PROJECT PORTFOLIO
NAME : ILIYASAHMAD M TATWANAGI
QUALIFICATION : BE (Mechanical) – MEP Engineer
CONTACT No : +91 8861444016/ +91 9743771734
EMAIL : iliyast79@gmail.com
3D VIEW OF BUILDING
 Building Type : Office Building
 Location : Bangalore
 Area : 17817 SF
 Floors : BS + GF + 4Floors
 Cooling Load : 38.1 Ton
 Design Occupancy : 344 People
 Air Distribution System : VAV Single Duct
HEAT LOAD REPORT
 Total Heat Load : 38.1 TR
 Calculated Sensible Load : 29.6 TR
 Calculated Latent load : 8.5 TR
 Peak Cooling Month and Hour : May 3
AIR DISTRIBUTION SYSTEM
 ADP is 53° F and CFM is 14537
 Duct Sizer tool used for designing duct
 VCD are placed before each diffuser
 Chilled water inlet temperature 7 °C and
outlet temperature 15 °C
 Backward curved aero-foil blade centrifugal
fan for AHU
 In line centrifugal fan selected for exhaust
duct system
PRESSURE LOSS
 Pressure drop due to bents and head
Static pressure in critical path : 15.27 pa
 Maximum pressure loss : 0.31 Pa
Total pressure loss : 17.77 Pa
 Based on pressure drop in critical path AHU fan
selected
EQUIPMENT SELECTION
 Total building load : 40 TR
 Diversity factor considered : 100% (For Office )
 Chiller :
Type – Scroll chiller water cooled
Capacity – 20 to 30 Ton
Total chillers - 02
 Cooling Tower
Type – Counter flow
Capacity – 50 Ton (Total building load * 1.25)
 Expansion tank selected for collecting excess water
and supplying it back to the cooling tower when
required
PLUMBING FIXTURE
 1% slope for sanitary piping
No 90° bents only Y-joints
used
ELECTRICAL SYSTEM
 Cables are sized and selected based on current
flow and standard catalogue
 Ladder type cable trays used
 As per NBC catalogue lighting fixture is at 7 feet
from floor
FIRE FIGHTING SYSTEM
 Fire fighting designed as per NBC standard
for commercial building
 Pipes are sized based on the number of
sprinklers
 Sprinklers are placed such that all area of
building is covered
3D View
Floor Plan
CLASH DETECTION REPORT
Interference check between MEP systems is performed
Clashes are highlighted by using id from report
CLASH DETECTION AND SOLUTION
COORDINATION OF MEP SYSTEMS
ANNOTATION
 Duct and air terminal tags.
 BOD of supply duct and bottom of false ceiling
BILL OF QUANTITIES (BOQ)
FAMILY CREATION
 Designing equipment with project specifications
 Designing of air terminal with specific neck size
 AHU designed with specified duct size (Supply & Return),
pipe size and fan requirements
THANK
YOU

More Related Content

What's hot

Marek Zgliczynski, International Electrotechnical Commission (IEC)
Marek Zgliczynski, International Electrotechnical Commission (IEC)Marek Zgliczynski, International Electrotechnical Commission (IEC)
Marek Zgliczynski, International Electrotechnical Commission (IEC)ATMOsphere Conferences & Events
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemSocheat Veng
 
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...ATMOsphere Conferences & Events
 
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...Centro Studi Galileo
 
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyZero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyATMOsphere Conferences & Events
 
Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Overbury
 
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONING
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONINGXVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONING
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONINGCentro Studi Galileo
 
Engineering plant facilities 04 mechanics hvac
Engineering plant facilities 04 mechanics hvacEngineering plant facilities 04 mechanics hvac
Engineering plant facilities 04 mechanics hvacLuis Cabrera
 
Hybrid Ventilation using CFD Simulation in the Cloud
Hybrid Ventilation using CFD Simulation in the CloudHybrid Ventilation using CFD Simulation in the Cloud
Hybrid Ventilation using CFD Simulation in the CloudSimScale
 
Ankersmid peliter cooler datasheet 0
Ankersmid peliter cooler datasheet 0Ankersmid peliter cooler datasheet 0
Ankersmid peliter cooler datasheet 0a1-cbiss
 
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigeration
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigerationXVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigeration
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigerationCentro Studi Galileo
 
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSOR
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSORXVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSOR
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSORCentro Studi Galileo
 
Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Satish kumar Hiremath
 

What's hot (17)

Praveen portfolio
Praveen portfolioPraveen portfolio
Praveen portfolio
 
Marek Zgliczynski, International Electrotechnical Commission (IEC)
Marek Zgliczynski, International Electrotechnical Commission (IEC)Marek Zgliczynski, International Electrotechnical Commission (IEC)
Marek Zgliczynski, International Electrotechnical Commission (IEC)
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF System
 
VRF II VRV
VRF II VRVVRF II VRV
VRF II VRV
 
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...
Monitoring of a CO2 commercial refrigeration system serving a supermarket in ...
 
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...
XVII CONVEGNO EUROPEO C. Zilio - HEAT EXCHANGER OPTIMISATION USING ZEOTROPIC ...
 
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyZero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
 
Britta Paetzold, HEAT
Britta Paetzold, HEATBritta Paetzold, HEAT
Britta Paetzold, HEAT
 
Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14Innovations - Toshiba 17.02.14
Innovations - Toshiba 17.02.14
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONING
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONINGXVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONING
XVII CONVEGNO EUROPEO P. De Larminat - LOWER GWP FLUIDS FOR AIR CONDITIONING
 
Engineering plant facilities 04 mechanics hvac
Engineering plant facilities 04 mechanics hvacEngineering plant facilities 04 mechanics hvac
Engineering plant facilities 04 mechanics hvac
 
Hybrid Ventilation using CFD Simulation in the Cloud
Hybrid Ventilation using CFD Simulation in the CloudHybrid Ventilation using CFD Simulation in the Cloud
Hybrid Ventilation using CFD Simulation in the Cloud
 
Ankersmid peliter cooler datasheet 0
Ankersmid peliter cooler datasheet 0Ankersmid peliter cooler datasheet 0
Ankersmid peliter cooler datasheet 0
 
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigeration
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigerationXVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigeration
XVI CONVEGNO EUROPEO C. Marotta - R404A replacements in commercial refrigeration
 
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSOR
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSORXVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSOR
XVII CONVEGNO EUROPEO A. Muresan - LARGE TRANSCRITICAL CO2 COMPRESSOR
 
Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)
 

Viewers also liked

New joinees hand book general
New joinees hand book generalNew joinees hand book general
New joinees hand book generalAmbrish Rai
 
La escuela ideal Ricardo
La escuela ideal RicardoLa escuela ideal Ricardo
La escuela ideal RicardoEna Montero
 
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016Florentina Neculae
 
Sấy bằng năng lượng mặt trời
Sấy bằng năng lượng mặt trờiSấy bằng năng lượng mặt trời
Sấy bằng năng lượng mặt trờiljmonking
 

Viewers also liked (6)

New joinees hand book general
New joinees hand book generalNew joinees hand book general
New joinees hand book general
 
La escuela ideal Ricardo
La escuela ideal RicardoLa escuela ideal Ricardo
La escuela ideal Ricardo
 
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016
Interview with Daily Tribune Bahrain - Ms. Fatima Bastaki - March 19-2016
 
Vulneravilidad de puentes
Vulneravilidad de puentesVulneravilidad de puentes
Vulneravilidad de puentes
 
Sấy bằng năng lượng mặt trời
Sấy bằng năng lượng mặt trờiSấy bằng năng lượng mặt trời
Sấy bằng năng lượng mặt trời
 
Bài tập ôn luyện Violympic Toán lớp 3
Bài tập ôn luyện Violympic Toán lớp 3Bài tập ôn luyện Violympic Toán lớp 3
Bài tập ôn luyện Violympic Toán lớp 3
 

Similar to Project portfolio

Crac precision climate_control_units_for_data_centres
Crac precision climate_control_units_for_data_centresCrac precision climate_control_units_for_data_centres
Crac precision climate_control_units_for_data_centresEeu SC
 
System_Guide_GB_low.pdf
System_Guide_GB_low.pdfSystem_Guide_GB_low.pdf
System_Guide_GB_low.pdfHafiUddin2
 
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technology
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technologyLcp hybrid –_effi_cient_performance_with_heat_pipe_technology
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technologyEeu SC
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplantmgr2222
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GBArjang Ahmadi
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEEAmit Kumar
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS STedyChriswanda1
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSMohammad Azam Khan
 
HVAC - Concept & Components
HVAC - Concept & ComponentsHVAC - Concept & Components
HVAC - Concept & ComponentsUmang Patel
 

Similar to Project portfolio (20)

Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
Trane Cube
Trane CubeTrane Cube
Trane Cube
 
G y un50_00
G y un50_00G y un50_00
G y un50_00
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
Crac precision climate_control_units_for_data_centres
Crac precision climate_control_units_for_data_centresCrac precision climate_control_units_for_data_centres
Crac precision climate_control_units_for_data_centres
 
Process Piping.pdf
Process Piping.pdfProcess Piping.pdf
Process Piping.pdf
 
System_Guide_GB_low.pdf
System_Guide_GB_low.pdfSystem_Guide_GB_low.pdf
System_Guide_GB_low.pdf
 
P y un50_00
P y un50_00P y un50_00
P y un50_00
 
Wrl hp y-na60_00
Wrl hp y-na60_00Wrl hp y-na60_00
Wrl hp y-na60_00
 
Urhe cf y-un50_00
Urhe cf y-un50_00Urhe cf y-un50_00
Urhe cf y-un50_00
 
R y un50_00
R y un50_00R y un50_00
R y un50_00
 
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technology
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technologyLcp hybrid –_effi_cient_performance_with_heat_pipe_technology
Lcp hybrid –_effi_cient_performance_with_heat_pipe_technology
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplant
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GB
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMS
 
HVAC - Concept & Components
HVAC - Concept & ComponentsHVAC - Concept & Components
HVAC - Concept & Components
 

Project portfolio

  • 1. PROJECT PORTFOLIO NAME : ILIYASAHMAD M TATWANAGI QUALIFICATION : BE (Mechanical) – MEP Engineer CONTACT No : +91 8861444016/ +91 9743771734 EMAIL : iliyast79@gmail.com
  • 2. 3D VIEW OF BUILDING  Building Type : Office Building  Location : Bangalore  Area : 17817 SF  Floors : BS + GF + 4Floors  Cooling Load : 38.1 Ton  Design Occupancy : 344 People  Air Distribution System : VAV Single Duct
  • 3. HEAT LOAD REPORT  Total Heat Load : 38.1 TR  Calculated Sensible Load : 29.6 TR  Calculated Latent load : 8.5 TR  Peak Cooling Month and Hour : May 3
  • 4. AIR DISTRIBUTION SYSTEM  ADP is 53° F and CFM is 14537  Duct Sizer tool used for designing duct  VCD are placed before each diffuser  Chilled water inlet temperature 7 °C and outlet temperature 15 °C  Backward curved aero-foil blade centrifugal fan for AHU  In line centrifugal fan selected for exhaust duct system
  • 5. PRESSURE LOSS  Pressure drop due to bents and head Static pressure in critical path : 15.27 pa  Maximum pressure loss : 0.31 Pa Total pressure loss : 17.77 Pa  Based on pressure drop in critical path AHU fan selected
  • 6. EQUIPMENT SELECTION  Total building load : 40 TR  Diversity factor considered : 100% (For Office )  Chiller : Type – Scroll chiller water cooled Capacity – 20 to 30 Ton Total chillers - 02  Cooling Tower Type – Counter flow Capacity – 50 Ton (Total building load * 1.25)  Expansion tank selected for collecting excess water and supplying it back to the cooling tower when required
  • 7. PLUMBING FIXTURE  1% slope for sanitary piping No 90° bents only Y-joints used
  • 8. ELECTRICAL SYSTEM  Cables are sized and selected based on current flow and standard catalogue  Ladder type cable trays used  As per NBC catalogue lighting fixture is at 7 feet from floor
  • 9. FIRE FIGHTING SYSTEM  Fire fighting designed as per NBC standard for commercial building  Pipes are sized based on the number of sprinklers  Sprinklers are placed such that all area of building is covered 3D View Floor Plan
  • 10. CLASH DETECTION REPORT Interference check between MEP systems is performed Clashes are highlighted by using id from report
  • 13. ANNOTATION  Duct and air terminal tags.  BOD of supply duct and bottom of false ceiling
  • 15. FAMILY CREATION  Designing equipment with project specifications  Designing of air terminal with specific neck size  AHU designed with specified duct size (Supply & Return), pipe size and fan requirements