Policy into Practice:
EURAXESS Researcher Career Skills for Career Development
PIPERS
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Helping researchers to pursue their professional ambitions:
A workshop for staff assisting researchers’ development
21 - 22 JUNE 2016
WARSAW, POLANDResearcher Development
The UK Experience
Dr Lowry McComb
Formerly Director of Researcher Development
Durham University, UK
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
What is Researcher Development?
• Knowledge and Intellectual Abilities
• e.g. Discipline-Specific Knowledge, Problem Solving, Critical
Thinking
• Personal Effectiveness
• e.g. Career Development, Time Management
• Research Governance and Organisation
• e.g. Project Planning, Research Grant Development, Research
Integrity
• Engagement, Influence and Impact
• e.g. Teaching, Publication, Impact Awareness, Outreach, Enterprise
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Importance of Researcher
Development
•Should improve the researcher’s ability to successfully
complete their research programme
•Preparation for future employment either in academia or
other employment
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
National Policy
• “…major funders of PhD
students should make all
funding related to PhD students
conditional on students’
training meeting stringent
minimum standards”
• Training “…should include the
provision of at least two weeks’
dedicated training a year,
principally in transferable
skills…”
Roberts Review, 2002
Professor Sir Gareth Roberts
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Global Context
Trends that will shape the economy over the next decade include:
• growing rewards from innovation, as the pace of
technological change increases and countries move into
higher-value activities;
• the importance of higher skill levels
Need to improve the UK’s capacity for science and innovation
• Investment in the science base
• Improving links with business
• Attract foreign direct investment
• Build high value-added firms that will raise private
investment
Research Councils UK
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Engineering and Physical Sciences
Research Council
EPSRC – Delivery Plan 2011-15
• Highly-skilled people are the most important output from
our research investments, and with industry warning of
STEM skill shortages, it has never been more important to
ensure our people have the skills most valuable to industry.
• We will act to further improve the quality of PhDs by
increasing the proportion of students funded via cohort
approaches.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
EU Funding
The Commission identifies the need to increase the number of
researchers, stating that the EU will need at least one million new
research jobs if it is to reach the R&D target of 3%, and that the number
of actual researchers required is significantly higher as many researchers
will retire over the next decade. As a result, the European Commission
calls on EU Member States to strengthen their capacity to attract and
train young people to become researchers, so as to offer internationally
competitive research careers to keep them in Europe as well as to attract
high quality researchers from abroad.
UKRO Europe Unit, Briefing Note E-2010-12
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Vitae Researcher
Development Framework
Vitae Researcher Development Framework
by researchers for researchers
Based on accounts of successful researchers
Literature survey
Definitions of research and research roles
Competency frameworks - academic and related occupations
Empirical data
>100 interviews with experienced researchers
Range of experiences, institution types, geographical context,
disciplines, demographics
>1000 characteristics and variants, clustered into groups
Broad consultation
242 sector responses
Employer validation
Sector advisory & project groups
Validation
Expert panel: 14 senior academics
Endorsement by stakeholder organisations
Framework of the
knowledge, behaviour
and attributes of
successful researchers
Enables self-
assessment of
strengths and areas for
further development
Common language for
researchers capabilities
Vitae Researcher Development
Framework
Vitae Researcher Development Framework
Vitae Researcher Development Statement
endorsed by Research and funding bodies, Universities UK,
employers and others
Referenced in QAA Quality Code for research degree programmes
Used in achieving HR Excellence in research
Over 90% research intensive universities
Internationally recognised
House of Lords review of HE STEM (2012)
‘…we were pleased to hear that the Researcher Development Framework (RDF), developed by
Vitae in consultation with employers, has gone some way to improve the employability skills of
postgraduates and guide the knowledge, behaviour and attributes of a successful researcher ‘
‘…several witnesses praised the RDF and use it when mapping or reviewing training
and courses in order to provide the skills in the RDF.’
Pan-European professional development
framework – feasibility study
(European Science Foundation)
‘Real demand among researchers for a more structured approach towards
researcher´s professional development and active career planning.’
‘RDF proved to be a solid basis for making researchers reflect on their skills and
attributes and on their career aspirations in general.’
‘Provides an important potential to support the professional
development of researchers in any national or institutional environment.’
‘This new study has revealed that within Europe there is a clear need for a European
Researcher Development Framework which can aid researcher´s professional
development. The adoption of the RDF, adapted as recommended in the report,
would also be a great tool for supporting intersect oral mobility. ‘
Martin Hynes, CEO, European Science Foundation
http://www.vitae.ac.uk/researchers/1271-569791/New-ESF-funded-feasibility-study-calls-for-a-single-European-Researcher-
Development-Framework-.html
Vitae Researcher Development Framework
Lenses
Highlighting sets of researchers’ capabilities
acquired or used in various other contexts
Direct focus within the RDF
Enterprise (EEUK, NCEE, RCUK)
Leadership (LFHE)
Knowledge exchange (AURIL)
Intrapreneurship
Researcher mobility
Under development
Impact
Placements
Supervision
Bridging the RDF to other frameworks
and professional standards
Teaching (UKPSF)
Engineering (Engineering Council)
Employability (surveys)
Public engagement (NCCPE, RCUK)
Information literacy (SCONUL)
Collaborative approach – Expert validation
http://www.vitae.ac.uk/researchers/437191/Increasing-the-impact-and-engagement-of-researchers.html
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
RDF Materials
RDF materials are now freely available from
https://www.vitae.ac.uk/researchers-professional-
development/about-the-vitae-researcher-development-
framework
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Key Features of a
Researcher Development
Programme for
Doctoral Students
Doctoral Training Programme
Handbook available at
http://www.dur.ac.uk/resourc
es/graduate.school/Handboo
k2011.pdf
Current Approaches: Course Titles
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Key Features of a
Researcher Development Programme for
Doctoral Students
Key Features
1. Streamlined Framework
2. Phased Approach
3. Enhances Engagement & Employability
4. Supports All
5. Measurable Outcomes
Vitae Framework
Good as a starting point, key
elements can be retained to develop
a more streamlined approach
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
1) Streamlined Framework
• Knowledge and Intellectual Abilities
e.g. Discipline-Specific Knowledge, Problem Solving,
Critical Thinking
• Personal Effectiveness
e.g. Career Development, Time Management
• Research Governance and Organisation
e.g. Project Planning, Research Grant Development,
Research Integrity
• Engagement, Influence and Impact
e.g. Teaching, Publication, Impact Awareness, Outreach,
Enterprise
2) Phased Approach
The Underpinning phase refers to the first nine months of a PhD. It
begins with a needs analysis and focuses on:
Example Course Themes:
• Team Work
• Career Options
• Information Management
• Personal Effectiveness
• Presenting & Teaching
• Professional Conduct
• Project Management
• Statistics
• Writing
• Academic Writing Skills
• Tackling a Literature Review
• Writing for Publication
• Systematic Reviews
2) Phased Approach
The Consolidating phase refers to the 9-20 month period of a PhD
and focuses on:
Example Course Themes:
• Career Planning
• Presenting (Advanced)
• Progressing
2) Phased Approach
The Completing phase refers to 20+ months of a PhD and focuses
on:
Example Course Themes:
• Advanced Writing
• Career Action
• Completing
2) Phased Approach
Enriching courses can be taken at any point during the PhD.
Example Course Themes:
• Business and Enterprise
• Resilience
• Professional Conduct
• Mini MBA Programme
• Public Engagement
• Working with Others
3) Enhances Engagement & Employability
Engagement
• Academic Led
Employability
• Inside Academia
• Outside Academia
3.5% of UK PGRs end up in permanent
academic posts in the UK
• Work in co-operation with the
careers services
• Embed Employer Participation
Careers in and outside science, taken from
Royal Society Report: A Century of Science
3) Enhances Engagement & Employability
4) Supports All: The Individual Students
16%
69%
15%
Postgraduate Students by Faculty (n=4280)
Science
Social Science & Health
Arts & Humanities
79%
15%
6%
Postgraduate Students by Study Type (n=4280)
Full Time
Part Time
Distance Learning
57%
43%
Postgraduate Students by Location (n=4280)
UK/EU
Overseas
38%
62%
PGR/PGT (n=4280)
PGR
PGT
Taken from https://www.dur.ac.uk/resources/student.registry/statistics/postgraduate/3.1summary/143-1.pdf, last accessed 23/7/15
4) Supports All: The Individual Students
Core Groups:
• Three Faculties
• PGR, PGT
• F/T, P/T, DL
• UK & OS
Every student is an individual so
training needs should be identified
and reviewed
4) Supports All: The Doctoral Training Centres
4) Supports All: The Innovative Training
Networks
PGR Training Programme
should also support
development of
partnerships which take
the form of collaborative…
• European Training
Networks (ETN)
• European Industrial
Doctorates (EID)
• European Joint
Doctorates (EJD)
5) Measurable Outcomes
Engagement with
RCUK and
Employers
Engagement with
Faculty and
Departmental PG
Leaders
Focus Groups with
Students
Training Course
Feedback
• Training Course Feedback
• Focus Groups with Students
• Engagement with Faculty
and Departmental PG
Leaders
• Engagement with RCUK and
Employers
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The EU Framework
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The European Charter for Researchers
The European Charter for Researchers is a set of general
principles and requirements which specifies the roles,
responsibilities and entitlements of researchers as well as of
employers and/or funders of researchers6. The aim of the
Charter is to ensure that the nature of the relationship
between researchers and employers or funders is conducive
to successful performance in generating, transferring, sharing
and disseminating knowledge and technological
development, and to the career development of researchers.
The Charter also recognizes the value of all forms of mobility
as a means for enhancing the professional development of
researchers.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Code of Conduct for the
Recruitment of Researchers
The Code of Conduct for the recruitment of researchers
consists of a set of general principles and requirements that
should be followed by employers and/or funders when
appointing or recruiting researchers. These principles and
requirements should ensure observance of values such as
transparency of the recruitment process and equal treatment
of all applicants, in particular with regard to the development
of an attractive, open and sustainable European labour
market for researchers, and are complementary to those
outlined in the European Charter for Researchers.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Access to research training and
continuous development
Employers and/or funders should ensure that all researchers
at any stage of their career, regardless of their contractual
situation, are given the opportunity for professional
development and for improving their employability through
access to measures for the continuing development of skills
and competencies.
Such measures should be regularly assessed for their
accessibility, take up and effectiveness in improving
competencies, skills and employability.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Career development
Employers and/or funders of researchers should draw up,
preferably within the framework of their human resources
management, a specific career development strategy for
researchers at all stages of their career, regardless of their
contractual situation, including for researchers on fixed-term
contracts. It should include the availability of mentors
involved in providing support and guidance for the personal
and professional development of researchers, thus
motivating them and contributing to reducing any insecurity
in their professional future. All researchers should be made
familiar with such provisions and arrangements.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Access to career advice
Employers and/or funders should ensure that
career advice and job placement assistance,
either in the institutions concerned, or
through collaboration with other structures, is
offered to researchers at all stages of their
careers, regardless of their contractual
situation.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The Human Resources Strategy for
Researchers ( HRS4R )
The "HR Strategy for Researchers" supports research
institutions and funding organisations in the implementation
of the Charter & Code in their policies and practices. The
concrete implementation of the Charter & Code by research
institutions will render them more attractive to researchers
looking for a new employer or for a host for their research
project. Funding organisations implementing the Charter &
Code principles will contribute to the attractiveness of their
national research systems and to the attractiveness of the
European Research Area more generally.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
HR Excellence in Research
The "HR Excellence in Research" award gives public
recognition to research institutions that have made progress
in aligning their human resource policies with the principles
set out in the "Charter & Code". Institutions that have been
awarded the right to use the icon can use it to highlight their
commitment to implement fair and transparent recruitment
and appraisal procedures for researchers.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional Development
Dean Hogan
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Building a research profile & developing research skills is now taken as a given.
Professional Development is much more.
The starting point is the researcher.
• What does the researcher want to do?
• Is she confident in her values?
• Does he have a realistic awareness of his strengths and areas for training &
development?
The aim is have the researcher take a strategic approach to their
professional development so that they can have career &
professional choices by being the most effective researcher possible.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Doctor heal thy self!
Researcher’s live a life of enquiry & evaluation.
By developing themselves professionally researchers can use the same principals
to realistically evaluate their own skill sets, awareness of professional
opportunities, their motivations and ambitions.
It is important that researchers take the time to understand their own values and
motivations as well as the opportunities realistically open to them given their
individual strengths, skills and personal situation.
Know what employers are looking for, how their skill-set matches
this and how to articulate their strengths. If there is gaps in what
they have to offer, make a development plan.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Short-term contracts and competition for roles necessitates that researchers
need to have direction and flexibility.
Professional Development will help them:
• Plan a career path by setting goals,
• Maximise the benefits of their current position,
• Raise their profile.
No matter what a researcher is planning to do, they will need goals
to help them choose between career options.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
If the researcher can combine self-understanding & awareness with a good
knowledge of career options they will have the best foundation for Professional
Development.
Then the researcher can take a strategic approach to their development.
As early as possible a researcher will need to think strategically about goals and
how their development & skills are in line with those goals.
This will lead to training needs analysis and development planning.
Knowledge of career options requires an understanding of
organisational & career structures, available roles, networking &
recruitment.
What training and/or supports are available?
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
An Academic Career
Highly competitive, only a small percentage of researchers will have a career in
academia.
The basic requirements for a long-term academic career are:
• publishing,
• teaching experience,
• experience in administration & supervision,
• knowledge of funding possibilities & preferably some success in funding.
An established professional network and a suitable profile
Familiarity with entrepreneurial needs/skills & knowledge transfer
experience would be desirable too.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Other things to consider for an academic career:
• Proven project management skills, especially research projects.
• International experience, mobility, conferences etc.
• Up to date on quality assessment in teaching and research.
• Appraised of current issues in higher education.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Researchers need to raise their profile
They will need to articulate the results of research and to how it contributes
to their field of study.
Communication skills are increasingly important to a research career
Communication skills will allow the researcher access to research
agenda conversations.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Another by-product of networking is that it is another way to raise profile
Presenting research to international colleagues builds confidence & is excellent
preparation for broader communication activities that come under the wider
heading of Public Engagement.
A successful researcher that can also positively communicate with the media &
general public is valuable to a research institution.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Funding
An ability to generate funding is greatly valued.
Early-career researchers participating in funding procurement will learn:
• Where they can find support for funding applications
• The different sources of research funding
• How to write grant proposals
Starting with ‘small’ applications will teach the researcher to adapt
to funding guidelines and adhere to deadlines
This can mean funding applications for equipment, travel,
conferences, or public engagement activities
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Early-career researchers can also be invited to assist more experienced
colleagues with funding applications.
Again, it will help them to understand how to evaluate & implement the funding
criteria.
By osmosis this will also help them to build their network through interaction
with other colleagues, administrators and national contact points etc.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Exposure to Knowledge Transfer activities can offer a number of benefits to
early-career researchers.
It can give them early exposure to industry along with the accompanying
expectations, work practices & possible opportunities.
It is yet another way to raise profile.
Awareness of the working relationship between research & industry
will also inform the researcher’s approach to funding procurement.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Knowledge Transfer activities include (I)
Information & Personnel Exchange: Knowledge transfer partnerships,
university-industry interaction, researcher secondment or researcher exchange
agreements, networking activities.
Commercial Development Activities: Mentoring programmes, supporting
researchers to take research results to market, recognising
innovation, training in business and entrepreneurial skills.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Knowledge Transfer activities include (II):
Collaborative Research: Partnerships with other research institutions, industry,
public sector & NGOs.
Collaborative Training: Aimed at developing the relevant skills for excellent
research, how to work & interact with industry, IPR and entrepreneurial
skills.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Collaboration can allow access to expertise & equipment otherwise unavailable.
An opportunity to learn different working methods and approaches to research.
It can also offer new funding opportunities.
Collaborative research can have much more impact as it is usually undertaken
with a path to market already planned or established.
It can present commercial opportunities such as spin-off ventures &
sow the seeds of future commercial collaborations.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional Development
Skills
The researcher does a personal skills inventory, using their CV as a reference.
Not just on the important generic and specific research skills but skills obtained
from previous (or even part-time) employment.
When the inventory is complete the participant invariably finds that
they possess a lot more skills than previously thought.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional Development
Interests
• What career themes is the researcher attracted to?
• Why?
• Are their interests social, enterprising, investigative, practical focus, creative,
systematic?
• “What gets me out of bed in the morning?”
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional Development
Personality Traits
• “How do I like to work?”
• “How do I work with others?”
• “What kind of work do I enjoy?”
• “Dislike? Why?”
• “What working environments suit me?”
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional Development
Values
• “What matters most to me?”
• “What do I value most in a role?”
• “What do I need to be fulfilled?”
• “What are my core values?”
• “What type of roles agree/disagree with my values?”
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Career anchors are the unique combination of perceived career competences,
motives and values. There are eight career anchors in total:
• Entrepreneurial creativity
• Technical/functional competence
• Service or dedication to the cause
• General managerial competence
• Pure challenge
• Autonomy/independence
• Lifestyle
• Security/stability
Career Anchors
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
What employers look for:
In 2009 Vitae surveyed 104 employers and found that most (73%) would welcome more
applications from doctoral graduates and that nearly a third (31%) are already actively
targeting doctoral graduates.
Employers are keen to recruit researchers both for their technical skills and for their ‘first
class brains’.
Employers typically expect researchers to be strongest in skills closely allied to the process
of research such as data analysis and problem solving and less strong on interpersonal
skills, leadership and commercial awareness.
However, the greater the organisation’s experience of researchers the
higher the anticipated level of competence across all skills.
Doctoral graduates are typically in competition with high achieving graduates
and will need to prove their particular value.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
What employers look for
Employers who already have links with universities are a good place for doctoral
researchers to start their job searching. These employers are more likely to understand
the skills possessed by researchers and may be willing to talk about their recruitment
needs.
A minority of employers do not have any interest in recruiting doctoral graduates.
If doctoral graduates are to overcome this during recruitment they will need
to focus on their individual skills and motivations rather than their
qualifications.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Professional development planning
Training needs analysis
A key part of researcher development is to identify what they require to
enhance their skills. The first stage of this process is to audit current skills and
strengths and identify areas for development.
This is often called ‘training needs analysis’ by employers, graduate schools etc.
but the approach is useful for considering all development
opportunities, not only formal training courses.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
A Training Needs Analysis is an examination of the skills you need in order to
complete a particular task against your current aptitudes. For example:
Skills associated with giving a poster presentation
• Discipline specific skills: completing the research and checking data
• Communication, design & writing skills: Organising data in a clear & engaging way
• Inter-personal & presentation skills: Presenting the poster confidently
to delegates
• Networking skills: Making the most of the opportunities presented at
the conference
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Planning
The plan should include clear and achievable targets with timed deadlines for
completing different activities. It should state clearly how you will access needed
training and development.
Important: Not all training has to be provided by practical courses or workshops.
Online training, simple desk-based research, talking to qualified
colleagues etc. can help fill some training gaps.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
The development plan should be an evolving document that is constantly being
reviewed as part of wider personal and professional development.
Review progress, where you are and where you want to be, at different points, for
example:
• Develop current role
• Prepare for promotion
• Find a new direction/job
Areas to consider as you progress:
• Have you completed the training identified?
• Have learned what you hoped from the training?
• What development needs do you still feel that you have?
• Setting of priorities and deadlines for future development.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Job search
For the researcher being clear on what they would like to do next and why, is
important – both to keep their career going in the right direction and to ensure
that they can explain their motivations to a future employer.
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Doctoral graduate destinations and impact three years on (Vitae 2010) asked
questions about how researchers found their current jobs:
• 33% of respondents found out about their current job through professional,
work or educational contacts and networks
• 16% through personal contacts
• 24% already worked for the organisation
• 22% had seen their position advertised in newspapers
• 20% had seen it on an employers website
• 10% recruitment agency
• 5% University careers service
• 8% through other careers services
• 6% speculative approach
• 1% headhunted
(Multi response questions: sum is greater than 100%)
This project has received funding from the European Union’s Seventh Framework Programme
for research, technological development and demonstration under grant agreement No 643330
Coffee
Professional development 1&2

Professional development 1&2

  • 1.
    Policy into Practice: EURAXESSResearcher Career Skills for Career Development PIPERS This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Helping researchers to pursue their professional ambitions: A workshop for staff assisting researchers’ development 21 - 22 JUNE 2016 WARSAW, POLANDResearcher Development The UK Experience Dr Lowry McComb Formerly Director of Researcher Development Durham University, UK
  • 2.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 What is Researcher Development? • Knowledge and Intellectual Abilities • e.g. Discipline-Specific Knowledge, Problem Solving, Critical Thinking • Personal Effectiveness • e.g. Career Development, Time Management • Research Governance and Organisation • e.g. Project Planning, Research Grant Development, Research Integrity • Engagement, Influence and Impact • e.g. Teaching, Publication, Impact Awareness, Outreach, Enterprise
  • 3.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Importance of Researcher Development •Should improve the researcher’s ability to successfully complete their research programme •Preparation for future employment either in academia or other employment
  • 4.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330
  • 5.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 National Policy • “…major funders of PhD students should make all funding related to PhD students conditional on students’ training meeting stringent minimum standards” • Training “…should include the provision of at least two weeks’ dedicated training a year, principally in transferable skills…” Roberts Review, 2002 Professor Sir Gareth Roberts
  • 6.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Global Context Trends that will shape the economy over the next decade include: • growing rewards from innovation, as the pace of technological change increases and countries move into higher-value activities; • the importance of higher skill levels Need to improve the UK’s capacity for science and innovation • Investment in the science base • Improving links with business • Attract foreign direct investment • Build high value-added firms that will raise private investment Research Councils UK
  • 7.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Engineering and Physical Sciences Research Council EPSRC – Delivery Plan 2011-15 • Highly-skilled people are the most important output from our research investments, and with industry warning of STEM skill shortages, it has never been more important to ensure our people have the skills most valuable to industry. • We will act to further improve the quality of PhDs by increasing the proportion of students funded via cohort approaches.
  • 8.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 EU Funding The Commission identifies the need to increase the number of researchers, stating that the EU will need at least one million new research jobs if it is to reach the R&D target of 3%, and that the number of actual researchers required is significantly higher as many researchers will retire over the next decade. As a result, the European Commission calls on EU Member States to strengthen their capacity to attract and train young people to become researchers, so as to offer internationally competitive research careers to keep them in Europe as well as to attract high quality researchers from abroad. UKRO Europe Unit, Briefing Note E-2010-12
  • 9.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Vitae Researcher Development Framework
  • 10.
    Vitae Researcher DevelopmentFramework by researchers for researchers Based on accounts of successful researchers Literature survey Definitions of research and research roles Competency frameworks - academic and related occupations Empirical data >100 interviews with experienced researchers Range of experiences, institution types, geographical context, disciplines, demographics >1000 characteristics and variants, clustered into groups Broad consultation 242 sector responses Employer validation Sector advisory & project groups Validation Expert panel: 14 senior academics Endorsement by stakeholder organisations
  • 11.
    Framework of the knowledge,behaviour and attributes of successful researchers Enables self- assessment of strengths and areas for further development Common language for researchers capabilities Vitae Researcher Development Framework
  • 12.
    Vitae Researcher DevelopmentFramework Vitae Researcher Development Statement endorsed by Research and funding bodies, Universities UK, employers and others Referenced in QAA Quality Code for research degree programmes Used in achieving HR Excellence in research Over 90% research intensive universities Internationally recognised House of Lords review of HE STEM (2012) ‘…we were pleased to hear that the Researcher Development Framework (RDF), developed by Vitae in consultation with employers, has gone some way to improve the employability skills of postgraduates and guide the knowledge, behaviour and attributes of a successful researcher ‘ ‘…several witnesses praised the RDF and use it when mapping or reviewing training and courses in order to provide the skills in the RDF.’
  • 13.
    Pan-European professional development framework– feasibility study (European Science Foundation) ‘Real demand among researchers for a more structured approach towards researcher´s professional development and active career planning.’ ‘RDF proved to be a solid basis for making researchers reflect on their skills and attributes and on their career aspirations in general.’ ‘Provides an important potential to support the professional development of researchers in any national or institutional environment.’ ‘This new study has revealed that within Europe there is a clear need for a European Researcher Development Framework which can aid researcher´s professional development. The adoption of the RDF, adapted as recommended in the report, would also be a great tool for supporting intersect oral mobility. ‘ Martin Hynes, CEO, European Science Foundation http://www.vitae.ac.uk/researchers/1271-569791/New-ESF-funded-feasibility-study-calls-for-a-single-European-Researcher- Development-Framework-.html
  • 14.
    Vitae Researcher DevelopmentFramework Lenses Highlighting sets of researchers’ capabilities acquired or used in various other contexts Direct focus within the RDF Enterprise (EEUK, NCEE, RCUK) Leadership (LFHE) Knowledge exchange (AURIL) Intrapreneurship Researcher mobility Under development Impact Placements Supervision Bridging the RDF to other frameworks and professional standards Teaching (UKPSF) Engineering (Engineering Council) Employability (surveys) Public engagement (NCCPE, RCUK) Information literacy (SCONUL) Collaborative approach – Expert validation http://www.vitae.ac.uk/researchers/437191/Increasing-the-impact-and-engagement-of-researchers.html
  • 16.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 RDF Materials RDF materials are now freely available from https://www.vitae.ac.uk/researchers-professional- development/about-the-vitae-researcher-development- framework
  • 17.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Key Features of a Researcher Development Programme for Doctoral Students
  • 18.
    Doctoral Training Programme Handbookavailable at http://www.dur.ac.uk/resourc es/graduate.school/Handboo k2011.pdf
  • 19.
  • 20.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Key Features of a Researcher Development Programme for Doctoral Students Key Features 1. Streamlined Framework 2. Phased Approach 3. Enhances Engagement & Employability 4. Supports All 5. Measurable Outcomes
  • 21.
    Vitae Framework Good asa starting point, key elements can be retained to develop a more streamlined approach
  • 22.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 1) Streamlined Framework • Knowledge and Intellectual Abilities e.g. Discipline-Specific Knowledge, Problem Solving, Critical Thinking • Personal Effectiveness e.g. Career Development, Time Management • Research Governance and Organisation e.g. Project Planning, Research Grant Development, Research Integrity • Engagement, Influence and Impact e.g. Teaching, Publication, Impact Awareness, Outreach, Enterprise
  • 23.
    2) Phased Approach TheUnderpinning phase refers to the first nine months of a PhD. It begins with a needs analysis and focuses on: Example Course Themes: • Team Work • Career Options • Information Management • Personal Effectiveness • Presenting & Teaching • Professional Conduct • Project Management • Statistics • Writing • Academic Writing Skills • Tackling a Literature Review • Writing for Publication • Systematic Reviews
  • 24.
    2) Phased Approach TheConsolidating phase refers to the 9-20 month period of a PhD and focuses on: Example Course Themes: • Career Planning • Presenting (Advanced) • Progressing
  • 25.
    2) Phased Approach TheCompleting phase refers to 20+ months of a PhD and focuses on: Example Course Themes: • Advanced Writing • Career Action • Completing
  • 26.
    2) Phased Approach Enrichingcourses can be taken at any point during the PhD. Example Course Themes: • Business and Enterprise • Resilience • Professional Conduct • Mini MBA Programme • Public Engagement • Working with Others
  • 27.
    3) Enhances Engagement& Employability Engagement • Academic Led
  • 28.
    Employability • Inside Academia •Outside Academia 3.5% of UK PGRs end up in permanent academic posts in the UK • Work in co-operation with the careers services • Embed Employer Participation Careers in and outside science, taken from Royal Society Report: A Century of Science 3) Enhances Engagement & Employability
  • 29.
    4) Supports All:The Individual Students 16% 69% 15% Postgraduate Students by Faculty (n=4280) Science Social Science & Health Arts & Humanities 79% 15% 6% Postgraduate Students by Study Type (n=4280) Full Time Part Time Distance Learning 57% 43% Postgraduate Students by Location (n=4280) UK/EU Overseas 38% 62% PGR/PGT (n=4280) PGR PGT Taken from https://www.dur.ac.uk/resources/student.registry/statistics/postgraduate/3.1summary/143-1.pdf, last accessed 23/7/15
  • 30.
    4) Supports All:The Individual Students Core Groups: • Three Faculties • PGR, PGT • F/T, P/T, DL • UK & OS Every student is an individual so training needs should be identified and reviewed
  • 31.
    4) Supports All:The Doctoral Training Centres
  • 32.
    4) Supports All:The Innovative Training Networks PGR Training Programme should also support development of partnerships which take the form of collaborative… • European Training Networks (ETN) • European Industrial Doctorates (EID) • European Joint Doctorates (EJD)
  • 33.
    5) Measurable Outcomes Engagementwith RCUK and Employers Engagement with Faculty and Departmental PG Leaders Focus Groups with Students Training Course Feedback • Training Course Feedback • Focus Groups with Students • Engagement with Faculty and Departmental PG Leaders • Engagement with RCUK and Employers
  • 34.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The EU Framework
  • 35.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The European Charter for Researchers The European Charter for Researchers is a set of general principles and requirements which specifies the roles, responsibilities and entitlements of researchers as well as of employers and/or funders of researchers6. The aim of the Charter is to ensure that the nature of the relationship between researchers and employers or funders is conducive to successful performance in generating, transferring, sharing and disseminating knowledge and technological development, and to the career development of researchers. The Charter also recognizes the value of all forms of mobility as a means for enhancing the professional development of researchers.
  • 36.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Code of Conduct for the Recruitment of Researchers The Code of Conduct for the recruitment of researchers consists of a set of general principles and requirements that should be followed by employers and/or funders when appointing or recruiting researchers. These principles and requirements should ensure observance of values such as transparency of the recruitment process and equal treatment of all applicants, in particular with regard to the development of an attractive, open and sustainable European labour market for researchers, and are complementary to those outlined in the European Charter for Researchers.
  • 37.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Access to research training and continuous development Employers and/or funders should ensure that all researchers at any stage of their career, regardless of their contractual situation, are given the opportunity for professional development and for improving their employability through access to measures for the continuing development of skills and competencies. Such measures should be regularly assessed for their accessibility, take up and effectiveness in improving competencies, skills and employability.
  • 38.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Career development Employers and/or funders of researchers should draw up, preferably within the framework of their human resources management, a specific career development strategy for researchers at all stages of their career, regardless of their contractual situation, including for researchers on fixed-term contracts. It should include the availability of mentors involved in providing support and guidance for the personal and professional development of researchers, thus motivating them and contributing to reducing any insecurity in their professional future. All researchers should be made familiar with such provisions and arrangements.
  • 39.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Access to career advice Employers and/or funders should ensure that career advice and job placement assistance, either in the institutions concerned, or through collaboration with other structures, is offered to researchers at all stages of their careers, regardless of their contractual situation.
  • 40.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The Human Resources Strategy for Researchers ( HRS4R ) The "HR Strategy for Researchers" supports research institutions and funding organisations in the implementation of the Charter & Code in their policies and practices. The concrete implementation of the Charter & Code by research institutions will render them more attractive to researchers looking for a new employer or for a host for their research project. Funding organisations implementing the Charter & Code principles will contribute to the attractiveness of their national research systems and to the attractiveness of the European Research Area more generally.
  • 41.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 HR Excellence in Research The "HR Excellence in Research" award gives public recognition to research institutions that have made progress in aligning their human resource policies with the principles set out in the "Charter & Code". Institutions that have been awarded the right to use the icon can use it to highlight their commitment to implement fair and transparent recruitment and appraisal procedures for researchers.
  • 42.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional Development Dean Hogan
  • 43.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Building a research profile & developing research skills is now taken as a given. Professional Development is much more. The starting point is the researcher. • What does the researcher want to do? • Is she confident in her values? • Does he have a realistic awareness of his strengths and areas for training & development? The aim is have the researcher take a strategic approach to their professional development so that they can have career & professional choices by being the most effective researcher possible.
  • 44.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Doctor heal thy self! Researcher’s live a life of enquiry & evaluation. By developing themselves professionally researchers can use the same principals to realistically evaluate their own skill sets, awareness of professional opportunities, their motivations and ambitions. It is important that researchers take the time to understand their own values and motivations as well as the opportunities realistically open to them given their individual strengths, skills and personal situation. Know what employers are looking for, how their skill-set matches this and how to articulate their strengths. If there is gaps in what they have to offer, make a development plan.
  • 45.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Short-term contracts and competition for roles necessitates that researchers need to have direction and flexibility. Professional Development will help them: • Plan a career path by setting goals, • Maximise the benefits of their current position, • Raise their profile. No matter what a researcher is planning to do, they will need goals to help them choose between career options.
  • 46.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 If the researcher can combine self-understanding & awareness with a good knowledge of career options they will have the best foundation for Professional Development. Then the researcher can take a strategic approach to their development. As early as possible a researcher will need to think strategically about goals and how their development & skills are in line with those goals. This will lead to training needs analysis and development planning. Knowledge of career options requires an understanding of organisational & career structures, available roles, networking & recruitment. What training and/or supports are available?
  • 47.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 An Academic Career Highly competitive, only a small percentage of researchers will have a career in academia. The basic requirements for a long-term academic career are: • publishing, • teaching experience, • experience in administration & supervision, • knowledge of funding possibilities & preferably some success in funding. An established professional network and a suitable profile Familiarity with entrepreneurial needs/skills & knowledge transfer experience would be desirable too.
  • 48.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Other things to consider for an academic career: • Proven project management skills, especially research projects. • International experience, mobility, conferences etc. • Up to date on quality assessment in teaching and research. • Appraised of current issues in higher education.
  • 49.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Researchers need to raise their profile They will need to articulate the results of research and to how it contributes to their field of study. Communication skills are increasingly important to a research career Communication skills will allow the researcher access to research agenda conversations.
  • 50.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Another by-product of networking is that it is another way to raise profile Presenting research to international colleagues builds confidence & is excellent preparation for broader communication activities that come under the wider heading of Public Engagement. A successful researcher that can also positively communicate with the media & general public is valuable to a research institution.
  • 51.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Funding An ability to generate funding is greatly valued. Early-career researchers participating in funding procurement will learn: • Where they can find support for funding applications • The different sources of research funding • How to write grant proposals Starting with ‘small’ applications will teach the researcher to adapt to funding guidelines and adhere to deadlines This can mean funding applications for equipment, travel, conferences, or public engagement activities
  • 52.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Early-career researchers can also be invited to assist more experienced colleagues with funding applications. Again, it will help them to understand how to evaluate & implement the funding criteria. By osmosis this will also help them to build their network through interaction with other colleagues, administrators and national contact points etc.
  • 53.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Exposure to Knowledge Transfer activities can offer a number of benefits to early-career researchers. It can give them early exposure to industry along with the accompanying expectations, work practices & possible opportunities. It is yet another way to raise profile. Awareness of the working relationship between research & industry will also inform the researcher’s approach to funding procurement.
  • 54.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Knowledge Transfer activities include (I) Information & Personnel Exchange: Knowledge transfer partnerships, university-industry interaction, researcher secondment or researcher exchange agreements, networking activities. Commercial Development Activities: Mentoring programmes, supporting researchers to take research results to market, recognising innovation, training in business and entrepreneurial skills.
  • 55.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Knowledge Transfer activities include (II): Collaborative Research: Partnerships with other research institutions, industry, public sector & NGOs. Collaborative Training: Aimed at developing the relevant skills for excellent research, how to work & interact with industry, IPR and entrepreneurial skills.
  • 56.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Collaboration can allow access to expertise & equipment otherwise unavailable. An opportunity to learn different working methods and approaches to research. It can also offer new funding opportunities. Collaborative research can have much more impact as it is usually undertaken with a path to market already planned or established. It can present commercial opportunities such as spin-off ventures & sow the seeds of future commercial collaborations.
  • 57.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional Development Skills The researcher does a personal skills inventory, using their CV as a reference. Not just on the important generic and specific research skills but skills obtained from previous (or even part-time) employment. When the inventory is complete the participant invariably finds that they possess a lot more skills than previously thought.
  • 58.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional Development Interests • What career themes is the researcher attracted to? • Why? • Are their interests social, enterprising, investigative, practical focus, creative, systematic? • “What gets me out of bed in the morning?”
  • 59.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional Development Personality Traits • “How do I like to work?” • “How do I work with others?” • “What kind of work do I enjoy?” • “Dislike? Why?” • “What working environments suit me?”
  • 60.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional Development Values • “What matters most to me?” • “What do I value most in a role?” • “What do I need to be fulfilled?” • “What are my core values?” • “What type of roles agree/disagree with my values?”
  • 61.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Career anchors are the unique combination of perceived career competences, motives and values. There are eight career anchors in total: • Entrepreneurial creativity • Technical/functional competence • Service or dedication to the cause • General managerial competence • Pure challenge • Autonomy/independence • Lifestyle • Security/stability Career Anchors
  • 62.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 What employers look for: In 2009 Vitae surveyed 104 employers and found that most (73%) would welcome more applications from doctoral graduates and that nearly a third (31%) are already actively targeting doctoral graduates. Employers are keen to recruit researchers both for their technical skills and for their ‘first class brains’. Employers typically expect researchers to be strongest in skills closely allied to the process of research such as data analysis and problem solving and less strong on interpersonal skills, leadership and commercial awareness. However, the greater the organisation’s experience of researchers the higher the anticipated level of competence across all skills. Doctoral graduates are typically in competition with high achieving graduates and will need to prove their particular value.
  • 63.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 What employers look for Employers who already have links with universities are a good place for doctoral researchers to start their job searching. These employers are more likely to understand the skills possessed by researchers and may be willing to talk about their recruitment needs. A minority of employers do not have any interest in recruiting doctoral graduates. If doctoral graduates are to overcome this during recruitment they will need to focus on their individual skills and motivations rather than their qualifications.
  • 64.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Professional development planning Training needs analysis A key part of researcher development is to identify what they require to enhance their skills. The first stage of this process is to audit current skills and strengths and identify areas for development. This is often called ‘training needs analysis’ by employers, graduate schools etc. but the approach is useful for considering all development opportunities, not only formal training courses.
  • 65.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 A Training Needs Analysis is an examination of the skills you need in order to complete a particular task against your current aptitudes. For example: Skills associated with giving a poster presentation • Discipline specific skills: completing the research and checking data • Communication, design & writing skills: Organising data in a clear & engaging way • Inter-personal & presentation skills: Presenting the poster confidently to delegates • Networking skills: Making the most of the opportunities presented at the conference
  • 66.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Planning The plan should include clear and achievable targets with timed deadlines for completing different activities. It should state clearly how you will access needed training and development. Important: Not all training has to be provided by practical courses or workshops. Online training, simple desk-based research, talking to qualified colleagues etc. can help fill some training gaps.
  • 67.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 The development plan should be an evolving document that is constantly being reviewed as part of wider personal and professional development. Review progress, where you are and where you want to be, at different points, for example: • Develop current role • Prepare for promotion • Find a new direction/job Areas to consider as you progress: • Have you completed the training identified? • Have learned what you hoped from the training? • What development needs do you still feel that you have? • Setting of priorities and deadlines for future development.
  • 68.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Job search For the researcher being clear on what they would like to do next and why, is important – both to keep their career going in the right direction and to ensure that they can explain their motivations to a future employer.
  • 69.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Doctoral graduate destinations and impact three years on (Vitae 2010) asked questions about how researchers found their current jobs: • 33% of respondents found out about their current job through professional, work or educational contacts and networks • 16% through personal contacts • 24% already worked for the organisation • 22% had seen their position advertised in newspapers • 20% had seen it on an employers website • 10% recruitment agency • 5% University careers service • 8% through other careers services • 6% speculative approach • 1% headhunted (Multi response questions: sum is greater than 100%)
  • 70.
    This project hasreceived funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement No 643330 Coffee

Editor's Notes

  • #12 11
  • #15 Researchers: Identify how specific areas such as enterprise can contribute to their professional development as a researcher Identify how the skills and attributes they have developed through research can contribute to, or underpin their development in those areas Select areas to develop further Provide evidence of transferability of skills Researcher developers: Demonstrate to researchers how specific areas can contribute towards professional development Enable researchers to recognise the learning they have acquired through particular activities Explore how RDF relates to other frameworks and vice versa Provide evidence of transferability of skills Align learning and development resources around a lens Institutions UK Professional Standards Framework
  • #30 postgraduate taught (PGT) programmes postgraduate research (PGR) students
  • #44 However, if our work does not fit with our values or motivations we are likely to become demotivated, disillusioned or not perform as well as we might.
  • #45 1). By definition researchers should be, and are, naturally curious and probing. 2). Development as a professional involves more than building your research profile and research skills. 3). Broader professional development is becoming increasingly significant as employers look for researchers who can ‘add value’ to their organisations.
  • #46 1).The realities of... 2). stronger profile for applications, whether for funding, promotion or a new post 3). Time spent thinking about your own values, strengths and areas to develop is time well spent as well as being informed about the requirements of different careers.
  • #47 If goals and objectives do not take into account important
  • #48 1). We all know the statistics 2). Networking is vital
  • #50 1). Researchers sometimes think that career opportunities will come to them through hard work and brilliance. Research only becomes valuable when it is presented at a conference or published through a journal. 2). The results and implications of your research.
  • #53 PI’s and the Research Office.
  • #57 direct funding from the collaborating organisation(s) or funding from a range of sources aimed at promoting knowledge exchange activities, e.g. KTPs, CASE studentships, Partnership Grants, etc.