Topics to be covered
 Introduction to Project Management
 Project Life Cycle
 10 Aspects of Project Management
 Organization Types
 Scope Management
 Schedule Management
 Cost Management
 Risk Management
 WBS using Mindmap tools
 Schedule with Microsoft Project Plan
 Initialize a project
 Create a task-based schedule
 Manage resources and assignments
 Track and analyze a project
 Communicate project information
 Creating RACI Matrix
 Creating Stakeholder Register
 Creating Risk Register
 Creating Issue Log
 Create Estimation Templates
Introduction to Project Management
• Why project management?
• Projects, Programs and Portfolios
• Project Success and Project Management
success
Project Life Cycle
• Initiation
• Planning
• Executing
• Monitoring and Controlling
• Closing
Initiation Planning
Monitoring and
Controlling
ClosingExecuting
10 Aspects of Project Management
• Scope
• Schedule
• Cost
• Quality
• Resources
• Risk
• Communication
• Procurement
• Stakeholders
• Integration
Organization Types
• Functional
• Matrix
• Weak matrix
• Balanced matrix
• Strong matrix
• Projectized
• Virtual
• Multi-dimensional
Scope Management
• Plan Scope Management
• Collect Requirements
• Define Scope
• Create WBS
• Validate Scope
• Control Scope
Schedule Management
• Plan Schedule Management
• Define Activities
• Sequence Activities
• Estimate Activity Durations
• Develop Schedule
• Control Schedule
Cost Management
• Plan Cost Management
• Estimate Costs
• Determine Budget
• Control Costs
Risk Management
• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis
• Perform Quantitative Risk Analysis
• Plan Risk Responses
• Implement Risk Responses
• Monitor Risks
WBS using Mindmap tools
• Brainstorm
• Involve team
• Involve customer
• Align with your organization type
Schedule with Microsoft Project Plan
• Prepare Integrated Plan
• Scope, Schedule & Cost
• Anticipate Problems (early)
• Delegate Systematic Manner
• Monitor holistic manner
Creating RACI Matrix
• Create roles
• Collaborative Agreement
• Proactive Delegation
• Involve Resources
• Agree on Expectations
Creating Stakeholder Register
Creating Stakeholder Register
• Who is Who
• Align Every one
• Know the Expectations
• Communicate as per Preferences
• Involve (when needed)
Creating Risk Register
• Expect the Unexpected
• Wisdom of Crowd
• Play with Strengths
• Plan B to deal with Unexpected
• Deal Thresholds with Grace
• Update regularly
Creating Issue Log
• Constructive Communication
• Proactive VS Reactive
• Seamless Team communication
Create Estimation Templates
• Analogous
• Parametric
• Bottom up
• Reserve Analysis
Thank you!
Thankyou Thankyou
LeaderGains Pte Ltd
www.leadergains.com
Sivaram Athmakuri
Founder & Director
© Copyright 2018 LeaderGains
sivaram@leadergains.com
+65 97344202
We train at your convenience –
classroom or online
© Copyright 2018 LeaderGains

More Related Content

Similar to Project management practising with tools

First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera courseFirstCADD2014
 
Project Management
Project ManagementProject Management
Project Management
mbchiorean
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - Cost
Cybrary
 
Project Management
Project ManagementProject Management
Project Management
Mark Roman
 
Project management Advanced
Project management  AdvancedProject management  Advanced
Project management Advanced
SivaramAthmakuri1
 
Why Project Management with Primavera?
Why Project Management with Primavera?Why Project Management with Primavera?
Why Project Management with Primavera?
Abhi Kalyan
 
Benefits of EPM
Benefits of EPMBenefits of EPM
Benefits of EPM
Hari Thapliyal
 
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge AreaOnline PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
GlobalSkillup
 
Top Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad ThaljiTop Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad Thalji
Top Pillars
 
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
Association for Project Management
 
Resource scheduling & capacity planning for project online webinar 25 oct18
Resource scheduling & capacity planning for project online  webinar 25 oct18Resource scheduling & capacity planning for project online  webinar 25 oct18
Resource scheduling & capacity planning for project online webinar 25 oct18
Mike Otranto
 
Riskmanagement 130215051514-phpapp01
Riskmanagement 130215051514-phpapp01Riskmanagement 130215051514-phpapp01
Riskmanagement 130215051514-phpapp01
naik royalz
 
APMO Strategic Mandala Risk Management
APMO Strategic Mandala Risk ManagementAPMO Strategic Mandala Risk Management
APMO Strategic Mandala Risk Management
PMOfficers PMOAcademy
 
Risk management
Risk managementRisk management
Risk management
Abhi Kalyan
 
Eduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course OutlineEduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course Outline
Business Fuel LLP
 
Project management for exhibition project
Project management for exhibition projectProject management for exhibition project
Project management for exhibition project
Rizwan Zafar
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
Daniele Pinto
 
Clockwork Content Strategy Meetup Presentation
Clockwork Content Strategy Meetup PresentationClockwork Content Strategy Meetup Presentation
Clockwork Content Strategy Meetup Presentation
Clockwork
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceSusan Schanta
 

Similar to Project management practising with tools (20)

First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera course
 
Project Management
Project ManagementProject Management
Project Management
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - Cost
 
Project Management
Project ManagementProject Management
Project Management
 
Project management Advanced
Project management  AdvancedProject management  Advanced
Project management Advanced
 
Why Project Management with Primavera?
Why Project Management with Primavera?Why Project Management with Primavera?
Why Project Management with Primavera?
 
Website Planning and Creation
Website Planning and CreationWebsite Planning and Creation
Website Planning and Creation
 
Benefits of EPM
Benefits of EPMBenefits of EPM
Benefits of EPM
 
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge AreaOnline PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
 
Top Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad ThaljiTop Pillars | PMP training I Mr. Riad Thalji
Top Pillars | PMP training I Mr. Riad Thalji
 
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
Alex Constantine - The Impact of AI on Project Professionals – Introducing a ...
 
Resource scheduling & capacity planning for project online webinar 25 oct18
Resource scheduling & capacity planning for project online  webinar 25 oct18Resource scheduling & capacity planning for project online  webinar 25 oct18
Resource scheduling & capacity planning for project online webinar 25 oct18
 
Riskmanagement 130215051514-phpapp01
Riskmanagement 130215051514-phpapp01Riskmanagement 130215051514-phpapp01
Riskmanagement 130215051514-phpapp01
 
APMO Strategic Mandala Risk Management
APMO Strategic Mandala Risk ManagementAPMO Strategic Mandala Risk Management
APMO Strategic Mandala Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Eduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course OutlineEduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course Outline
 
Project management for exhibition project
Project management for exhibition projectProject management for exhibition project
Project management for exhibition project
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
Clockwork Content Strategy Meetup Presentation
Clockwork Content Strategy Meetup PresentationClockwork Content Strategy Meetup Presentation
Clockwork Content Strategy Meetup Presentation
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program Assurance
 

Recently uploaded

Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
rivaraj2711
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
EUS+ Management & Consulting Excellence
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 

Recently uploaded (16)

Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 

Project management practising with tools

  • 1. Project Management Practising with Tools LeaderGains Pte Ltd 1, Scotts Rd, #24-10, Shaw Center, SINGAPORE 228208 +65 97344202 contactus@leadergains.com © Copyright 2018 LeaderGains
  • 2. Topics to be covered  Introduction to Project Management  Project Life Cycle  10 Aspects of Project Management  Organization Types  Scope Management  Schedule Management  Cost Management  Risk Management  WBS using Mindmap tools  Schedule with Microsoft Project Plan  Initialize a project  Create a task-based schedule  Manage resources and assignments  Track and analyze a project  Communicate project information  Creating RACI Matrix  Creating Stakeholder Register  Creating Risk Register  Creating Issue Log  Create Estimation Templates
  • 3. Introduction to Project Management • Why project management? • Projects, Programs and Portfolios • Project Success and Project Management success
  • 4. Project Life Cycle • Initiation • Planning • Executing • Monitoring and Controlling • Closing Initiation Planning Monitoring and Controlling ClosingExecuting
  • 5. 10 Aspects of Project Management • Scope • Schedule • Cost • Quality • Resources • Risk • Communication • Procurement • Stakeholders • Integration
  • 6. Organization Types • Functional • Matrix • Weak matrix • Balanced matrix • Strong matrix • Projectized • Virtual • Multi-dimensional
  • 7. Scope Management • Plan Scope Management • Collect Requirements • Define Scope • Create WBS • Validate Scope • Control Scope
  • 8. Schedule Management • Plan Schedule Management • Define Activities • Sequence Activities • Estimate Activity Durations • Develop Schedule • Control Schedule
  • 9. Cost Management • Plan Cost Management • Estimate Costs • Determine Budget • Control Costs
  • 10. Risk Management • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis • Perform Quantitative Risk Analysis • Plan Risk Responses • Implement Risk Responses • Monitor Risks
  • 11. WBS using Mindmap tools • Brainstorm • Involve team • Involve customer • Align with your organization type
  • 12. Schedule with Microsoft Project Plan • Prepare Integrated Plan • Scope, Schedule & Cost • Anticipate Problems (early) • Delegate Systematic Manner • Monitor holistic manner
  • 13. Creating RACI Matrix • Create roles • Collaborative Agreement • Proactive Delegation • Involve Resources • Agree on Expectations Creating Stakeholder Register
  • 14. Creating Stakeholder Register • Who is Who • Align Every one • Know the Expectations • Communicate as per Preferences • Involve (when needed)
  • 15. Creating Risk Register • Expect the Unexpected • Wisdom of Crowd • Play with Strengths • Plan B to deal with Unexpected • Deal Thresholds with Grace • Update regularly
  • 16. Creating Issue Log • Constructive Communication • Proactive VS Reactive • Seamless Team communication
  • 17. Create Estimation Templates • Analogous • Parametric • Bottom up • Reserve Analysis
  • 18. Thank you! Thankyou Thankyou LeaderGains Pte Ltd www.leadergains.com Sivaram Athmakuri Founder & Director © Copyright 2018 LeaderGains sivaram@leadergains.com +65 97344202
  • 19. We train at your convenience – classroom or online © Copyright 2018 LeaderGains