SlideShare a Scribd company logo
BY:
VARTIKA SHARMA.
PRIYA SINGH.
CONTENTS OF THE PRESENTATION..
 WHAT IS PRODUCTION CONTROL.
 DEFINITION BY VARIOUS AUTHORS.
 NEED AND IMPORTANCE OF PRODUCTION
CONTROL.
 STEPS INVOLVED IN PRODUCTION CONTROL.
Production control is the task of predicting, planning
and scheduling work, taking into account manpower,
materials availability and other capacity restrictions,
and cost so as to achieve proper quality and quantity at
the time it is needed and then following up the schedule
to see that the plan is carried out, using whatever
systems have proven satisfactory for the purpose.
DEFINITION BY OTHER AUTHORS…
 According to Henry Fayol, “Production control may be
defined as the art and science of ensuring that all which
occurs is in accordance with the rules established and the
instructions issued”.
 According to Spriegel and Lansburgh, “Production
control is the process of production planning in advance of
operations, establishing the exact route of each individual
item part or assembly; setting, starting and finishing dates
for each important item, assembly and the finished
product; and releasing the necessary orders as well as
initiating the required follow up to effectuate the smooth
functioning of the enterprise.”
IMPORTANCE OF PRODUCTION
CONTROL…….
 Better Service to Customers: Production planning and control, through proper scheduling and
expediting of work, helps in providing better services to customers is terms of better quality of goods
at reasonable prices as per promised delivery dates. Delivery in time and proper quality, both help in
winning the confidence of customers, improving relations with customers and promoting profitable
repeat orders.
 Fewer Rush Orders : In an organization, where there is effective system of production planning and
control, production, operations move smoothly as per original planning and matching with the
promised delivery dates. Consequently, there will be fewer rush orders in the plant and less overtime
than, in the same industry, without adequate production planning and control.
 Better Control of Inventory : A sound system of production planning and control helps
in maintaining inventory at proper levels and, thereby, minimizing investment in inventory. It requires
lower inventory of work-in-progress and less finished stock to give efficient service to customers. It
also helps in exercising better control over raw-material inventory, which contributes to more effective
purchasing.
 More Effective Use of Equipment : An efficient system of production planning and control makes
for the most effective use of equipment. It provides information to the management on regular basis
pertaining to the present position of all orders in process, equipment and personnel requirements for
next few weeks. The workers can be communicated well in advance if any retrenchment, lay-offs,
transfer, etc. is likely to come about. Also, unnecessary purchases of equipment and materials can be
avoided. Thus, it is possible to ensure proper utilization of equipment and other resources.
 Reduced Idle Time : Production planning and control helps in reducing idle
time i.e. loss of time by workers waiting for materials and other facilities;
because ensures that materials and other facilities are available to the workers in
time as per the production schedule. Consequently, less man-hours are lost,
which has a positive impact on the cost of production.
 Improved Plant Morale : An effective system of production planning and
control co-ordinates the activities of all the departments involved in the
production activity. It ensures even flow of work and avoids rush orders. It
maintains healthy working conditions in the plant thus, there is improve plant
morale as a by-product.
 Good public image: A proper system of production planning and control is
helpful in keeping systematized operations in an organization. Such an
organization is in a position to meet its orders in time to the satisfaction of its
customers.Customers satisfaction leads to increased sales, increased profits,
industrial harmony and ultimately good public image of the enterprise .
 Lower capital requirements: Under a sound system of production planning
and control, everything relating to production is planned well in advance of
operations. Where, when and what is required in the form of input is known
before the actual production process starts. Inputs are made available as per
schedule which ensures even flow of production without any bottlenecks.
Facilities are used more effectively and inventory levels are kept as per schedule
neither more nor less. Thus,production planning and control helps, in
minimizing capital investment in equipment and inventories.
STEPS INVOLVED IN PRODUCTION
CONTROL..
1. ROUTING.
Routing is the first step in production planning and control.
Routing can be defined as the process of deciding the path (route) of
work and the sequence of operations.
 Routing fixes in advance:
 The quantity and quality of the product.
 The men, machines, materials, etc. to be used.
 The type, number and sequence of manufacturing operations, and
 The place of production.
IN SHORT, ROUTING DETERMINES ‘WHAT’, ‘HOW MUCH’,
‘WITH WHICH’, ‘HOW’AND ‘WHERE’ TO PRODUCE.
So, routing is an important step in production planning and control.
Production planning starts with it.
Routing gives a very systematic method of converting raw-materials
into finished goods. It leads to smooth and efficient work. It leads to
optimum utilization of resources; namely, men, machines, materials,
etc. It leads to division of labor. It ensures a continuous flow of
materials without any backtracking. It saves time and space. It makes
the work easy for the production engineers and foremen. It has a
great influence on design of factory's building and installed
machines.
2. SCHEDULING.
 Scheduling is the second step in production planning and control. It
comes after routing.
 Scheduling means to:
 Fix the amount of work to do.
 Arrange the different manufacturing operations in order of priority.
 Fix the starting and completing, date and time, for each operation.
 Scheduling is also done for materials, parts, machines, etc. So, it is like
a time-table of production. It is similar to the time-table, prepared by
the railways.
 Time element is given special importance in scheduling. There are
different types of schedules; namely, Master schedule, Operation
schedule and Daily schedule.
 Scheduling helps to make optimum use of time. It sees
that each piece of work is started and completed at a
certain predetermined time. It helps to complete the
job systematically and in time. It brings
time coordination in production planning. All this
helps to deliver the goods to the customers in time. It
also eliminates the idle capacity. It keeps labor
continuously employed.
 So, scheduling is an important step in production
planning and control. It is essential in a factory, where
many products are produced at the same time.
3. DISPATCHING OR
IMPLEMENTING
 Dispatching is the third step in production planning and
control. It is the action, doing or implementation stage. It
comes after routing and scheduling.
 Dispatching means starting the process of production. It
provides the necessary authority to start the work. It is
based on route-sheets and schedule sheets.
 Dispatching may be either centralized or decentralized:
 Under centralized dispatching, orders are issued directly by
a centralized authority.
 Under decentralized dispatching, orders are issued by the
concerned department.
 Dispatching includes the following:
 Issue of materials, tools, fixtures, etc., which are necessary for
actual production.
 Issue of orders, instructions, drawings, etc. for starting the work.
 Maintaining proper records of the starting and completing each
job on time.
 Moving the work from one process to another as per the
schedule.
 Starting the control procedure.
 Recording the idle time of machines.

4. FOLLOW-UP
 Follow-up or Expediting is the last step in production planning and
control. It is a controlling device. It is concerned with evaluation of the
results.
 Follow-up finds out and removes the defects, delays, limitations,
bottlenecks, loopholes, etc. in the production process. It measures the
actual performance and compares it to the expected performance. It
maintains proper records of work, delays and bottlenecks. Such records
are used in future to control production.
 Follow-up is performed by ‘Expediters’ or ‘Stock Chasers’.
 Follow-up is necessary when production decreases even when there is
proper routing and scheduling. Production may be disturbed due to
break-downs of machinery, failure of power, shortage of materials,
strikes, absenteeism, etc.
 Follow-up removes these difficulties and allows a smooth production.

More Related Content

What's hot

Production management
Production managementProduction management
Production management
Ms. Shery Asthana
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
shart sood
 
Production control
Production controlProduction control
Production controlsadia saeed
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
Production management
Production managementProduction management
Production management
Siddhi Shrivas
 
Production management
Production managementProduction management
Production management
Simran Kaur
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
Nishant Agrawal
 
Production management
Production managementProduction management
Production management
shreenibasa maharana
 
Ppc New
Ppc NewPpc New
Ppc New
vishakeb
 
production planning and control
production planning and controlproduction planning and control
production planning and control
Paritosh Kasaudhan
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Priyanka Modugu
 
Production Process
Production ProcessProduction Process
Production Process
amandeep singh
 
Perpetual Inventory System
Perpetual Inventory SystemPerpetual Inventory System
Perpetual Inventory System
BhavyaChaturvedi1
 
FIFO and LIFO
FIFO and LIFOFIFO and LIFO
FIFO and LIFO
RajaKrishnan M
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
shrinivas kulkarni
 
Inventory management
Inventory managementInventory management
Inventory management
Narendra Chaudhary
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Rajendran Ananda Krishnan
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
sudhir pawar
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
MRPeasy
 

What's hot (20)

Production management
Production managementProduction management
Production management
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Production control
Production controlProduction control
Production control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production management
Production managementProduction management
Production management
 
Production management
Production managementProduction management
Production management
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production management
Production managementProduction management
Production management
 
Ppc New
Ppc NewPpc New
Ppc New
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Production Process
Production ProcessProduction Process
Production Process
 
Perpetual Inventory System
Perpetual Inventory SystemPerpetual Inventory System
Perpetual Inventory System
 
FIFO and LIFO
FIFO and LIFOFIFO and LIFO
FIFO and LIFO
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Inventory management
Inventory managementInventory management
Inventory management
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 

Similar to Production control

Operations Research
Operations ResearchOperations Research
Operations Research
mini244
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2Abu Bashar
 
Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02
prashant arora
 
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
mohdyazar
 
Introduction to Production Planning by Jasmin Dalal
Introduction to Production Planning  by Jasmin DalalIntroduction to Production Planning  by Jasmin Dalal
Introduction to Production Planning by Jasmin Dalal
jasmindalal
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
Faizan Akhtar
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
Darshan Shah
 
PRODUCTION PLANNING AND CONTROL.pdf
 PRODUCTION PLANNING AND CONTROL.pdf PRODUCTION PLANNING AND CONTROL.pdf
PRODUCTION PLANNING AND CONTROL.pdf
vijay511413
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4Jyoti Yadav
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
dharma raja`
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
Shubhendu S. Shukla
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
Jenıstön Delımä
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
srishti gupta
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
Aijaz Aryan
 
New text document
New text documentNew text document
New text documentsalunkhev15
 
PPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.pptPPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.ppt
GODWINPITHALISNE
 
Production planning and control (ala)
Production planning and control (ala)Production planning and control (ala)
Production planning and control (ala)
Sonal Upadhyay
 
production planning & control
production planning & controlproduction planning & control
production planning & control
Deepshikha
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
Nittamallik216
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme
felizmessiento2022
 

Similar to Production control (20)

Operations Research
Operations ResearchOperations Research
Operations Research
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2
 
Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02
 
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
 
Introduction to Production Planning by Jasmin Dalal
Introduction to Production Planning  by Jasmin DalalIntroduction to Production Planning  by Jasmin Dalal
Introduction to Production Planning by Jasmin Dalal
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
PRODUCTION PLANNING AND CONTROL.pdf
 PRODUCTION PLANNING AND CONTROL.pdf PRODUCTION PLANNING AND CONTROL.pdf
PRODUCTION PLANNING AND CONTROL.pdf
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
New text document
New text documentNew text document
New text document
 
PPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.pptPPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.ppt
 
Production planning and control (ala)
Production planning and control (ala)Production planning and control (ala)
Production planning and control (ala)
 
production planning & control
production planning & controlproduction planning & control
production planning & control
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme
 

Recently uploaded

Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 

Recently uploaded (20)

Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 

Production control

  • 2. CONTENTS OF THE PRESENTATION..  WHAT IS PRODUCTION CONTROL.  DEFINITION BY VARIOUS AUTHORS.  NEED AND IMPORTANCE OF PRODUCTION CONTROL.  STEPS INVOLVED IN PRODUCTION CONTROL.
  • 3. Production control is the task of predicting, planning and scheduling work, taking into account manpower, materials availability and other capacity restrictions, and cost so as to achieve proper quality and quantity at the time it is needed and then following up the schedule to see that the plan is carried out, using whatever systems have proven satisfactory for the purpose.
  • 4. DEFINITION BY OTHER AUTHORS…  According to Henry Fayol, “Production control may be defined as the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued”.  According to Spriegel and Lansburgh, “Production control is the process of production planning in advance of operations, establishing the exact route of each individual item part or assembly; setting, starting and finishing dates for each important item, assembly and the finished product; and releasing the necessary orders as well as initiating the required follow up to effectuate the smooth functioning of the enterprise.”
  • 5.
  • 6. IMPORTANCE OF PRODUCTION CONTROL…….  Better Service to Customers: Production planning and control, through proper scheduling and expediting of work, helps in providing better services to customers is terms of better quality of goods at reasonable prices as per promised delivery dates. Delivery in time and proper quality, both help in winning the confidence of customers, improving relations with customers and promoting profitable repeat orders.  Fewer Rush Orders : In an organization, where there is effective system of production planning and control, production, operations move smoothly as per original planning and matching with the promised delivery dates. Consequently, there will be fewer rush orders in the plant and less overtime than, in the same industry, without adequate production planning and control.  Better Control of Inventory : A sound system of production planning and control helps in maintaining inventory at proper levels and, thereby, minimizing investment in inventory. It requires lower inventory of work-in-progress and less finished stock to give efficient service to customers. It also helps in exercising better control over raw-material inventory, which contributes to more effective purchasing.  More Effective Use of Equipment : An efficient system of production planning and control makes for the most effective use of equipment. It provides information to the management on regular basis pertaining to the present position of all orders in process, equipment and personnel requirements for next few weeks. The workers can be communicated well in advance if any retrenchment, lay-offs, transfer, etc. is likely to come about. Also, unnecessary purchases of equipment and materials can be avoided. Thus, it is possible to ensure proper utilization of equipment and other resources.
  • 7.  Reduced Idle Time : Production planning and control helps in reducing idle time i.e. loss of time by workers waiting for materials and other facilities; because ensures that materials and other facilities are available to the workers in time as per the production schedule. Consequently, less man-hours are lost, which has a positive impact on the cost of production.  Improved Plant Morale : An effective system of production planning and control co-ordinates the activities of all the departments involved in the production activity. It ensures even flow of work and avoids rush orders. It maintains healthy working conditions in the plant thus, there is improve plant morale as a by-product.  Good public image: A proper system of production planning and control is helpful in keeping systematized operations in an organization. Such an organization is in a position to meet its orders in time to the satisfaction of its customers.Customers satisfaction leads to increased sales, increased profits, industrial harmony and ultimately good public image of the enterprise .  Lower capital requirements: Under a sound system of production planning and control, everything relating to production is planned well in advance of operations. Where, when and what is required in the form of input is known before the actual production process starts. Inputs are made available as per schedule which ensures even flow of production without any bottlenecks. Facilities are used more effectively and inventory levels are kept as per schedule neither more nor less. Thus,production planning and control helps, in minimizing capital investment in equipment and inventories.
  • 8.
  • 9. STEPS INVOLVED IN PRODUCTION CONTROL.. 1. ROUTING. Routing is the first step in production planning and control. Routing can be defined as the process of deciding the path (route) of work and the sequence of operations.  Routing fixes in advance:  The quantity and quality of the product.  The men, machines, materials, etc. to be used.  The type, number and sequence of manufacturing operations, and  The place of production. IN SHORT, ROUTING DETERMINES ‘WHAT’, ‘HOW MUCH’, ‘WITH WHICH’, ‘HOW’AND ‘WHERE’ TO PRODUCE.
  • 10. So, routing is an important step in production planning and control. Production planning starts with it. Routing gives a very systematic method of converting raw-materials into finished goods. It leads to smooth and efficient work. It leads to optimum utilization of resources; namely, men, machines, materials, etc. It leads to division of labor. It ensures a continuous flow of materials without any backtracking. It saves time and space. It makes the work easy for the production engineers and foremen. It has a great influence on design of factory's building and installed machines.
  • 11. 2. SCHEDULING.  Scheduling is the second step in production planning and control. It comes after routing.  Scheduling means to:  Fix the amount of work to do.  Arrange the different manufacturing operations in order of priority.  Fix the starting and completing, date and time, for each operation.  Scheduling is also done for materials, parts, machines, etc. So, it is like a time-table of production. It is similar to the time-table, prepared by the railways.  Time element is given special importance in scheduling. There are different types of schedules; namely, Master schedule, Operation schedule and Daily schedule.
  • 12.  Scheduling helps to make optimum use of time. It sees that each piece of work is started and completed at a certain predetermined time. It helps to complete the job systematically and in time. It brings time coordination in production planning. All this helps to deliver the goods to the customers in time. It also eliminates the idle capacity. It keeps labor continuously employed.  So, scheduling is an important step in production planning and control. It is essential in a factory, where many products are produced at the same time.
  • 13. 3. DISPATCHING OR IMPLEMENTING  Dispatching is the third step in production planning and control. It is the action, doing or implementation stage. It comes after routing and scheduling.  Dispatching means starting the process of production. It provides the necessary authority to start the work. It is based on route-sheets and schedule sheets.  Dispatching may be either centralized or decentralized:  Under centralized dispatching, orders are issued directly by a centralized authority.  Under decentralized dispatching, orders are issued by the concerned department.
  • 14.  Dispatching includes the following:  Issue of materials, tools, fixtures, etc., which are necessary for actual production.  Issue of orders, instructions, drawings, etc. for starting the work.  Maintaining proper records of the starting and completing each job on time.  Moving the work from one process to another as per the schedule.  Starting the control procedure.  Recording the idle time of machines. 
  • 15. 4. FOLLOW-UP  Follow-up or Expediting is the last step in production planning and control. It is a controlling device. It is concerned with evaluation of the results.  Follow-up finds out and removes the defects, delays, limitations, bottlenecks, loopholes, etc. in the production process. It measures the actual performance and compares it to the expected performance. It maintains proper records of work, delays and bottlenecks. Such records are used in future to control production.  Follow-up is performed by ‘Expediters’ or ‘Stock Chasers’.  Follow-up is necessary when production decreases even when there is proper routing and scheduling. Production may be disturbed due to break-downs of machinery, failure of power, shortage of materials, strikes, absenteeism, etc.  Follow-up removes these difficulties and allows a smooth production.