Effective Management of a Large
Project in an Automobile Industry
By Rajesh Kumar Sharma
General Manager – FIAPL Pune
ID # : 2233482
A Project on
Effective Management of a Large
Project in an Automobile Industry
Acknowledgement
To begin with, I would like to express my immense gratitude towards
all the professionals who have come across in my journey of life. Last
23 years has been a wonderful travel where I got the opportunity to
meet some unsung people but masters in their area. These people
grew along with the growth of the organization & became wonderful
mentors and teachers for many including me.
My thanks also goes to professional teachers across the border in
Japan, Thailand, China, Italy & USA. I got ample exposure and
learnings from them along with performing my professional
responsibilities and this becomes the backbone of my project work.
My thanks goes to the management of FIAPL also, my present
employer who encouraged me to go for this course & supported me
in all possible way
I would also like to thank my family for their constant support in my
struggle towards work & education. When discussing with them,
every problem easily produces several solutions and every day brings
new opportunities of going forwards and upwards.
Last of all my thanks goes to IIM – C for giving me a platform to come
up with this project work.
Rajesh K Sharma
9049986395
24
th
March 2017
Preface
Through this paper I have tried to, determine, analyses and recommend
various new and existing project management techniques which are
used in automobile companies. Every company has its own project
management skill set, and its own organizational structure. No matter
how similar the product is, or how its structure is complicated. Every
organization follows its own project management rules. Type of Project
management teams may vary from company to company or maybe
even project to project.
Project management skills remain in high demand within automobile
organizations. Ironically, project management methods and practices
remain inconsistent even though numerous templates, methodologies
and repositories are available for use in improving consistency in project
management practices.
In my past industrial experience cutting across organisation my major
observation related to Project is summed up in the following sentences.
1) Personality traits of successful project managers tend to constrain
standardization efforts within organizations yet contribute heavily
to success. Such characteristics include individual determination,
focus, and ability to influence, drive to deadline / key performance
indicators.
2) The demands of top management plays a major part in
Subverting initial project objectives.
3) The involvement of external suppliers and system integrators in
particular, tends to skew project management within large-scale
projects.
Agenda
 Brief background of Project management
 Characteristics of a Project
 KPIs & KAIs of a project
 Classification of Projects
 Why Program / Project management
 Program Management- Vision , Need & Objective
 7 Steps of Project management.
• Step 1
• Step 2
• Step 3
• Step 4
• Step 5
• Step 6
• Step 7
 Conclusion
 Assessment
 Value Proposition
Brief Background of Project
Management
To start this section, one must first understand what a project is.
A project is defined by Project Management Institute (PMI) Standard
committee in “A guide to the project management body of knowledge”
as “A temporary endeavor undertaken to create a unique product or
service” (Institute, 2004).
A project is a one-time activity with the following attributes (Meredith
and Mantel, 2006).
1. A well-defined purpose
2. A life cycle starting slowly, reaching peak, and then declining
3. Interdependencies and system interactions within the
Organization, the industry, and environment in which it exists
4. Uniqueness about its objectives, operational characteristics and
outputs
5. Deliberate conflict built into it.
A project can also be considered that (Nicholas, 1990):
1) Involve a definable purpose and end result specified in terms of
cost, schedule, and performance requirements.
2) Cut across organizational lines and utilize skills and talents from
multiple disciplines and organizations.
3) Involve unfamiliarity, uncertainty, and risks. Given that a project
differs from what was previously done, it also involves
unfamiliarity.
4) Encompass new technology, which, for the organization
undertaking that project, possess significant elements of
uncertainty and risk.
5) Are temporary activities with personnel, material, and facilities
assembled to accomplish as goal within a scheduled time
frame. Once the goal is achieved, the project ceases to exist.
The project resources may be reconfigured to begin work on a
new goal.
6) Is the process of achieving a goal, going through distinct
phases, called the “PROJECT LIFE CLYCLE”.
A project includes any series of activities and tasks. Those activities and
tasks should be:
• Definable in terms of a specific, finite objective
• Infrequent, unique, or unfamiliar to the existing organization
• Complex with respect to organizational interdependence in
detailed task accomplishment
• Critical to the company in terms of extent of commitment in
resources, market potential or some other aspect that has
significant impact on the company’s business position.
To embark upon a project is to opt for action, for controlled change over time.
“A project is not a dream … but a dream that comes true can be a project”.
The project method is the frame within which the dream can take shape and
become reality.
Progress Group Initiating Planning Executing Monitoring and Controlling Closing
Knowledge Area
Monitor and Control Project Work
Perform Integrated Change Control
Plan Scope Management Validate Scope
Collect Requirements Control Scope
Define Scope
Create WBS
Plan Schedule Management
Define Activities
Sequence Activities
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Plan Cost Management
Estimate Costs
Determine Budget
Quality Plan Quality Management Perform Quality Assurance Control Quality
Acquire Project Team
Develop Project Team
Manage Project Team
Communications Plan Communications Management Manage Communications Control Communications
Plan Risk Management
Identify Risks
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Response
Procurement Plan Procurement Management Conduct Procurements Control Procurements Close Procurements
Stakeholder Identify Stakeholders Plan Stakeholder Management Manage Stakeholder Engagement Control Stakeholder Engagement
HR
Plan HR Management
Risk
Control Risks
Time
Control Schedule
Cost
Control Cost
Integration
Develop Project Charter Develop Project Management Plan Direct / Manage Project Work Close Project
Scope
Project Characteristic
Projects have a purpose
Projects have clearly-defined aims and set out to produce clearly-
defined results. Their purpose is to solve a “problem”, and this
involves analyzing needs beforehand. Suggesting one or more
solutions, it aims at lasting social change.
Projects are realistic
Their aims must be achievable, and this means taking account
both of requirements and of the financial and human resources
available.
Projects are limited in time and space:
They have a beginning and an end, and are implemented in a
specific place and context.
Projects are complex:
Projects call on various planning and implementation skills, and
involve various partners and players.
Projects are collective:
Projects are the product of collective endeavor. They are run by
teams, involve various partners and cater for the needs of others.
Projects are unique:
All projects stem from new ideas. They provide a specific response
to a need (problem) in a specific context. They are innovative.
Projects are an adventure:
Every project is different and ground-breaking; they always involve
some uncertainty and risk.
Projects can be assessed:
Projects are planned and broken down into measurable aims,
which must be open for evaluation.
Projects are made up of stages, projects have distinct, identifiable
stages
The key elements of project management are classified as follows:
KPIs and KAIs of a Project
Project Classification
One of the first things in the strategic planning of a project is to identify
the complexity of it.
Doing so gives us a picture of the magnitude & the gravity of a project.
This helps in planning the resource required to manage efficiently &
identifies the focus of the Management for proper tracking &
monitoring.
Different organizations employ different yard stick to rate a project.
Below is an example which can be used to do a rating. Here Scale and
the Startup time of the project can be set at the discretion of the
Management of the organization.
Why Program / Project Management
Why is it applied?
 To execute programs & projects within Scope, Timing &
Budget
 To provide standardized global Program & Project
management for consistency of processes, tool, template
usage
 Minimize manufacturing change costs
It’s Purpose
 To enable flawless execution of program launches
 To focus project teams on their critical path
 Ensures the enterprise is focused on managing the Iron
Triangle (Scope /Timing / Cost)
Program Management - Vision
What was the performance of the last launch you were involved with?
Was everything on-time, within budget and within scope?
Did your team define consider the critical path?
Was there urgency around these critical path tasks?
Think about the Lessons Learned that were generated. Is there a
disciplined approach to ensure these Lessons Learned are analyzed and
incorporated into the next launch?
Keeping this in mind Vision of a Program can be
Program Management - Need
Within the organization, what do we need to do better with
regards to Managing Programs & Projects?
Does everyone raise the flag when they are going to be late? Or
over budget?
Are all reports standardized?
Program Management - Objective
Do you see Manufacturing Change Costs as unavoidable? What is the
correct amount of Manufacturing Change Costs that the team should
strive for? 5%? Or 8%?
How are schedules tracked to ensure equipment installations and
activities take place when they should?
Are there costs and delays due to the lack of Planning, Executing,
Monitoring and controlling the project?
Program Management 7 Steps
One of the easiest way to manage project of any magnitude is by step
approach.
The step approach simplifies the concept of project progress, giving
clear dimension & direction to the project team to follow & achieve.
Typically any project can be managed by 7 step approach. The first 5
steps are directly from the Program Management Body of Knowledge
(PMBOK). The last 2 focues on lessons learned and continuous
improvement
Before we discuss Step 1, I’d like to explain the interaction between the
Seven Steps of Program Management.
• With Program Management, the team starts with Step 1 which
is Initiating.
• Before Step 1 is completed, the team must start with Step 2
Planning.
• Again, before Step 2 is completed, and even before Step 1 is
completed the team will start Step 3, Executing.
• An interesting thing about Program Management is that Step
4, Monitoring and Controlling, begins almost at the Project
Start.
• Step 5 occurs toward the end of the project, as it is titled
Project Closing.
• Step 6, Analysis of Losses, commences at the Project Start, as
losses may occur at any point in a program, and it is important
to capture and analyze them in a timely manner.
• Finally, Step 7 lags behind Step 6 a little, because data
collection and analysis need to occur before feedback to the
other pillars is necessary. Refer the below illustration
The Process of Program & Project
Management
Getting Started – Program Management
Note the difference between Program CONCEPT Approval and Program
Approval – which comes later. Program Concept is an assignment to
work on an idea – may be “we need to build an all new vehicle in
2021…”
Program Approval is – “I approve of your plan and release funds to
execute with this specific scope of work and these deliverables”
Program management is high level and can manage many projects
within the program. Projects are often much smaller.
Once the program gets approved the first important activity is the
selection of the leader – The program manager
• The Program Management Team is identified, based on
experience in the related field, potential Manufacturing
Location, familiarity & the extent of the program.
• A gap analysis of skills and knowledge is performed on the
Program Management Team at the beginning to identify the
training needs & impart specialized training if required.
• It is critical for the Program Manager to identify all
stakeholders and to determine, manage, and influence their
requirements to ensure a successful project
Once the program leader is selected.
• Then along with management team Scope, Timing and
Costs assumptions of the program is well defined.
• The strategic planning team provides a Manufacturing
Study prior to program approval that defines the
program Scope, Timing & Cost assumptions.
• This study is part of the business case which is
presented to Senior Management for consideration.
• If it is approved, the program commences.
• The Project Charter is created to support this B/case.
Once the team is formed, it starts with the activity of reviewing
lessons learned from previous programs.
For this they conduct various workshops to review all lessons
learned that may be applied based on Program Scope. This can
be Technical, Financial or Operational.
The objective is to integrate applicable lessons learned into the
preliminary Program Plan. They also Track the number of
applicable lessons learned / number of lessons learned applied
7 Steps of Program Management
We will start with step 1
Step 1: Initiating
Step 2: Planning
Now we will move to step 3
Step 3: Executing
During the Execution Phase maximum action takes place. As such this is
where the majority of resources are required. The main activities during
this step are
• Communication of the Detailed Master Plan
• Manage the financial glide path
• Initiate Procurement
• Execute to detailed Master Plan
 Resource management
 Supplier management
 Training
• Manage risks to Timing, Cost, and Scope (Iron Triangle).
 Execute the communication plan
 Report status to Evaluator
Key early on as part of the execution step, is clear communication of the
detailed master plan that should be developed during the Step.
This is typically an event at the department / organization level with the
project team and all key stakeholders present to ensure alignment on
scope cost and timing.
It is better to have and record all the planning on a Program
management portal.
There are many software available which can be an important tool
The Functionality of the PM portal plays a key role in the ongoing
alignment of cost, time scope, risk and issue tracking
In summary the Portal allows for real-time standardized Master plan
publication, tracking and reporting of the project covering
 Cost
 Timing
 Scope
 Early Visibility / tracking of issues
Kickoff Project Team meetings. Plan other important meetings involving
stakeholders, project team, management & the project evaluator. Walk
through the flow below.
Share point sites and databases are excellent tools for document
repositories.
Accessing and reviewing information within is VERY helpful to reduce
the number of inquiries. It is ESSENTIAL that the information within be
clear and accurate.
Communication plans should also include the format and templates for
specific documents
Earlier on I had mentioned in the project need one sentence - “Full
transparency of risks in a timely manner”
Not only do we need transparency but quick resolution to avoid delays
and / or incurring unnecessary costs is very important in the effective
management of a project
During the course of project meetings evolve a method for team
members to timely Escalate Issues / Risks, as needed during execution
phase. This can be done by:
 Defining risk category (High , Med , Low)
 Determining Decision Authority needed
 Determining the timeframe for escalation.

The below table gives an image how to prioritize an issue & escalation
timeframe
During this stage the process of Procurement also starts – the extended
project team comes into act to write specifications and bid packages /
requisitions are being processed / Purchase Orders placed and supplier
selected.
There are various steps involved in selection of a supplier to execute the
work. After receiving technical & commercial bids from various
suppliers a techno commercial alignment of all the suppliers is done.
Then based on a standardized rating template as fixed by the project
team the best supplier is selected. LCC (Life cycle cost is an important
parameter in the selection of the final supplier. All these are included in
the master time plan and monitored
During this Procurement Process suppliers are engaged to provide
timing inputs in standardized Microsoft Project format on a regular
basis – timing contains interdependencies between activities focusing
on critical path timing - frequency of updates from supplier adjusts
based on execution phase
Technology department project managers and timing specialists review
supplier submissions against base plan to ensure data integrity prior to
loading in PM Portal load
Portal timing view gives a visual depiction of activities
• Green checkmarks for milestones completed on time
• Yellow for milestones in process & within schedule of the
project plan
• Red for milestones which is delayed & urgent action to be
taken
Step 4: Monitor and Control
Step 5: Project Closing
Step 6: Analysis & stratification
Step 7: Feedback to next Project
Conclusion
Assessment
Projects should be segmented across functional groups within the
organization. Each function should develop “Project Plans” for its own
work independent of other functions and thus no end-to-end project
plans should exist. To help alleviate this problem a system of milestone
“hand-offs” should be developed to identify the cross function work
dependencies. This however, can necessitate the need for a
consolidated master milestone plan that requires additional effort to
support and maintain.
While most of the approaches taken by the team’s project managers are
implemented out of a need to “get the job done”, they are indicative of
an organization with no structured approach to executing projects. This
has led to inconsistencies and inefficiencies across the organization.
It is possible to address each of these findings on an individual basis and
develop individual project team solutions. However, such an approach,
without consideration of the enterprise as a whole, will lead to minimal
success with mediocre results.
The ability of an automobile company business to succeed is driven by
its effectiveness in implementing strategic change in a rapidly changing
environment. India has a very rapid dynamic environment.
Value Proposition
The competition has to be dealt with a lot of vision. Developing an
organizational project management framework for the systematic
management of projects, programs and portfolios in alignment with the
organizations strategic goals is a proven means of implementing
strategic change and implementing organizational project management
involves embedding skills, knowledge, process, tools and organizational
structures within an organization to support this framework to deliver
strategic change.
An organization’s effectiveness in delivering business strategy can
therefore be called its organizational project management capability.
Most organizations are at a low level of maturity. Building this maturity
iteratively is the key to more effectively delivering the organization’s
strategy.
Project management technology is a major component in enabling
project management capability. It provides a means of automating the
analysis of project scope, cost and time, and the complexities of
managing this across multiple projects.
Any technology implementation needs to assess the business processes
that will be required to support it, the skills and knowledge that needs
to be in place within the user base, and what organizational changes are
necessary.
All this needs to be in line with the organizations project management
maturity. Focusing on the technology leads to trying to leapfrog
maturity levels, and the associated cultural challenges that come with
this.
Lack of project management adoption is typical because the
organization tried to implement toolset functionality that required a
higher level of maturity than the organization was actually at. An
organizational project management toolset should be deployed at an
appropriate level of maturity, and be capable of evolving over time in
line with your processes and people.
To achieve increasing levels of project management capability it
requires greater sophistication in terms of tool usage, and therefore
increasing maturity in terms of processes and people in place.
When it comes to implementing project management technology it is
important is to walk, skip then run.
So in this situation adapting a powerful tool like 7 steps of project
management will be of great benefit to organizations.
#####################################THE END ###################################
References

More Related Content

What's hot

MBA marketing (summer internship report)
MBA marketing (summer internship report)MBA marketing (summer internship report)
MBA marketing (summer internship report)MANUJ SINGH
 
Tata motors marketing strategy
Tata motors marketing strategy Tata motors marketing strategy
Tata motors marketing strategy shanid kp
 
MBA Project Report On HR (1).pdf
MBA Project Report On HR (1).pdfMBA Project Report On HR (1).pdf
MBA Project Report On HR (1).pdfMayankJain615
 
Project on-tata-motors
Project on-tata-motorsProject on-tata-motors
Project on-tata-motorsSanchit Jasuja
 
Project titles for mba research project
Project titles for mba research projectProject titles for mba research project
Project titles for mba research projectEzhil Arasan
 
PESTLE Analysis of FMCG retail in India
PESTLE Analysis of FMCG retail in IndiaPESTLE Analysis of FMCG retail in India
PESTLE Analysis of FMCG retail in IndiaMeher Kalyani
 
BBA final year internship project report
BBA final year internship project reportBBA final year internship project report
BBA final year internship project reportJaimin Patel
 
A project report on ratio analysis 2016
A project report on ratio analysis 2016A project report on ratio analysis 2016
A project report on ratio analysis 2016Shakti Prasad Tiwari
 
Project Report Outlook (
Project Report Outlook (Project Report Outlook (
Project Report Outlook (Satyam Sharma
 
Research project report on 4th sem of mba
Research project report on  4th sem of mbaResearch project report on  4th sem of mba
Research project report on 4th sem of mbaMohd Affan Ali
 
A SUMMER TRAINING PROJECT REPORT
A SUMMER TRAINING PROJECT REPORTA SUMMER TRAINING PROJECT REPORT
A SUMMER TRAINING PROJECT REPORTPrateek Bhola
 
Tata motors limited
Tata motors limitedTata motors limited
Tata motors limitedDarshan Garg
 
Comprehensive project Report on Honda
Comprehensive project Report on HondaComprehensive project Report on Honda
Comprehensive project Report on HondaDarshan Rajyaguru
 
SIP REPORT OF CRM ON MARUTI SUZUKI
SIP REPORT OF CRM ON MARUTI SUZUKI SIP REPORT OF CRM ON MARUTI SUZUKI
SIP REPORT OF CRM ON MARUTI SUZUKI Santosh Oza
 
Summer Internship project presentation
Summer Internship project presentationSummer Internship project presentation
Summer Internship project presentationShri Theja
 
Sample mba final year project
Sample mba final year projectSample mba final year project
Sample mba final year projectSiddanna Balapgol
 

What's hot (20)

MBA marketing (summer internship report)
MBA marketing (summer internship report)MBA marketing (summer internship report)
MBA marketing (summer internship report)
 
Tata motors marketing strategy
Tata motors marketing strategy Tata motors marketing strategy
Tata motors marketing strategy
 
MBA Project Report On HR (1).pdf
MBA Project Report On HR (1).pdfMBA Project Report On HR (1).pdf
MBA Project Report On HR (1).pdf
 
Project on-tata-motors
Project on-tata-motorsProject on-tata-motors
Project on-tata-motors
 
Project titles for mba research project
Project titles for mba research projectProject titles for mba research project
Project titles for mba research project
 
PESTLE Analysis of FMCG retail in India
PESTLE Analysis of FMCG retail in IndiaPESTLE Analysis of FMCG retail in India
PESTLE Analysis of FMCG retail in India
 
BBA final year internship project report
BBA final year internship project reportBBA final year internship project report
BBA final year internship project report
 
A project report on ratio analysis 2016
A project report on ratio analysis 2016A project report on ratio analysis 2016
A project report on ratio analysis 2016
 
Final outlook
Final outlookFinal outlook
Final outlook
 
Project Report Outlook (
Project Report Outlook (Project Report Outlook (
Project Report Outlook (
 
Research project report on 4th sem of mba
Research project report on  4th sem of mbaResearch project report on  4th sem of mba
Research project report on 4th sem of mba
 
A SUMMER TRAINING PROJECT REPORT
A SUMMER TRAINING PROJECT REPORTA SUMMER TRAINING PROJECT REPORT
A SUMMER TRAINING PROJECT REPORT
 
Interim report
Interim reportInterim report
Interim report
 
SIP report executive summary
SIP report executive summarySIP report executive summary
SIP report executive summary
 
Tata motors limited
Tata motors limitedTata motors limited
Tata motors limited
 
Comprehensive project Report on Honda
Comprehensive project Report on HondaComprehensive project Report on Honda
Comprehensive project Report on Honda
 
SIP REPORT OF CRM ON MARUTI SUZUKI
SIP REPORT OF CRM ON MARUTI SUZUKI SIP REPORT OF CRM ON MARUTI SUZUKI
SIP REPORT OF CRM ON MARUTI SUZUKI
 
Summer Internship project presentation
Summer Internship project presentationSummer Internship project presentation
Summer Internship project presentation
 
A project report on itc
A project report on itcA project report on itc
A project report on itc
 
Sample mba final year project
Sample mba final year projectSample mba final year project
Sample mba final year project
 

Similar to Project report submitted in IIM Calcutta

Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 
Read about the Quality Management Process on page 25 of the text. .docx
Read about the Quality Management Process on page 25 of the text. .docxRead about the Quality Management Process on page 25 of the text. .docx
Read about the Quality Management Process on page 25 of the text. .docxcatheryncouper
 
MGT 6302, Project Management Strategy and Tactics 1 .docx
MGT 6302, Project Management Strategy and Tactics 1  .docxMGT 6302, Project Management Strategy and Tactics 1  .docx
MGT 6302, Project Management Strategy and Tactics 1 .docxpauline234567
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxgilpinleeanna
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estatehando2845
 
Project Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfProject Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfFaisalAziz831398
 
I have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfI have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfamitpurbey2
 
I have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfI have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfMadansilks
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentIJMER
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project StandardsUjjwal Joshi
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)Innovate Vancouver
 

Similar to Project report submitted in IIM Calcutta (20)

Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Read about the Quality Management Process on page 25 of the text. .docx
Read about the Quality Management Process on page 25 of the text. .docxRead about the Quality Management Process on page 25 of the text. .docx
Read about the Quality Management Process on page 25 of the text. .docx
 
MGT 6302, Project Management Strategy and Tactics 1 .docx
MGT 6302, Project Management Strategy and Tactics 1  .docxMGT 6302, Project Management Strategy and Tactics 1  .docx
MGT 6302, Project Management Strategy and Tactics 1 .docx
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docx
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estate
 
Project Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfProject Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdf
 
I have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfI have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdf
 
I have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdfI have to do a project..no one stops at the sign in front of my hous.pdf
I have to do a project..no one stops at the sign in front of my hous.pdf
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile Development
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
Pmbok
PmbokPmbok
Pmbok
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)
 
Why project.pptx
Why project.pptxWhy project.pptx
Why project.pptx
 
Assignment
Assignment Assignment
Assignment
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 

Recently uploaded

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxSaujanya Jung Pandey
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectivesmintusiprd
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentationthomas851723
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentationthomas851723
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607dollysharma2066
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 

Recently uploaded (20)

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptx
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectives
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentation
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentation
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 

Project report submitted in IIM Calcutta

  • 1. Efecti Management of a Large Project in an Automobile Industry Rajesh Kumar Sharma ID #: 2233482 Executive Programme in Leadership & Management 2016~2017 Effective Management of a Large Project in an Automobile Industry By Rajesh Kumar Sharma General Manager – FIAPL Pune ID # : 2233482 A Project on Effective Management of a Large Project in an Automobile Industry
  • 2. Acknowledgement To begin with, I would like to express my immense gratitude towards all the professionals who have come across in my journey of life. Last 23 years has been a wonderful travel where I got the opportunity to meet some unsung people but masters in their area. These people grew along with the growth of the organization & became wonderful mentors and teachers for many including me. My thanks also goes to professional teachers across the border in Japan, Thailand, China, Italy & USA. I got ample exposure and learnings from them along with performing my professional responsibilities and this becomes the backbone of my project work. My thanks goes to the management of FIAPL also, my present employer who encouraged me to go for this course & supported me in all possible way I would also like to thank my family for their constant support in my struggle towards work & education. When discussing with them, every problem easily produces several solutions and every day brings new opportunities of going forwards and upwards. Last of all my thanks goes to IIM – C for giving me a platform to come up with this project work. Rajesh K Sharma 9049986395 24 th March 2017
  • 3. Preface Through this paper I have tried to, determine, analyses and recommend various new and existing project management techniques which are used in automobile companies. Every company has its own project management skill set, and its own organizational structure. No matter how similar the product is, or how its structure is complicated. Every organization follows its own project management rules. Type of Project management teams may vary from company to company or maybe even project to project. Project management skills remain in high demand within automobile organizations. Ironically, project management methods and practices remain inconsistent even though numerous templates, methodologies and repositories are available for use in improving consistency in project management practices. In my past industrial experience cutting across organisation my major observation related to Project is summed up in the following sentences. 1) Personality traits of successful project managers tend to constrain standardization efforts within organizations yet contribute heavily to success. Such characteristics include individual determination, focus, and ability to influence, drive to deadline / key performance indicators. 2) The demands of top management plays a major part in Subverting initial project objectives. 3) The involvement of external suppliers and system integrators in particular, tends to skew project management within large-scale projects.
  • 4. Agenda  Brief background of Project management  Characteristics of a Project  KPIs & KAIs of a project  Classification of Projects  Why Program / Project management  Program Management- Vision , Need & Objective  7 Steps of Project management. • Step 1 • Step 2 • Step 3 • Step 4 • Step 5 • Step 6 • Step 7  Conclusion  Assessment  Value Proposition
  • 5. Brief Background of Project Management To start this section, one must first understand what a project is. A project is defined by Project Management Institute (PMI) Standard committee in “A guide to the project management body of knowledge” as “A temporary endeavor undertaken to create a unique product or service” (Institute, 2004). A project is a one-time activity with the following attributes (Meredith and Mantel, 2006). 1. A well-defined purpose 2. A life cycle starting slowly, reaching peak, and then declining 3. Interdependencies and system interactions within the Organization, the industry, and environment in which it exists 4. Uniqueness about its objectives, operational characteristics and outputs 5. Deliberate conflict built into it. A project can also be considered that (Nicholas, 1990): 1) Involve a definable purpose and end result specified in terms of cost, schedule, and performance requirements. 2) Cut across organizational lines and utilize skills and talents from multiple disciplines and organizations. 3) Involve unfamiliarity, uncertainty, and risks. Given that a project differs from what was previously done, it also involves unfamiliarity. 4) Encompass new technology, which, for the organization undertaking that project, possess significant elements of uncertainty and risk.
  • 6. 5) Are temporary activities with personnel, material, and facilities assembled to accomplish as goal within a scheduled time frame. Once the goal is achieved, the project ceases to exist. The project resources may be reconfigured to begin work on a new goal. 6) Is the process of achieving a goal, going through distinct phases, called the “PROJECT LIFE CLYCLE”. A project includes any series of activities and tasks. Those activities and tasks should be: • Definable in terms of a specific, finite objective • Infrequent, unique, or unfamiliar to the existing organization • Complex with respect to organizational interdependence in detailed task accomplishment • Critical to the company in terms of extent of commitment in resources, market potential or some other aspect that has significant impact on the company’s business position. To embark upon a project is to opt for action, for controlled change over time. “A project is not a dream … but a dream that comes true can be a project”. The project method is the frame within which the dream can take shape and become reality.
  • 7. Progress Group Initiating Planning Executing Monitoring and Controlling Closing Knowledge Area Monitor and Control Project Work Perform Integrated Change Control Plan Scope Management Validate Scope Collect Requirements Control Scope Define Scope Create WBS Plan Schedule Management Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Plan Cost Management Estimate Costs Determine Budget Quality Plan Quality Management Perform Quality Assurance Control Quality Acquire Project Team Develop Project Team Manage Project Team Communications Plan Communications Management Manage Communications Control Communications Plan Risk Management Identify Risks Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Response Procurement Plan Procurement Management Conduct Procurements Control Procurements Close Procurements Stakeholder Identify Stakeholders Plan Stakeholder Management Manage Stakeholder Engagement Control Stakeholder Engagement HR Plan HR Management Risk Control Risks Time Control Schedule Cost Control Cost Integration Develop Project Charter Develop Project Management Plan Direct / Manage Project Work Close Project Scope
  • 8. Project Characteristic Projects have a purpose Projects have clearly-defined aims and set out to produce clearly- defined results. Their purpose is to solve a “problem”, and this involves analyzing needs beforehand. Suggesting one or more solutions, it aims at lasting social change. Projects are realistic Their aims must be achievable, and this means taking account both of requirements and of the financial and human resources available. Projects are limited in time and space: They have a beginning and an end, and are implemented in a specific place and context. Projects are complex: Projects call on various planning and implementation skills, and involve various partners and players. Projects are collective: Projects are the product of collective endeavor. They are run by teams, involve various partners and cater for the needs of others. Projects are unique: All projects stem from new ideas. They provide a specific response to a need (problem) in a specific context. They are innovative. Projects are an adventure: Every project is different and ground-breaking; they always involve some uncertainty and risk. Projects can be assessed: Projects are planned and broken down into measurable aims, which must be open for evaluation. Projects are made up of stages, projects have distinct, identifiable stages
  • 9. The key elements of project management are classified as follows: KPIs and KAIs of a Project
  • 10. Project Classification One of the first things in the strategic planning of a project is to identify the complexity of it. Doing so gives us a picture of the magnitude & the gravity of a project. This helps in planning the resource required to manage efficiently & identifies the focus of the Management for proper tracking & monitoring. Different organizations employ different yard stick to rate a project. Below is an example which can be used to do a rating. Here Scale and the Startup time of the project can be set at the discretion of the Management of the organization.
  • 11. Why Program / Project Management Why is it applied?  To execute programs & projects within Scope, Timing & Budget  To provide standardized global Program & Project management for consistency of processes, tool, template usage  Minimize manufacturing change costs It’s Purpose  To enable flawless execution of program launches  To focus project teams on their critical path  Ensures the enterprise is focused on managing the Iron Triangle (Scope /Timing / Cost)
  • 12. Program Management - Vision What was the performance of the last launch you were involved with? Was everything on-time, within budget and within scope? Did your team define consider the critical path? Was there urgency around these critical path tasks? Think about the Lessons Learned that were generated. Is there a disciplined approach to ensure these Lessons Learned are analyzed and incorporated into the next launch? Keeping this in mind Vision of a Program can be
  • 13. Program Management - Need Within the organization, what do we need to do better with regards to Managing Programs & Projects? Does everyone raise the flag when they are going to be late? Or over budget? Are all reports standardized?
  • 14. Program Management - Objective Do you see Manufacturing Change Costs as unavoidable? What is the correct amount of Manufacturing Change Costs that the team should strive for? 5%? Or 8%? How are schedules tracked to ensure equipment installations and activities take place when they should? Are there costs and delays due to the lack of Planning, Executing, Monitoring and controlling the project?
  • 15. Program Management 7 Steps One of the easiest way to manage project of any magnitude is by step approach. The step approach simplifies the concept of project progress, giving clear dimension & direction to the project team to follow & achieve. Typically any project can be managed by 7 step approach. The first 5 steps are directly from the Program Management Body of Knowledge (PMBOK). The last 2 focues on lessons learned and continuous improvement Before we discuss Step 1, I’d like to explain the interaction between the Seven Steps of Program Management. • With Program Management, the team starts with Step 1 which is Initiating.
  • 16. • Before Step 1 is completed, the team must start with Step 2 Planning. • Again, before Step 2 is completed, and even before Step 1 is completed the team will start Step 3, Executing. • An interesting thing about Program Management is that Step 4, Monitoring and Controlling, begins almost at the Project Start. • Step 5 occurs toward the end of the project, as it is titled Project Closing. • Step 6, Analysis of Losses, commences at the Project Start, as losses may occur at any point in a program, and it is important to capture and analyze them in a timely manner. • Finally, Step 7 lags behind Step 6 a little, because data collection and analysis need to occur before feedback to the other pillars is necessary. Refer the below illustration
  • 17. The Process of Program & Project Management
  • 18.
  • 19. Getting Started – Program Management Note the difference between Program CONCEPT Approval and Program Approval – which comes later. Program Concept is an assignment to work on an idea – may be “we need to build an all new vehicle in 2021…” Program Approval is – “I approve of your plan and release funds to execute with this specific scope of work and these deliverables” Program management is high level and can manage many projects within the program. Projects are often much smaller.
  • 20. Once the program gets approved the first important activity is the selection of the leader – The program manager • The Program Management Team is identified, based on experience in the related field, potential Manufacturing Location, familiarity & the extent of the program. • A gap analysis of skills and knowledge is performed on the Program Management Team at the beginning to identify the training needs & impart specialized training if required. • It is critical for the Program Manager to identify all stakeholders and to determine, manage, and influence their requirements to ensure a successful project
  • 21. Once the program leader is selected. • Then along with management team Scope, Timing and Costs assumptions of the program is well defined. • The strategic planning team provides a Manufacturing Study prior to program approval that defines the program Scope, Timing & Cost assumptions. • This study is part of the business case which is presented to Senior Management for consideration. • If it is approved, the program commences. • The Project Charter is created to support this B/case. Once the team is formed, it starts with the activity of reviewing lessons learned from previous programs. For this they conduct various workshops to review all lessons learned that may be applied based on Program Scope. This can be Technical, Financial or Operational. The objective is to integrate applicable lessons learned into the preliminary Program Plan. They also Track the number of applicable lessons learned / number of lessons learned applied
  • 22. 7 Steps of Program Management We will start with step 1
  • 25.
  • 26.
  • 27. Now we will move to step 3
  • 28. Step 3: Executing During the Execution Phase maximum action takes place. As such this is where the majority of resources are required. The main activities during this step are • Communication of the Detailed Master Plan • Manage the financial glide path • Initiate Procurement • Execute to detailed Master Plan  Resource management  Supplier management  Training • Manage risks to Timing, Cost, and Scope (Iron Triangle).  Execute the communication plan  Report status to Evaluator Key early on as part of the execution step, is clear communication of the detailed master plan that should be developed during the Step. This is typically an event at the department / organization level with the project team and all key stakeholders present to ensure alignment on scope cost and timing. It is better to have and record all the planning on a Program management portal. There are many software available which can be an important tool The Functionality of the PM portal plays a key role in the ongoing alignment of cost, time scope, risk and issue tracking
  • 29. In summary the Portal allows for real-time standardized Master plan publication, tracking and reporting of the project covering  Cost  Timing  Scope  Early Visibility / tracking of issues Kickoff Project Team meetings. Plan other important meetings involving stakeholders, project team, management & the project evaluator. Walk through the flow below. Share point sites and databases are excellent tools for document repositories. Accessing and reviewing information within is VERY helpful to reduce the number of inquiries. It is ESSENTIAL that the information within be clear and accurate. Communication plans should also include the format and templates for specific documents
  • 30. Earlier on I had mentioned in the project need one sentence - “Full transparency of risks in a timely manner” Not only do we need transparency but quick resolution to avoid delays and / or incurring unnecessary costs is very important in the effective management of a project During the course of project meetings evolve a method for team members to timely Escalate Issues / Risks, as needed during execution phase. This can be done by:  Defining risk category (High , Med , Low)  Determining Decision Authority needed  Determining the timeframe for escalation.  The below table gives an image how to prioritize an issue & escalation timeframe During this stage the process of Procurement also starts – the extended project team comes into act to write specifications and bid packages / requisitions are being processed / Purchase Orders placed and supplier selected. There are various steps involved in selection of a supplier to execute the work. After receiving technical & commercial bids from various suppliers a techno commercial alignment of all the suppliers is done. Then based on a standardized rating template as fixed by the project team the best supplier is selected. LCC (Life cycle cost is an important
  • 31. parameter in the selection of the final supplier. All these are included in the master time plan and monitored During this Procurement Process suppliers are engaged to provide timing inputs in standardized Microsoft Project format on a regular basis – timing contains interdependencies between activities focusing on critical path timing - frequency of updates from supplier adjusts based on execution phase Technology department project managers and timing specialists review supplier submissions against base plan to ensure data integrity prior to loading in PM Portal load Portal timing view gives a visual depiction of activities • Green checkmarks for milestones completed on time • Yellow for milestones in process & within schedule of the project plan • Red for milestones which is delayed & urgent action to be taken
  • 32. Step 4: Monitor and Control
  • 33.
  • 34. Step 5: Project Closing
  • 35.
  • 36.
  • 37. Step 6: Analysis & stratification
  • 38. Step 7: Feedback to next Project
  • 40. Assessment Projects should be segmented across functional groups within the organization. Each function should develop “Project Plans” for its own work independent of other functions and thus no end-to-end project plans should exist. To help alleviate this problem a system of milestone “hand-offs” should be developed to identify the cross function work dependencies. This however, can necessitate the need for a consolidated master milestone plan that requires additional effort to support and maintain. While most of the approaches taken by the team’s project managers are implemented out of a need to “get the job done”, they are indicative of an organization with no structured approach to executing projects. This has led to inconsistencies and inefficiencies across the organization. It is possible to address each of these findings on an individual basis and develop individual project team solutions. However, such an approach, without consideration of the enterprise as a whole, will lead to minimal success with mediocre results. The ability of an automobile company business to succeed is driven by its effectiveness in implementing strategic change in a rapidly changing environment. India has a very rapid dynamic environment.
  • 41. Value Proposition The competition has to be dealt with a lot of vision. Developing an organizational project management framework for the systematic management of projects, programs and portfolios in alignment with the organizations strategic goals is a proven means of implementing strategic change and implementing organizational project management involves embedding skills, knowledge, process, tools and organizational structures within an organization to support this framework to deliver strategic change. An organization’s effectiveness in delivering business strategy can therefore be called its organizational project management capability. Most organizations are at a low level of maturity. Building this maturity iteratively is the key to more effectively delivering the organization’s strategy. Project management technology is a major component in enabling project management capability. It provides a means of automating the analysis of project scope, cost and time, and the complexities of managing this across multiple projects. Any technology implementation needs to assess the business processes that will be required to support it, the skills and knowledge that needs to be in place within the user base, and what organizational changes are necessary. All this needs to be in line with the organizations project management maturity. Focusing on the technology leads to trying to leapfrog maturity levels, and the associated cultural challenges that come with this.
  • 42. Lack of project management adoption is typical because the organization tried to implement toolset functionality that required a higher level of maturity than the organization was actually at. An organizational project management toolset should be deployed at an appropriate level of maturity, and be capable of evolving over time in line with your processes and people. To achieve increasing levels of project management capability it requires greater sophistication in terms of tool usage, and therefore increasing maturity in terms of processes and people in place. When it comes to implementing project management technology it is important is to walk, skip then run. So in this situation adapting a powerful tool like 7 steps of project management will be of great benefit to organizations. #####################################THE END ################################### References