Investment Cost Break-up of a 50 MWp CSP Plant with Storage
                                    Parabolic Trough

SN                        Description of Works                                Head           Rs. Cr/MW        %
 1 Solar Field including Mirrors, Structure Supports, Hardwares,      Solar Field                  3.50     24.14%
   Steam Piping, Heat Collecting Elements etc.
 2 Storage Device (4 Hours)                                           Storage Device                 1.20       8.28%
 3 Allowances - R&D, Interface & Engg., Solar Observatory,            Allowances                     1.20       8.28%
   Solar Steam Generator, Acquisition & development cost,
   Manpower training etc.
 4 Power block                                                        Power block                    1.80   12.41%
 5 Balance of plant                                                   Balance of plant               1.08    7.45%
 6 Land cost, levelling, internal roads, approach road, green         Land Development               0.60    4.14%
   development compound wall fencing gates etc
 7 Civil works                                                        Civil works                    0.96       6.62%
 8 Labor                                                              Labor                          0.72       4.97%
 9 Electrical & Grid access                                           Electrical & Grid              0.84       5.79%
                                                                      access
10 Project Management, technical consultant and owners                Project Management             0.36       2.48%
   engineers
11 Project Engineering, Construction supervision and                  Project Engineering            0.24       1.66%
   commissioning
12 Project Finance including IDC                                      Project Finance                 1.60 11.03%
13 Insurance                                                          Insurance                       0.10   0.69%
14 Contingencies                                                      Contingencies                   0.30   2.07%
   Total                                                                                             14.50 100.00%



                                               Insurance   Contingencies
                        Project!Finance           1%            2%
                              11%
                  Project!Engineering                                                Solar!Field
                          2%                                                            24%
         Project!Management
                  3%

              Electrical!&!Grid!
                   access
                     6%


                        Labor
                         5%
                                                                                               Storage!Device
                                                                                                     8%

                      Civil!works
                          7%

                                                                                        Allowances
                   Land!Development
                                                                                            8%
                          4%
                                   Balance!of!plant
                                         7%                        Power!block
                                                                      12%
CSP Solar Energy Value Chain




                Support             Heat collecting                   Tracking      Solar steam
Mirror
               Structure              elements                         system        generator


              Hardware            Absorptive coating


              Galvanizing             Fabrication


              Fabrication                 Alloy steel


              Steel item



                                                                                                      Detailed
Wet cooling                                                                                         Engineering
                     Turbine              Generator             Power block
Dry cooling                                                                                       Integration and
                                                                                                    Interface &
                                                                                                   supervision in
                     Sliding                                                                         installatin
                   parameters




     Cables, Wiring, Switch yard,
Transformers, Grid interface, Metering                        Electrical
             Protection


 Land cost, Site development, Levelling
                                                             Civil works
      Fencing, Foundation, Roads


                                                                                                       Power
           Solar observatory                             Site data capture                           Generation


                                              Construction, Installation,                                Grid
                                              Testing and Comissioning




                                          Equipment
   ERA                                                                           Jointly
                                           Supplier

More Related Content

What's hot

Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
Ashish Verma
 
Proposal solar
Proposal solarProposal solar
Proposal solar
Sashikant Tiwari
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
allearthrenewables
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design ProjectMichael Clarke
 
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability WorkshopMaya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Sandia National Laboratories: Energy & Climate: Renewables
 
Thermography for Solar Panel - Testo® India
Thermography for Solar Panel - Testo® IndiaThermography for Solar Panel - Testo® India
Thermography for Solar Panel - Testo® India
testoindiaseo
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
Gensol Engineering Limited
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
GreenQ Partners
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
Harry Indig
 
Data Center Efficiency Martijn Loderus, Sun
Data  Center  Efficiency    Martijn  Loderus,  SunData  Center  Efficiency    Martijn  Loderus,  Sun
Data Center Efficiency Martijn Loderus, SunNiklas Johnsson
 
4 cseg presentation
4 cseg presentation4 cseg presentation
4 cseg presentation
Bilal Janjua
 
Introduction of QE-R Quantum Efficiency System
Introduction of QE-R Quantum Efficiency SystemIntroduction of QE-R Quantum Efficiency System
Introduction of QE-R Quantum Efficiency System
Enlitech
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2Will Gubb
 
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
Rick Borry
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
Saurabh Parihar
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical Persepective
Puneet Jaggi
 

What's hot (17)

Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design Project
 
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability WorkshopMaya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
 
Thermography for Solar Panel - Testo® India
Thermography for Solar Panel - Testo® IndiaThermography for Solar Panel - Testo® India
Thermography for Solar Panel - Testo® India
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Data Center Efficiency Martijn Loderus, Sun
Data  Center  Efficiency    Martijn  Loderus,  SunData  Center  Efficiency    Martijn  Loderus,  Sun
Data Center Efficiency Martijn Loderus, Sun
 
4 cseg presentation
4 cseg presentation4 cseg presentation
4 cseg presentation
 
Introduction of QE-R Quantum Efficiency System
Introduction of QE-R Quantum Efficiency SystemIntroduction of QE-R Quantum Efficiency System
Introduction of QE-R Quantum Efficiency System
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2
 
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical Persepective
 

Viewers also liked

Work Areas App Ii
Work Areas App IiWork Areas App Ii
Work Areas App Ii
talha20
 
Asha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West BengalAsha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West Bengal
Sudha Sati
 
C. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texasC. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texas
Jeffrey Pickett
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
Jeffrey Pickett
 
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit PriceCarlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
San Diego County Water Authority
 
Adelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeilAdelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeil
Andrea_AUST
 
Desalination
DesalinationDesalination
Desalination
Phúc Phạm hồng
 
Water desalination
Water desalinationWater desalination
Water desalination
Ayman Mohamed
 
District cooling design & case study
District cooling design & case studyDistrict cooling design & case study
District cooling design & case study
Abdelrahim Ramadan
 

Viewers also liked (9)

Work Areas App Ii
Work Areas App IiWork Areas App Ii
Work Areas App Ii
 
Asha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West BengalAsha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West Bengal
 
C. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texasC. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texas
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit PriceCarlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
 
Adelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeilAdelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeil
 
Desalination
DesalinationDesalination
Desalination
 
Water desalination
Water desalinationWater desalination
Water desalination
 
District cooling design & case study
District cooling design & case studyDistrict cooling design & case study
District cooling design & case study
 

Similar to Solar CSP - Investment Cost Break-up

PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011PCAPP Monthly Status Briefing - September 2011
Hyundai Heavy Industries IR presentation 08032012
Hyundai Heavy Industries IR presentation 08032012Hyundai Heavy Industries IR presentation 08032012
Hyundai Heavy Industries IR presentation 08032012TradeWindsnews
 
Final project presentation
Final  project presentationFinal  project presentation
Final project presentationfaisal00121
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
 
Wattminder exec brief
Wattminder exec briefWattminder exec brief
Wattminder exec briefSam Beal
 
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology VenturesCED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CEDPrograms
 
Ak Nagpal Su Kam
Ak  Nagpal  Su  KamAk  Nagpal  Su  Kam
Ak Nagpal Su Kam
Varun Chandra
 
HelioVolt Printed Electronics/PV USA Dec 2010
HelioVolt Printed Electronics/PV USA Dec 2010HelioVolt Printed Electronics/PV USA Dec 2010
HelioVolt Printed Electronics/PV USA Dec 2010
HelioVolt
 
March9 2009-workshop-slides
March9 2009-workshop-slidesMarch9 2009-workshop-slides
March9 2009-workshop-slidesSWITCHOntario
 
Arc flash hazard and its reduction
Arc flash hazard and its reductionArc flash hazard and its reduction
Arc flash hazard and its reduction
Svtech Solutions
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
Donald Jones
 
February 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status BriefingFebruary 2013 BGCAPP Monthly Status Briefing
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
Exergy
 
Onshore Windfarm Part 2
Onshore Windfarm Part 2Onshore Windfarm Part 2
Onshore Windfarm Part 2
Grant Elder
 
Tamara babayan
Tamara babayanTamara babayan
Tamara babayanindrih
 
National Bo S Process Cost Webinar
National Bo S Process Cost WebinarNational Bo S Process Cost Webinar
National Bo S Process Cost Webinar
SolarTech
 

Similar to Solar CSP - Investment Cost Break-up (20)

PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011
 
Hyundai Heavy Industries IR presentation 08032012
Hyundai Heavy Industries IR presentation 08032012Hyundai Heavy Industries IR presentation 08032012
Hyundai Heavy Industries IR presentation 08032012
 
Final project presentation
Final  project presentationFinal  project presentation
Final project presentation
 
PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011
 
Global Solar Summit
Global Solar SummitGlobal Solar Summit
Global Solar Summit
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Wattminder exec brief
Wattminder exec briefWattminder exec brief
Wattminder exec brief
 
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology VenturesCED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
 
Ak Nagpal Su Kam
Ak  Nagpal  Su  KamAk  Nagpal  Su  Kam
Ak Nagpal Su Kam
 
HelioVolt Printed Electronics/PV USA Dec 2010
HelioVolt Printed Electronics/PV USA Dec 2010HelioVolt Printed Electronics/PV USA Dec 2010
HelioVolt Printed Electronics/PV USA Dec 2010
 
March9 2009-workshop-slides
March9 2009-workshop-slidesMarch9 2009-workshop-slides
March9 2009-workshop-slides
 
Mobidemics Lecture 7 Partners
Mobidemics Lecture 7 PartnersMobidemics Lecture 7 Partners
Mobidemics Lecture 7 Partners
 
Arc flash hazard and its reduction
Arc flash hazard and its reductionArc flash hazard and its reduction
Arc flash hazard and its reduction
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
 
February 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status BriefingFebruary 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status Briefing
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
Onshore Windfarm Part 2
Onshore Windfarm Part 2Onshore Windfarm Part 2
Onshore Windfarm Part 2
 
Tamara babayan
Tamara babayanTamara babayan
Tamara babayan
 
National Bo S Process Cost Webinar
National Bo S Process Cost WebinarNational Bo S Process Cost Webinar
National Bo S Process Cost Webinar
 
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
 

Solar CSP - Investment Cost Break-up

  • 1. Investment Cost Break-up of a 50 MWp CSP Plant with Storage Parabolic Trough SN Description of Works Head Rs. Cr/MW % 1 Solar Field including Mirrors, Structure Supports, Hardwares, Solar Field 3.50 24.14% Steam Piping, Heat Collecting Elements etc. 2 Storage Device (4 Hours) Storage Device 1.20 8.28% 3 Allowances - R&D, Interface & Engg., Solar Observatory, Allowances 1.20 8.28% Solar Steam Generator, Acquisition & development cost, Manpower training etc. 4 Power block Power block 1.80 12.41% 5 Balance of plant Balance of plant 1.08 7.45% 6 Land cost, levelling, internal roads, approach road, green Land Development 0.60 4.14% development compound wall fencing gates etc 7 Civil works Civil works 0.96 6.62% 8 Labor Labor 0.72 4.97% 9 Electrical & Grid access Electrical & Grid 0.84 5.79% access 10 Project Management, technical consultant and owners Project Management 0.36 2.48% engineers 11 Project Engineering, Construction supervision and Project Engineering 0.24 1.66% commissioning 12 Project Finance including IDC Project Finance 1.60 11.03% 13 Insurance Insurance 0.10 0.69% 14 Contingencies Contingencies 0.30 2.07% Total 14.50 100.00% Insurance Contingencies Project!Finance 1% 2% 11% Project!Engineering Solar!Field 2% 24% Project!Management 3% Electrical!&!Grid! access 6% Labor 5% Storage!Device 8% Civil!works 7% Allowances Land!Development 8% 4% Balance!of!plant 7% Power!block 12%
  • 2. CSP Solar Energy Value Chain Support Heat collecting Tracking Solar steam Mirror Structure elements system generator Hardware Absorptive coating Galvanizing Fabrication Fabrication Alloy steel Steel item Detailed Wet cooling Engineering Turbine Generator Power block Dry cooling Integration and Interface & supervision in Sliding installatin parameters Cables, Wiring, Switch yard, Transformers, Grid interface, Metering Electrical Protection Land cost, Site development, Levelling Civil works Fencing, Foundation, Roads Power Solar observatory Site data capture Generation Construction, Installation, Grid Testing and Comissioning Equipment ERA Jointly Supplier