Chapter 4 Project Organization 1
Ch 4
Project Organization
“Organize - to form into an
association for a common purpose
or arrange systematically”
Chapter 4 Project Organization2
Project Organization
 Specialization of the human elements
 Different types = functional, product
line, geographical location, production
process, type of customer, subsidiary
organization, time, vertical or horizontal
organization
 How to tie project to the parent firm
 How to organize the project itself
Chapter 4 Project Organization3
Project as Part of Functional
Organization
 E.g. new technology project – under
vice president of engineering
 Introduction of new product line – under
vice president of marketing
 Project assigned to the functional unit
that has most interest
Chapter 4 Project Organization4
President
VP Finance VP Marketing VP
Manufacturing
VP
Engineering
Functional Organization
Project New
Model Proton
SURIE
New Layout –
Robot Line
Chapter 4 Project Organization5
Major Advantages
 Maximum flexibility in the use of staff
 Individual experts can be utilized by many
different projects
 Specialist in the division can be grouped to
share knowledge and experience
 Functional division serves as a base of
technological continuity
 Functional division contains normal of
advancement
Chapter 4 Project Organization6
Disadvantages
 The client is not the focus of activity and
concern
 Tend to be oriented towards functional
activities
 No individual is given full responsibility for the
project
 Slow response to client’s needs
 Tendency to sub-optimize the project
 Motivation of project team is weak
 Does not facilitate a holistic approach to the
project
Chapter 4 Project Organization7
Pure Project Organization
 Project is separated from the rest of the
parent system
 Becomes self contained unit
Chapter 4 Project Organization8
Advantages
 PM has full line authority over the project
 All project workforce directly responsible to
the PM
 Lines of communication are shortened
 Maintain permanent group of experts
 High level of commitment
 Ability to make swift decisions
 Unity of command
 Simple and flexible structure
 Support holistic approach to the project
Chapter 4 Project Organization9
Project Organization
F in a n c e M a n u fa c tu rin g
V ic e P re s id e n t P ro je c t A
F in a n c e M a n u fa c tu rin g
V ic e P re s id e n t P ro je c t B
F in a n c e M a n u fa c tu rin g
V ic e P re s id e n t P ro je c t C
P re s id e n t
Chapter 4 Project Organization10
Disadvantages
 Duplication of effort
 Stockpile equipment and technical
assistance “just in case”
 Lack of expertise in high technology
project
 Foster inconsistency and cutting
corners
 Project takes on a life of its own
 Worry about “life after project ends”
Chapter 4 Project Organization11
Matrix Organization
 Combination of functional and pure
project organizations
 Matrix project is not separated from
parent organizations
 Individuals come from respective
functions divisions and are assigned to
the project full time or part time
Chapter 4 Project Organization12
Matrix Organization
PM1
PM2
PM3
Manufacturing Program Manager R&D Marketing
President
Chapter 4 Project Organization13
Matrix Organization
 Cross-functional team members
 Draw temporarily on technological expertise
of relevant functions
 High technology areas – integrate functional
specialties
 Iterations in adapting “over the wall” approach
 Systems approach – integrity of product
design
 Close coordination and communication
among all parties
Chapter 4 Project Organization14
Advantages of Matrix
Approach
 The project is the point of emphasis
 Reasonable access t pools of technical
talents
 Less anxiety about what happens after
project completion
 Rapid response to client needs
 Access to administrative units of the parent
firms
 Better balance of company resources in
multiple projects
 Flexibility in control
Chapter 4 Project Organization15
Disadvantages
 Delicate balance of power
 Movement of resources – conflict
 Projects resist death
 Complex division of authority and
responsibility
 Violates the principle of unity of
command
Chapter 4 Project Organization16
Mixed Organizational Systems
 Divisionalization – breaking down large
organization into smaller more flexible units
 Spin-off the large projects as subsidiaries or
independent operations
 Allow formation of venture team
 Hybrid leads to flexibility
 Dissimilar groupings encourage overlap,
duplication and friction
Chapter 4 Project Organization17
Mixed Organization
P r o je c t M F in a n c e E n g in e e r in g P r o je c t N
P r e s id e n t
Chapter 4 Project Organization18
Staff Organization
 Set up like functional organization
 Adds a staff office to administer
projects
 Used for small, short run projects
Chapter 4 Project Organization19
Staff Organization
Finance Manufacturing Engineering
President
Project S
Chapter 4 Project Organization20
Choosing an Organizational
Form
 Functional form – major focus on in-depth
technology, require large capital investment
 Pure project – large number of similar
projects
 Matrix organization – require integration of
inputs from several functional areas and
involves reasonably sophisticated technology
and several projects must share technical
expertise
 Matrix organizations are complex
Chapter 4 Project Organization21
Selection of Project
Organization
 Define the project / objectives
 Determine the key tasks
 Arrange key tasks by sequence and
decompose them into work packages
 Determine project subsystems
 List special characteristics – level of
technology, probable length, resource
requirements, level of outsourcing
Chapter 4 Project Organization22
Project Team
 Project office – control center, chart
room (focus of all project activity)
 Close location to project manager
 Co-location of external parties
 Reduce physical distance
 Better communication
 Pressure to complete tasks
Chapter 4 Project Organization23
Key Team Members
 Project Engineer
 Manufacturing Engineer
 Field Manager
 Contract Administrator
 Project Controller
 Support Services Manager
Chapter 4 Project Organization24
Work Organization
 Project engineer (technical performance) and
project controller (budget) report to PM
 PM forecast of personnel needs
 Prepare WBS to determine exact nature of
tasks
 Skills requirements are assessed and
aggregated
 Outsourcing of certain tasks
Chapter 4 Project Organization25
Typical Organization of
Engineering Projects
F ie ld M a n a g e r
M a n u f a c t u r in g E n g in e e r
P r o je c t E n g in e e r
S u p p o r t S e r v ic e s M a n a g e r
C o n t r o l A d m in is t r a t o r
P r o je c t c o n t r o lle r
P r o je c t M a n a g e r
Chapter 4 Project Organization26
Staff Critical to Project
Success
 Senior project team members
 Staffs whom the PM will require close
communication
 Staffs with rare skills for project success
Chapter 4 Project Organization27
Human Factors
 Technical problem with a human dimension
 Perfectionist – can cause delay
 Motivation – recognition, achievement,
responsibility, advancement, the work itself
 Interpersonal conflict
 Management by Objectives (MBO) – allows
worker to take responsibility for design and
performance of a task
Chapter 4 Project Organization28
Advantages of MBO
 Participative mechanism
 Allow professionals to design their own
method
 Team members know what is expected of
them
 Members have the opportunity to participate
in deciding their own responsibilities
 Members get timely feedback on their
performance
 Project manager is provided a tool for
evaluating and controlling performance
Chapter 4 Project Organization29
MBO
 Superior set objectives in consultation
and agreement with subordinates
 Subordinate develops action plan, a
detailed plan and scheduled that will
result in achieving the objective
 Final plan becomes a contract
Chapter 4 Project Organization30
Major Sources of Conflict
Life cycle phase Conflict source
Project formation Priorities, procedures,
schedules
Buildup phase Priorities, schedule,
procedures
Main program Schedule, technical,
manpower
Phase out Schedules, personality,
manpower

More Related Content

What's hot

Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerEarl Tongol
 
4. the project in the organizational structure
4. the project in the organizational structure4. the project in the organizational structure
4. the project in the organizational structureJeanette C. Patindol
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAssociation for Project Management
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Project team management
Project team managementProject team management
Project team managementsirjana Tiwari
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Managerkanti choudhary
 
Project management communication
Project management communicationProject management communication
Project management communicationlaksha vijayaratnam
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTAbraham Ncunge
 
Project Management Organizational Structures
Project Management Organizational StructuresProject Management Organizational Structures
Project Management Organizational StructuresJ. Scott Christianson
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 
10 causes of project failure.
10 causes of project failure.10 causes of project failure.
10 causes of project failure.Muhammad Abbas
 

What's hot (20)

Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project Manager
 
PM 01 - Introduction to Project Management
PM 01 - Introduction to Project ManagementPM 01 - Introduction to Project Management
PM 01 - Introduction to Project Management
 
4. the project in the organizational structure
4. the project in the organizational structure4. the project in the organizational structure
4. the project in the organizational structure
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challenges
 
Project organisation structure
Project organisation structureProject organisation structure
Project organisation structure
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Project team management
Project team managementProject team management
Project team management
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Project management communication
Project management communicationProject management communication
Project management communication
 
Project controls
Project controlsProject controls
Project controls
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Chap 3 Organization Structure
Chap 3 Organization StructureChap 3 Organization Structure
Chap 3 Organization Structure
 
Project Termination
Project TerminationProject Termination
Project Termination
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
Project Management Organizational Structures
Project Management Organizational StructuresProject Management Organizational Structures
Project Management Organizational Structures
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
10 causes of project failure.
10 causes of project failure.10 causes of project failure.
10 causes of project failure.
 

Viewers also liked

Managing Customer Expectations
Managing Customer ExpectationsManaging Customer Expectations
Managing Customer ExpectationsFaakor Agyekum
 
Matrix: The future of communication is decentralised, secure and interoperable
Matrix: The future of communication is decentralised, secure and interoperableMatrix: The future of communication is decentralised, secure and interoperable
Matrix: The future of communication is decentralised, secure and interoperableAlan Quayle
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projecDr. Johnson Mavole
 
Effective communication matrix
Effective communication matrixEffective communication matrix
Effective communication matrixThe Bid Coach Ltd
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint university(kust)
 
Chapter 8 product, service, and brands (building customer value)
Chapter 8   product, service, and brands (building customer value)Chapter 8   product, service, and brands (building customer value)
Chapter 8 product, service, and brands (building customer value)Lance Üü
 
Triple Constraints of Projects: Scope, Cost & Schedule
Triple Constraints of Projects: Scope, Cost & ScheduleTriple Constraints of Projects: Scope, Cost & Schedule
Triple Constraints of Projects: Scope, Cost & Scheduleshofiulalom
 
Product, Services, and Branding Strategy
Product, Services, and Branding StrategyProduct, Services, and Branding Strategy
Product, Services, and Branding StrategyMehmet Cihangir
 
6 Characteristics of a Project
6 Characteristics of a Project6 Characteristics of a Project
6 Characteristics of a ProjectBrightWork
 
Chapter 4 Types Of Organization
Chapter 4   Types Of OrganizationChapter 4   Types Of Organization
Chapter 4 Types Of Organizationguevarra_2000
 
Organizational Structure
Organizational StructureOrganizational Structure
Organizational StructureMary Ann Adiong
 

Viewers also liked (11)

Managing Customer Expectations
Managing Customer ExpectationsManaging Customer Expectations
Managing Customer Expectations
 
Matrix: The future of communication is decentralised, secure and interoperable
Matrix: The future of communication is decentralised, secure and interoperableMatrix: The future of communication is decentralised, secure and interoperable
Matrix: The future of communication is decentralised, secure and interoperable
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projec
 
Effective communication matrix
Effective communication matrixEffective communication matrix
Effective communication matrix
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
Chapter 8 product, service, and brands (building customer value)
Chapter 8   product, service, and brands (building customer value)Chapter 8   product, service, and brands (building customer value)
Chapter 8 product, service, and brands (building customer value)
 
Triple Constraints of Projects: Scope, Cost & Schedule
Triple Constraints of Projects: Scope, Cost & ScheduleTriple Constraints of Projects: Scope, Cost & Schedule
Triple Constraints of Projects: Scope, Cost & Schedule
 
Product, Services, and Branding Strategy
Product, Services, and Branding StrategyProduct, Services, and Branding Strategy
Product, Services, and Branding Strategy
 
6 Characteristics of a Project
6 Characteristics of a Project6 Characteristics of a Project
6 Characteristics of a Project
 
Chapter 4 Types Of Organization
Chapter 4   Types Of OrganizationChapter 4   Types Of Organization
Chapter 4 Types Of Organization
 
Organizational Structure
Organizational StructureOrganizational Structure
Organizational Structure
 

Similar to Organizing Project Teams

Chapter - 06 Project Organization.pptx
Chapter - 06 Project Organization.pptxChapter - 06 Project Organization.pptx
Chapter - 06 Project Organization.pptxSaif Uddin
 
Unit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documenUnit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documenhariharankh1
 
Software project management
Software project managementSoftware project management
Software project managementnil65
 
Project organization By Mohd Samim Faizy
Project organization By Mohd Samim FaizyProject organization By Mohd Samim Faizy
Project organization By Mohd Samim Faizysamimfaizy1
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptxgarkapifye
 
Project management
Project management  Project management
Project management Karan Madra
 
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...StanleyRonoh1
 
Pm Session 9
Pm Session 9Pm Session 9
Pm Session 9dmdk12
 
Project management 1
Project management 1Project management 1
Project management 1bnettel
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).pptAbelMuluqen
 
Project management - Indian Business Academy
Project management - Indian Business AcademyProject management - Indian Business Academy
Project management - Indian Business AcademyGajjala vivekananda
 
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5Muzette Charles, PMP
 
Introduction project managemen
Introduction project managemenIntroduction project managemen
Introduction project managemenMostafa Elgamala
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Managementproject management
 

Similar to Organizing Project Teams (20)

Chapter - 06 Project Organization.pptx
Chapter - 06 Project Organization.pptxChapter - 06 Project Organization.pptx
Chapter - 06 Project Organization.pptx
 
Unit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documenUnit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documen
 
Software project management
Software project managementSoftware project management
Software project management
 
Project organization By Mohd Samim Faizy
Project organization By Mohd Samim FaizyProject organization By Mohd Samim Faizy
Project organization By Mohd Samim Faizy
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx
 
Project management
Project management  Project management
Project management
 
Ch5
Ch5Ch5
Ch5
 
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...
PM LESSON 1- PROJECT MNT IN CONTEMPORARY ORGS intro Concepts History 2023 stu...
 
Pm Session 9
Pm Session 9Pm Session 9
Pm Session 9
 
Project management 1
Project management 1Project management 1
Project management 1
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt
 
Project Management Team
Project Management TeamProject Management Team
Project Management Team
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
Project management - Indian Business Academy
Project management - Indian Business AcademyProject management - Indian Business Academy
Project management - Indian Business Academy
 
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
 
Introduction project managemen
Introduction project managemenIntroduction project managemen
Introduction project managemen
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
Project Planning and Management
Project Planning and ManagementProject Planning and Management
Project Planning and Management
 

Recently uploaded

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 

Organizing Project Teams

  • 1. Chapter 4 Project Organization 1 Ch 4 Project Organization “Organize - to form into an association for a common purpose or arrange systematically”
  • 2. Chapter 4 Project Organization2 Project Organization  Specialization of the human elements  Different types = functional, product line, geographical location, production process, type of customer, subsidiary organization, time, vertical or horizontal organization  How to tie project to the parent firm  How to organize the project itself
  • 3. Chapter 4 Project Organization3 Project as Part of Functional Organization  E.g. new technology project – under vice president of engineering  Introduction of new product line – under vice president of marketing  Project assigned to the functional unit that has most interest
  • 4. Chapter 4 Project Organization4 President VP Finance VP Marketing VP Manufacturing VP Engineering Functional Organization Project New Model Proton SURIE New Layout – Robot Line
  • 5. Chapter 4 Project Organization5 Major Advantages  Maximum flexibility in the use of staff  Individual experts can be utilized by many different projects  Specialist in the division can be grouped to share knowledge and experience  Functional division serves as a base of technological continuity  Functional division contains normal of advancement
  • 6. Chapter 4 Project Organization6 Disadvantages  The client is not the focus of activity and concern  Tend to be oriented towards functional activities  No individual is given full responsibility for the project  Slow response to client’s needs  Tendency to sub-optimize the project  Motivation of project team is weak  Does not facilitate a holistic approach to the project
  • 7. Chapter 4 Project Organization7 Pure Project Organization  Project is separated from the rest of the parent system  Becomes self contained unit
  • 8. Chapter 4 Project Organization8 Advantages  PM has full line authority over the project  All project workforce directly responsible to the PM  Lines of communication are shortened  Maintain permanent group of experts  High level of commitment  Ability to make swift decisions  Unity of command  Simple and flexible structure  Support holistic approach to the project
  • 9. Chapter 4 Project Organization9 Project Organization F in a n c e M a n u fa c tu rin g V ic e P re s id e n t P ro je c t A F in a n c e M a n u fa c tu rin g V ic e P re s id e n t P ro je c t B F in a n c e M a n u fa c tu rin g V ic e P re s id e n t P ro je c t C P re s id e n t
  • 10. Chapter 4 Project Organization10 Disadvantages  Duplication of effort  Stockpile equipment and technical assistance “just in case”  Lack of expertise in high technology project  Foster inconsistency and cutting corners  Project takes on a life of its own  Worry about “life after project ends”
  • 11. Chapter 4 Project Organization11 Matrix Organization  Combination of functional and pure project organizations  Matrix project is not separated from parent organizations  Individuals come from respective functions divisions and are assigned to the project full time or part time
  • 12. Chapter 4 Project Organization12 Matrix Organization PM1 PM2 PM3 Manufacturing Program Manager R&D Marketing President
  • 13. Chapter 4 Project Organization13 Matrix Organization  Cross-functional team members  Draw temporarily on technological expertise of relevant functions  High technology areas – integrate functional specialties  Iterations in adapting “over the wall” approach  Systems approach – integrity of product design  Close coordination and communication among all parties
  • 14. Chapter 4 Project Organization14 Advantages of Matrix Approach  The project is the point of emphasis  Reasonable access t pools of technical talents  Less anxiety about what happens after project completion  Rapid response to client needs  Access to administrative units of the parent firms  Better balance of company resources in multiple projects  Flexibility in control
  • 15. Chapter 4 Project Organization15 Disadvantages  Delicate balance of power  Movement of resources – conflict  Projects resist death  Complex division of authority and responsibility  Violates the principle of unity of command
  • 16. Chapter 4 Project Organization16 Mixed Organizational Systems  Divisionalization – breaking down large organization into smaller more flexible units  Spin-off the large projects as subsidiaries or independent operations  Allow formation of venture team  Hybrid leads to flexibility  Dissimilar groupings encourage overlap, duplication and friction
  • 17. Chapter 4 Project Organization17 Mixed Organization P r o je c t M F in a n c e E n g in e e r in g P r o je c t N P r e s id e n t
  • 18. Chapter 4 Project Organization18 Staff Organization  Set up like functional organization  Adds a staff office to administer projects  Used for small, short run projects
  • 19. Chapter 4 Project Organization19 Staff Organization Finance Manufacturing Engineering President Project S
  • 20. Chapter 4 Project Organization20 Choosing an Organizational Form  Functional form – major focus on in-depth technology, require large capital investment  Pure project – large number of similar projects  Matrix organization – require integration of inputs from several functional areas and involves reasonably sophisticated technology and several projects must share technical expertise  Matrix organizations are complex
  • 21. Chapter 4 Project Organization21 Selection of Project Organization  Define the project / objectives  Determine the key tasks  Arrange key tasks by sequence and decompose them into work packages  Determine project subsystems  List special characteristics – level of technology, probable length, resource requirements, level of outsourcing
  • 22. Chapter 4 Project Organization22 Project Team  Project office – control center, chart room (focus of all project activity)  Close location to project manager  Co-location of external parties  Reduce physical distance  Better communication  Pressure to complete tasks
  • 23. Chapter 4 Project Organization23 Key Team Members  Project Engineer  Manufacturing Engineer  Field Manager  Contract Administrator  Project Controller  Support Services Manager
  • 24. Chapter 4 Project Organization24 Work Organization  Project engineer (technical performance) and project controller (budget) report to PM  PM forecast of personnel needs  Prepare WBS to determine exact nature of tasks  Skills requirements are assessed and aggregated  Outsourcing of certain tasks
  • 25. Chapter 4 Project Organization25 Typical Organization of Engineering Projects F ie ld M a n a g e r M a n u f a c t u r in g E n g in e e r P r o je c t E n g in e e r S u p p o r t S e r v ic e s M a n a g e r C o n t r o l A d m in is t r a t o r P r o je c t c o n t r o lle r P r o je c t M a n a g e r
  • 26. Chapter 4 Project Organization26 Staff Critical to Project Success  Senior project team members  Staffs whom the PM will require close communication  Staffs with rare skills for project success
  • 27. Chapter 4 Project Organization27 Human Factors  Technical problem with a human dimension  Perfectionist – can cause delay  Motivation – recognition, achievement, responsibility, advancement, the work itself  Interpersonal conflict  Management by Objectives (MBO) – allows worker to take responsibility for design and performance of a task
  • 28. Chapter 4 Project Organization28 Advantages of MBO  Participative mechanism  Allow professionals to design their own method  Team members know what is expected of them  Members have the opportunity to participate in deciding their own responsibilities  Members get timely feedback on their performance  Project manager is provided a tool for evaluating and controlling performance
  • 29. Chapter 4 Project Organization29 MBO  Superior set objectives in consultation and agreement with subordinates  Subordinate develops action plan, a detailed plan and scheduled that will result in achieving the objective  Final plan becomes a contract
  • 30. Chapter 4 Project Organization30 Major Sources of Conflict Life cycle phase Conflict source Project formation Priorities, procedures, schedules Buildup phase Priorities, schedule, procedures Main program Schedule, technical, manpower Phase out Schedules, personality, manpower