SlideShare a Scribd company logo
1 of 2
Download to read offline
Mr. Palmquist has an established track record in the hard bid public
works arena as a general contractor and PM/CM owner’s
representative/construction manager, specialized in major to mega
development programs. Mr. Palmquist has successfully
programmed, managed design development and completed
construction via multiple delivery platforms on some of the highest
profile projects in the nation. From a ground up understanding of
engineering principals, manufacturing, contract delivery and
construction processes, combined with in depth study of owner
business models comes the background for management and
leadership abilities required to excel, inspiring team excellence in the
most challenging arenas including transportation, heavy
manufacturing, energy systems, medical, high tech manufacturing,
geophysical laboratories, high tech research and development, high
rise office, computer environments, multiuse real estate
development, schools, US Army Corps of Engineers military base
projects including military hospitals.
Mr. Palmquist has a thorough background in the specialties of
construction claims, construction and program control systems, hard
bid, negotiations and dispute settlement. Project delivery methods
include Agency CM, CM at Risk fast track, Component CMAR,
GMAX, Design Build and Build Operate Transfer/P3.
Mr. Palmquist has the advantage of combining knowledge gained
from a background of construction field experience and construction
hard bid work as a general contractor, ultimately applied to high
profile leadership roles on design/construct mega programs.
Mr. Palmquist played lead roles on mega programs such as for the
re-programming required in 2001 for American Airlines Terminal 8
JFK and also serving as Activation Manager on San Francisco
International Airport Master plan and LAX Master plan Development,
(2007) and more recently as serving as structural construction
manager for Bradley West expansion at LAX, (2012).
Summary of Experience
Aviation Specialty
Mr. Palmquist has an established track record in the hard bid public works
arena as a general contractor and PM/CM owner’s representative and
construction manager/program manager, specialized in major and mega
aviation development programs. Mr. Palmquist has successfully
programmed, managed design development and completed construction
via multiple delivery platforms on the highest profile projects in the nation.
An in depth understanding of civil, structural mechanical, electrical, fueling,
aviation, baggage handling systems and automated security screening
systems and security systems combined with a thorough background in
phasing construction programs around existing airport operations provides
the base for a 23-year track record of proven successes on contiguous
major airport programs including JFK, LAX, SAN, SFO, SNA, SJC, ORD,
ATL.
Mr. Palmquist is also experienced in the specialties of claims, construction
and program control systems, hard bid, negotiations and dispute
settlement. He specialized in the development, design and construction of
concrete and steel structural framing systems and is experienced in fast
track, hard bid, Gmax, Design Build, CMAR and P3 delivery
methodologies. Mr. Palmquist combines technical construction expertise
such as contrasting construction production efficiency analyses with airport
operations constraints to ascertain optimum programming strategies
initially, and then ultimately, in formulating detailed construction strategy
and tactical technique by reiterating detailed risk and cost/ benefit metrics.
Mr. Palmquist played lead roles on mega programs for re-programming
required in 2001 for American Airlines Terminal 8 JFK; Activation Manager
on San Francisco International Airport Masterplan and LAX Masterplan
Development and more recently as serving as structural construction
manager for Bradley West expansion at LAX.
Mr. Palmquist is a proven leader on large and mega programs, having
established and supported these successful teams from initialization
through closeout especially after combining this experience with the depth
of vision, appreciation and decisiveness that full P&L responsibility affords,
with consistent proven results. An early innovator in project controls
combined with a continuing drive for field efficiency and advances such as
BIM utilization are the norm, along with superior packaging in these
delivery methods that plain make sense. Winning teams trump all in
efficiency models and these are always the goal and consistent outcome
with a proven leadership style and strategy for any type project and
challenge.

More Related Content

Similar to Presentationlinkin

Proschek, Thomas Resume r2
Proschek, Thomas Resume r2Proschek, Thomas Resume r2
Proschek, Thomas Resume r2
Tom Proschek
 
Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15
Mark Dimmitt
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
Robert Retsch
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
Penny McAlpine
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)
Robert Palac
 
Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)
Michael A. Myrick
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
Alistair Howson
 

Similar to Presentationlinkin (20)

Proschek, Thomas Resume r2
Proschek, Thomas Resume r2Proschek, Thomas Resume r2
Proschek, Thomas Resume r2
 
CV-CRLIV-2015-ABB
CV-CRLIV-2015-ABBCV-CRLIV-2015-ABB
CV-CRLIV-2015-ABB
 
CV-CRLIV-2015-ABB
CV-CRLIV-2015-ABBCV-CRLIV-2015-ABB
CV-CRLIV-2015-ABB
 
Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15
 
Brian Nicholls profesional profile 2016 08-11
Brian Nicholls profesional profile  2016 08-11Brian Nicholls profesional profile  2016 08-11
Brian Nicholls profesional profile 2016 08-11
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March Resume
 
B T Resume 4 25 16
B T  Resume 4  25 16B T  Resume 4  25 16
B T Resume 4 25 16
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)
 
JohnsonBruce 2015
JohnsonBruce 2015JohnsonBruce 2015
JohnsonBruce 2015
 
180328 profectus presentation developers
180328 profectus presentation   developers180328 profectus presentation   developers
180328 profectus presentation developers
 
Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)
 
Resume Rev A 3-22-16
Resume Rev A 3-22-16Resume Rev A 3-22-16
Resume Rev A 3-22-16
 
VCA Structural Brochure
VCA Structural BrochureVCA Structural Brochure
VCA Structural Brochure
 
CM Resume
CM Resume CM Resume
CM Resume
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 

Recently uploaded

Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
Sampad Kar
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 

Recently uploaded (20)

Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 

Presentationlinkin

  • 1. Mr. Palmquist has an established track record in the hard bid public works arena as a general contractor and PM/CM owner’s representative/construction manager, specialized in major to mega development programs. Mr. Palmquist has successfully programmed, managed design development and completed construction via multiple delivery platforms on some of the highest profile projects in the nation. From a ground up understanding of engineering principals, manufacturing, contract delivery and construction processes, combined with in depth study of owner business models comes the background for management and leadership abilities required to excel, inspiring team excellence in the most challenging arenas including transportation, heavy manufacturing, energy systems, medical, high tech manufacturing, geophysical laboratories, high tech research and development, high rise office, computer environments, multiuse real estate development, schools, US Army Corps of Engineers military base projects including military hospitals. Mr. Palmquist has a thorough background in the specialties of construction claims, construction and program control systems, hard bid, negotiations and dispute settlement. Project delivery methods include Agency CM, CM at Risk fast track, Component CMAR, GMAX, Design Build and Build Operate Transfer/P3. Mr. Palmquist has the advantage of combining knowledge gained from a background of construction field experience and construction hard bid work as a general contractor, ultimately applied to high profile leadership roles on design/construct mega programs. Mr. Palmquist played lead roles on mega programs such as for the re-programming required in 2001 for American Airlines Terminal 8 JFK and also serving as Activation Manager on San Francisco International Airport Master plan and LAX Master plan Development, (2007) and more recently as serving as structural construction manager for Bradley West expansion at LAX, (2012). Summary of Experience
  • 2. Aviation Specialty Mr. Palmquist has an established track record in the hard bid public works arena as a general contractor and PM/CM owner’s representative and construction manager/program manager, specialized in major and mega aviation development programs. Mr. Palmquist has successfully programmed, managed design development and completed construction via multiple delivery platforms on the highest profile projects in the nation. An in depth understanding of civil, structural mechanical, electrical, fueling, aviation, baggage handling systems and automated security screening systems and security systems combined with a thorough background in phasing construction programs around existing airport operations provides the base for a 23-year track record of proven successes on contiguous major airport programs including JFK, LAX, SAN, SFO, SNA, SJC, ORD, ATL. Mr. Palmquist is also experienced in the specialties of claims, construction and program control systems, hard bid, negotiations and dispute settlement. He specialized in the development, design and construction of concrete and steel structural framing systems and is experienced in fast track, hard bid, Gmax, Design Build, CMAR and P3 delivery methodologies. Mr. Palmquist combines technical construction expertise such as contrasting construction production efficiency analyses with airport operations constraints to ascertain optimum programming strategies initially, and then ultimately, in formulating detailed construction strategy and tactical technique by reiterating detailed risk and cost/ benefit metrics. Mr. Palmquist played lead roles on mega programs for re-programming required in 2001 for American Airlines Terminal 8 JFK; Activation Manager on San Francisco International Airport Masterplan and LAX Masterplan Development and more recently as serving as structural construction manager for Bradley West expansion at LAX. Mr. Palmquist is a proven leader on large and mega programs, having established and supported these successful teams from initialization through closeout especially after combining this experience with the depth of vision, appreciation and decisiveness that full P&L responsibility affords, with consistent proven results. An early innovator in project controls combined with a continuing drive for field efficiency and advances such as BIM utilization are the norm, along with superior packaging in these delivery methods that plain make sense. Winning teams trump all in efficiency models and these are always the goal and consistent outcome with a proven leadership style and strategy for any type project and challenge.