CURRENT PRODUCTION PERFORMANCE
UPDATE
6th – 12th October 2023
OLUWASEYITAN AGBAJE
Production Monitoring
WRFM
Petroleum Engineering Dept.
Overview
2
Introduction: Reliability and production
loss elimination are critical
components for the success of any
industry. Ensuring equipment,
machines, and systems perform their
intended functions without degradation
or failure is essential for operational
efficiency and effectiveness.
Key Findings: The document
emphasizes the identification of
integrity reliability issues through
various means such as PMR failures,
SCE failures, and site audits.
Understanding and addressing these
issues are vital for maintaining
operational integrity and efficiency. It
highlights the structured approach of
Production Loss Elimination (PLE)
processes, which are designed to
effectively manage potential or actual
production loss reliability issues.
PLE processes provides a systematic and effective method to manage potential or actual production loss reliability issues. It
involves effective identification, analysis, and mitigation of potential threats, ultimately reducing the risk of production losses and
improving operational performance and efficiency.
PLE Process Key Aims:
 VISIBILITY of emerging production threats and unplanned loss events
 Appropriate level of ANALYSIS is conducted when required
 SMARTER preventative and corrective ACTIONS
 MONITORING to prevent production loss escalation
 using basic tools such as ‘5-Why’ and where necessary escalating to more detailed Root Cause Analysis (RCA) tools.
3
Structured Approach of Production Loss Elimination (PLE) Processes
High Level Process Flow
PLE COMPONENTS Production Loss Management System (PLMS) is a software tool which
records production targets and losses (planned and unplanned)
Threat is any equipment issue, working practice or external factor that
could directly or indirectly affect production
RCA is a method employ to identify the underlying reasons
behind a problem or production loss. It helps pinpoint the
fundamental causes of inefficiencies or disruption in the
production
CEAT is a process used to monitor and measure uptime and
performance of key equipment in production facilities
Loss Recording is a process used to record, document and
categorize different types of losses that occur in the production
N:B
All actions derived from these component will be recorded
within PLMS and monitored towards closure using available
PLMS reporting
Key PLE components comprise:
 PLMS Entry, Quality Checks and Reporting
 Emerging Production Threats (Identifying and
Managing)
 Loss Recording
 RCA
 Critical Equipment Availability Tracking
4
5
PLE RELIABILITY STRATEGY
Breakdown of key components:
 Safety Critical Element (SCE) Performance Standard failures or deteriorating trends identified through
Assurance Planned Maintenance Routines (PMRs) or corrective intervention are investigated and
measures implemented to avoid problem reoccurrence or eventual failure.
 Proactively manage incurred or potential production losses associated with equipment failures or
performance degradation and ensure investigative analysis effort is aligned to quantified losses or
perceived threat.
 Appropriate Maintenance Culture.
 Actual or Potential Problem Recording & Validation.
 Investigation Execution and Management.
 Rectification Work Implementation and Action Tracking.
PLE Reliability Strategy specifically focuses on optimizing the reliability and availability of production system and equipment to
minimize downtime and maximize productivity.
This strategy emphasizes proactive maintenance, predictive analytics, asset performance management and other measure
aimed at ensuring the reliable operation of production assets
6
 Define & Rank;
Focuses on selecting high-impact problems which will be rectified
by dedicated PLE Reliability Resource to ensure greatest business needs
are addressed.
 Measure
Documenting the current process, validating how
it is measured and assessing baseline performance. Within agreed detailed
boundaries of agreed charter or procedures
PLE WORK RELIABILITY INVESTIGATIVE STATGES
7
Analyse
This stage executes full detailed analysis of defined problem, covering:
• Establish, Document & Confirm Timeline.
PLE Reliability Investigative Work Stages
Measure Analyse Improve Control
Define &
Complete RCA Investigation.
• Validate Findings.
Improve
Based on validated findings, define requirements to ultimately deliver a
Fixed Forever Solution:
• Present Recommendations.
• Generate Specific, Measureable, Achievable, Realistic & Timely
(SMART) Corrective Actions.
• Agree Single Point Accountability & Responsibility for action
completion.
• Agree Target Date for completion.
Control
Monitor recommended solution implementation:
• Where Applicable, Verify Detailed Plan Exists to Close Action.
• Identify Threats to Delivery.
• Formally Close Reliability Investigative Work.
8
Progress Monitoring
The Reliability Hopper shall accurately detail status of PLE Reliability Team
investigative work. This shall be formally issued to all relevant stakeholders monthly.
9
 NEPL faces operational challenges related to reliability
and production losses, which can impact its overall
performance and efficiency. Adopting the Production
Loss Elimination Reliability Strategy can help NEPL
address these challenges effectively by implementing
structured processes and proactive measures to
enhance reliability and eliminate production losses.
Organizations are recommended to define "Fixed Forever
Solutions" based on validated findings to address root
causes effectively. These solutions should be sustainable
and aimed at preventing recurrence of reliability issues.
Implementing SMART corrective actions (Specific,
Measurable, Achievable, Realistic, Timely) ensures that
solutions are well-defined, measurable, and aligned with
organizational goals.
CONCLUSION AND RECOMMENDATION
Production loss elimination and strategy presentation ppt.pptx

More Related Content

Similar to Production loss elimination and strategy presentation ppt.pptx

Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
Pharmaceutical
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
Thushan9
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
shivamagarwal223
 
Test performance indicators
Test performance indicatorsTest performance indicators
Test performance indicators
Idexcel Technologies
 
Release management - Understanding Key Performance Indicators (KPIs)
Release management - Understanding Key Performance Indicators (KPIs)Release management - Understanding Key Performance Indicators (KPIs)
Release management - Understanding Key Performance Indicators (KPIs)
Beyrem CHOUAIEB
 
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALMike Poland, CMRP
 
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness TrainingISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
Operational Excellence Consulting
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
Bharatlal Sain
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
Doreen Yeo
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
sumit686096
 
Quality Management
Quality ManagementQuality Management
Quality Management
manobili17
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
drishtipuro1234
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
sethnainaa
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
Continuity and Resilience
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
Andreea Precup
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
ssuser089410
 

Similar to Production loss elimination and strategy presentation ppt.pptx (20)

Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Tpm Diagnostic 4
Tpm Diagnostic              4Tpm Diagnostic              4
Tpm Diagnostic 4
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 
Test performance indicators
Test performance indicatorsTest performance indicators
Test performance indicators
 
Release management - Understanding Key Performance Indicators (KPIs)
Release management - Understanding Key Performance Indicators (KPIs)Release management - Understanding Key Performance Indicators (KPIs)
Release management - Understanding Key Performance Indicators (KPIs)
 
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
 
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness TrainingISO 22301:2019 (Business Continuity Management Systems) Awareness Training
ISO 22301:2019 (Business Continuity Management Systems) Awareness Training
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
RCM
RCMRCM
RCM
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 

Recently uploaded

İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
Emre Günaydın
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
jeevanprasad8
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
RCC Institute of Information Technology
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
VigneshvaranMech
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Production loss elimination and strategy presentation ppt.pptx

  • 1. CURRENT PRODUCTION PERFORMANCE UPDATE 6th – 12th October 2023 OLUWASEYITAN AGBAJE Production Monitoring WRFM Petroleum Engineering Dept.
  • 2. Overview 2 Introduction: Reliability and production loss elimination are critical components for the success of any industry. Ensuring equipment, machines, and systems perform their intended functions without degradation or failure is essential for operational efficiency and effectiveness. Key Findings: The document emphasizes the identification of integrity reliability issues through various means such as PMR failures, SCE failures, and site audits. Understanding and addressing these issues are vital for maintaining operational integrity and efficiency. It highlights the structured approach of Production Loss Elimination (PLE) processes, which are designed to effectively manage potential or actual production loss reliability issues.
  • 3. PLE processes provides a systematic and effective method to manage potential or actual production loss reliability issues. It involves effective identification, analysis, and mitigation of potential threats, ultimately reducing the risk of production losses and improving operational performance and efficiency. PLE Process Key Aims:  VISIBILITY of emerging production threats and unplanned loss events  Appropriate level of ANALYSIS is conducted when required  SMARTER preventative and corrective ACTIONS  MONITORING to prevent production loss escalation  using basic tools such as ‘5-Why’ and where necessary escalating to more detailed Root Cause Analysis (RCA) tools. 3 Structured Approach of Production Loss Elimination (PLE) Processes High Level Process Flow
  • 4. PLE COMPONENTS Production Loss Management System (PLMS) is a software tool which records production targets and losses (planned and unplanned) Threat is any equipment issue, working practice or external factor that could directly or indirectly affect production RCA is a method employ to identify the underlying reasons behind a problem or production loss. It helps pinpoint the fundamental causes of inefficiencies or disruption in the production CEAT is a process used to monitor and measure uptime and performance of key equipment in production facilities Loss Recording is a process used to record, document and categorize different types of losses that occur in the production N:B All actions derived from these component will be recorded within PLMS and monitored towards closure using available PLMS reporting Key PLE components comprise:  PLMS Entry, Quality Checks and Reporting  Emerging Production Threats (Identifying and Managing)  Loss Recording  RCA  Critical Equipment Availability Tracking 4
  • 5. 5 PLE RELIABILITY STRATEGY Breakdown of key components:  Safety Critical Element (SCE) Performance Standard failures or deteriorating trends identified through Assurance Planned Maintenance Routines (PMRs) or corrective intervention are investigated and measures implemented to avoid problem reoccurrence or eventual failure.  Proactively manage incurred or potential production losses associated with equipment failures or performance degradation and ensure investigative analysis effort is aligned to quantified losses or perceived threat.  Appropriate Maintenance Culture.  Actual or Potential Problem Recording & Validation.  Investigation Execution and Management.  Rectification Work Implementation and Action Tracking. PLE Reliability Strategy specifically focuses on optimizing the reliability and availability of production system and equipment to minimize downtime and maximize productivity. This strategy emphasizes proactive maintenance, predictive analytics, asset performance management and other measure aimed at ensuring the reliable operation of production assets
  • 6. 6  Define & Rank; Focuses on selecting high-impact problems which will be rectified by dedicated PLE Reliability Resource to ensure greatest business needs are addressed.  Measure Documenting the current process, validating how it is measured and assessing baseline performance. Within agreed detailed boundaries of agreed charter or procedures PLE WORK RELIABILITY INVESTIGATIVE STATGES
  • 7. 7 Analyse This stage executes full detailed analysis of defined problem, covering: • Establish, Document & Confirm Timeline. PLE Reliability Investigative Work Stages Measure Analyse Improve Control Define & Complete RCA Investigation. • Validate Findings. Improve Based on validated findings, define requirements to ultimately deliver a Fixed Forever Solution: • Present Recommendations. • Generate Specific, Measureable, Achievable, Realistic & Timely (SMART) Corrective Actions. • Agree Single Point Accountability & Responsibility for action completion. • Agree Target Date for completion. Control Monitor recommended solution implementation: • Where Applicable, Verify Detailed Plan Exists to Close Action. • Identify Threats to Delivery. • Formally Close Reliability Investigative Work.
  • 8. 8 Progress Monitoring The Reliability Hopper shall accurately detail status of PLE Reliability Team investigative work. This shall be formally issued to all relevant stakeholders monthly.
  • 9. 9  NEPL faces operational challenges related to reliability and production losses, which can impact its overall performance and efficiency. Adopting the Production Loss Elimination Reliability Strategy can help NEPL address these challenges effectively by implementing structured processes and proactive measures to enhance reliability and eliminate production losses. Organizations are recommended to define "Fixed Forever Solutions" based on validated findings to address root causes effectively. These solutions should be sustainable and aimed at preventing recurrence of reliability issues. Implementing SMART corrective actions (Specific, Measurable, Achievable, Realistic, Timely) ensures that solutions are well-defined, measurable, and aligned with organizational goals. CONCLUSION AND RECOMMENDATION