To whom it may concern:
History
My working career commenced as a nurse at Grootte Schuur Hospital in Cape Town in
1976 and changed to the Administration side at Tygerberg Hospital after the birth of my
first child. I remained with the Cape Provincial Administration as a Data Typist working
on the first computers, until my husband (who was in the banking sector) was relocated
to Klerksdorp in 1984. I then continued working for Medical Specialists at the
Klerksdorp Medical Benefit society until he was once again relocated to Harrismith,
where I obtained a position as a PR and Receptionist at the Toyota Group’s Camargue
Transport Systems, an Engineering company who manufactured Marine Containers.
After working with the company for 3 years I was retrenched due to closure of the
Company. I then started working for a Medical Specialist at Hoogland Medical Centre in
Bethlehem, where I remained till my husband was once again transferred to the Vaal
Triangle. For 5 years I commuted and worked for An Electrical Engineering Company in
Midrand, who were doing the Engineering on all the new connections in the rural areas
for Eskom. My duties included Public Relations, financial and quantity surveying of
reticulation lines.
In 2004 obtained a position with a Quantity Surveying Company, C&L Developments
and started my career as contractor. Initially I was with BHP Billiton until my services
were required at Sasol
Sasol
In June 2005 my career started at Sasol Technology where I have been ever since.
Starting off, my duties were as QS, working mainly on shutdowns. My services were
then required to assist Sasol Technology in closing out (Capitalising) a mega project. I
then moved to Natref where I continued as cost controller on small, medium and large
projects. I remained at Natref for ten years, where I gained vast experience in working
in the unique Joint Venture environment.
Apart from a cost controller’s duties I had the privilege of also training new cost
controllers, who have since moved on in their career. I have gained vast experience in
all aspects in the Project environment, Intercompany liaison, working on major refinery
shutdowns achieving good Safety records, and received value recognition in 2012 from
the ex- managing Director of Natref for Customer focus.
Because I managed myself, I continued to maintain further training to better myself. I
attended the following courses:
 Applied fundamentals of project management - (2008)
 NEC3 – Introduction to the NEC3(ECC) – (2008)
 NEC3 M1 – ECC Project manager and supervisors duties (2008)
 NEC3 M2 –ECC Planning and Programming (2008)
 NEC3 M3 –ECC Schedule of cost components (2008)
 Fire Training, Emergency Preparedness training (2008)
 Positive Power and Influence programme – (2009)
 Personal resilience – (2010)
 Positive negotiation skills – (2010)
 Assertiveness Skills – (2011)
 Manage self-Development programme – (2011)
 Capital Project risk Management – (2011)
 Hazard Identification Process – (2012)
 Working knowledge of the JBCC - (2013)
Some of the projects I worked on included new plants, as well as maintenance projects,
which include:
Sasol 1
 SCI Gas Conversion (completed and capitalised the project) - mega project > 9
billion
 AAA (capitalised the project) - medium project > 50 million
 Gas Conditioning for Membranes - medium project > 50 million
 Waste Heat Boiler Replacement - medium project > 50 million
 Parallel NG Line to ATR -medium project > 50 million
Natref – National Refinery
Small projects < 50 million
 C12001 spray nozzles
 Sample points for 13000
 Flare drum pump out facilities
 Routing of water from F11006 to sour water stripper
 CDU Parallel condensate header
 Slurry loading system
 N2 purge facility to J13010 compressor
 White Products Imports Pipelines (including Natcos part) phase 1
 FCC Temperature Indicator (FCC basket of projects)
 FCC reactor stripper - extra TI's and density measurement (FCC basket of
projects)
 B26001 additional TI's
 FCC/DHC feed tank management
 Boilers refurbishment
 C16004C&D fin fan redesign to improve reliability
 Air Blower
 Furnace Trip systems
 Diesel Filters
 Spray mist system
 Tank 39
 Upgrade of foam pourers on crude oil tanks
 Ethanol Blending Basic Engineering and extended basic engineering
Medium projects >50 million
 Platformer reactor
 HF Alky Phase 1 and Phase 2
 DU Creep phase 1 and phase 2
 2012 and 2013 Tie Ins
Mega Project > 1 billion
 Pre- feasibility, feasibility and basic engineering
From 2012 my contract changed from being directly with Sasol Technology, when I
formed part of the Natref Clean Fuels II project team as their Cost controller. This
project was to enable the refinery to comply with the Euro 5 Specifications. I was
involved from pre-feasibility, feasibility and we had just completed basic engineering
when the project has was put on hold, resulting in the termination of my contract in
January 2015.

More Related Content

Viewers also liked

Cenário Botafogo
Cenário BotafogoCenário Botafogo
Cenário Botafogo
SuporteaoCorretor
 
Global Office
Global OfficeGlobal Office
Global Office
SuporteaoCorretor
 
Thiruvalluvar thirukkural
Thiruvalluvar thirukkuralThiruvalluvar thirukkural
Thiruvalluvar thirukkural
Sakthi Jegan
 
Know yourself - Know others - Tips for cross-functional team
Know yourself - Know others - Tips for cross-functional teamKnow yourself - Know others - Tips for cross-functional team
Know yourself - Know others - Tips for cross-functional team
Tai Huynh
 
Key performance indicators for Digital marketing
Key performance indicators for Digital marketingKey performance indicators for Digital marketing
Key performance indicators for Digital marketing
Dr. Delminquoe L. Cunningham
 
Capture ROI Success in B2B Digital Marketing
Capture ROI Success in B2B Digital MarketingCapture ROI Success in B2B Digital Marketing
Capture ROI Success in B2B Digital Marketing
Winnie Ng
 
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
Tung Nguyen Xuan
 

Viewers also liked (8)

Cenário Botafogo
Cenário BotafogoCenário Botafogo
Cenário Botafogo
 
Global Office
Global OfficeGlobal Office
Global Office
 
PR2P AXELOS
PR2P AXELOSPR2P AXELOS
PR2P AXELOS
 
Thiruvalluvar thirukkural
Thiruvalluvar thirukkuralThiruvalluvar thirukkural
Thiruvalluvar thirukkural
 
Know yourself - Know others - Tips for cross-functional team
Know yourself - Know others - Tips for cross-functional teamKnow yourself - Know others - Tips for cross-functional team
Know yourself - Know others - Tips for cross-functional team
 
Key performance indicators for Digital marketing
Key performance indicators for Digital marketingKey performance indicators for Digital marketing
Key performance indicators for Digital marketing
 
Capture ROI Success in B2B Digital Marketing
Capture ROI Success in B2B Digital MarketingCapture ROI Success in B2B Digital Marketing
Capture ROI Success in B2B Digital Marketing
 
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
Thuyết minh hướng dẫn đồ án kỹ thuật thi công 1
 

Similar to Covering letter

Narendra Kumar- Resume
Narendra Kumar- ResumeNarendra Kumar- Resume
Narendra Kumar- ResumeNarendra Kumar
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015Sayan Ml
 
General Presentation GI Dynamics
General Presentation  GI DynamicsGeneral Presentation  GI Dynamics
General Presentation GI Dynamics
wvdzande
 
N. Weir (Final) CEng_AppForm03-10-2012_2310
N. Weir (Final) CEng_AppForm03-10-2012_2310N. Weir (Final) CEng_AppForm03-10-2012_2310
N. Weir (Final) CEng_AppForm03-10-2012_2310Dr Neill Weir
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1dCORE
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - GanamotseGaenamele Ganamotse
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms
 
Richard Allen CV 270515
Richard Allen CV 270515Richard Allen CV 270515
Richard Allen CV 270515Richard Allen
 
Cvnn Executive Summary
Cvnn Executive SummaryCvnn Executive Summary
Cvnn Executive SummaryNaven Naiker
 

Similar to Covering letter (20)

CV 1
CV 1CV 1
CV 1
 
mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
 
Narendra Kumar- Resume
Narendra Kumar- ResumeNarendra Kumar- Resume
Narendra Kumar- Resume
 
Project Cambodia
Project CambodiaProject Cambodia
Project Cambodia
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
General Presentation GI Dynamics
General Presentation  GI DynamicsGeneral Presentation  GI Dynamics
General Presentation GI Dynamics
 
David Singleton CV
David Singleton CVDavid Singleton CV
David Singleton CV
 
N. Weir (Final) CEng_AppForm03-10-2012_2310
N. Weir (Final) CEng_AppForm03-10-2012_2310N. Weir (Final) CEng_AppForm03-10-2012_2310
N. Weir (Final) CEng_AppForm03-10-2012_2310
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - Ganamotse
 
The Projects
The ProjectsThe Projects
The Projects
 
CV Peter Heinzelmann
CV Peter HeinzelmannCV Peter Heinzelmann
CV Peter Heinzelmann
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16
 
Richard Allen CV 270515
Richard Allen CV 270515Richard Allen CV 270515
Richard Allen CV 270515
 
M. T. R. Azad
M. T. R. AzadM. T. R. Azad
M. T. R. Azad
 
Cvnn Executive Summary
Cvnn Executive SummaryCvnn Executive Summary
Cvnn Executive Summary
 

Covering letter

  • 1. To whom it may concern: History My working career commenced as a nurse at Grootte Schuur Hospital in Cape Town in 1976 and changed to the Administration side at Tygerberg Hospital after the birth of my first child. I remained with the Cape Provincial Administration as a Data Typist working on the first computers, until my husband (who was in the banking sector) was relocated to Klerksdorp in 1984. I then continued working for Medical Specialists at the Klerksdorp Medical Benefit society until he was once again relocated to Harrismith, where I obtained a position as a PR and Receptionist at the Toyota Group’s Camargue Transport Systems, an Engineering company who manufactured Marine Containers. After working with the company for 3 years I was retrenched due to closure of the Company. I then started working for a Medical Specialist at Hoogland Medical Centre in Bethlehem, where I remained till my husband was once again transferred to the Vaal Triangle. For 5 years I commuted and worked for An Electrical Engineering Company in Midrand, who were doing the Engineering on all the new connections in the rural areas for Eskom. My duties included Public Relations, financial and quantity surveying of reticulation lines. In 2004 obtained a position with a Quantity Surveying Company, C&L Developments and started my career as contractor. Initially I was with BHP Billiton until my services were required at Sasol Sasol In June 2005 my career started at Sasol Technology where I have been ever since. Starting off, my duties were as QS, working mainly on shutdowns. My services were then required to assist Sasol Technology in closing out (Capitalising) a mega project. I then moved to Natref where I continued as cost controller on small, medium and large projects. I remained at Natref for ten years, where I gained vast experience in working in the unique Joint Venture environment. Apart from a cost controller’s duties I had the privilege of also training new cost controllers, who have since moved on in their career. I have gained vast experience in all aspects in the Project environment, Intercompany liaison, working on major refinery shutdowns achieving good Safety records, and received value recognition in 2012 from the ex- managing Director of Natref for Customer focus. Because I managed myself, I continued to maintain further training to better myself. I attended the following courses:  Applied fundamentals of project management - (2008)  NEC3 – Introduction to the NEC3(ECC) – (2008)  NEC3 M1 – ECC Project manager and supervisors duties (2008)
  • 2.  NEC3 M2 –ECC Planning and Programming (2008)  NEC3 M3 –ECC Schedule of cost components (2008)  Fire Training, Emergency Preparedness training (2008)  Positive Power and Influence programme – (2009)  Personal resilience – (2010)  Positive negotiation skills – (2010)  Assertiveness Skills – (2011)  Manage self-Development programme – (2011)  Capital Project risk Management – (2011)  Hazard Identification Process – (2012)  Working knowledge of the JBCC - (2013) Some of the projects I worked on included new plants, as well as maintenance projects, which include: Sasol 1  SCI Gas Conversion (completed and capitalised the project) - mega project > 9 billion  AAA (capitalised the project) - medium project > 50 million  Gas Conditioning for Membranes - medium project > 50 million  Waste Heat Boiler Replacement - medium project > 50 million  Parallel NG Line to ATR -medium project > 50 million Natref – National Refinery Small projects < 50 million  C12001 spray nozzles  Sample points for 13000  Flare drum pump out facilities  Routing of water from F11006 to sour water stripper  CDU Parallel condensate header  Slurry loading system  N2 purge facility to J13010 compressor  White Products Imports Pipelines (including Natcos part) phase 1  FCC Temperature Indicator (FCC basket of projects)  FCC reactor stripper - extra TI's and density measurement (FCC basket of projects)  B26001 additional TI's  FCC/DHC feed tank management  Boilers refurbishment  C16004C&D fin fan redesign to improve reliability  Air Blower
  • 3.  Furnace Trip systems  Diesel Filters  Spray mist system  Tank 39  Upgrade of foam pourers on crude oil tanks  Ethanol Blending Basic Engineering and extended basic engineering Medium projects >50 million  Platformer reactor  HF Alky Phase 1 and Phase 2  DU Creep phase 1 and phase 2  2012 and 2013 Tie Ins Mega Project > 1 billion  Pre- feasibility, feasibility and basic engineering From 2012 my contract changed from being directly with Sasol Technology, when I formed part of the Natref Clean Fuels II project team as their Cost controller. This project was to enable the refinery to comply with the Euro 5 Specifications. I was involved from pre-feasibility, feasibility and we had just completed basic engineering when the project has was put on hold, resulting in the termination of my contract in January 2015.