This document provides details of an HVAC design project for a commercial building in Bangalore, India. It includes a project portfolio, floor plans, 3D renderings, load calculations, air distribution design, equipment selection and specifications. Ductwork, piping, electrical, plumbing and fire protection designs are presented along with coordination, interference checking and annotation of the project.
7. AIR DISTRIBUTION SYSTEM
Floor mounted AHU is selected to distribute air
Comfort condition 77ºF And 50% RH
ADP is 54ºF And 8,000 CFM
Chilled water inlet 8ºC And outlet is 15ºC
VCD are placed at beginning of each Duct
Backward curved Aerofoil blade Centrifugal fan is selected
for AHU
Inline centrifugal fan is selected for Exhaust air
MERV – 8 Filter is selected for AHU
8. DUCT PRESSURE DROP ANALYSIS
Pressure drop is due to bends and head
Static pressure in critical path is 29 Pa & 52 Pa
Based on Static pressure in critical path AHU fan is selected
9. CHILLER PLANT DESIGN
Total building cooling load 352 TR
Water cooled screw chillers 2 quantities
175TR+175TR
Cooling tower Approach is 3ºC And Range is 4ºC to
8ºC
16. CLASH DETECTION & SOLUTION
Clash in between
supply duct and cable
tray.
Clash is solved by
moving supply duct
Clash in between
column and supply duct.
Clash is solved by
moving supply duct
17. ANNOTATION
Labels are created to annotate duct size, flow
rate and BOD
Diffusers are tagged with neck size and CFM