Project details
Project consist of
1. Flat roof PV install over 3 different
buildings
C Centre 6000 sqm
D Cinema 3600 sqm
E Hypermarket 7400 sqm
total net available area of
17,000sqm
2. 1,000 parking bays covered with
PV canopy
each bay covers approx 15sqm
Project consist of
1. Flat roof PV install over 3 different
buildings
C Centre 6000 sqm
D Cinema 3600 sqm
E Hypermarket 7400 sqm
total net available area of
17,000sqm
2. 1,000 parking bays covered with
PV canopy
each bay covers approx 15sqm
PV Roof system
• Estimated number of 7.500 PV panels projected
net available sqm subject to obstructions on the roof area
• Equals 1,875kWp installed power
• Objective : anual power generation of 3,200MWh
based on optimized azimuth and inclination
• Estimated number of 7.500 PV panels projected
net available sqm subject to obstructions on the roof area
• Equals 1,875kWp installed power
• Objective : anual power generation of 3,200MWh
based on optimized azimuth and inclination
System specially designed for light roof
constructions. Low ballast limit roofload
PV Roof system
PV System Flatroof mounting, total ~ 1,875kWp
PV modules
Inverter
Flat roof mounting system ( ballast )
Cabling
Monitoring
Installation, commissioning
Excl. travel & boarding expenses
civil works
Solar carpark
• Calculated 1,000 parking bays estimated 5,5mtr x 2,75mtr
• Per parking bay 2,5kWp PV system, 12 panels
• Estimated number of 12,000 PV panels projected
Equals 2,500kWp installed power
• Objective : anual power generation of 4,400MWh
based on optimized azimuth and inclination
• Calculated 1,000 parking bays estimated 5,5mtr x 2,75mtr
• Per parking bay 2,5kWp PV system, 12 panels
• Estimated number of 12,000 PV panels projected
Equals 2,500kWp installed power
• Objective : anual power generation of 4,400MWh
based on optimized azimuth and inclination
Solar carpark
Carpark Solar Canopy, total ~ 2,500kWp
Carpark structure
PV Modules
String Inverters
Mounting on canopy structure
Cabling
Monitoring
Fundation
Installation, commissioning
Carpark Solar Canopy, total ~ 2,500kWp
Carpark structure
PV Modules
String Inverters
Mounting on canopy structure
Cabling
Monitoring
Fundation
Installation, commissioning
Excl. travel & boarding expenses
civil works
single or double row possible
PV Assessment

More Related Content

What's hot

Green fuel technologies
Green fuel technologiesGreen fuel technologies
Green fuel technologies
dimensions24
 
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case StudyHow to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
EMEX
 
Syzygy Renewables_Company_Info_August 2016
Syzygy Renewables_Company_Info_August 2016Syzygy Renewables_Company_Info_August 2016
Syzygy Renewables_Company_Info_August 2016
Andrew Hancock
 
Rooftop Solar Systems
Rooftop Solar SystemsRooftop Solar Systems
Frits ogg 6th world summit for small wind 2015 smart windturbines odp
Frits ogg 6th world summit for small wind 2015 smart windturbines odpFrits ogg 6th world summit for small wind 2015 smart windturbines odp
Frits ogg 6th world summit for small wind 2015 smart windturbines odp
Frits Ogg
 
Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
Syed Khurram Iqbal
 
SETH electricity storage
SETH electricity storageSETH electricity storage
SETH electricity storage
Luc Traonvouez
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at silicon
Navneet Das
 
Owen Square Community Energy Project
Owen Square Community Energy ProjectOwen Square Community Energy Project
Owen Square Community Energy Project
EMEX
 
Grid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI ServicesGrid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI Services
Alternergy
 
Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?
Loic Charmoille
 
Questionnaire PSSP Program
Questionnaire PSSP ProgramQuestionnaire PSSP Program
Questionnaire PSSP Program
Avish Thakral
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV system
ashmomio
 
Telescopic offshore wind turbin tp
Telescopic offshore wind turbin tpTelescopic offshore wind turbin tp
Telescopic offshore wind turbin tp
prekubatortto
 
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
Corporación Tecnológica de Andalucía
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
Hardik Parmar
 
Km22 power generation using shock absorber (wecompress)
Km22 power generation using shock absorber (wecompress)Km22 power generation using shock absorber (wecompress)
Km22 power generation using shock absorber (wecompress)
1000kv technologies
 
Auto-Bidding: Optimizing battery performance through energy management systems
Auto-Bidding: Optimizing battery performance through energy management systemsAuto-Bidding: Optimizing battery performance through energy management systems
Auto-Bidding: Optimizing battery performance through energy management systems
Loic Charmoille
 
Wind power station prasantation
Wind power station prasantationWind power station prasantation
Wind power station prasantation
Mohamed Nazique
 

What's hot (19)

Green fuel technologies
Green fuel technologiesGreen fuel technologies
Green fuel technologies
 
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case StudyHow to Deploy Energy Storage Technology at the Enterprise Level – Case Study
How to Deploy Energy Storage Technology at the Enterprise Level – Case Study
 
Syzygy Renewables_Company_Info_August 2016
Syzygy Renewables_Company_Info_August 2016Syzygy Renewables_Company_Info_August 2016
Syzygy Renewables_Company_Info_August 2016
 
Rooftop Solar Systems
Rooftop Solar SystemsRooftop Solar Systems
Rooftop Solar Systems
 
Frits ogg 6th world summit for small wind 2015 smart windturbines odp
Frits ogg 6th world summit for small wind 2015 smart windturbines odpFrits ogg 6th world summit for small wind 2015 smart windturbines odp
Frits ogg 6th world summit for small wind 2015 smart windturbines odp
 
Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
 
SETH electricity storage
SETH electricity storageSETH electricity storage
SETH electricity storage
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at silicon
 
Owen Square Community Energy Project
Owen Square Community Energy ProjectOwen Square Community Energy Project
Owen Square Community Energy Project
 
Grid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI ServicesGrid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI Services
 
Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?
 
Questionnaire PSSP Program
Questionnaire PSSP ProgramQuestionnaire PSSP Program
Questionnaire PSSP Program
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV system
 
Telescopic offshore wind turbin tp
Telescopic offshore wind turbin tpTelescopic offshore wind turbin tp
Telescopic offshore wind turbin tp
 
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
Mesa redonda: Tecnologías y tendencias de almacenamiento energético | Vía ele...
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
 
Km22 power generation using shock absorber (wecompress)
Km22 power generation using shock absorber (wecompress)Km22 power generation using shock absorber (wecompress)
Km22 power generation using shock absorber (wecompress)
 
Auto-Bidding: Optimizing battery performance through energy management systems
Auto-Bidding: Optimizing battery performance through energy management systemsAuto-Bidding: Optimizing battery performance through energy management systems
Auto-Bidding: Optimizing battery performance through energy management systems
 
Wind power station prasantation
Wind power station prasantationWind power station prasantation
Wind power station prasantation
 

Similar to PV Project MENA (2)

Photovoltaic in buildings for EV charging and grid support
Photovoltaic in buildings for EV charging and grid supportPhotovoltaic in buildings for EV charging and grid support
Photovoltaic in buildings for EV charging and grid support
MAYANK ACHARYA
 
STORETEC CASE STUDY
STORETEC CASE STUDYSTORETEC CASE STUDY
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
allearthrenewables
 
SolarWall®
SolarWall® SolarWall®
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINYPHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
ArifFaisal13
 
Tarec in renewable energy - pv intro eng v1.0
Tarec in renewable energy - pv intro eng v1.0Tarec in renewable energy - pv intro eng v1.0
Tarec in renewable energy - pv intro eng v1.0
frankjoh
 
APsystems Value Proposition
APsystems Value PropositionAPsystems Value Proposition
APsystems Value Proposition
Clive Rippon
 
Tarec in renewable energy - pv intro eng v1.1
Tarec in renewable energy - pv intro eng v1.1Tarec in renewable energy - pv intro eng v1.1
Tarec in renewable energy - pv intro eng v1.1
frankjoh
 
GRID CONNECTED PV SYSTEM & RAPS
GRID CONNECTED PV SYSTEM & RAPSGRID CONNECTED PV SYSTEM & RAPS
GRID CONNECTED PV SYSTEM & RAPS
swathi860855
 
New Energy Conference-P.Ponsekar from CNPV
New Energy Conference-P.Ponsekar from CNPVNew Energy Conference-P.Ponsekar from CNPV
New Energy Conference-P.Ponsekar from CNPV
EDAMA
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
Schneider Electric
 
SOLAR INSTALLATION PRESENTATION.pdf
SOLAR INSTALLATION PRESENTATION.pdfSOLAR INSTALLATION PRESENTATION.pdf
SOLAR INSTALLATION PRESENTATION.pdf
MerceditaAzarcon
 
120816 solar products overview presentation full range
120816 solar products overview presentation full range120816 solar products overview presentation full range
120816 solar products overview presentation full range
Mohammed Netarwala
 
The Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of ThingsThe Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of Things
SUDHAKARA RAO PARVATANENI
 
Kiet pv presentation
Kiet pv presentationKiet pv presentation
Kiet pv presentation
capricorn_ktl
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
Rajesh Pindoriya
 
Solar pannels 2
Solar pannels 2Solar pannels 2
Solar pannels 2
parvathiharini
 
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
Ankit Singh
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Invest Northern Ireland
 
GreenStudio - Chapter 4 5 4 Photovoltaics
GreenStudio - Chapter 4 5 4 PhotovoltaicsGreenStudio - Chapter 4 5 4 Photovoltaics
GreenStudio - Chapter 4 5 4 Photovoltaics
Galala University
 

Similar to PV Project MENA (2) (20)

Photovoltaic in buildings for EV charging and grid support
Photovoltaic in buildings for EV charging and grid supportPhotovoltaic in buildings for EV charging and grid support
Photovoltaic in buildings for EV charging and grid support
 
STORETEC CASE STUDY
STORETEC CASE STUDYSTORETEC CASE STUDY
STORETEC CASE STUDY
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
 
SolarWall®
SolarWall® SolarWall®
SolarWall®
 
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINYPHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
PHOTOVOLTAIC ENERGY THE ULTIMATE GREEN POWER DESTINY
 
Tarec in renewable energy - pv intro eng v1.0
Tarec in renewable energy - pv intro eng v1.0Tarec in renewable energy - pv intro eng v1.0
Tarec in renewable energy - pv intro eng v1.0
 
APsystems Value Proposition
APsystems Value PropositionAPsystems Value Proposition
APsystems Value Proposition
 
Tarec in renewable energy - pv intro eng v1.1
Tarec in renewable energy - pv intro eng v1.1Tarec in renewable energy - pv intro eng v1.1
Tarec in renewable energy - pv intro eng v1.1
 
GRID CONNECTED PV SYSTEM & RAPS
GRID CONNECTED PV SYSTEM & RAPSGRID CONNECTED PV SYSTEM & RAPS
GRID CONNECTED PV SYSTEM & RAPS
 
New Energy Conference-P.Ponsekar from CNPV
New Energy Conference-P.Ponsekar from CNPVNew Energy Conference-P.Ponsekar from CNPV
New Energy Conference-P.Ponsekar from CNPV
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
 
SOLAR INSTALLATION PRESENTATION.pdf
SOLAR INSTALLATION PRESENTATION.pdfSOLAR INSTALLATION PRESENTATION.pdf
SOLAR INSTALLATION PRESENTATION.pdf
 
120816 solar products overview presentation full range
120816 solar products overview presentation full range120816 solar products overview presentation full range
120816 solar products overview presentation full range
 
The Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of ThingsThe Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of Things
 
Kiet pv presentation
Kiet pv presentationKiet pv presentation
Kiet pv presentation
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
Solar pannels 2
Solar pannels 2Solar pannels 2
Solar pannels 2
 
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
 
GreenStudio - Chapter 4 5 4 Photovoltaics
GreenStudio - Chapter 4 5 4 PhotovoltaicsGreenStudio - Chapter 4 5 4 Photovoltaics
GreenStudio - Chapter 4 5 4 Photovoltaics
 

PV Project MENA (2)

  • 2. Project details Project consist of 1. Flat roof PV install over 3 different buildings C Centre 6000 sqm D Cinema 3600 sqm E Hypermarket 7400 sqm total net available area of 17,000sqm 2. 1,000 parking bays covered with PV canopy each bay covers approx 15sqm Project consist of 1. Flat roof PV install over 3 different buildings C Centre 6000 sqm D Cinema 3600 sqm E Hypermarket 7400 sqm total net available area of 17,000sqm 2. 1,000 parking bays covered with PV canopy each bay covers approx 15sqm
  • 3. PV Roof system • Estimated number of 7.500 PV panels projected net available sqm subject to obstructions on the roof area • Equals 1,875kWp installed power • Objective : anual power generation of 3,200MWh based on optimized azimuth and inclination • Estimated number of 7.500 PV panels projected net available sqm subject to obstructions on the roof area • Equals 1,875kWp installed power • Objective : anual power generation of 3,200MWh based on optimized azimuth and inclination System specially designed for light roof constructions. Low ballast limit roofload
  • 4. PV Roof system PV System Flatroof mounting, total ~ 1,875kWp PV modules Inverter Flat roof mounting system ( ballast ) Cabling Monitoring Installation, commissioning Excl. travel & boarding expenses civil works
  • 5. Solar carpark • Calculated 1,000 parking bays estimated 5,5mtr x 2,75mtr • Per parking bay 2,5kWp PV system, 12 panels • Estimated number of 12,000 PV panels projected Equals 2,500kWp installed power • Objective : anual power generation of 4,400MWh based on optimized azimuth and inclination • Calculated 1,000 parking bays estimated 5,5mtr x 2,75mtr • Per parking bay 2,5kWp PV system, 12 panels • Estimated number of 12,000 PV panels projected Equals 2,500kWp installed power • Objective : anual power generation of 4,400MWh based on optimized azimuth and inclination
  • 6. Solar carpark Carpark Solar Canopy, total ~ 2,500kWp Carpark structure PV Modules String Inverters Mounting on canopy structure Cabling Monitoring Fundation Installation, commissioning Carpark Solar Canopy, total ~ 2,500kWp Carpark structure PV Modules String Inverters Mounting on canopy structure Cabling Monitoring Fundation Installation, commissioning Excl. travel & boarding expenses civil works single or double row possible