Non-TWITTER users: • FAST FOLLOW by texting “follow followthegulls” to 40404 • Text messages will be sent directly to your phone each time we tweet Standard text messaging rates do apply.
  • 38. Stay Linked to the CBBT @FollowTheGulls | www.cbbt.com