SlideShare a Scribd company logo
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
2
Email: info@aps-oie.com
Summary Introduction:
Name : Arshia Petro Santa Khavar Mianeh (APS)
Company Type : Private
Grading : Grade 3 on Oil and Gas / Grade 4 on Construction
Economy Code : 411394313547
Board of Directors : A.Abnoos – M.Moslemi – M.Tavasoli – M.Eskandari
Chairman : A.Abnoos
Managing Director : M.Moslemi
Tel No. : +9821 8856 3849, +9821 8856 3859, +9821 8837 9173, +9821 8837 9178
Fax No. : +9821 8856 3861
Central office Address :
Apartment No.3 , Third floor, Building No.162, Darya Blvd, Between Paknegad
and Motahari, Gharb County , Tehran.
Yard Address : 37 Km, West Bandar Abbas
Email Address : info@aps-oie.com
Web Site : www.aps-oie.com
Scope of Work : We are a General Contractor performing turnkey projects, project management
and project development in all oil & gas, petrochemical power plants both
National and International.
We are performing all Engineering services, Fabrication plans, Research plans in
all our permitted fields, also all Consultant & Construction services for
petrochemical complex, Oil & Gas Refineries & Petrochemical plants.
Arshia Petro Sanat fulfill all Oil & Gas pipeline projects, Water pipelines, Auxilary
facilities of power plants, in both on shore & off shore, Ship Repairing, Excavation,
Earth filling, Drilling, Installation & Commissioning, Project control & planning,
Technical support services for Administrative & Contractual proposals, Making
consortium with similar companies, feasibility studies, Engineering &
Procurement, Implementation of Management systems & Strategic Management,
Risk Management, Contract Management & Project Management for Oil & Gas
and petrochemical, would be in our scope of work.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
3
Email: info@aps-oie.com
History :
Arshia Petro Sanat Khavar Mianeh (APS) started activity as a Fabrication Subcontractor called Abnoos,
in year 1997, in Lordegan city.
The objectives of this group had been summarized in, offering a new method of services to Oil & Gas
Contractors/Clients and did its best with fulfilling projects on time, satisfying the clients, being capable
in forming expert project teams as well as, project cost’s control. In South Pars Phase 14, platform has
been rolled up by this small group in 20 days period successfully.
We have achieved precious experiences over the years in all aspects of EPCI oil / Gas, petrochemical &
power plants.
This subcontracting company, just because of its patriotism, aimed to develop the country industry
and changed totally to a Company named :Arshia Petro Sanat Khavar Mianeh , in year 2008. One of
the main reasons for this company was the company accurate management to achieve the best
economical way to do the projects in a safe mode. We have started to go ahead in our way to develop.
We also achieved the Grading for Oil & Gas and construction in 2014 for performing our projects in
ideal way.
Vision :
Arshia petro Sanat, with reliance to its abilities for accomplishment of all on shore & off shore
construction projects with high quality and in a minimum time proceeded to go head in Engineering,
Procurement and Construction of all on shore & off shore structures & equipments to help our
country’s self development.
We will ascertain this, by the help of our capable & formidable experts and modern technology &
equipment.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
4
Email: info@aps-oie.com
Competitive advantages :
APS, has been created an experienced team to assist the economical and industrial organizations’
managers and clients for going ahead to development in both onshore and offshore fields.
We have achieved a precious experience over the years, to fabricate, installation, testing and
commissioning as with support of applying required modern equipments. We owe our reputation from
capable managers and experts in our company, which are one of our main funds. The basic objective
of our management team is customer’s satisfaction; we are presenting high quality services to our
customers and clients. In fact, our executive, monitoring and safety systems allow us to reach our goals
to present ideal services in a cost effectiveness way with high quality level.
In other hand, our experienced dynamic personnel and management ,facilitate the way to achieve our
objectives in this regard.
Accomplishment the projects in minimum period in a high quality level with being cost effectiveness,
achieving our customer’s satisfaction and ability to do different projects simultaneously are the major
signs of our company ability to perform the job in a best way.
The following items are the witness of our competitive advantages:
- High financial strength :
 To perform the 1188000000000 Rials Project in 4 years.
- High level QA/QC management :
 Obtaining the international certificates: ISO/TS29001:2010, ISO9001:2008, ISO14001:2004
OHSAS18001:2007, HSE-MS
 Main bearing and bearing support with 4 meters diameter on installed piece in SPM
project.
- Performing the project in minimum period :
 Fabrication of 2 sets of tripods for south pars phases 14 with 1000 tons weight in 30 days.
 Structure fabrication of deck B for south pars phase 14 in 3 months.
 Construction of 4 sets jackets for south pars phase 14 with 8000 tons weight in 150 days.
 Construction of tripods and piles for phase 19A, 19C, with 3000 tons weight in 90 days.
 Construction of tripods and piles for projects south pars phase 20, 21 with 1200 tons in 60
days.
 Construction of mechanical part for the first SPM in Iran in 7 months.
 Hook up operation for phase 12 platform in 60 days.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
5
Email: info@aps-oie.com
Company Abilities
Aligned with realization of appropriate infrastructures for sustainable development of our country,
through outsourcing the projects to private sector, we are proud to support the clients with our
potential abilities.
Our domain services includes: all management services, engineering, procurement of material and
equipments, projects management in Oil / Gas, petrochemical and power plants.
Our scope of work includes below:
 All fixed equipment construction such as pressure tanks, storage tanks, heat exchanges,
chemical packages, towers, …
 All Oil & Gas platforms structures.
 All platforms ancillaries such as: jackets / tripods, bridges, flares, piles,..
 Air conditioning systems installation on all Oil / Gas platforms.
 Oil & Gas platforms piping.
 Hydro test activities on pipelines and storage tanks.
 Civil operation of Oil & Gas platforms,
 Electrical, instrument operation for Oil & Gas platforms.
 Offshore & onshore Oil and Gas pipelines.
 Offshore cable lying.
 Internal inspection and Hydro test in Oil & Gas pipelines.
 Sea fastening and load out operations.
 Hook up operation.
 Offshore installation of jacket, piles, platforms installation.
 Precommissioning / commissioning.
 Vessels periodic maintenance on dry dock or floating dock on the supervision of clients.
 Subsea inspection and video recording.
 Subsea repair and maintenance of vessels & main structures.
 Offshore structures maintenance & development.
 Paint / sand blasting of marine & submarine projects.
 Anode installation projects on offshore & onshore pipelines.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
6
Email: info@aps-oie.com
Codified procedures in Arshia petro Sanat Khavar Mianeh :
No. Procedure Name Applicable in
1 Management strategic procedure
The objective of this procedure is to clarify communication
methods of top management with company downstream process
and projects, in order to monitor its effectiveness to go along
company main goals.
2 Quality management system
This procedure is prepared to clarify the quality management
system’s policy as well to determine the managers & personnel
responsibilities in company.
3 HSE
This procedure is to define :
- To decrease the accident / incident to minimum level.
- To decrease the environmental pollutants to minimum level.
- To decrease the wastage in processes to minimum level and gain
the favorable output.
- Finally analysies the HSE data and monitoring improvement is
happened or not.
4 Project Control Procedure
This procedure is to define :
- Project management contains activity such as initiating,
planning, executing, controlling, and closing the work of a team
to achieve specific goals and meet specific success criteria base
on PMBOK standard.
- Project management software in our company base on
Primavera P6 and Microsoft Project Server 2013.
- All projects are managed by Project Management Office (PMO)
since 2013
5 Training procedure
This procedure is prepared to ensure the managers and
personnel’s competence, and the competence include / education
/ training / skills and experiences.
6
Continuous improvement
procedure
The procedure goal is to implement corrective measures and
preventive actions for performing continuous improvement to
eliminate the problems and fix deficiencies.
7
Business development & CRM
procedure
This procedure is to define an administrative method to describe
relationship and/ communication with potential customers /
clients, obtaining projects from clients, and how to keep in touch
with them. The methods of customer’s satisfaction and its
measurement would be described in this procedure.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
7
Email: info@aps-oie.com
No. Procedure Name Applicable in
8 Analysis and overview procedure
This procedure objective is to analyze company performance,
method statements and procedures within a specified period in
order to increase productivity.
9 Value engineering procedure
This is an efficient method to identify and remove unnecessary
costs and short implementation time and optimization of projects.
10
Human resource management
procedure
The purpose of this procedure is to implement the policies and
goals of organizations and individuals in the area of staff.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
8
Email: info@aps-oie.com
Integrated Management System Policy :
Arshia Petro Sanate Khavar Mianeh, utilized the specialized human resources, advanced systems and
know-how in the world, is active in Offshore Oil & Gas Projects.
This Company is a general Contractor (G.C) performing turnkey projects, management contract (MC),
Engineering, Procurement & Construction (E.P.C), also provides consulting services.
In order to promote the quality & quantity of the projects, environmental protection, sanitation &
safety rules observation in work place based on:
ISO/TS29001:2010,ISO 9001:2008,ISO14001:2004,OHSAS18001:2007,HSE-MS
Hereby declare the outlines of Integrated Management System as follows:
 Increasing the competitive ability with fair prices
 Efficient use of all resources and reduce costs on the projects
 Endeavor for customers’ satisfaction, identification of beneficiaries & supp0ly their needs in
accordance with legal rules
 Pollutant prevention for environmental protection through continuous improvement
 Promotion of personnel’s technical , scientific & HSE level through detail planning for related
training courses
 Ensuring compliance with observation of legal rules,standards,clients’ requirements
 Prevent and reduce occupational diseases and accidents by identifying and assessing risks in
order to keep health human resources
Establishment & preservation of IMS standards in company & achieving our mentioned objectives, is
related to all personnel’s cooperation & the top management of company hereby declare his
commitment toward the legal compliances for objectives determination and implementation.
This IMS Policy would be overviewed in specified period by top management.
M.Moslemi
Direct Manager
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
9
Email: info@aps-oie.com
Certificates
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
10
Email: info@aps-oie.com
HSEQ Certificates :
1- Certificates of Jas.ANZ- Australia from Jul 2013 until Jul 2016
 ISO 9001 : 2008
 ISO 14001 : 2004
 ISO 29001 : 2010
 OHSAS 18001 : 2007
 HSE-MS
2- Certificates of qcb- Italia from Jul 2016 until Jul 2019
 ISO 9001 : 2008
 ISO 14001 : 2004
 ISO 29001 : 2010
 OHSAS 18001 : 2007
 HSE-MS
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
11
Email: info@aps-oie.com
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
12
Email: info@aps-oie.com
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
13
Email: info@aps-oie.com
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
14
Email: info@aps-oie.com
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
15
Email: info@aps-oie.com
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
16
Email: info@aps-oie.com
Grading Certificate :
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
17
Email: info@aps-oie.com
Clients Satisfaction :
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
18
Email: info@aps-oie.com
Clients Specifications’:
No. Clients Name
Contact
Person
Contract Scope Address
1 ISOICO Mr.Hafezpour
Construction of 2 Bridges, 2 Jackets of SPD-
14B/SPD-14A & Flares of SPD-14A, B, C, D
37 km of West Bandar
Abbas,ISOICO Yard
2
Arman Sazeh Aryan
Co.
Mr.Arzoughi Constructin of jacket A, D S.P.phase 14
37 km of West Bandar
Abbas,ISOICO Yard
3
Mobin Sazeh
Gostare Khalije fars
Mr.Abbaspour
Construction & Installation of sea fastening
for jacket C, S.P phase 14
37 km of West Bandar
Abbas,ISOICO Yard
4
Mobin Sazeh
Gostare Khalije fars
Mr.Abbaspour
Construction & Installati0n of sea fastening
for jacket B, S.P phase 14
37 km of West Bandar
Abbas,ISOICO Yard
5
Bahr Gostareshe
Hormoz
Shipbuilding co.
Mr.Ghasemizadeh
Operation of main structure & ancillaries for
Deck B, S.P.phase 14
37 km of West Bandar
Abbas,ISOICO Yard
6
Mobin Sazeh
Gostare Khalije fars
Mr.Abbaspour Operation of platforms 07, 08 Hendijan field
37 km of West Bandar
Abbas,ISOICO Yard
7
Mobin Sazeh
Gostare Khalije fars
Mr.Abbaspour
Piping operation for 07, 08 platforms of
hendijan field
37 km of West Bandar
Abbas,ISOICO Yard
8
Arvand Poolad
Faraynd Int.Co
Mr.Mamjad Construction & Installation of One SPM
Khorramshahr, Yard
No.3, IOEC
9 IOEC Mr.Jazayeri
Construction of tripods, flares, piles of S.P
phase 19C
Khorramshahr, Yard
No.3, IOEC
10
Arvand Poolad
Faraynd Int.Co
Mr.Mamjad
Construction of tripods, flares, piles of S.P
phase 19A
Khorramshahr, Yard
No.3, IOEC
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
19
Email: info@aps-oie.com
Experiences
 South Pars Gas Field Development
 Oil Field Development
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
20
Email: info@aps-oie.com
South Pars Gas Field Development :
Phase 12
SPM (Single
Point Mooring)
Construction
Hook up
operation
Phase 19
Construction of
Ancillaries Part C
Construction of
Ancillaries Part A
Phase 14
Piping operation
Electrical System
& Instrument
Operation
Construction of
Platform
Construction of
Platform Jackets
Construction of
Ancillaries
Phase 20 & 21
Construction of
Ancillaries
Construction of
Platform
Phase 15&16
4 Inch onshore
pipeline
32 Inch onshore
pipeline
Phase 17&18
4 Inch onshore
pipeline
32 Inch onshore
pipeline
Hook Up & Pre-
Commissioning
17B
Hook Up & Pre-
Commissioning
18B
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
21
Email: info@aps-oie.com
Phase 12 :
SPM Construction
Client Arvand Poolad farayand Co./IOEC
Location Khorramshahr
Duration 9 months
Nowadays, The marine terminal as one of the best ways to load oil and its
derivatives with respect to the minimum cost compared with loading docks,
always have been in center of attention & interest to apply.
As,the Marine Terminals ( SPM,single point mooring ) have been already
interested by Iranian clients, some of the local companies entered to
Engineering, Procurement & Fabrication of SPMs.
APS Co. according to the priority of the subject & for support of Islamic
Country development initiated the project of one Single Point Mooring
Fabrication & commissioning for South Pars Phase 12 as IOEC subcontractor.
Fabrication of this SPM in Khorramshahr yard is accomplishing as a complete
National Project.
Hook up Operation project for platform C, S.P.Phase 12
Client IOEC
Location South Pars Free Zone
Duration 2 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
22
Email: info@aps-oie.com
Phase 14 :
Piping Operation of S.P.Phase 14 Platform
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 12 months
Electrical System & Instrument Operation for S.P.Phase 14 platforms
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 12 months
Construction of platform B,S.P Phase 14 project
Client Bahr Gostaresh Ship building Co
Location Bandar Abbas
Duration 4 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
23
Email: info@aps-oie.com
Construction of Jackets A,D,S.P.Phase 14
Client ISOICO
Location Bandar Abbas
Duration 90 days
Construction of Jackets B,C,S.P.Phase 14
Client ISOICO
Location Bandar Abbas
Duration 5 months
Ancillaries of S.P Phase 14 project
Client Nadim Gostaresh Khalij Fars
Location Bandar Abbas
Duration 4 Months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
24
Email: info@aps-oie.com
Phase 15 & 16 :
32 ,4 Inch pipeline project , South Pars Phases 15,16
Client IOEC
Location Booshehr
Duration 6 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
25
Email: info@aps-oie.com
Phase 17 & 18 :
32,4 Inch pipeline project, South pars Phases 17,18
Client IOEC
Location Booshehr
Duration 7 months
Hook up operation project for platform B, S.P.Phase 17 & 18
Client Bahr Gostaresh Ship building Co
Location Bandar Abbas
Duration 4 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
26
Email: info@aps-oie.com
Phase 19 :
Construction of tripods,Bridges,piles & flares of S.P Phase 19C
Client IOEC
Location Khorramshahr
Duration 7 months
Construction Project for tripods, bridges & piles of S.P.Phase 19A
Client Arvand Poolad Farayand
Location Khorramshahr
Duration 7 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
27
Email: info@aps-oie.com
Phase 20 & 21 :
SPD20 Platform Construction Project for S.P.Phase 20, 21
Client IOEC
Location KHorramshahr
Duration 7 months
Ancillaries Construction project , S.P.Phase 20, 21
Client Arvand Poolad Farayand
Location Khorramshahr
Duration 5 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
28
Email: info@aps-oie.com
Oil Field Development :
Hendijan
Development of
Platforms 07,08
Piping Platforms
07, 08
Electrical &
Instrument
Platforms 07, 08
Engineering & Pre
Commissioning
Platforms 07, 08
Hengam
Construction of
Platform
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
29
Email: info@aps-oie.com
Hendijan Field :
Piping project for platforms 07, 08 Hendijan Field
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 12 months
Development of Platforms 07,08 project
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 8 months
Electrical System & Instrument operation for Platforms 07,08 project
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 11 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
30
Email: info@aps-oie.com
Engineering and Pre Commissioning platforms 07, 08 Hendijan Field
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 12 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
31
Email: info@aps-oie.com
Hengam Field :
Other Project :
ABOOZAR GAS FLOW INCREASE PROJECT
Client Petro Sahel Ofogh Kish/PEDCO
Location KHARK ISLAND
Duration 6 months
Construction and installation Hengam oil platform
Client Mobin Sazeh Gostar
Location Bandar Abbas
Duration 12 months
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
32
Email: info@aps-oie.com
Completed Projects:
Discription Client Location
Storage tanks piping Bana Gostar Co Bandar Abbas
Structure fabrication & piping Zolal Iran Co. Mahshahr
Structure fabricating & piping Mehvarsazan Co. Mahshahr
Pipng for Maroon Petrochimi Mehvarsazan Co. Mahshahr
Kharg Oil port renovation project include piping,
structure & pile driving
Tehran Berkli Kharg Island
Lavan jetty structure fabrication includes piping,
structure & pile driving
NIOPDC Lavan
Structure fabrication & piping Ramshir Co Assaluyeh
Structure fabrication & piping Yegan Foolad Co Assaluyeh,Phases 6,7,8
16 inch pipeline project from Abadan to Darkhoin
Tasdid offshore
development co
Khoozestan
Engineering,construction & installation of 2 Hinge Flange
for Aboozar 1200 vessel
I O E C Khorramshahr
Engineering,construction & Installation of Moldering
system on Aboozar 81 vessel
I O E C Khorramshahr
Construction & Installation of Sea fastening for
Bahregnsar
I O E C Khorramshahr
Ancillary construction for S.P.9,10 phases IOEC / MSM Khorramshahr
Piping for Bahregansar,P.P I O E C Khorramshahr
Heli Deck construction for S.P Phases 9,10 IOEC/MSM Khorramshahr
Bahregansar Platforms Load out IOEC Khorramshahr
Dorood & Foroozan Renovation & revamping project IOOC/RGD Dorood & Foroozan Oil Field
Renocatin & revamping of IOOC Platforms IOOC/RGD Persian Gulf
Ancillaries Structure Fabrication of S.P.Phase 16 ISOICO/ASA Bandar Abbas
Skid beam Fabrication/Weighing support ISOICO/ASA Bandar Abbas
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
33
Email: info@aps-oie.com
Technical Ability
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
34
Email: info@aps-oie.com
Company Organization Chart :
Managing Director
Technical
Consultants
Legal advisers
Market
Development
Management
Execution
Management
Procurement
Management
QC / QA
Management
Financial and
Administrative
Management
Engineering
Manager
PMO
Order
Engineering
Sales
Engineering
Quality
Control
Quality
Assurance
Management Office
HSEQ
Management
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
35
Email: info@aps-oie.com
Key personnel List :
No. Name Academic Degree Position Experience
1 M.Moslemi BS in Mechanic Engineering Managing Director 12 years
2 A.Kamali khah MS in Mechanic Engineering Technical Consultant 17 years
3 R.Hosseinpour MS in International Law Lawyer Consultant 10 years
4 A.Akbari BS in Mechanic Engineering Commercial Manager 20 years
5 E.Basakha BS in Industrial Engineering Construction Manager 12 years
6 J.Imani BS in Civil Engineering Engineering Dep. Manager 20 years
7 A.Afshang BS in Mechanic Engineering Strucural Dep. Manager 11 years
8 M.Sasani BS in Mechanic Engineering Piping Dep. Manager 15 years
9 A.Khodabakhsh BS in Electrical Engineering Elec and Ins Dep. Manager 12 years
10 H.Jalalifar MS in Mecateronic
Commissuning Dep.
Manager
10 years
11 A.Samyari BS in Mathematics PMO Manager 11 years
12 S.Salahshoor BS in Mechanic Engineering Q/C Manager 10 years
13 J.Atashkar BS in Industrial Manager HSE Manager 20 years
14 B.Sohrabi BS in Industrial Engineering
Market Development
Manager
10 years
15 Z.Eskandari BS in Acounting
Admi. And Financial
Manager
13 years
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
36
Email: info@aps-oie.com
Equipment List :
No. Equipment Name Quantity Specification Property Type
1 Crane 2 50 tons Self Property
2 Crane 3 30 tons Self Property
3 Crane 3 25 tons Self Property
4 Crane 5 10 tons Self Property
5 Trailer 2 Self Property
6 Flooring Tractor 3 Self Property
7 Tractor 4 Self Property
8 Forklift 3 5.5 tons Self Property
9 Forklift 3 3.5 tons Self Property
10 Bus 5 Self Property
11 Mini Bus 8 Self Property
12 Nissan-Saypa-Mazda Pick up 4 Self Property
13 pasenger car 10 Self Property
14 Motor cycle 3 125 cc Self Property
15 Water Tank 2 Self Property
16 Compressor 5 Self Property
17 Rectifyer 230 Self Property
18 Water Tank 4 5000 liter Self Property
19 Gazoline Tank 2 20000 liter Self Property
20 Gazoline Tank 2 3000 liter Self Property
21 Container 10 6 meters Self Property
22 Container 8 12 meters Self Property
23 Residential (Conex) 22 12 meters Self Property
24 Residential 11 Self Property
25 Oven 5 Self Property
26 Manual Oven 300 Self Property
27 Grinding Machine 350 Self Property
28 Mini Grinding machine 300 Self Property
29 Saypa Diesel water tank 1 Self Property
30 Color inspection equipment 3 Self Property
31 Rail cutting machine 10 Self Property
32 Manual cutting machine 80 Self Property
33 Circular cutting machine 30 Self Property
34 Chain bevel cutting machine 25 Self Property
35 Banding machine(4 inch) 2 Self Property
36 Diesel Electric Generator 10 Self Property
37 Electrical Panel 00 Self Property
38 Welding Cable 10000 Self Property
39 3 phase cable 0000 Self Property
40 Chain Block 00 1-8 tons Self Property
41 Jack 00 5-50 tons Self Property
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
37
Email: info@aps-oie.com
42 Hydrolic Jack 0 50 tons Self Property
43 Hydrolic Jack 0 100 tons Self Property
44 Sand Blasting Pot 9 Self Property
45 Digital Grinding Machine 80 00 Self Property
46 Airless 7 Self Property
47 Water jet machine 4 7550 b Self Property
48 Magnet Drill 4 Self Property
49 Scaffolfing pipe 0000 6 meters Self Property
50 Scaffolding panel 7000 4,6 meters Self Property
51 Scaffolding fastener 00000 Self Property
52 Topography Camera 0 Self Property
53 Air Capsule (tank) 000 Self Property
54 Gas Capsule (tank) 100 Self Property
55 Termometer 0 Self Property
56
Welding Inspection
Equipment
0 Self Property
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
38
Email: info@aps-oie.com
Codes & Standards Related to Quality Control
1. GENERAL INTERNATIONAL SPECIFICATION AND STANDARDS
API Spec 5L Line pipe
API SPEC 2B API Specification for Fabrication of Structural Steel Pipe
API SPEC 2C Specification for Offshore Pedestal Mounted Cranes
API RP 2L Planning, Designing & Constructing Heliports for Fixed Offshore Platforms
API Spec 6D Pipeline valves (gate, plug, ball and check valves) -
API Std 1104 Welding of Pipelines and Related Facilities
ASME B16.5 Pipe flanges and flanged fittings (NPS ½ through NPS 24)
ASME B31.3 Process piping
ASME B31.4 Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids
ASME B31.8 Gas transmission and distribution piping system
ASME PV Code 8 Div. 1 Boiler and Pressure Vessel Code - Pressure Vessels
ISO 9000/9001 Quality systems
MSS SP-75 Specification for high test wrought butt welding fittings
NACE MR01-75 Petroleum and natural gas industries—Materials for use in H2S-containing
environments in oil and gas production
ANSI AW WA D100 Welded Steel Tanks for Water Storage
API Spec 2C Offshore Cranes
API Std 650 Welded Steel Tanks for Oil Storage
ASME Sec. II Material Specification
ASME Sec. V Non-Destructive Examination
ASME Sec. IX Welding and Brazing Qualifications
ASTM 370 Testing Of Materials
AWS D1.1/D1.1M Structural Welding Code
AWS D1.1 Structural Welding Code – Steel
AWS A2.4 Symbols for Welding and NDT
AWS A3.0 Welding Terms and Definitions
EN 10204 Metallic Products-Types of Inspection Documents
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
39
Email: info@aps-oie.com
2. SPECIFIC INTERNATIONAL PIPING SPECIFICATION AND STANDARDS
ASME B16.9 Factory-made wrought steel butt welding fittings
ASME B16.10 Face-to-face and end-to-end dimensions of valves
ASME B16.11 Forged fittings, socket-welding and threaded
ASME B16.20 Metallic gaskets for pipe flanges – Ring joint, Spiral-wound and Jacketed
ASME B16.21 Non metallic flat gasket for pipe flanges
ASME B16.25 Butt welding ends
ASME B16.34 Valves - Flanged, threaded and welding ends
ASME B16.36 Steel Orifice Flanges
ASME B16.48 Steel line blanks
ASME B18.2 Square, hexagonal bolts and nuts
ASME B36.10M Carbon steel pipe
ASME B36.19M Stainless steel pipe
API RP 5L Specification for Line Pipe.
EEMUA 142 Acoustic insulation of pipes, valves and flanges
EEMUA 144 90/10 Copper Nickel Alloy Piping for Offshore Applications - Specification - Tubes
Seamless and Welded
EEMUA 145 90/10 Copper Nickel Alloy Piping for Offshore Applications – Specification – Flanges
Composite and Solid
EEMUA 146 90/10 Copper Nickel Alloy Piping for Offshore Applications – Specification – Fittings
ISO 10474 Steel products – inspection documents
MSS SP 43 Wrought Stainless Steel Butt-Welding Fittings
MSS SP 53 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping
Components
MSS SP 54 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping
Components
MSS SP 55 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping
Components
MSS SP 61 Pressure Testing of Steel Valves
NACE MR0175/ISO 15156 Petroleum and Natural Gas Industries
Parts 1/2/3: Material for use in H2S containing Environments in Oil and Gas Production - 2004 TC 2
2008
Corrigenda Corrigenda Pack – 2005
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
40
Email: info@aps-oie.com
3. SPECIFIC INTERNATIONAL PIPELINE STANDARDS
API RP 1111 Design, Construction, Operation and Maintenance of Offshore Hydrocarbon Pipeline
API 1104 Welding of Pipelines and Related Facilities
ASME B16.47 Large Diameter Steel Flanges (NPS 26 thru NPS 60)
BS 4515-1(2009) Welding of Steel Pipelines on Land and Offshore
DNV OS-F1 01 Submarine Pipeline Systems
ISO 15590-1 Induction Bends, Fittings and Flanges for Pipelines Part 1: Induction Bends
MSS SP-44 Steel Pipeline Flanges
4. SPECIFIC INTERNATIONAL STRUCTURAL STANDARDS
API RP 2A-WSD Planning, Designing and Construction of Fixed Offshore Platforms Working Stress
Design
API RP 2B Fabrication of Structural Steel Pipe
API RP 2X Ultrasonic and Magnetic Examination of Offshore Structural Fabrication and
Guidelines for Qualification of Technicians
API RP 2H Carbon manganese steel plate for offshore platform tubular joints.
API RP 2MT1 As -rolled carbon manganese steel plate with improved toughness for offshore
structures.
API RP 2W Specification for Steel Plates for Offshore Structures, Produced by Thermo Mechanical
Control Processing (TMCP).
API RP 2Y Specification for Steel Plates, Quenched-and-Tempered, for Offshore Structures.
API RP 5Z Recommended Practice for Preproduction Qualification for Steel Plate for Offshore
Structures.
API RP 2Z Preproduction qualification for steel plates for offshore structures
American Society for Testing and Materials (ASTM)
A6 Std. Specification for general requirements for rolled structural steel bars, plates, shapes
and sheet piling
A36 Specification for Structural Steel.
A53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless.
A106 Specification for Seamless Carbon Steel Pipe for High-Temperature Service
A131 Specification for Structural Steel for Ships.
A194 Carbon and Alloy Steel Nuts for Bolts for High Pressure and High Temperature Service.
A325 Standard Specifications for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum
Tensile Strength.
A370 Standard Test Methods and Definitions for Mechanical Testing of Steel Products.
A500 Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural
Tubing in Rounds and Shapes.
A537 Specification for Pressure Vessel Plates, Heat-Treated, Carbon-Manganese-Silicon Steel.
A572 Specification for High-Strength, Low-Alloy Columbium-Vanadium-Steels of Structural
Quality.
A578 Specification for Straight-Beam Ultrasonic Examination of Plain and Clad Steel Plates for
Special Applications.
A633 Specification for Normalized High-Strength Low-Alloy Structural Steel.
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
41
Email: info@aps-oie.com
A709 Standard Specification for Carbon and High-Strength Low Alloy Structure Steel Shapes,
Plates and Bars and Quenched and Tempered Alloy Structure Steel Plates for Bridges.
American Welding Society (ANSI/AWS)
D1.1 Structural Welding Code Steel
AWS A3.0 Welding Terms and Definitions
British Standards Institute (BSI)
BS 5762 Methods for Crack Tip Opening Displacement (CTOD) Testing
European Standards (EN)
EN 10025 Hot rolled products of non-alloy structural steels and their technical delivery conditions
EN 10225 Weld able structural steel for fixed offshore structures – Technical delivery conditions
EN 10029 Tolerances on dimensions, shape and mass for hot rolled steel plates 3mm thick or above
EN 10045 Charpy Impact Test on Metallic Materials
EN 10113 Hot Rolled Products in Weld able Fine Grain Structural Steels
EN 10002 Tensile Testing of Metallic Materials
5. SPECIFIC INTERNATIONAL PAINTING & COATING STANDARDS
ISO 209-1 Wrought aluminium and aluminium alloys – Chemical composition and forms of products.
Part 1: Chemical composition
ISO 1512 Paints and varnishes – sampling of products in liquid or paste form
ISO 2063 Metallic and other inorganic coatings – Thermal spraying-Zinc, aluminium and their alloys
ISO 2431 Paint and varnishes – Determination of flow time by use of flow cups
ISO 2808 Paint and varnishes – Determination of film thickness
ISO 2811-1 Paint and varnishes – Determination of density
ISO 4624 Paint and varnishes – Pull tests for adhesion
ISO 4628-1,2,3,4 Paint and varnishes – Evaluation of degradation of paint coatings
ISO 7253 Paint and varnishes – Determination of the resistance to neutral salt spray
ISO 8501-1 Preparation of steel substrates before application of paints and related products – Visual
assessment of surface cleanliness – Part 1: Rust grades and preparation grades of uncoated
steel substrates and steel substrates after overall removal of previous coatings
ISO 8502-1 Preparation of steel substrates before application of paints and related products – Tests for
the assessment of surface cleanliness – Part 1: Field test for soluble iron corrosion products
ISO 8502-2 Preparation of steel substrates before application of paints and related products – Test for
the assessment of surface cleanliness- Part 2: Laboratory determination of chloride on
cleaned surfaces
ISO 8502-3 Preparation of steel substrates before application of paints and related products – Test for
the assessment of surface cleanliness – Part 3: Assessment of dust on steel surfaces
prepared for painting (pressure-sensitive tape method)
ISO 8502-4 Preparation of steel substrates before application of paints and related products – Test for
the assessment of surface cleanliness – Part 4: Guidance on the estimation of the
probability of condensation prior to paint application
Doc No : APS/BD-CP001
Rev No. 03
Rev Date 2016/09/06
Arshia Petro Sanat Khavar Mianeh
(APS)
Profile Company
Web site: https://aps-oie.com
42
Email: info@aps-oie.com
ISO 8503-1 Preparation of steel substrates before application of paints and related products - Surface
roughness characteristics of blast steel substrates – Part 1: Specifications and definitions
for ISO surface profile comparators for the assessment of abrasive blast cleaned surfaces.
ISO 8503-2 Preparation of steel substrates before application of paints and related products – Surface
roughness characteristics of blast cleaned steel substrates – Part 2: Method for the grading
of surface profile abrasive blast cleaned steel – Comparator procedure
ISO 8504-2 Preparation of steel substrates before application of paints and related products – Surface
preparation methods – Part 2: Abrasive blast cleaning
ISO 8504-3 Preparation of steel substrates before application of paints and related products – Surface
preparation methods – Part 3: Hand and power tool cleaning
ISO 1005 Quality management: guidelines for quality plans
ISO 14918 Thermal spraying – Approval testing of thermal sprayers
ISO 14922-2 Thermal spraying – Quality requirement of thermally sprayed structures
ISO 11124-2 Preparation of steel substrates before application of paints and related products –
Specifications for metallic blast cleaning abrasives chilled iron grit
ISO 1124-3 Preparation of steel substrates before application of paints and related products –
Specifications for metallic blast cleaning abrasives – High carbon cast steel and grit
ISO 11126-3 Preparation of steel substrates before application of paints and related products –
Specifications for metallic blast cleaning abrasives – Copper refinery slag
ISO 11126-7 Preparation of steel substrates before application of paints and related products –
Specifications for metallic blast cleaning abrasives – Fued aluminium oxide
ISO11126-10 Preparation of steel substrates before application of paints and related products-
specifications for non-metallic blast cleaning abrasive-Almandite Granet
ISO 19840 Paint and varnishes – Corrosion protection of steel structures by protective paint systems.
Measurements of, and acceptance criteria for the thickness of dry films on rough surfaces
ISO 6272 Paints and varnishes – Falling weight resistance (impact)
ISO 3248 Paints and varnishes – Determination of the effect of heat
ASTM C 868 Test method for chemical resistance of protective linings
ASTM D 4940 Standard test method for conductivity analyses of water soluble contamination of blasting
abrasives
ASTM D 4285 Standard test method for indicating oil or water in compressed air
ASTM D 5162 Standard practice for discontinuity (holiday) testing of non-conductive protective coating
on metallic substrates
ASTM E 96 Test methods for water vapour transmission of materials
BS 4800 Paint colours for building purposes
BS 3900 F10 Methods of test for paints – Determination of resistance to cathodic disbonding of coatings
for use in marine environments
RAL Colour cards

More Related Content

What's hot

company profile
company profilecompany profile
company profile
Anwer abdulateef
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
randy lapuhapu
 
Descon Appericiation Letter
Descon Appericiation LetterDescon Appericiation Letter
Descon Appericiation Letter
M Mansha Tariq
 
SATISH-C.V.
SATISH-C.V.SATISH-C.V.
SATISH-C.V.
satish sonawane
 
2016 RESUME
2016 RESUME2016 RESUME
2016 RESUME
Josh Blunt
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
ahmed haridi
 
Resume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical SupervisorResume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical Supervisor
Marc Richards
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
Altaf Tanwar
 
russel-resume
russel-resumerussel-resume
russel-resume
Nava Russel
 
BMT Presentation 2016 (1)
BMT Presentation 2016 (1)BMT Presentation 2016 (1)
BMT Presentation 2016 (1)
Dai Tu Vo
 
Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.
Sajid Jahangir
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
Majdi Shalgheen
 
LAURENT, JPR MECHANICAL TECHNICIAN
LAURENT, JPR MECHANICAL TECHNICIANLAURENT, JPR MECHANICAL TECHNICIAN
LAURENT, JPR MECHANICAL TECHNICIAN
JOHN LAURENT
 
sanjay_Mechanical_Technician_-1
sanjay_Mechanical_Technician_-1sanjay_Mechanical_Technician_-1
sanjay_Mechanical_Technician_-1
Sanjay Patel
 
Mohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cvMohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cv
Mohd Feidzal Hashim
 
Certified qa qc Mechanical engineer
Certified qa qc Mechanical engineerCertified qa qc Mechanical engineer
Certified qa qc Mechanical engineer
Sanjary Educational Academy
 
Islam Kamel - Resume
Islam Kamel - ResumeIslam Kamel - Resume
Islam Kamel - Resume
Islam Kamel
 
Mario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive TechnicianMario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive Technician
Mario Clariza
 
00-Mechanical Technician---
00-Mechanical Technician---00-Mechanical Technician---
00-Mechanical Technician---
rohan contractor
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
Amine Halimi
 

What's hot (20)

company profile
company profilecompany profile
company profile
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Descon Appericiation Letter
Descon Appericiation LetterDescon Appericiation Letter
Descon Appericiation Letter
 
SATISH-C.V.
SATISH-C.V.SATISH-C.V.
SATISH-C.V.
 
2016 RESUME
2016 RESUME2016 RESUME
2016 RESUME
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
Resume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical SupervisorResume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical Supervisor
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
 
russel-resume
russel-resumerussel-resume
russel-resume
 
BMT Presentation 2016 (1)
BMT Presentation 2016 (1)BMT Presentation 2016 (1)
BMT Presentation 2016 (1)
 
Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
LAURENT, JPR MECHANICAL TECHNICIAN
LAURENT, JPR MECHANICAL TECHNICIANLAURENT, JPR MECHANICAL TECHNICIAN
LAURENT, JPR MECHANICAL TECHNICIAN
 
sanjay_Mechanical_Technician_-1
sanjay_Mechanical_Technician_-1sanjay_Mechanical_Technician_-1
sanjay_Mechanical_Technician_-1
 
Mohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cvMohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cv
 
Certified qa qc Mechanical engineer
Certified qa qc Mechanical engineerCertified qa qc Mechanical engineer
Certified qa qc Mechanical engineer
 
Islam Kamel - Resume
Islam Kamel - ResumeIslam Kamel - Resume
Islam Kamel - Resume
 
Mario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive TechnicianMario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive Technician
 
00-Mechanical Technician---
00-Mechanical Technician---00-Mechanical Technician---
00-Mechanical Technician---
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 

Viewers also liked

Grupo scorpion David
Grupo scorpion DavidGrupo scorpion David
Grupo scorpion David
David Fernandez
 
Resum fisling siti diah ayu f. (081810201008)
Resum fisling siti diah ayu f. (081810201008)Resum fisling siti diah ayu f. (081810201008)
Resum fisling siti diah ayu f. (081810201008)
sitidiah ayufebriani
 
Anexo b solicitud-de-apoyo
Anexo b   solicitud-de-apoyoAnexo b   solicitud-de-apoyo
Anexo b solicitud-de-apoyo
Elide010203
 
Task 7 survey responses pictures
Task 7 survey responses picturesTask 7 survey responses pictures
Task 7 survey responses pictures
harry pugh
 
Ordenagailua eta informatika
Ordenagailua eta informatikaOrdenagailua eta informatika
Ordenagailua eta informatika
Oihan Fernandez Mateos
 

Viewers also liked (6)

Grupo scorpion David
Grupo scorpion DavidGrupo scorpion David
Grupo scorpion David
 
Resum fisling siti diah ayu f. (081810201008)
Resum fisling siti diah ayu f. (081810201008)Resum fisling siti diah ayu f. (081810201008)
Resum fisling siti diah ayu f. (081810201008)
 
Nire film begikoenak
Nire film begikoenakNire film begikoenak
Nire film begikoenak
 
Anexo b solicitud-de-apoyo
Anexo b   solicitud-de-apoyoAnexo b   solicitud-de-apoyo
Anexo b solicitud-de-apoyo
 
Task 7 survey responses pictures
Task 7 survey responses picturesTask 7 survey responses pictures
Task 7 survey responses pictures
 
Ordenagailua eta informatika
Ordenagailua eta informatikaOrdenagailua eta informatika
Ordenagailua eta informatika
 

Similar to Profile Company

ABI Resources and Service Pte Ltd
ABI Resources and Service Pte LtdABI Resources and Service Pte Ltd
ABI Resources and Service Pte Ltd
Karp Appavoo 🔗
 
Instrumentation design engineer
Instrumentation design engineerInstrumentation design engineer
Instrumentation design engineer
Maheswaran Nagarajan
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Leepaa
LeepaaLeepaa
Leepaa
leepaa
 
MY CV RESUME reviewed
MY CV RESUME reviewedMY CV RESUME reviewed
MY CV RESUME reviewed
Wilfred Arende
 
Thea Kleinschmidt CV 15.03.2015
Thea Kleinschmidt CV 15.03.2015Thea Kleinschmidt CV 15.03.2015
Thea Kleinschmidt CV 15.03.2015
Thea Kleinschmidt
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
Vijay Bharati
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
gobinath gobinath
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent Mandar
Mandar Sawant
 
ALI CV NEW11
ALI CV NEW11ALI CV NEW11
ALI CV NEW11
Ali Faroug
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
Giovanni Antonio Friso
 
Green line profile
Green line profile Green line profile
Study of procedural aspects of cng valve production
Study of procedural aspects of cng valve productionStudy of procedural aspects of cng valve production
Study of procedural aspects of cng valve production
Supa Buoy
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
Arbaaz Malik
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
savvas salakidis
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
Vijaya Kumar
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa
 
Eng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas ConsultantEng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas Consultant
Mahmoud A.Alkhishy
 

Similar to Profile Company (20)

ABI Resources and Service Pte Ltd
ABI Resources and Service Pte LtdABI Resources and Service Pte Ltd
ABI Resources and Service Pte Ltd
 
Instrumentation design engineer
Instrumentation design engineerInstrumentation design engineer
Instrumentation design engineer
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Leepaa
LeepaaLeepaa
Leepaa
 
MY CV RESUME reviewed
MY CV RESUME reviewedMY CV RESUME reviewed
MY CV RESUME reviewed
 
Thea Kleinschmidt CV 15.03.2015
Thea Kleinschmidt CV 15.03.2015Thea Kleinschmidt CV 15.03.2015
Thea Kleinschmidt CV 15.03.2015
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent Mandar
 
ALI CV NEW11
ALI CV NEW11ALI CV NEW11
ALI CV NEW11
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 
Green line profile
Green line profile Green line profile
Green line profile
 
Study of procedural aspects of cng valve production
Study of procedural aspects of cng valve productionStudy of procedural aspects of cng valve production
Study of procedural aspects of cng valve production
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Eng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas ConsultantEng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas Consultant
 

Recently uploaded

Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
gharris9
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
samililja
 
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Dutch Power
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
OECD Directorate for Financial and Enterprise Affairs
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
gpww3sf4
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Gregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptxGregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptx
gharris9
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
SkillCertProExams
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
OECD Directorate for Financial and Enterprise Affairs
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
OECD Directorate for Financial and Enterprise Affairs
 
Updated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidismUpdated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidism
Faculty of Medicine And Health Sciences
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
amekonnen
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
ToshihiroIto4
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
artemacademy2
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
OECD Directorate for Financial and Enterprise Affairs
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
Frederic Leger
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Dutch Power
 

Recently uploaded (20)

Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
 
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
 
Gregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptxGregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptx
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
 
Updated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidismUpdated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidism
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
 
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
 

Profile Company

  • 1.
  • 2. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 2 Email: info@aps-oie.com Summary Introduction: Name : Arshia Petro Santa Khavar Mianeh (APS) Company Type : Private Grading : Grade 3 on Oil and Gas / Grade 4 on Construction Economy Code : 411394313547 Board of Directors : A.Abnoos – M.Moslemi – M.Tavasoli – M.Eskandari Chairman : A.Abnoos Managing Director : M.Moslemi Tel No. : +9821 8856 3849, +9821 8856 3859, +9821 8837 9173, +9821 8837 9178 Fax No. : +9821 8856 3861 Central office Address : Apartment No.3 , Third floor, Building No.162, Darya Blvd, Between Paknegad and Motahari, Gharb County , Tehran. Yard Address : 37 Km, West Bandar Abbas Email Address : info@aps-oie.com Web Site : www.aps-oie.com Scope of Work : We are a General Contractor performing turnkey projects, project management and project development in all oil & gas, petrochemical power plants both National and International. We are performing all Engineering services, Fabrication plans, Research plans in all our permitted fields, also all Consultant & Construction services for petrochemical complex, Oil & Gas Refineries & Petrochemical plants. Arshia Petro Sanat fulfill all Oil & Gas pipeline projects, Water pipelines, Auxilary facilities of power plants, in both on shore & off shore, Ship Repairing, Excavation, Earth filling, Drilling, Installation & Commissioning, Project control & planning, Technical support services for Administrative & Contractual proposals, Making consortium with similar companies, feasibility studies, Engineering & Procurement, Implementation of Management systems & Strategic Management, Risk Management, Contract Management & Project Management for Oil & Gas and petrochemical, would be in our scope of work.
  • 3. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 3 Email: info@aps-oie.com History : Arshia Petro Sanat Khavar Mianeh (APS) started activity as a Fabrication Subcontractor called Abnoos, in year 1997, in Lordegan city. The objectives of this group had been summarized in, offering a new method of services to Oil & Gas Contractors/Clients and did its best with fulfilling projects on time, satisfying the clients, being capable in forming expert project teams as well as, project cost’s control. In South Pars Phase 14, platform has been rolled up by this small group in 20 days period successfully. We have achieved precious experiences over the years in all aspects of EPCI oil / Gas, petrochemical & power plants. This subcontracting company, just because of its patriotism, aimed to develop the country industry and changed totally to a Company named :Arshia Petro Sanat Khavar Mianeh , in year 2008. One of the main reasons for this company was the company accurate management to achieve the best economical way to do the projects in a safe mode. We have started to go ahead in our way to develop. We also achieved the Grading for Oil & Gas and construction in 2014 for performing our projects in ideal way. Vision : Arshia petro Sanat, with reliance to its abilities for accomplishment of all on shore & off shore construction projects with high quality and in a minimum time proceeded to go head in Engineering, Procurement and Construction of all on shore & off shore structures & equipments to help our country’s self development. We will ascertain this, by the help of our capable & formidable experts and modern technology & equipment.
  • 4. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 4 Email: info@aps-oie.com Competitive advantages : APS, has been created an experienced team to assist the economical and industrial organizations’ managers and clients for going ahead to development in both onshore and offshore fields. We have achieved a precious experience over the years, to fabricate, installation, testing and commissioning as with support of applying required modern equipments. We owe our reputation from capable managers and experts in our company, which are one of our main funds. The basic objective of our management team is customer’s satisfaction; we are presenting high quality services to our customers and clients. In fact, our executive, monitoring and safety systems allow us to reach our goals to present ideal services in a cost effectiveness way with high quality level. In other hand, our experienced dynamic personnel and management ,facilitate the way to achieve our objectives in this regard. Accomplishment the projects in minimum period in a high quality level with being cost effectiveness, achieving our customer’s satisfaction and ability to do different projects simultaneously are the major signs of our company ability to perform the job in a best way. The following items are the witness of our competitive advantages: - High financial strength :  To perform the 1188000000000 Rials Project in 4 years. - High level QA/QC management :  Obtaining the international certificates: ISO/TS29001:2010, ISO9001:2008, ISO14001:2004 OHSAS18001:2007, HSE-MS  Main bearing and bearing support with 4 meters diameter on installed piece in SPM project. - Performing the project in minimum period :  Fabrication of 2 sets of tripods for south pars phases 14 with 1000 tons weight in 30 days.  Structure fabrication of deck B for south pars phase 14 in 3 months.  Construction of 4 sets jackets for south pars phase 14 with 8000 tons weight in 150 days.  Construction of tripods and piles for phase 19A, 19C, with 3000 tons weight in 90 days.  Construction of tripods and piles for projects south pars phase 20, 21 with 1200 tons in 60 days.  Construction of mechanical part for the first SPM in Iran in 7 months.  Hook up operation for phase 12 platform in 60 days.
  • 5. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 5 Email: info@aps-oie.com Company Abilities Aligned with realization of appropriate infrastructures for sustainable development of our country, through outsourcing the projects to private sector, we are proud to support the clients with our potential abilities. Our domain services includes: all management services, engineering, procurement of material and equipments, projects management in Oil / Gas, petrochemical and power plants. Our scope of work includes below:  All fixed equipment construction such as pressure tanks, storage tanks, heat exchanges, chemical packages, towers, …  All Oil & Gas platforms structures.  All platforms ancillaries such as: jackets / tripods, bridges, flares, piles,..  Air conditioning systems installation on all Oil / Gas platforms.  Oil & Gas platforms piping.  Hydro test activities on pipelines and storage tanks.  Civil operation of Oil & Gas platforms,  Electrical, instrument operation for Oil & Gas platforms.  Offshore & onshore Oil and Gas pipelines.  Offshore cable lying.  Internal inspection and Hydro test in Oil & Gas pipelines.  Sea fastening and load out operations.  Hook up operation.  Offshore installation of jacket, piles, platforms installation.  Precommissioning / commissioning.  Vessels periodic maintenance on dry dock or floating dock on the supervision of clients.  Subsea inspection and video recording.  Subsea repair and maintenance of vessels & main structures.  Offshore structures maintenance & development.  Paint / sand blasting of marine & submarine projects.  Anode installation projects on offshore & onshore pipelines.
  • 6. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 6 Email: info@aps-oie.com Codified procedures in Arshia petro Sanat Khavar Mianeh : No. Procedure Name Applicable in 1 Management strategic procedure The objective of this procedure is to clarify communication methods of top management with company downstream process and projects, in order to monitor its effectiveness to go along company main goals. 2 Quality management system This procedure is prepared to clarify the quality management system’s policy as well to determine the managers & personnel responsibilities in company. 3 HSE This procedure is to define : - To decrease the accident / incident to minimum level. - To decrease the environmental pollutants to minimum level. - To decrease the wastage in processes to minimum level and gain the favorable output. - Finally analysies the HSE data and monitoring improvement is happened or not. 4 Project Control Procedure This procedure is to define : - Project management contains activity such as initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria base on PMBOK standard. - Project management software in our company base on Primavera P6 and Microsoft Project Server 2013. - All projects are managed by Project Management Office (PMO) since 2013 5 Training procedure This procedure is prepared to ensure the managers and personnel’s competence, and the competence include / education / training / skills and experiences. 6 Continuous improvement procedure The procedure goal is to implement corrective measures and preventive actions for performing continuous improvement to eliminate the problems and fix deficiencies. 7 Business development & CRM procedure This procedure is to define an administrative method to describe relationship and/ communication with potential customers / clients, obtaining projects from clients, and how to keep in touch with them. The methods of customer’s satisfaction and its measurement would be described in this procedure.
  • 7. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 7 Email: info@aps-oie.com No. Procedure Name Applicable in 8 Analysis and overview procedure This procedure objective is to analyze company performance, method statements and procedures within a specified period in order to increase productivity. 9 Value engineering procedure This is an efficient method to identify and remove unnecessary costs and short implementation time and optimization of projects. 10 Human resource management procedure The purpose of this procedure is to implement the policies and goals of organizations and individuals in the area of staff.
  • 8. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 8 Email: info@aps-oie.com Integrated Management System Policy : Arshia Petro Sanate Khavar Mianeh, utilized the specialized human resources, advanced systems and know-how in the world, is active in Offshore Oil & Gas Projects. This Company is a general Contractor (G.C) performing turnkey projects, management contract (MC), Engineering, Procurement & Construction (E.P.C), also provides consulting services. In order to promote the quality & quantity of the projects, environmental protection, sanitation & safety rules observation in work place based on: ISO/TS29001:2010,ISO 9001:2008,ISO14001:2004,OHSAS18001:2007,HSE-MS Hereby declare the outlines of Integrated Management System as follows:  Increasing the competitive ability with fair prices  Efficient use of all resources and reduce costs on the projects  Endeavor for customers’ satisfaction, identification of beneficiaries & supp0ly their needs in accordance with legal rules  Pollutant prevention for environmental protection through continuous improvement  Promotion of personnel’s technical , scientific & HSE level through detail planning for related training courses  Ensuring compliance with observation of legal rules,standards,clients’ requirements  Prevent and reduce occupational diseases and accidents by identifying and assessing risks in order to keep health human resources Establishment & preservation of IMS standards in company & achieving our mentioned objectives, is related to all personnel’s cooperation & the top management of company hereby declare his commitment toward the legal compliances for objectives determination and implementation. This IMS Policy would be overviewed in specified period by top management. M.Moslemi Direct Manager
  • 9. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 9 Email: info@aps-oie.com Certificates
  • 10. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 10 Email: info@aps-oie.com HSEQ Certificates : 1- Certificates of Jas.ANZ- Australia from Jul 2013 until Jul 2016  ISO 9001 : 2008  ISO 14001 : 2004  ISO 29001 : 2010  OHSAS 18001 : 2007  HSE-MS 2- Certificates of qcb- Italia from Jul 2016 until Jul 2019  ISO 9001 : 2008  ISO 14001 : 2004  ISO 29001 : 2010  OHSAS 18001 : 2007  HSE-MS
  • 11. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 11 Email: info@aps-oie.com
  • 12. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 12 Email: info@aps-oie.com
  • 13. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 13 Email: info@aps-oie.com
  • 14. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 14 Email: info@aps-oie.com
  • 15. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 15 Email: info@aps-oie.com
  • 16. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 16 Email: info@aps-oie.com Grading Certificate :
  • 17. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 17 Email: info@aps-oie.com Clients Satisfaction :
  • 18. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 18 Email: info@aps-oie.com Clients Specifications’: No. Clients Name Contact Person Contract Scope Address 1 ISOICO Mr.Hafezpour Construction of 2 Bridges, 2 Jackets of SPD- 14B/SPD-14A & Flares of SPD-14A, B, C, D 37 km of West Bandar Abbas,ISOICO Yard 2 Arman Sazeh Aryan Co. Mr.Arzoughi Constructin of jacket A, D S.P.phase 14 37 km of West Bandar Abbas,ISOICO Yard 3 Mobin Sazeh Gostare Khalije fars Mr.Abbaspour Construction & Installation of sea fastening for jacket C, S.P phase 14 37 km of West Bandar Abbas,ISOICO Yard 4 Mobin Sazeh Gostare Khalije fars Mr.Abbaspour Construction & Installati0n of sea fastening for jacket B, S.P phase 14 37 km of West Bandar Abbas,ISOICO Yard 5 Bahr Gostareshe Hormoz Shipbuilding co. Mr.Ghasemizadeh Operation of main structure & ancillaries for Deck B, S.P.phase 14 37 km of West Bandar Abbas,ISOICO Yard 6 Mobin Sazeh Gostare Khalije fars Mr.Abbaspour Operation of platforms 07, 08 Hendijan field 37 km of West Bandar Abbas,ISOICO Yard 7 Mobin Sazeh Gostare Khalije fars Mr.Abbaspour Piping operation for 07, 08 platforms of hendijan field 37 km of West Bandar Abbas,ISOICO Yard 8 Arvand Poolad Faraynd Int.Co Mr.Mamjad Construction & Installation of One SPM Khorramshahr, Yard No.3, IOEC 9 IOEC Mr.Jazayeri Construction of tripods, flares, piles of S.P phase 19C Khorramshahr, Yard No.3, IOEC 10 Arvand Poolad Faraynd Int.Co Mr.Mamjad Construction of tripods, flares, piles of S.P phase 19A Khorramshahr, Yard No.3, IOEC
  • 19. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 19 Email: info@aps-oie.com Experiences  South Pars Gas Field Development  Oil Field Development
  • 20. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 20 Email: info@aps-oie.com South Pars Gas Field Development : Phase 12 SPM (Single Point Mooring) Construction Hook up operation Phase 19 Construction of Ancillaries Part C Construction of Ancillaries Part A Phase 14 Piping operation Electrical System & Instrument Operation Construction of Platform Construction of Platform Jackets Construction of Ancillaries Phase 20 & 21 Construction of Ancillaries Construction of Platform Phase 15&16 4 Inch onshore pipeline 32 Inch onshore pipeline Phase 17&18 4 Inch onshore pipeline 32 Inch onshore pipeline Hook Up & Pre- Commissioning 17B Hook Up & Pre- Commissioning 18B
  • 21. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 21 Email: info@aps-oie.com Phase 12 : SPM Construction Client Arvand Poolad farayand Co./IOEC Location Khorramshahr Duration 9 months Nowadays, The marine terminal as one of the best ways to load oil and its derivatives with respect to the minimum cost compared with loading docks, always have been in center of attention & interest to apply. As,the Marine Terminals ( SPM,single point mooring ) have been already interested by Iranian clients, some of the local companies entered to Engineering, Procurement & Fabrication of SPMs. APS Co. according to the priority of the subject & for support of Islamic Country development initiated the project of one Single Point Mooring Fabrication & commissioning for South Pars Phase 12 as IOEC subcontractor. Fabrication of this SPM in Khorramshahr yard is accomplishing as a complete National Project. Hook up Operation project for platform C, S.P.Phase 12 Client IOEC Location South Pars Free Zone Duration 2 months
  • 22. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 22 Email: info@aps-oie.com Phase 14 : Piping Operation of S.P.Phase 14 Platform Client Mobin Sazeh Gostar Location Bandar Abbas Duration 12 months Electrical System & Instrument Operation for S.P.Phase 14 platforms Client Mobin Sazeh Gostar Location Bandar Abbas Duration 12 months Construction of platform B,S.P Phase 14 project Client Bahr Gostaresh Ship building Co Location Bandar Abbas Duration 4 months
  • 23. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 23 Email: info@aps-oie.com Construction of Jackets A,D,S.P.Phase 14 Client ISOICO Location Bandar Abbas Duration 90 days Construction of Jackets B,C,S.P.Phase 14 Client ISOICO Location Bandar Abbas Duration 5 months Ancillaries of S.P Phase 14 project Client Nadim Gostaresh Khalij Fars Location Bandar Abbas Duration 4 Months
  • 24. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 24 Email: info@aps-oie.com Phase 15 & 16 : 32 ,4 Inch pipeline project , South Pars Phases 15,16 Client IOEC Location Booshehr Duration 6 months
  • 25. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 25 Email: info@aps-oie.com Phase 17 & 18 : 32,4 Inch pipeline project, South pars Phases 17,18 Client IOEC Location Booshehr Duration 7 months Hook up operation project for platform B, S.P.Phase 17 & 18 Client Bahr Gostaresh Ship building Co Location Bandar Abbas Duration 4 months
  • 26. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 26 Email: info@aps-oie.com Phase 19 : Construction of tripods,Bridges,piles & flares of S.P Phase 19C Client IOEC Location Khorramshahr Duration 7 months Construction Project for tripods, bridges & piles of S.P.Phase 19A Client Arvand Poolad Farayand Location Khorramshahr Duration 7 months
  • 27. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 27 Email: info@aps-oie.com Phase 20 & 21 : SPD20 Platform Construction Project for S.P.Phase 20, 21 Client IOEC Location KHorramshahr Duration 7 months Ancillaries Construction project , S.P.Phase 20, 21 Client Arvand Poolad Farayand Location Khorramshahr Duration 5 months
  • 28. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 28 Email: info@aps-oie.com Oil Field Development : Hendijan Development of Platforms 07,08 Piping Platforms 07, 08 Electrical & Instrument Platforms 07, 08 Engineering & Pre Commissioning Platforms 07, 08 Hengam Construction of Platform
  • 29. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 29 Email: info@aps-oie.com Hendijan Field : Piping project for platforms 07, 08 Hendijan Field Client Mobin Sazeh Gostar Location Bandar Abbas Duration 12 months Development of Platforms 07,08 project Client Mobin Sazeh Gostar Location Bandar Abbas Duration 8 months Electrical System & Instrument operation for Platforms 07,08 project Client Mobin Sazeh Gostar Location Bandar Abbas Duration 11 months
  • 30. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 30 Email: info@aps-oie.com Engineering and Pre Commissioning platforms 07, 08 Hendijan Field Client Mobin Sazeh Gostar Location Bandar Abbas Duration 12 months
  • 31. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 31 Email: info@aps-oie.com Hengam Field : Other Project : ABOOZAR GAS FLOW INCREASE PROJECT Client Petro Sahel Ofogh Kish/PEDCO Location KHARK ISLAND Duration 6 months Construction and installation Hengam oil platform Client Mobin Sazeh Gostar Location Bandar Abbas Duration 12 months
  • 32. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 32 Email: info@aps-oie.com Completed Projects: Discription Client Location Storage tanks piping Bana Gostar Co Bandar Abbas Structure fabrication & piping Zolal Iran Co. Mahshahr Structure fabricating & piping Mehvarsazan Co. Mahshahr Pipng for Maroon Petrochimi Mehvarsazan Co. Mahshahr Kharg Oil port renovation project include piping, structure & pile driving Tehran Berkli Kharg Island Lavan jetty structure fabrication includes piping, structure & pile driving NIOPDC Lavan Structure fabrication & piping Ramshir Co Assaluyeh Structure fabrication & piping Yegan Foolad Co Assaluyeh,Phases 6,7,8 16 inch pipeline project from Abadan to Darkhoin Tasdid offshore development co Khoozestan Engineering,construction & installation of 2 Hinge Flange for Aboozar 1200 vessel I O E C Khorramshahr Engineering,construction & Installation of Moldering system on Aboozar 81 vessel I O E C Khorramshahr Construction & Installation of Sea fastening for Bahregnsar I O E C Khorramshahr Ancillary construction for S.P.9,10 phases IOEC / MSM Khorramshahr Piping for Bahregansar,P.P I O E C Khorramshahr Heli Deck construction for S.P Phases 9,10 IOEC/MSM Khorramshahr Bahregansar Platforms Load out IOEC Khorramshahr Dorood & Foroozan Renovation & revamping project IOOC/RGD Dorood & Foroozan Oil Field Renocatin & revamping of IOOC Platforms IOOC/RGD Persian Gulf Ancillaries Structure Fabrication of S.P.Phase 16 ISOICO/ASA Bandar Abbas Skid beam Fabrication/Weighing support ISOICO/ASA Bandar Abbas
  • 33. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 33 Email: info@aps-oie.com Technical Ability
  • 34. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 34 Email: info@aps-oie.com Company Organization Chart : Managing Director Technical Consultants Legal advisers Market Development Management Execution Management Procurement Management QC / QA Management Financial and Administrative Management Engineering Manager PMO Order Engineering Sales Engineering Quality Control Quality Assurance Management Office HSEQ Management
  • 35. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 35 Email: info@aps-oie.com Key personnel List : No. Name Academic Degree Position Experience 1 M.Moslemi BS in Mechanic Engineering Managing Director 12 years 2 A.Kamali khah MS in Mechanic Engineering Technical Consultant 17 years 3 R.Hosseinpour MS in International Law Lawyer Consultant 10 years 4 A.Akbari BS in Mechanic Engineering Commercial Manager 20 years 5 E.Basakha BS in Industrial Engineering Construction Manager 12 years 6 J.Imani BS in Civil Engineering Engineering Dep. Manager 20 years 7 A.Afshang BS in Mechanic Engineering Strucural Dep. Manager 11 years 8 M.Sasani BS in Mechanic Engineering Piping Dep. Manager 15 years 9 A.Khodabakhsh BS in Electrical Engineering Elec and Ins Dep. Manager 12 years 10 H.Jalalifar MS in Mecateronic Commissuning Dep. Manager 10 years 11 A.Samyari BS in Mathematics PMO Manager 11 years 12 S.Salahshoor BS in Mechanic Engineering Q/C Manager 10 years 13 J.Atashkar BS in Industrial Manager HSE Manager 20 years 14 B.Sohrabi BS in Industrial Engineering Market Development Manager 10 years 15 Z.Eskandari BS in Acounting Admi. And Financial Manager 13 years
  • 36. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 36 Email: info@aps-oie.com Equipment List : No. Equipment Name Quantity Specification Property Type 1 Crane 2 50 tons Self Property 2 Crane 3 30 tons Self Property 3 Crane 3 25 tons Self Property 4 Crane 5 10 tons Self Property 5 Trailer 2 Self Property 6 Flooring Tractor 3 Self Property 7 Tractor 4 Self Property 8 Forklift 3 5.5 tons Self Property 9 Forklift 3 3.5 tons Self Property 10 Bus 5 Self Property 11 Mini Bus 8 Self Property 12 Nissan-Saypa-Mazda Pick up 4 Self Property 13 pasenger car 10 Self Property 14 Motor cycle 3 125 cc Self Property 15 Water Tank 2 Self Property 16 Compressor 5 Self Property 17 Rectifyer 230 Self Property 18 Water Tank 4 5000 liter Self Property 19 Gazoline Tank 2 20000 liter Self Property 20 Gazoline Tank 2 3000 liter Self Property 21 Container 10 6 meters Self Property 22 Container 8 12 meters Self Property 23 Residential (Conex) 22 12 meters Self Property 24 Residential 11 Self Property 25 Oven 5 Self Property 26 Manual Oven 300 Self Property 27 Grinding Machine 350 Self Property 28 Mini Grinding machine 300 Self Property 29 Saypa Diesel water tank 1 Self Property 30 Color inspection equipment 3 Self Property 31 Rail cutting machine 10 Self Property 32 Manual cutting machine 80 Self Property 33 Circular cutting machine 30 Self Property 34 Chain bevel cutting machine 25 Self Property 35 Banding machine(4 inch) 2 Self Property 36 Diesel Electric Generator 10 Self Property 37 Electrical Panel 00 Self Property 38 Welding Cable 10000 Self Property 39 3 phase cable 0000 Self Property 40 Chain Block 00 1-8 tons Self Property 41 Jack 00 5-50 tons Self Property
  • 37. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 37 Email: info@aps-oie.com 42 Hydrolic Jack 0 50 tons Self Property 43 Hydrolic Jack 0 100 tons Self Property 44 Sand Blasting Pot 9 Self Property 45 Digital Grinding Machine 80 00 Self Property 46 Airless 7 Self Property 47 Water jet machine 4 7550 b Self Property 48 Magnet Drill 4 Self Property 49 Scaffolfing pipe 0000 6 meters Self Property 50 Scaffolding panel 7000 4,6 meters Self Property 51 Scaffolding fastener 00000 Self Property 52 Topography Camera 0 Self Property 53 Air Capsule (tank) 000 Self Property 54 Gas Capsule (tank) 100 Self Property 55 Termometer 0 Self Property 56 Welding Inspection Equipment 0 Self Property
  • 38. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 38 Email: info@aps-oie.com Codes & Standards Related to Quality Control 1. GENERAL INTERNATIONAL SPECIFICATION AND STANDARDS API Spec 5L Line pipe API SPEC 2B API Specification for Fabrication of Structural Steel Pipe API SPEC 2C Specification for Offshore Pedestal Mounted Cranes API RP 2L Planning, Designing & Constructing Heliports for Fixed Offshore Platforms API Spec 6D Pipeline valves (gate, plug, ball and check valves) - API Std 1104 Welding of Pipelines and Related Facilities ASME B16.5 Pipe flanges and flanged fittings (NPS ½ through NPS 24) ASME B31.3 Process piping ASME B31.4 Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids ASME B31.8 Gas transmission and distribution piping system ASME PV Code 8 Div. 1 Boiler and Pressure Vessel Code - Pressure Vessels ISO 9000/9001 Quality systems MSS SP-75 Specification for high test wrought butt welding fittings NACE MR01-75 Petroleum and natural gas industries—Materials for use in H2S-containing environments in oil and gas production ANSI AW WA D100 Welded Steel Tanks for Water Storage API Spec 2C Offshore Cranes API Std 650 Welded Steel Tanks for Oil Storage ASME Sec. II Material Specification ASME Sec. V Non-Destructive Examination ASME Sec. IX Welding and Brazing Qualifications ASTM 370 Testing Of Materials AWS D1.1/D1.1M Structural Welding Code AWS D1.1 Structural Welding Code – Steel AWS A2.4 Symbols for Welding and NDT AWS A3.0 Welding Terms and Definitions EN 10204 Metallic Products-Types of Inspection Documents
  • 39. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 39 Email: info@aps-oie.com 2. SPECIFIC INTERNATIONAL PIPING SPECIFICATION AND STANDARDS ASME B16.9 Factory-made wrought steel butt welding fittings ASME B16.10 Face-to-face and end-to-end dimensions of valves ASME B16.11 Forged fittings, socket-welding and threaded ASME B16.20 Metallic gaskets for pipe flanges – Ring joint, Spiral-wound and Jacketed ASME B16.21 Non metallic flat gasket for pipe flanges ASME B16.25 Butt welding ends ASME B16.34 Valves - Flanged, threaded and welding ends ASME B16.36 Steel Orifice Flanges ASME B16.48 Steel line blanks ASME B18.2 Square, hexagonal bolts and nuts ASME B36.10M Carbon steel pipe ASME B36.19M Stainless steel pipe API RP 5L Specification for Line Pipe. EEMUA 142 Acoustic insulation of pipes, valves and flanges EEMUA 144 90/10 Copper Nickel Alloy Piping for Offshore Applications - Specification - Tubes Seamless and Welded EEMUA 145 90/10 Copper Nickel Alloy Piping for Offshore Applications – Specification – Flanges Composite and Solid EEMUA 146 90/10 Copper Nickel Alloy Piping for Offshore Applications – Specification – Fittings ISO 10474 Steel products – inspection documents MSS SP 43 Wrought Stainless Steel Butt-Welding Fittings MSS SP 53 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping Components MSS SP 54 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping Components MSS SP 55 Quality Standards for Steel Castings for Valves, Flanges, Fittings and Other Piping Components MSS SP 61 Pressure Testing of Steel Valves NACE MR0175/ISO 15156 Petroleum and Natural Gas Industries Parts 1/2/3: Material for use in H2S containing Environments in Oil and Gas Production - 2004 TC 2 2008 Corrigenda Corrigenda Pack – 2005
  • 40. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 40 Email: info@aps-oie.com 3. SPECIFIC INTERNATIONAL PIPELINE STANDARDS API RP 1111 Design, Construction, Operation and Maintenance of Offshore Hydrocarbon Pipeline API 1104 Welding of Pipelines and Related Facilities ASME B16.47 Large Diameter Steel Flanges (NPS 26 thru NPS 60) BS 4515-1(2009) Welding of Steel Pipelines on Land and Offshore DNV OS-F1 01 Submarine Pipeline Systems ISO 15590-1 Induction Bends, Fittings and Flanges for Pipelines Part 1: Induction Bends MSS SP-44 Steel Pipeline Flanges 4. SPECIFIC INTERNATIONAL STRUCTURAL STANDARDS API RP 2A-WSD Planning, Designing and Construction of Fixed Offshore Platforms Working Stress Design API RP 2B Fabrication of Structural Steel Pipe API RP 2X Ultrasonic and Magnetic Examination of Offshore Structural Fabrication and Guidelines for Qualification of Technicians API RP 2H Carbon manganese steel plate for offshore platform tubular joints. API RP 2MT1 As -rolled carbon manganese steel plate with improved toughness for offshore structures. API RP 2W Specification for Steel Plates for Offshore Structures, Produced by Thermo Mechanical Control Processing (TMCP). API RP 2Y Specification for Steel Plates, Quenched-and-Tempered, for Offshore Structures. API RP 5Z Recommended Practice for Preproduction Qualification for Steel Plate for Offshore Structures. API RP 2Z Preproduction qualification for steel plates for offshore structures American Society for Testing and Materials (ASTM) A6 Std. Specification for general requirements for rolled structural steel bars, plates, shapes and sheet piling A36 Specification for Structural Steel. A53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless. A106 Specification for Seamless Carbon Steel Pipe for High-Temperature Service A131 Specification for Structural Steel for Ships. A194 Carbon and Alloy Steel Nuts for Bolts for High Pressure and High Temperature Service. A325 Standard Specifications for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength. A370 Standard Test Methods and Definitions for Mechanical Testing of Steel Products. A500 Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes. A537 Specification for Pressure Vessel Plates, Heat-Treated, Carbon-Manganese-Silicon Steel. A572 Specification for High-Strength, Low-Alloy Columbium-Vanadium-Steels of Structural Quality. A578 Specification for Straight-Beam Ultrasonic Examination of Plain and Clad Steel Plates for Special Applications. A633 Specification for Normalized High-Strength Low-Alloy Structural Steel.
  • 41. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 41 Email: info@aps-oie.com A709 Standard Specification for Carbon and High-Strength Low Alloy Structure Steel Shapes, Plates and Bars and Quenched and Tempered Alloy Structure Steel Plates for Bridges. American Welding Society (ANSI/AWS) D1.1 Structural Welding Code Steel AWS A3.0 Welding Terms and Definitions British Standards Institute (BSI) BS 5762 Methods for Crack Tip Opening Displacement (CTOD) Testing European Standards (EN) EN 10025 Hot rolled products of non-alloy structural steels and their technical delivery conditions EN 10225 Weld able structural steel for fixed offshore structures – Technical delivery conditions EN 10029 Tolerances on dimensions, shape and mass for hot rolled steel plates 3mm thick or above EN 10045 Charpy Impact Test on Metallic Materials EN 10113 Hot Rolled Products in Weld able Fine Grain Structural Steels EN 10002 Tensile Testing of Metallic Materials 5. SPECIFIC INTERNATIONAL PAINTING & COATING STANDARDS ISO 209-1 Wrought aluminium and aluminium alloys – Chemical composition and forms of products. Part 1: Chemical composition ISO 1512 Paints and varnishes – sampling of products in liquid or paste form ISO 2063 Metallic and other inorganic coatings – Thermal spraying-Zinc, aluminium and their alloys ISO 2431 Paint and varnishes – Determination of flow time by use of flow cups ISO 2808 Paint and varnishes – Determination of film thickness ISO 2811-1 Paint and varnishes – Determination of density ISO 4624 Paint and varnishes – Pull tests for adhesion ISO 4628-1,2,3,4 Paint and varnishes – Evaluation of degradation of paint coatings ISO 7253 Paint and varnishes – Determination of the resistance to neutral salt spray ISO 8501-1 Preparation of steel substrates before application of paints and related products – Visual assessment of surface cleanliness – Part 1: Rust grades and preparation grades of uncoated steel substrates and steel substrates after overall removal of previous coatings ISO 8502-1 Preparation of steel substrates before application of paints and related products – Tests for the assessment of surface cleanliness – Part 1: Field test for soluble iron corrosion products ISO 8502-2 Preparation of steel substrates before application of paints and related products – Test for the assessment of surface cleanliness- Part 2: Laboratory determination of chloride on cleaned surfaces ISO 8502-3 Preparation of steel substrates before application of paints and related products – Test for the assessment of surface cleanliness – Part 3: Assessment of dust on steel surfaces prepared for painting (pressure-sensitive tape method) ISO 8502-4 Preparation of steel substrates before application of paints and related products – Test for the assessment of surface cleanliness – Part 4: Guidance on the estimation of the probability of condensation prior to paint application
  • 42. Doc No : APS/BD-CP001 Rev No. 03 Rev Date 2016/09/06 Arshia Petro Sanat Khavar Mianeh (APS) Profile Company Web site: https://aps-oie.com 42 Email: info@aps-oie.com ISO 8503-1 Preparation of steel substrates before application of paints and related products - Surface roughness characteristics of blast steel substrates – Part 1: Specifications and definitions for ISO surface profile comparators for the assessment of abrasive blast cleaned surfaces. ISO 8503-2 Preparation of steel substrates before application of paints and related products – Surface roughness characteristics of blast cleaned steel substrates – Part 2: Method for the grading of surface profile abrasive blast cleaned steel – Comparator procedure ISO 8504-2 Preparation of steel substrates before application of paints and related products – Surface preparation methods – Part 2: Abrasive blast cleaning ISO 8504-3 Preparation of steel substrates before application of paints and related products – Surface preparation methods – Part 3: Hand and power tool cleaning ISO 1005 Quality management: guidelines for quality plans ISO 14918 Thermal spraying – Approval testing of thermal sprayers ISO 14922-2 Thermal spraying – Quality requirement of thermally sprayed structures ISO 11124-2 Preparation of steel substrates before application of paints and related products – Specifications for metallic blast cleaning abrasives chilled iron grit ISO 1124-3 Preparation of steel substrates before application of paints and related products – Specifications for metallic blast cleaning abrasives – High carbon cast steel and grit ISO 11126-3 Preparation of steel substrates before application of paints and related products – Specifications for metallic blast cleaning abrasives – Copper refinery slag ISO 11126-7 Preparation of steel substrates before application of paints and related products – Specifications for metallic blast cleaning abrasives – Fued aluminium oxide ISO11126-10 Preparation of steel substrates before application of paints and related products- specifications for non-metallic blast cleaning abrasive-Almandite Granet ISO 19840 Paint and varnishes – Corrosion protection of steel structures by protective paint systems. Measurements of, and acceptance criteria for the thickness of dry films on rough surfaces ISO 6272 Paints and varnishes – Falling weight resistance (impact) ISO 3248 Paints and varnishes – Determination of the effect of heat ASTM C 868 Test method for chemical resistance of protective linings ASTM D 4940 Standard test method for conductivity analyses of water soluble contamination of blasting abrasives ASTM D 4285 Standard test method for indicating oil or water in compressed air ASTM D 5162 Standard practice for discontinuity (holiday) testing of non-conductive protective coating on metallic substrates ASTM E 96 Test methods for water vapour transmission of materials BS 4800 Paint colours for building purposes BS 3900 F10 Methods of test for paints – Determination of resistance to cathodic disbonding of coatings for use in marine environments RAL Colour cards