The document provides updates on several projects at OSX shipbuilding. It summarizes that:
1) FPSO OSX-1 has achieved sail away and is scheduled to arrive in Brazil in early October. OSX-2/WHP-1 engineering is underway with construction starting in late 2011.
2) OSX-3/WHP-2 timelines have VLCC acquisition and engineering beginning in 2012.
3) Standardization efforts and the OSXflex engineering concept aim to accelerate future FPSO delivery timelines starting with OSX-4 and OSX-5.
4) ITN phase 1 will provide workforce training with enrollment through late 2011 and classes starting in early 2012