FAIL TO PLAN, PLAN TO FAIL
(SO PLAN TO SUCCEED)
Nobody launches a new project and
intends for it to fail. But time and
again projects do fail, for a vast
range of reasons.
For people in charge of projects, big
and small, it may seem that the stakes
are high, and often they are.
But there are ways of stacking the
odds in your favour. Among the most
important is resisting the very human
urge to jump straight in. Good planning
is vital for success.
In the following pages you’ll discover
the five steps that will ensure that
your planning hits the mark to deliver
successful projects.
RESIST THE VERY HUMAN
URGE TO JUMP STRAIGHT
IN. GOOD PLANNING IS
VITAL FOR SUCCESS
Share eBook
As the track dust settled and the
jubilation subsided, Scotland’s public
funds watchdog, Audit Scotland,
stepped in to give its assessment.
And it was good. In fact, it was great.
Not only were around 1.2 million
tickets sold, but, in the end, the
Games were also delivered under
budget, with £34 million left in the pot.
Audit Scotland identified many reasons
for the success, but chief among them
was that “a shared vision agreed by
the strategic partners allowed partners
to work towards a common objective”.
Whether your project is a colossal
celebration of sport or a small product
upgrade your starting block will be the
same – you’ll need to figure out what
you want to achieve.
2
UNDERSTAND WHAT
YOU WANT TO ACHIEVE
So your organisation has spotted
a need, perhaps to improve a
product or service, or even launch
something new. It’s easy to get
carried away and jump straight in.
But you should stop and ask yourself
one simple question: Why? What do
I expect to happen after investing
considerable time and effort on this?
What does success look like?
For a sense of this success, you
can look back to a wet night in
August 2014 in Glasgow. Despite
the rain, the thousands of fans
who congregated in Scotland’s
national stadium, Hampden Park,
showed no signs of the weather
dampening their spirits. If anything,
the roar of the crowds at the final
events of the 2014 Commonwealth
Games must have given the
organisers confidence that the
competition was surely a triumph.
STEP 1: Create the guiding light
“A SHARED VISION
AGREED BY THE
STRATEGIC PARTNERS
ALLOWED PARTNERS
TO WORK TOWARDS
A COMMON OBJECTIVE”
Share eBook
3
It may seem obvious that you need
to establish your overall objectives,
but not everyone is doing it properly,
according to survey results published
by the Project Management Institute
(PMI) in its 2015 report Pulse of the
Profession. The PMI looked at the
reasons for the projects of its member
organisations failing in the previous 12
months. It discovered that the primary
reason in 30 per cent of cases was the
absence of an adequate vision or goal
for the project.
Some may call it a vision or a
guiding light, but, when you boil
them down, they do the same thing.
It’s a statement that reflects the
core of your idea, and it’s worth
spending time crafting this guiding
light into something meaningful
that reflects the core of your
idea in simple language.
This is what will win hearts and
minds. But, crucially, it can also be
used as a reference for decision
making further down the line.
Let’s say the chief executive wants
the new product you’re working
on to include an extra feature,
but you think that it isn’t in keeping
with the scope of the project. You can
simply point to the vision and ask:
“Does your request fit with this?”
OF PROJECTS FAILED,
PRIMARILY DUE TO
INACCURATE VISION
OR GOALS
Source: PMI
30%
Share eBook
WHAT TO CONSIDER FOR
YOUR GUIDING LIGHT
PROJECT TEAM
TIMESCALES OBJECTIVES
REASON, NEED,
RATIONALE
ASSUMPTIONS
CONSTRAINTS
KEY
REQUIREMENTS
EXPECTED
OUTCOME
4
Create a guiding light for success
Discover how to get started
Share eBook
5
DON’T LEAVE ANY
STONE UNTURNED
Ever heard the phrase: “There’s no
such thing as a wrong answer”?
Well it’s worth bearing that in mind
when you’re gathering together
information during the planning
phase of a project.
You’ll need to identify key players
in the project and, where possible,
get them all together physically or
virtually. In reality, getting a full
house may not be possible, so you
may need to catch up with some
people individually.
At this point there should be no filter
– every point is valid, every idea has
a place. Encouraging a free flow of
information should be your main
goal. And don’t forget to capture
expectations and assumptions as
well as requirements. You’ll need
to manage all of these during the
life of the project through effective
communication (more on that later).
“EVERY POINT IS VALID,
EVERY IDEA HAS A PLACE.
ENCOURAGING A FREE
FLOW OF INFORMATION
IS YOUR MAIN GOAL. AND
DON’T FORGET TO CAPTURE
EXPECTATIONS AND
ASSUMPTIONS AS WELL
AS REQUIREMENTS”
STEP 2: Capture requirements, expectations and assumptions
Share eBook
6
According to reports from the BBC, the
problem was due to the rail operator
RFF giving the wrong dimensions to
the train company. The measurements
were for stations built 30 years ago,
but there are plenty more stations
that are 50 years old, and they had
wider platforms.
It’s likely that this could have been
avoided with one simple “I should
mention...” (or “je dois mentionner”),
but that means getting the right
people involved. You should create
the right environment to encourage
people to share, so you can tap into
the deep reserve of their collective
knowledge and experience.
France’s national train operator
SNCF certainly knows how it feels
to have missed a crucial piece
of information after hitting the
headlines in 2014. It launched
a €15 billion makeover of the
country’s regional express trains,
which included a fleet of shiny
new rolling stock. Any commuters
waiting excitedly at platforms for the
new carriages to arrive would have
been disappointed. It turned out
that the trains were delayed –
because they were too wide for
some 1,300 platforms – which
then needed to be ‘shaved’ at a
considerable cost to the state.
€15 BILLION
FRENCH RAIL OPERATOR
SNCF’S INVESTMENT
IN NEW TRAINS...
WHICH WERE TOO BIG
FOR PLATFORMS
Share eBook
WAYS TO GATHER
REQUIREMENTS
PROTOTYPES
MIND MAPPING FOCUS GROUPS
INTERVIEWS
QUESTIONNAIRES
GROUP
CREATIVITY
BRAINSTORMING
FACILITATED
WORKSHOPS
7
Gather your requirements
Discover how to get started
Share eBook
8
SORT THROUGH WHAT YOU
NEED (AND DON’T NEED)
So you’ve gathered a gold mine of
information from the people who
matter. It’s now time to dig into the
information to figure out what’s
precious, and what isn’t worth
its weight in gold.
In other words, what do you need to
deliver? The simple way of thinking
about your deliverables is to take
everyone’s requirements and
measure them against your vision.
You’ll start by taking the wish
list, prioritising it and focusing on
everything you absolutely need.
And this is a chance to decide on
what won’t make the cut. This
list of deliverables will give you
your project scope.
You’ll then need to let your
stakeholders know what you’ve
decided and why, again using
the vision to help justify your
decision and to get agreement
from all parties. By managing
expectations you’ll avoid lengthy
confusion at the delivery stage
when the CEO is wondering where
that exciting idea of theirs went.
“THE SIMPLE WAY OF THINKING ABOUT YOUR
DELIVERABLES IS TO TAKE EVERYONE’S REQUIREMENTS
AND MEASURE THEM AGAINST YOUR VISION”
STEP 3: Decide on the deliverables
Share eBook
9
By communicating the scope to the
stakeholders, this is also a chance
for them to spot any gaps. Despite
the best efforts from the best minds
in your organisation, some things can
be missed, but as you build up an
understanding of how the project will
develop, those missing links should
become more visible.
What you’ll be left with is a highly
focused scope. It’s something you
want to get correct up front before
rushing in to kick off the project,
and with good reason, according
to experienced project manager
Dr Andrew Makar, consultant at
Tactical Project Management. “A
project’s scope has a direct impact
on the other two elements of the
project’s triple constraint – time
and resources,” he said. “If the
project team can’t agree to the
scope, the other two elements will
keep changing despite the project
manager’s best intent.”
Imagine the scenario: you’re
building the house you’ve imagined
for years. You’ve saved just enough
to make your dreams a reality.
You’ve got plans which have been
approved and construction is under
way, except you’ve forgotten to add
something at the outset. After a bit
of head scratching and a cup of tea
(or ten) your contractor comes back
with a new cost which is wildly more
than if it was planned from the
start. Your budget’s burst, your bank
doesn’t want to know and you end
up with a shell of a house without a
roof. And you really need a roof.
“A PROJECT’S SCOPE HAS A
DIRECT IMPACT ON THE OTHER
TWO ELEMENTS OF THE PROJECT’S
TRIPLE CONSTRAINT – TIME AND
RESOURCES. IF THE PROJECT TEAM
CAN’T AGREE TO THE SCOPE, THE
OTHER TWO ELEMENTS WILL KEEP
CHANGING DESPITE THE PROJECT
MANAGER’S BEST INTENT”
Dr Andrew Makar, consultant at
Tactical Project Management
Share eBook
SCOPE
STATEMENT
USER
ACCEPTANCE
CRITERIA
PROJECT
ASSUMPTIONS
PROJECT SCOPE
DESCRIPTION
PROJECT
DELIVERABLES
PROJECT
BOUNDARIES
PROJECT
CONSTRAINTS
DELIVERABLE 1
DELIVERABLE 2
DELIVERABLE 3
PROCESS
CRITERIA
WHAT IS IN SCOPE
WHAT IS OUT OF SCOPE
TIME LIMITATION
RESOURCE LIMITATION
TECHNICAL LIMITATION
CONTRACT LIMITATION
PROJECT GOALS & OBJECTIVES
PROJECT DETAILS & CHARACTERISTICS
10
Develop a scope
Discover how to get started
Share eBook
11
PLAN FOR THE BEST,
EXPECT THE WORST
As the saying goes: hope for the best,
but expect the worst. It’s the ‘worst’
part of the equation that you need to
spend time assessing.
Fixating on the negative may not make
you a big hit at parties, or anywhere
really, but it will give you a chance to
put measures in place to help reduce
that risk, whether that’s having some
form of insurance or backup plan.
You’ll have to think about the
risks from inside and outside your
organisation and understand their
potential impact – ranging from small
knocks to the timetable to cataclysmic
changes in the marketplace that
makes your project irrelevant.
“IDENTIFYING RISK STILL
ISN’T SECOND NATURE
FOR EVERYONE MANAGING
PROJECTS”
STEP 4: IDENTIFY THE RISKS
Share eBook
12
and risks not being properly defined.
You would have thought that, over
time, the value of identifying project
risks would have been more widely
embedded, but actually the reverse
is happening. The report points out
that “64 per cent of organisations
report the frequent use of risk
management practices, down from
a high of 71 per cent in 2012”.
It goes on to say that: “83 per
cent of high performers report
frequent use of risk management
practices, compared to only 49
per cent of low performers.” In
other words, identifying risk still
isn’t second nature for everyone
managing projects.
For example, it’s worth keeping a
watchful eye on the ‘enemy within’.
Are there cultural issues in your
organisation or even office politics that
could throw a spanner in the works?
The day-to-day risks could range from
recruitment delays to a lack of training
on new technologies. And then there
are the bigger issues that you’ll need
to keep in view, such as the possibility
of funding drying up or suppliers not
delivering on time. And you may even
want to think about the impact of
global catastrophes, such as Ebola
outbreaks or hurricanes, if your project
relies on areas of the world where
these are possibilities.
According to the PMI’s 2015 Pulse of
the Profession report, of the projects
that failed in the last 12 months
30 per cent were due to opportunities
OF HIGH
PERFORMERS
REPORT FREQUENT
USE OF RISK
MANAGEMENT
PRACTICES
Source: PMI
83%
Share eBook
PROJECT RISKS
TECHNICAL
TECHNOLOGY
PERFORMANCE
RELIABILITY
QUALITY
COMPLEXITY
VENDORS
SUPPLIERS
REGULATORY
CUSTOMER TEAM
FUNDING
MARKET
ENVIRONMENT
TEAM
SCHEDULE
METHODS
EQUIPMENT
TOOLS
RESOURCES
ATTITUDE
AVAILABILITY
EXPERIENCE
KNOWLEDGE
EDUCATION
FUNDING
DEPENDENCIES
CULTURE
PLAN
MANAGEMENT
INTERNAL EXTERNAL
PROJECT
MANAGEMENT
13
Plot out the risks
Discover how to get started
Share eBook
KEEP THE PEOPLE WHO
MATTER IN THE LOOP
And you’ll want to keep them in the
loop regularly. Their involvement
can help you make the right
decisions, so you can ultimately
deliver a successful project.
You’ll also have to make
sure that you are bringing
as much clarity to your
communications as
possible, and pitch
the right level of detail
to the right stakeholder.
For anyone in doubt about
the value of crystal clear
communication at the start and
throughout the life of a project,
here’s one sobering fact – one
out of five projects fail due to
ineffective communications,
according to PMI’s Pulse of the
Profession report.
To have a fighting chance of success,
the most crucial information
you’ll want to communicate with
stakeholders is the scope – what
you are planning on delivering.
1 IN 5 PROJECTS FAIL DUE TO
INEFFECTIVE COMMUNICATIONS
Source: PMI
STEP 5: Communicate clearly throughout14
Share eBook
Plan your communications
Discover how to get started
PROJECT STAKEHOLDER
COMMUNICATION PLAN
•	FULLY ENGAGED
•	GREATEST EFFORT TO SATISFY
•	MANAGE CLOSELY
•	KEEP SATISFIED
•	DON’T BORE WITH MESSAGE
•	KEEP INFORMED
•	GIVE ADEQUATE INFORMATION
•	ENSURE NO MAJOR ISSUES ARISE
•	HELP WITH THE DETAIL OF
THE PROJECT
•	KEEP INFORMED
•	MONITOR (MINIMUM EFFORT)
•	DO NOT EXCESSIVELY
COMMUNICATE
LOW INTEREST HIGH INTEREST
LOWPOWERHIGHPOWER
Share eBook
THE 5-STEP GUIDE TO PLANNING
SUCCESSFUL PROJECTS
www.mindgenius.com
STEP 1.
Create the guiding light
Understand why this project is needed and create a guiding
light so everyone can work toward a common goal.
STEP 2.
Capture requirements,
expectations and assumptions
Identify and involve the right people and comprehensively
gather their requirements, expectations and assumptions.
Encourage a free-flow of information from stakeholders so you
don’t miss a thing.
STEP 3.
Decide on the deliverables
Take the wish list from stakeholders and measure it against
the vision to determine what the project needs to deliver (the
scope). Agree it with your stakeholders.
STEP 4.
Identify the risks
Take the time to find out the risks to your project. Involve your
stakeholders to draw from their collective knowledge. Look at
internal, external, technical and project management risks.
STEP 5.
Communicate clearly throughout
Communicate with stakeholders with the right frequency
and at the right level throughout planning and beyond to get
information, spot gaps and get agreement on everything from
the vision to the scope.
HIT THE LAUNCH BUTTON
Discover how to get started
16
REFERENCES
www.mindgenius.com
So you’ve read our highlights of news stories and reports in the previous pages and want to learn more? Here’s our sources:
Well done to Commonwealth Games. Audit Scotland gives its assessment
www.audit-scotland.gov.uk/docs/central/2015/nr_150312_commonwealth_games_third.pdf
The Project Management Institute sheds light on the reasons for project failures, and the adoption of risk identification in its 2015 report
Pulse of the Profession: Capturing the value of project management
www.pmi.org/~/media/PDF/learning/pulse-of-the-profession-2015.ashx
Oops. There’s trouble on the railtracks in France. New trains are too wide for platforms, reports The Telegraph
www.telegraph.co.uk/news/worldnews/europe/france/10845789/French-rail-company-order-2000-trains-too-wide-for-platforms.html
The Project Management Institute points out the value of good communications for project success in the 2013 report The high cost of low
performance: the essential role of communications
www.pmi.org/~/media/PDF/Business-Solutions/The-High-Cost-Low-Performance-The-Essential-Role-of-Communications.ashx
This guide © MindGenius Ltd 2015
17
PLAN FOR PROJECT SUCCESS
Make the complex simple with MindGenius, an intuitive
planning tool for people who manage projects.
Capture and organise your project needs to create a
plan that works, present it effectively to get the people
who matter on board and control your project through to
a successful completion.
For projects, it’s the start of something special.
www.mindgenius.com/plan

Project Planning: How to Achieve the Impossible

  • 1.
    MISSION CONTROLLED THE 5-STEPGUIDE TO PLANNING PROJECTS
  • 2.
    1 FAIL TO PLAN,PLAN TO FAIL (SO PLAN TO SUCCEED) Nobody launches a new project and intends for it to fail. But time and again projects do fail, for a vast range of reasons. For people in charge of projects, big and small, it may seem that the stakes are high, and often they are. But there are ways of stacking the odds in your favour. Among the most important is resisting the very human urge to jump straight in. Good planning is vital for success. In the following pages you’ll discover the five steps that will ensure that your planning hits the mark to deliver successful projects. RESIST THE VERY HUMAN URGE TO JUMP STRAIGHT IN. GOOD PLANNING IS VITAL FOR SUCCESS Share eBook
  • 3.
    As the trackdust settled and the jubilation subsided, Scotland’s public funds watchdog, Audit Scotland, stepped in to give its assessment. And it was good. In fact, it was great. Not only were around 1.2 million tickets sold, but, in the end, the Games were also delivered under budget, with £34 million left in the pot. Audit Scotland identified many reasons for the success, but chief among them was that “a shared vision agreed by the strategic partners allowed partners to work towards a common objective”. Whether your project is a colossal celebration of sport or a small product upgrade your starting block will be the same – you’ll need to figure out what you want to achieve. 2 UNDERSTAND WHAT YOU WANT TO ACHIEVE So your organisation has spotted a need, perhaps to improve a product or service, or even launch something new. It’s easy to get carried away and jump straight in. But you should stop and ask yourself one simple question: Why? What do I expect to happen after investing considerable time and effort on this? What does success look like? For a sense of this success, you can look back to a wet night in August 2014 in Glasgow. Despite the rain, the thousands of fans who congregated in Scotland’s national stadium, Hampden Park, showed no signs of the weather dampening their spirits. If anything, the roar of the crowds at the final events of the 2014 Commonwealth Games must have given the organisers confidence that the competition was surely a triumph. STEP 1: Create the guiding light “A SHARED VISION AGREED BY THE STRATEGIC PARTNERS ALLOWED PARTNERS TO WORK TOWARDS A COMMON OBJECTIVE” Share eBook
  • 4.
    3 It may seemobvious that you need to establish your overall objectives, but not everyone is doing it properly, according to survey results published by the Project Management Institute (PMI) in its 2015 report Pulse of the Profession. The PMI looked at the reasons for the projects of its member organisations failing in the previous 12 months. It discovered that the primary reason in 30 per cent of cases was the absence of an adequate vision or goal for the project. Some may call it a vision or a guiding light, but, when you boil them down, they do the same thing. It’s a statement that reflects the core of your idea, and it’s worth spending time crafting this guiding light into something meaningful that reflects the core of your idea in simple language. This is what will win hearts and minds. But, crucially, it can also be used as a reference for decision making further down the line. Let’s say the chief executive wants the new product you’re working on to include an extra feature, but you think that it isn’t in keeping with the scope of the project. You can simply point to the vision and ask: “Does your request fit with this?” OF PROJECTS FAILED, PRIMARILY DUE TO INACCURATE VISION OR GOALS Source: PMI 30% Share eBook
  • 5.
    WHAT TO CONSIDERFOR YOUR GUIDING LIGHT PROJECT TEAM TIMESCALES OBJECTIVES REASON, NEED, RATIONALE ASSUMPTIONS CONSTRAINTS KEY REQUIREMENTS EXPECTED OUTCOME 4 Create a guiding light for success Discover how to get started Share eBook
  • 6.
    5 DON’T LEAVE ANY STONEUNTURNED Ever heard the phrase: “There’s no such thing as a wrong answer”? Well it’s worth bearing that in mind when you’re gathering together information during the planning phase of a project. You’ll need to identify key players in the project and, where possible, get them all together physically or virtually. In reality, getting a full house may not be possible, so you may need to catch up with some people individually. At this point there should be no filter – every point is valid, every idea has a place. Encouraging a free flow of information should be your main goal. And don’t forget to capture expectations and assumptions as well as requirements. You’ll need to manage all of these during the life of the project through effective communication (more on that later). “EVERY POINT IS VALID, EVERY IDEA HAS A PLACE. ENCOURAGING A FREE FLOW OF INFORMATION IS YOUR MAIN GOAL. AND DON’T FORGET TO CAPTURE EXPECTATIONS AND ASSUMPTIONS AS WELL AS REQUIREMENTS” STEP 2: Capture requirements, expectations and assumptions Share eBook
  • 7.
    6 According to reportsfrom the BBC, the problem was due to the rail operator RFF giving the wrong dimensions to the train company. The measurements were for stations built 30 years ago, but there are plenty more stations that are 50 years old, and they had wider platforms. It’s likely that this could have been avoided with one simple “I should mention...” (or “je dois mentionner”), but that means getting the right people involved. You should create the right environment to encourage people to share, so you can tap into the deep reserve of their collective knowledge and experience. France’s national train operator SNCF certainly knows how it feels to have missed a crucial piece of information after hitting the headlines in 2014. It launched a €15 billion makeover of the country’s regional express trains, which included a fleet of shiny new rolling stock. Any commuters waiting excitedly at platforms for the new carriages to arrive would have been disappointed. It turned out that the trains were delayed – because they were too wide for some 1,300 platforms – which then needed to be ‘shaved’ at a considerable cost to the state. €15 BILLION FRENCH RAIL OPERATOR SNCF’S INVESTMENT IN NEW TRAINS... WHICH WERE TOO BIG FOR PLATFORMS Share eBook
  • 8.
    WAYS TO GATHER REQUIREMENTS PROTOTYPES MINDMAPPING FOCUS GROUPS INTERVIEWS QUESTIONNAIRES GROUP CREATIVITY BRAINSTORMING FACILITATED WORKSHOPS 7 Gather your requirements Discover how to get started Share eBook
  • 9.
    8 SORT THROUGH WHATYOU NEED (AND DON’T NEED) So you’ve gathered a gold mine of information from the people who matter. It’s now time to dig into the information to figure out what’s precious, and what isn’t worth its weight in gold. In other words, what do you need to deliver? The simple way of thinking about your deliverables is to take everyone’s requirements and measure them against your vision. You’ll start by taking the wish list, prioritising it and focusing on everything you absolutely need. And this is a chance to decide on what won’t make the cut. This list of deliverables will give you your project scope. You’ll then need to let your stakeholders know what you’ve decided and why, again using the vision to help justify your decision and to get agreement from all parties. By managing expectations you’ll avoid lengthy confusion at the delivery stage when the CEO is wondering where that exciting idea of theirs went. “THE SIMPLE WAY OF THINKING ABOUT YOUR DELIVERABLES IS TO TAKE EVERYONE’S REQUIREMENTS AND MEASURE THEM AGAINST YOUR VISION” STEP 3: Decide on the deliverables Share eBook
  • 10.
    9 By communicating thescope to the stakeholders, this is also a chance for them to spot any gaps. Despite the best efforts from the best minds in your organisation, some things can be missed, but as you build up an understanding of how the project will develop, those missing links should become more visible. What you’ll be left with is a highly focused scope. It’s something you want to get correct up front before rushing in to kick off the project, and with good reason, according to experienced project manager Dr Andrew Makar, consultant at Tactical Project Management. “A project’s scope has a direct impact on the other two elements of the project’s triple constraint – time and resources,” he said. “If the project team can’t agree to the scope, the other two elements will keep changing despite the project manager’s best intent.” Imagine the scenario: you’re building the house you’ve imagined for years. You’ve saved just enough to make your dreams a reality. You’ve got plans which have been approved and construction is under way, except you’ve forgotten to add something at the outset. After a bit of head scratching and a cup of tea (or ten) your contractor comes back with a new cost which is wildly more than if it was planned from the start. Your budget’s burst, your bank doesn’t want to know and you end up with a shell of a house without a roof. And you really need a roof. “A PROJECT’S SCOPE HAS A DIRECT IMPACT ON THE OTHER TWO ELEMENTS OF THE PROJECT’S TRIPLE CONSTRAINT – TIME AND RESOURCES. IF THE PROJECT TEAM CAN’T AGREE TO THE SCOPE, THE OTHER TWO ELEMENTS WILL KEEP CHANGING DESPITE THE PROJECT MANAGER’S BEST INTENT” Dr Andrew Makar, consultant at Tactical Project Management Share eBook
  • 11.
    SCOPE STATEMENT USER ACCEPTANCE CRITERIA PROJECT ASSUMPTIONS PROJECT SCOPE DESCRIPTION PROJECT DELIVERABLES PROJECT BOUNDARIES PROJECT CONSTRAINTS DELIVERABLE 1 DELIVERABLE2 DELIVERABLE 3 PROCESS CRITERIA WHAT IS IN SCOPE WHAT IS OUT OF SCOPE TIME LIMITATION RESOURCE LIMITATION TECHNICAL LIMITATION CONTRACT LIMITATION PROJECT GOALS & OBJECTIVES PROJECT DETAILS & CHARACTERISTICS 10 Develop a scope Discover how to get started Share eBook
  • 12.
    11 PLAN FOR THEBEST, EXPECT THE WORST As the saying goes: hope for the best, but expect the worst. It’s the ‘worst’ part of the equation that you need to spend time assessing. Fixating on the negative may not make you a big hit at parties, or anywhere really, but it will give you a chance to put measures in place to help reduce that risk, whether that’s having some form of insurance or backup plan. You’ll have to think about the risks from inside and outside your organisation and understand their potential impact – ranging from small knocks to the timetable to cataclysmic changes in the marketplace that makes your project irrelevant. “IDENTIFYING RISK STILL ISN’T SECOND NATURE FOR EVERYONE MANAGING PROJECTS” STEP 4: IDENTIFY THE RISKS Share eBook
  • 13.
    12 and risks notbeing properly defined. You would have thought that, over time, the value of identifying project risks would have been more widely embedded, but actually the reverse is happening. The report points out that “64 per cent of organisations report the frequent use of risk management practices, down from a high of 71 per cent in 2012”. It goes on to say that: “83 per cent of high performers report frequent use of risk management practices, compared to only 49 per cent of low performers.” In other words, identifying risk still isn’t second nature for everyone managing projects. For example, it’s worth keeping a watchful eye on the ‘enemy within’. Are there cultural issues in your organisation or even office politics that could throw a spanner in the works? The day-to-day risks could range from recruitment delays to a lack of training on new technologies. And then there are the bigger issues that you’ll need to keep in view, such as the possibility of funding drying up or suppliers not delivering on time. And you may even want to think about the impact of global catastrophes, such as Ebola outbreaks or hurricanes, if your project relies on areas of the world where these are possibilities. According to the PMI’s 2015 Pulse of the Profession report, of the projects that failed in the last 12 months 30 per cent were due to opportunities OF HIGH PERFORMERS REPORT FREQUENT USE OF RISK MANAGEMENT PRACTICES Source: PMI 83% Share eBook
  • 14.
  • 15.
    KEEP THE PEOPLEWHO MATTER IN THE LOOP And you’ll want to keep them in the loop regularly. Their involvement can help you make the right decisions, so you can ultimately deliver a successful project. You’ll also have to make sure that you are bringing as much clarity to your communications as possible, and pitch the right level of detail to the right stakeholder. For anyone in doubt about the value of crystal clear communication at the start and throughout the life of a project, here’s one sobering fact – one out of five projects fail due to ineffective communications, according to PMI’s Pulse of the Profession report. To have a fighting chance of success, the most crucial information you’ll want to communicate with stakeholders is the scope – what you are planning on delivering. 1 IN 5 PROJECTS FAIL DUE TO INEFFECTIVE COMMUNICATIONS Source: PMI STEP 5: Communicate clearly throughout14 Share eBook
  • 16.
    Plan your communications Discoverhow to get started PROJECT STAKEHOLDER COMMUNICATION PLAN • FULLY ENGAGED • GREATEST EFFORT TO SATISFY • MANAGE CLOSELY • KEEP SATISFIED • DON’T BORE WITH MESSAGE • KEEP INFORMED • GIVE ADEQUATE INFORMATION • ENSURE NO MAJOR ISSUES ARISE • HELP WITH THE DETAIL OF THE PROJECT • KEEP INFORMED • MONITOR (MINIMUM EFFORT) • DO NOT EXCESSIVELY COMMUNICATE LOW INTEREST HIGH INTEREST LOWPOWERHIGHPOWER Share eBook
  • 17.
    THE 5-STEP GUIDETO PLANNING SUCCESSFUL PROJECTS www.mindgenius.com STEP 1. Create the guiding light Understand why this project is needed and create a guiding light so everyone can work toward a common goal. STEP 2. Capture requirements, expectations and assumptions Identify and involve the right people and comprehensively gather their requirements, expectations and assumptions. Encourage a free-flow of information from stakeholders so you don’t miss a thing. STEP 3. Decide on the deliverables Take the wish list from stakeholders and measure it against the vision to determine what the project needs to deliver (the scope). Agree it with your stakeholders. STEP 4. Identify the risks Take the time to find out the risks to your project. Involve your stakeholders to draw from their collective knowledge. Look at internal, external, technical and project management risks. STEP 5. Communicate clearly throughout Communicate with stakeholders with the right frequency and at the right level throughout planning and beyond to get information, spot gaps and get agreement on everything from the vision to the scope. HIT THE LAUNCH BUTTON Discover how to get started 16
  • 18.
    REFERENCES www.mindgenius.com So you’ve readour highlights of news stories and reports in the previous pages and want to learn more? Here’s our sources: Well done to Commonwealth Games. Audit Scotland gives its assessment www.audit-scotland.gov.uk/docs/central/2015/nr_150312_commonwealth_games_third.pdf The Project Management Institute sheds light on the reasons for project failures, and the adoption of risk identification in its 2015 report Pulse of the Profession: Capturing the value of project management www.pmi.org/~/media/PDF/learning/pulse-of-the-profession-2015.ashx Oops. There’s trouble on the railtracks in France. New trains are too wide for platforms, reports The Telegraph www.telegraph.co.uk/news/worldnews/europe/france/10845789/French-rail-company-order-2000-trains-too-wide-for-platforms.html The Project Management Institute points out the value of good communications for project success in the 2013 report The high cost of low performance: the essential role of communications www.pmi.org/~/media/PDF/Business-Solutions/The-High-Cost-Low-Performance-The-Essential-Role-of-Communications.ashx This guide © MindGenius Ltd 2015 17
  • 19.
    PLAN FOR PROJECTSUCCESS Make the complex simple with MindGenius, an intuitive planning tool for people who manage projects. Capture and organise your project needs to create a plan that works, present it effectively to get the people who matter on board and control your project through to a successful completion. For projects, it’s the start of something special. www.mindgenius.com/plan