EXPERIENCE HIGHLIGHTS :
Over twenty four years’ experience in the following areas.
 Experience in different industries including:oil and gas,pipeline construction,general construction,water
treatmentconstruction,rail,defense (aerospace) and finance.
 Extensive experience in controlling program/projectlife cycle, from master planning, concept,design
through to construction/testing and commissioning
 Extensive experience in deriving/maintaining program/projectspecific Work Break Down Structures
(WBS) with “strategic” performance measurementcapabilities atan Enterprise Wide/Projectand WBS
levels
 Extensive experience in deriving/maintaining program/projectOrganization Break Down Structures (OBS)
with “strategic” performance measurementcapabilities atan OBS Contractor/Subcontractor levels
 Extensive experience in Planning/Cost/Quality/Risk and Claims Managementand Control - The setting up
of Earned Value ManagementSystems (integrated time/cost/quality/risk/claims and extension oftime
managementsystems)
 Extensive experience in managing design change bulletins,contract deviation/provisional
variation/variation requestand change order procedures and systems
 Extensive experience in the setting up and implementation ofrisk /issue managementsystems to identify
existing issues/anticipate future risks and establish mitigation/contingencyactions and plans
 Extensive experience in defining/setting up and implementing documentcontrol/communication
managementsystems.Deriving of program/projectcommunications channels (ie communication
matrices),inputs to and outputs from the channels.Deriving of program/projectstrategic reporting
requirements.
 Extensive experience in establishing program/projectrequired flow charts ,process maps and forms
 Extensive experience in setting up projectcostestimating/bid systems using project/productcomponent
libraries.
 Extensive experience in system developmentusing MS Access 2003,Visual Basic Programming,Excel
Programming,Foxpro etc.
 Structured ProjectManagementMethodologies and other standards used/familiar with include:Prince2,
British Aerospace ProjectManagement& Control Standards,ANSI/EIA 748 Earned Value Management
Standard,The Society of Construction Law Delay and Disruption Protocol,ProjectManagementBook of
Knowledge (The ProjectManagementInstitute), ISO9001:2000 and ISO 19011:2002 Standard,FIDIC.
KEY SKILLS/ABILITIES:
 Planning: product, activity & process based planning;costestimating and developmentofwork
breakdown structure models; WBS/OBS resource assignmentmatrix;project quality, management&
technical deliverables dependencies/activities;risk identification,assessment& mitigation activities;risk
contingencyplans;resource assignments;activity/resource calendars;logic networks;critical path
analysis;resource profiling (manpower,materials etc.);resource management/leveling;definition of
progress WBS/OBS reporting levels & costcollection points;WBS/OBS baseline/budget(BCWS)
formulation;detailed projectcostbreakdown;projectcostplan;projectcostcurves for managementstages
(e.g. engineering,procurement,construction & installation);projectcostcurves for products (e.g.
processes plants,process units);projectcostcurves for manpower/contractors;projectcostcurves for
materials;definition ofhow adherence to the plan will be monitored & controlled
 Starting up Projects: Defining the project/programme organization;ProjectBoard roles and job
descriptions;customer/supplier environment;assurance roles;programme/projectsupportroles;
role/candidate matrix;projectbrief; acceptance criteria,risk identification,estimation,evaluation,counter-
actions & management;projectapproach and initiation stage plan
 Initiating Projects: Planning quality(quality system to be used,change control approaches,configuration
managementapproaches etc);planning a project; refining the business case & risks;setting up project
controls & projectfiles
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 2 of 8
 Controlling Project Stages: work package definitions & authorizations,assessing completed work
packages,assessing progress (WBS/OBS/material earned value charts,cost/schedule variance analysis
reports,costto completion,forecasting budgetatcompletion,capturing/examining projectissues,
reviewing stage status,qualityreviews, checkpointreportanalysis,highlightreports,corrective actions
(recovery plans),projectissues escalation,change control (requestfor change,off specification),impact
analysis (assessmentofthe change impact,importance & cost), ensuring a viable business case
 Managing Project/Product Deliveries: managing team plans,risk logs,executing work package,quality
logs (checks carried outon the productto ensure conformance to quality standard),checkpointreports,
delivering work packages,claims/counter claims activities,surveillance
 Managing Stage Boundaries: planning a stage,updating a projectplan, updating the project business
case,updating the risk log, end stage reports,next stage plans,exception plans,updating lessons learned
reports
 Closing Projects: decommissioning a project,identifying follow on actions,projectevaluation review,
projectcost control close-outreports
Additional Skills:
 Major Infrastructure Designs
 Experienced in underground pipeline installation ofwater/sewage lines (pipe diameters - 300mm to 3m,
maximum crossing length for a typical installation approx:80m),using non-disruptive techniques including
conventional pipe jacking and microtunelling
 Experienced with the use of Primavera Expedition/Documentumn/Aconexas document-control applications,
logging and tracking projectinformation,meeting minutes,letters,transmittals,submittals etc
 Process write-ups,process map definitions,process flow diagrams,procedures write-ups,cause & effect
diagrams
 PC literate e.g. using Excel, MS Word, MS Projects2003,Primavera P3,Primavera Enterprise 6.0,
Pertmaster Advance, MS PowerPoint,Internet, FrontPage 2003,Met Stock
 Experienced in Microsoft Dynamics financial system & projects performance reporting
 Designing/publishing Web Sites
 Software development/assemblylanguage programming:writing programmes/information management
systems in Foxbase+2.1,MicrosoftAccess 2003,Visual Basic,Pascal,C, Foxpro2.5 etc.
 Operating systems:IBM AS400 & UNIX AIX
 Analyzing securities charts (identifying marketturning points ata relatively early stage)
 Design/Faultfinding/repair work at PCB/microprocessor level
 Fluent in English and Arabic, working knowledge ofFrench and Spanish languages
Project/Proposal Details
EMPLOYER : ARUP (ArupMajorProjects Division)
JOB TITLE : Senior Project Controls Manager
Projects/
Proposals
Worked On:
Projects Description: Projects Scope: Client Consultant Main
Contractor
Approxi
mate
Project
Value
Arabian Canal
Project
The Arabian Canal is the
biggestand mostcomplexcivil
engineering projectever
undertaken in the Middle East.
It will become a globally
recognized landmark
destination for both visitors
and residents.The 75km man-
made waterwaywill flow inland
from the north, near Palm
Jumeriah,to Dubai Waterfront
at Jebel Ali, and will feature a
range of mixed-use
developments bysome ofthe
region’s top developers.
Limitless will develop an area
in excess of 10,000 hectares
through which the canal will
flow.
Master Planning,
Concept,
Preliminary/Sche
matic,Detailed
Design,
Tendering,
Construction/Tes
ting and
Commissioning
Limitless
(Subsidiary of
Dubai World)
Multiple
Consultants
Multiple
Contractors
($50
Billion
US)
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 3 of 8
Heart of Europe
Project
The Heart of Europe
developmentwill be located in
Nakheel´s iconic The World
Island Projectin Dubai,UAE.
Several European countries
will be represented within the
master plan,each one
incorporating its essential
characteristics
in a modern architectural
interpretation.Moving
away from a “theme park”
concept, each part will
carry, through a contemporary
architectural language,
the spiritof Germany, Austria,
S. Petersburg,Switzerland,
Sweden and the Netherlands.
Different types of shops,
restaurants,cultural activities,
leisure facilities will be
provided.
Master Planning,
Concept,
Preliminary/Sche
matic,Detailed
Design,
Tendering
KLEINDIENST
Properties
Multiple
Consultants
Multiple
Contractors
>($12
Billion
AED)
Al Mashtal
Project
The Project consistofstate-of-
the-art Grade ‘A’ office and
residential developmentof
approximately749,304m² and
consists ofthe following
components:5 Residential
Towers,Hotel/Serviced
Apartment, 3 Office Towers,2
Residential Towers,Boutique
Hotel, Podiums,Arena,
Ballroom,Public Gallery,
Mosque and Car Park
Facilities.
Concept,
Preliminary
/Schematic,
Detailed Design,
Tendering,
Construction/Tes
ting and
Commissioning
Sorouh Multiple
Consultants
Multiple
Contractors
(AED 3
Billion)
Atlantis
Management
Staff
Accommodation
Project
Management Accommodation
1 & 2, Staff Accommodation 4,
Staff Accommodation 5, Staff
Accommodation 1,2 & 3
Concept,
Preliminary
/Schematic,
Detailed Design,
Tendering,
Construction/Tes
ting and
Commissioning
Istithmar Multiple
Consultants
Multiple
Contractors
(AED
900
million.)
EMPLOYER : Hill lnternational (Project Management & Claims
Consultants)
JOB TITLE : Project Controls Manager
Projects/
Proposals
Worked On:
Projects Description: Projects
Scope:
Client Consultant Main
Contractor
Approxi
mate
Project
Value
City of
Arabia
Project
The City of Arabia Project is one
of the biggest privately owned
projects of its kind in the Middle
East and comprises of (a)
Infrastructure works including
Sewerage Treatment Plant,
132KVA Substation, Filteration
System, Roads and Bridges,
District Cooling, Landscaping (b)
"Biggest Mall in the World" (c)
Wadi Walk (d) ten towers
between 30 and 80 floors (e) 5
and 4 star hotels (f) Restless
Planet(g) Light Train (Automated
Master
Planning,
Concept,
Preliminary/Sc
hematic,
Detailed
Design,
Tendering,
Construction/T
esting and
Commissionin
g
IMGG – Ilyas &
Mustafa
Galadari
Management
Investment&
Development
(L.L.C)
Multiple
Consultants
Multiple
Contractors
($2
Billion
US)
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 4 of 8
People Mover) (h) Schools and
other City buildings/facilities.
OQYANA
Project
OQYANA is a development
project built on 20 man-made
islands of the WORLD which is
located 4 km off the coast of
Dubai. OQYANA’s development
will have views of the Dubai
coastline and be accessible from
the mainland through ferry
service. The population of the
entire development is forecasted
between ten (10) to twelve (12)
thousand, as it will comprise of
more than 1,650 sea-view
apartments and mansions, water
homes, canal homes, and two
high-end hotels, including a spa
resort. It will also contain inter-
linked walkways and a marina
with over 1,500 private yacht
berths.
Master
Planning,
Concept,
Preliminary/Sc
hematic,
Detailed
Design,
Tendering
OQYANA Multiple
Consultants
Multiple
Contractors
>($2.5
Billion
US)
Daman
Tower
Project
3 high towers mixed use, above
50 floors, includes residential
apartments, offices, hotel,
serviced apartments,podium and
retail areas.
Concept,
Preliminary
/Schematic,
Detailed
Design,
Tendering,
Construction/T
esting and
Commissionin
g
DAMAN Multiple
Consultants
Multiple
Contractors
($2
Billion
US)
Duja Tower
Project
Mixed-used commercial and
residential tower, including a car
park structure, 50 stories plus a
ground floor, a mezzanine floor
and four basementlevels,totaling
195 meters in height. A car park
structure, consisting of 10 stories
plus a ground floor, will be
constructed adjacentto the tower.
Total built-up area approximately
167,000 square meters (1.8
million square feet).
Concept,
Preliminary
/Schematic,
Detailed
Design,
Tendering,
Construction/T
esting and
Commissionin
g
His Excellency
Nasser Abdulla
Hussein
Lootah.
Multiple
Consultants
Multiple
Contractors
($177
million)
Durra
Tower
Project
76-story, 330-meter tower The
project comprises a tower with a
built-up area of 134,398 square
meters that will accommodate
102 three-bedroom, 325 two-
bedroom and 283 one-bedroom
apartments. An adjacent car
parking structure with a built-up
area of around 32,630 square
meters will accommodate 884
vehicles.
Concept,
Preliminary
/Schematic,
Detailed
Design,
Tendering,
Construction/T
esting and
Commissionin
g
Al Hamid
Group
Multiple
Consultants
Multiple
Contractors
(US$140
million.)
Multiple
Proposals
Umm Al Ramool
Redevelopment,Enoc High Rise
Building, Dubai Water Front
Development,Dubai Marina 2,
Corniche Mixed Used
Development,Creek View &
Terraces Project
Concept,
Preliminary
/Schematic,
Detailed
Design,
Tendering,
Construction/T
esting and
Commissionin
g
Varied Clients US $
Billions.
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 5 of 8
EMPLOYER : DMJM International (Program Manager)
JOB TITLE : Project Controls Manager
Project Projects Description: Client Consultant Main Contractor Approximate
Project Value
Mubadala -
ERWDA
(Environment
Agency)
Building Project
The Mubadala / ERWDA
Building is measuring about
18,950 m2 with a scope of Work
comprising butnot limited to the
following: (a) Office Building
(Partial basement, Ground,
Mezzanine, Nine upper floors
and Roof Penthouse) (b)
Laboratory Building (Ground,
Mezzanine, Two upper floors,
Roof/Penthouse) (c) Carpark
Building (Ground and Six upper
floors) (d) On Site Parking (e)
Roads & Pavements (f)
Landscaping (g) All other
associated works including
interior design. Exterior finishes
are reconstituted stone
cladding, and upside down
Roofing system. The Project
includes fair amount of solar
tinted, double glazed,aluminium
Curtain walling.
ALDAR
Properties
PJSC
Jung
Brannen
Associates
(Prime
Consultant)
Khatib &
Alami
(Main
Consultant)
Consolidated
Contractors
International
Company
AED 230
Million
(Approx:
$64M)
Shuweihat
Water
Transmission
Scheme
Lot A – Twin D.I 1600 dia.
Pipeline from Shuweihatto
Mirfa (97.3km) plus branch lines
and structural works including
washout,air release valve ,
bypass chambers,thrust
blocks,Non disruptive road
crossing works and connection
via fiber optic cables to main
control system
Abu Dhabi
Water &
Electricity
Authority
Maunsel Marubeni/Taisei
Consortium
$261million
Shuweihat
Water
Transmission
Scheme
Lot B - Twin D.I 1600 dia.
Pipeline from Mirfa to Mussafah
(127km) & single 1600 dia
pipeline from Mussafah to Unit
IV (13.2km) plus related works
similar to LotA above.
Abu Dhabi
Water &
Electricity
Authority
Tebodin Marubeni/Taisei
Consortium
$348million
Shuweihat
Water
Transmission
Scheme
Lot C – Intermediate Pumping
Station at Mirfa along with 4
reservoirs of10MG capacities
each, surge vessels,
compressors,chlorination
facility, overflow lagoon,piping
works,
SCADA/control/telemetry
Abu Dhabi
Water &
Electricity
Authority
Tebodin Marubeni/Taisei
Consortium
$92million
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 6 of 8
systems,accommodation and
office buildings
Shuweihat
Water
Transmission
Scheme
Lot D – Water Distribution
Pumping Station with 6 no.
10MG capacity reservoirs and
1200dia distribution line to
Mussafah plus related works
similar to LotC above
Abu Dhabi
Water &
Electricity
Authority
Penspen Marubeni/Taisei
Consortium
$81million
Shuweihat
Water
Transmission
Scheme
Lot E – DN 1000 D.I. Pipeline
from Shuweihatto new Sila
tank compound (104km) plus
related works similar to Lot A
above. Pump Station plus
related works similar to Lot C
above.
Abu Dhabi
Water &
Electricity
Authority
ItalConsult Al Jaber
Microtunneling
$72million
Shuweihat
Water
Transmission
Scheme
Lot F – DN 1200 DI pipeline
from Mussafah to Al Wathba
(27km),branch line connections
to existing networks plus supply
and installation ofvariable
speed pumps
Abu Dhabi
Water &
Electricity
Authority
Penspen Al Jaber Energy
Services
$51million
EMPLOYER : Petrofac International
JOB TITLE : Project Controls Engineer (ContractPosition-UAE)
Projects/Prop
osals
Description:
Works Description Client Bidders/Main
Contractor
Approximate
Project
Value
Proposal
Sohar
(Oman)
Refinery
Proposal
Engineering,Procurement,Construction ofan oil refinery
based in Sohar,Oman. The projectconsisted ofa number
of process units,utilityunits,offsite facilities and marine
facilities. Petrofac’s scope ofwork limited to EPC of
twelve units including, gas oil recovery; LPG Merox;
Kerosene- Merox;Amine/Hydrogen, Sour Water Stripper;
Sulfur Recovery1&2;Tail Gas Treating; Marine Loading
Facilities and Sulfur Granulation & Packaging.
Oman
Petroleum
Joint Venture
Between:
LURGI Oel-Gas-
Chemie GmbH,
Petrofac
International,SK
Engineering &
Construction,
Galfar Eng &
Contg. L.L.C
$1billion
Proposal
AZERBAIJA
N-GEORGIA-
TURKEY
(AGT)
PIPELINES
PROPOSAL
AGT Pipelines Projectsetup to manage the Engineering,
Procurement,Installation & Commissioning ofthe Baku-
Tbilisi-Ceyhan (BTC) Oil Export Pipeline (approx:
1750km,42” to 46” Diameter Pipeline) and the South
Caucasus Pipeline (SCP) Gas Export (approx: 690km,42”
Diameter Pipeline).The pipeline System includes a head
pump station and three intermediate Pump Stations,four
intermediate Pigging Stations,pig traps,valve stations,a
cathodic protection system,an optical fiber based
communications systems and an Integrated Control
System (ICS). The ICS comprises a SupervisoryControl
and Data Acquisition (SCADA) system,pipeline shutdown
(PSD) system,local emergencyshutdown (ESD) system,
fire and gas detection (F&G) system,leak detection
system and telecommunications
Value Approximately:
British
Petroleum
Joint Venture
Between:
Petrofac/SPIE
$900million
Project
- NFGP –
AGRU/ SRU
Modification
Works
Engineering,Procurement,Installation & Commissioning
of the Acid Gas Removal Unit/ Sulfur Recovery unit
modifications work.The upgrade of the AGRU is required
to achieve a maximum of1.0% mole CO2 in the treated
gas.
Qatar
Petroleum
$9million
EMPLOYER : Abu Dhabi Free Zone Authority, UAE (Government
Authority responsible for the construction of a “Free
Zone” on the Saadiyat Island)
JOB TITLE : ProjectPlanning Manager (Contract Position-UAE)
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 7 of 8
Project Project Description
Establishment of the
Abu Dhabi Securities
Market (Stock
Exchange)
To establish ADSM as a legal entity, review the SEC laws,to establish trading rules;clearing,
depositoryand settlementrules & regulations,listing rules,brokers rules,committees roles,
business rules,securities management system functional requirements,systems acceptance
test criteria,to define technology/infrastructure requirements,to selectinformation technology&
IT contractors,to establish a training works plan,public awareness program,to convert from a
‘materialized’ to a ‘dematerialized’ market,to implement the civil contractor works plan,to
supply& install electronic trading systems,to recruit, listcompanies,register brokers broker,to
undertake marketing/advertisementcampaigns and to transfer company shareholder registers.
Development of
Saadiyat Island
The development of Saadiyat Island, to include the following facilities: stock exchange, futures
and options exchange,commodities exchange,clearing house,specialized commodities storage,
handling and warehousing facilities, sea port and handling facilities, industrial zone and cargo
village, commercial and residential real estate, communications and information infrastructure,
social and leisure facilities,and supporting infrastructure including a bridge to Abu Dhabi city and
an airport. The ADFZA project was a Major Abu Dhabi GovernmentAcquisition Programme.
EMPLOYER : British Aerospace Military Aircraft
& Aerostructures,Warton (uk)
JOB TITLE : Network Controller (ContractPosition-UK)
Project Project Description
Future Offensive
Aircraft Systems
FOAS, The Future Offensive Aircraft System was a UK Ministry of Defense Sponsored research
& developmentprojectto find a ‘system’ thatcould replace its fleet of Tornado GR.4 interdictor
strike aircraft early in the 21stcentury. The true 'system of systems'conceptevolved into a
combination ofmanned,unmanned and conventional air-launched cruise missile (CALCM).
FOAS comprised ofconceptstudies and technologydemonstrator programmes involving nine
Integrated Product Teams (flightcontrols,propulsions,vehicle systems,weapons,mission,
supportand training,cockpit, systems and requirements) and alliance partners including GEC
Marconi, Rolls Royce, Racal and Smith Industries.
EMPLOYER : Biwater International (U.A.E)
JOB TITLE : Assistantto Planning Manager
Project Project Description
Sewage Treatment
Works Extension at Al
Mafraq
The construction ofa sewage treatmentworks extension atAl Mafraq in Abu Dhabi.The plant
provides full tertiary treatmentfor approx 164,000 m³/d with 100% of the effluent being re-used
for the irrigation of Abu Dhabi.Works included Engineering,Procurement,Construction and
Commissioning of:(a) 6 primaryclarifiers,2 grit removal units,12 aeration tanks,12 secondary
settlementtanks,8 primaryand 32 secondarysludge digesters,sludge recirculation pump
station,18 gas holding tanks,48 sludge drying beds,12 effluentstorage tanks and a central
building complex.
My Role:
EMPLOYER : Al Manbaa Drilling Company.(UAE)
JOB TITLE : Planning and DevelopmentManager
Project Projects Description
Various projects
Projects included soil stabilization works as well as pipe laying of300mm to 3000mm diameter
duct/water/sewage pipes underground using non-disruptive methods (NDRC).Both conventional
pipe jacking and micro tunneling techniques were used.Iseki & Soltau micro tunneling machines
were used to achieve very accurate line and grade tolerances (one inch),they were also ideal
for use in unstable soil conditions and below ground water level.
CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK)
Page 8 of 8
EMPLOYER : British Rail (UK)
JOB TITLE : Technical Officer (UK Position)
Project Projects Description
Various projects
Railwayrelated projects including, infrastructure managementand maintenance,signalling
design, installation,testing and commissioning,operational telecommunication design,
installation,testing and commissioning and track renewals.Projects ranged between one day
and three years in duration.

More Related Content

Viewers also liked

Viewers also liked (10)

Muhammad Naseer Cv
Muhammad Naseer CvMuhammad Naseer Cv
Muhammad Naseer Cv
 
MY CV 777
MY CV 777MY CV 777
MY CV 777
 
CV of Accountant
CV of AccountantCV of Accountant
CV of Accountant
 
abdulelah saleh ahmed saeed
abdulelah saleh ahmed saeedabdulelah saleh ahmed saeed
abdulelah saleh ahmed saeed
 
Abdulaziz Alhamdan Resume
Abdulaziz Alhamdan ResumeAbdulaziz Alhamdan Resume
Abdulaziz Alhamdan Resume
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)
 
Faisal CV
Faisal CVFaisal CV
Faisal CV
 
WAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cvWAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cv
 
mohammed altamimi(c.v)
mohammed altamimi(c.v)mohammed altamimi(c.v)
mohammed altamimi(c.v)
 
Morsi's CV Updated
Morsi's CV UpdatedMorsi's CV Updated
Morsi's CV Updated
 

Similar to Majed Bushnaq CV - June 2016 Project List

Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui
 
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdfRamzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdfsahnounramzi2
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...petroEDGE
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 pDavid Wahl
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016David Wahl
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam HarbyEssam Harby
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megatmegat zainurul anuar
 

Similar to Majed Bushnaq CV - June 2016 Project List (20)

Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
 
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdfRamzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
C.V - Hosam A. Eid Mohammed kandeel
C.V - Hosam A. Eid Mohammed kandeelC.V - Hosam A. Eid Mohammed kandeel
C.V - Hosam A. Eid Mohammed kandeel
 
KHALED CV
KHALED CVKHALED CV
KHALED CV
 
Product-oriented construction management
Product-oriented construction managementProduct-oriented construction management
Product-oriented construction management
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 p
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016
 
RESUME
RESUMERESUME
RESUME
 
Chayanisa CV
Chayanisa CVChayanisa CV
Chayanisa CV
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megat
 

Majed Bushnaq CV - June 2016 Project List

  • 1. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 1 of 8 CURRICULUM VITAE (SECTION 3 of 3) NAME : Majed Bushnaq CONTACT DETAILS : Tele: +44-(7539) 106455 - UK Mobile:+971-50-6621866 – UAE +971-56-6816708-UAE e-mail:majedb2000@hotmail.com DATE OF BIRTH : 21 February 1965 NATIONALITY : British SECTION 3 - Detailed Experiences and Project Descriptions EXPERIENCE HIGHLIGHTS : Over twenty four years’ experience in the following areas.  Experience in different industries including:oil and gas,pipeline construction,general construction,water treatmentconstruction,rail,defense (aerospace) and finance.  Extensive experience in controlling program/projectlife cycle, from master planning, concept,design through to construction/testing and commissioning  Extensive experience in deriving/maintaining program/projectspecific Work Break Down Structures (WBS) with “strategic” performance measurementcapabilities atan Enterprise Wide/Projectand WBS levels  Extensive experience in deriving/maintaining program/projectOrganization Break Down Structures (OBS) with “strategic” performance measurementcapabilities atan OBS Contractor/Subcontractor levels  Extensive experience in Planning/Cost/Quality/Risk and Claims Managementand Control - The setting up of Earned Value ManagementSystems (integrated time/cost/quality/risk/claims and extension oftime managementsystems)  Extensive experience in managing design change bulletins,contract deviation/provisional variation/variation requestand change order procedures and systems  Extensive experience in the setting up and implementation ofrisk /issue managementsystems to identify existing issues/anticipate future risks and establish mitigation/contingencyactions and plans  Extensive experience in defining/setting up and implementing documentcontrol/communication managementsystems.Deriving of program/projectcommunications channels (ie communication matrices),inputs to and outputs from the channels.Deriving of program/projectstrategic reporting requirements.  Extensive experience in establishing program/projectrequired flow charts ,process maps and forms  Extensive experience in setting up projectcostestimating/bid systems using project/productcomponent libraries.  Extensive experience in system developmentusing MS Access 2003,Visual Basic Programming,Excel Programming,Foxpro etc.  Structured ProjectManagementMethodologies and other standards used/familiar with include:Prince2, British Aerospace ProjectManagement& Control Standards,ANSI/EIA 748 Earned Value Management Standard,The Society of Construction Law Delay and Disruption Protocol,ProjectManagementBook of Knowledge (The ProjectManagementInstitute), ISO9001:2000 and ISO 19011:2002 Standard,FIDIC. KEY SKILLS/ABILITIES:  Planning: product, activity & process based planning;costestimating and developmentofwork breakdown structure models; WBS/OBS resource assignmentmatrix;project quality, management& technical deliverables dependencies/activities;risk identification,assessment& mitigation activities;risk contingencyplans;resource assignments;activity/resource calendars;logic networks;critical path analysis;resource profiling (manpower,materials etc.);resource management/leveling;definition of progress WBS/OBS reporting levels & costcollection points;WBS/OBS baseline/budget(BCWS) formulation;detailed projectcostbreakdown;projectcostplan;projectcostcurves for managementstages (e.g. engineering,procurement,construction & installation);projectcostcurves for products (e.g. processes plants,process units);projectcostcurves for manpower/contractors;projectcostcurves for materials;definition ofhow adherence to the plan will be monitored & controlled  Starting up Projects: Defining the project/programme organization;ProjectBoard roles and job descriptions;customer/supplier environment;assurance roles;programme/projectsupportroles; role/candidate matrix;projectbrief; acceptance criteria,risk identification,estimation,evaluation,counter- actions & management;projectapproach and initiation stage plan  Initiating Projects: Planning quality(quality system to be used,change control approaches,configuration managementapproaches etc);planning a project; refining the business case & risks;setting up project controls & projectfiles
  • 2. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 2 of 8  Controlling Project Stages: work package definitions & authorizations,assessing completed work packages,assessing progress (WBS/OBS/material earned value charts,cost/schedule variance analysis reports,costto completion,forecasting budgetatcompletion,capturing/examining projectissues, reviewing stage status,qualityreviews, checkpointreportanalysis,highlightreports,corrective actions (recovery plans),projectissues escalation,change control (requestfor change,off specification),impact analysis (assessmentofthe change impact,importance & cost), ensuring a viable business case  Managing Project/Product Deliveries: managing team plans,risk logs,executing work package,quality logs (checks carried outon the productto ensure conformance to quality standard),checkpointreports, delivering work packages,claims/counter claims activities,surveillance  Managing Stage Boundaries: planning a stage,updating a projectplan, updating the project business case,updating the risk log, end stage reports,next stage plans,exception plans,updating lessons learned reports  Closing Projects: decommissioning a project,identifying follow on actions,projectevaluation review, projectcost control close-outreports Additional Skills:  Major Infrastructure Designs  Experienced in underground pipeline installation ofwater/sewage lines (pipe diameters - 300mm to 3m, maximum crossing length for a typical installation approx:80m),using non-disruptive techniques including conventional pipe jacking and microtunelling  Experienced with the use of Primavera Expedition/Documentumn/Aconexas document-control applications, logging and tracking projectinformation,meeting minutes,letters,transmittals,submittals etc  Process write-ups,process map definitions,process flow diagrams,procedures write-ups,cause & effect diagrams  PC literate e.g. using Excel, MS Word, MS Projects2003,Primavera P3,Primavera Enterprise 6.0, Pertmaster Advance, MS PowerPoint,Internet, FrontPage 2003,Met Stock  Experienced in Microsoft Dynamics financial system & projects performance reporting  Designing/publishing Web Sites  Software development/assemblylanguage programming:writing programmes/information management systems in Foxbase+2.1,MicrosoftAccess 2003,Visual Basic,Pascal,C, Foxpro2.5 etc.  Operating systems:IBM AS400 & UNIX AIX  Analyzing securities charts (identifying marketturning points ata relatively early stage)  Design/Faultfinding/repair work at PCB/microprocessor level  Fluent in English and Arabic, working knowledge ofFrench and Spanish languages Project/Proposal Details EMPLOYER : ARUP (ArupMajorProjects Division) JOB TITLE : Senior Project Controls Manager Projects/ Proposals Worked On: Projects Description: Projects Scope: Client Consultant Main Contractor Approxi mate Project Value Arabian Canal Project The Arabian Canal is the biggestand mostcomplexcivil engineering projectever undertaken in the Middle East. It will become a globally recognized landmark destination for both visitors and residents.The 75km man- made waterwaywill flow inland from the north, near Palm Jumeriah,to Dubai Waterfront at Jebel Ali, and will feature a range of mixed-use developments bysome ofthe region’s top developers. Limitless will develop an area in excess of 10,000 hectares through which the canal will flow. Master Planning, Concept, Preliminary/Sche matic,Detailed Design, Tendering, Construction/Tes ting and Commissioning Limitless (Subsidiary of Dubai World) Multiple Consultants Multiple Contractors ($50 Billion US)
  • 3. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 3 of 8 Heart of Europe Project The Heart of Europe developmentwill be located in Nakheel´s iconic The World Island Projectin Dubai,UAE. Several European countries will be represented within the master plan,each one incorporating its essential characteristics in a modern architectural interpretation.Moving away from a “theme park” concept, each part will carry, through a contemporary architectural language, the spiritof Germany, Austria, S. Petersburg,Switzerland, Sweden and the Netherlands. Different types of shops, restaurants,cultural activities, leisure facilities will be provided. Master Planning, Concept, Preliminary/Sche matic,Detailed Design, Tendering KLEINDIENST Properties Multiple Consultants Multiple Contractors >($12 Billion AED) Al Mashtal Project The Project consistofstate-of- the-art Grade ‘A’ office and residential developmentof approximately749,304m² and consists ofthe following components:5 Residential Towers,Hotel/Serviced Apartment, 3 Office Towers,2 Residential Towers,Boutique Hotel, Podiums,Arena, Ballroom,Public Gallery, Mosque and Car Park Facilities. Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/Tes ting and Commissioning Sorouh Multiple Consultants Multiple Contractors (AED 3 Billion) Atlantis Management Staff Accommodation Project Management Accommodation 1 & 2, Staff Accommodation 4, Staff Accommodation 5, Staff Accommodation 1,2 & 3 Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/Tes ting and Commissioning Istithmar Multiple Consultants Multiple Contractors (AED 900 million.) EMPLOYER : Hill lnternational (Project Management & Claims Consultants) JOB TITLE : Project Controls Manager Projects/ Proposals Worked On: Projects Description: Projects Scope: Client Consultant Main Contractor Approxi mate Project Value City of Arabia Project The City of Arabia Project is one of the biggest privately owned projects of its kind in the Middle East and comprises of (a) Infrastructure works including Sewerage Treatment Plant, 132KVA Substation, Filteration System, Roads and Bridges, District Cooling, Landscaping (b) "Biggest Mall in the World" (c) Wadi Walk (d) ten towers between 30 and 80 floors (e) 5 and 4 star hotels (f) Restless Planet(g) Light Train (Automated Master Planning, Concept, Preliminary/Sc hematic, Detailed Design, Tendering, Construction/T esting and Commissionin g IMGG – Ilyas & Mustafa Galadari Management Investment& Development (L.L.C) Multiple Consultants Multiple Contractors ($2 Billion US)
  • 4. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 4 of 8 People Mover) (h) Schools and other City buildings/facilities. OQYANA Project OQYANA is a development project built on 20 man-made islands of the WORLD which is located 4 km off the coast of Dubai. OQYANA’s development will have views of the Dubai coastline and be accessible from the mainland through ferry service. The population of the entire development is forecasted between ten (10) to twelve (12) thousand, as it will comprise of more than 1,650 sea-view apartments and mansions, water homes, canal homes, and two high-end hotels, including a spa resort. It will also contain inter- linked walkways and a marina with over 1,500 private yacht berths. Master Planning, Concept, Preliminary/Sc hematic, Detailed Design, Tendering OQYANA Multiple Consultants Multiple Contractors >($2.5 Billion US) Daman Tower Project 3 high towers mixed use, above 50 floors, includes residential apartments, offices, hotel, serviced apartments,podium and retail areas. Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/T esting and Commissionin g DAMAN Multiple Consultants Multiple Contractors ($2 Billion US) Duja Tower Project Mixed-used commercial and residential tower, including a car park structure, 50 stories plus a ground floor, a mezzanine floor and four basementlevels,totaling 195 meters in height. A car park structure, consisting of 10 stories plus a ground floor, will be constructed adjacentto the tower. Total built-up area approximately 167,000 square meters (1.8 million square feet). Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/T esting and Commissionin g His Excellency Nasser Abdulla Hussein Lootah. Multiple Consultants Multiple Contractors ($177 million) Durra Tower Project 76-story, 330-meter tower The project comprises a tower with a built-up area of 134,398 square meters that will accommodate 102 three-bedroom, 325 two- bedroom and 283 one-bedroom apartments. An adjacent car parking structure with a built-up area of around 32,630 square meters will accommodate 884 vehicles. Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/T esting and Commissionin g Al Hamid Group Multiple Consultants Multiple Contractors (US$140 million.) Multiple Proposals Umm Al Ramool Redevelopment,Enoc High Rise Building, Dubai Water Front Development,Dubai Marina 2, Corniche Mixed Used Development,Creek View & Terraces Project Concept, Preliminary /Schematic, Detailed Design, Tendering, Construction/T esting and Commissionin g Varied Clients US $ Billions.
  • 5. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 5 of 8 EMPLOYER : DMJM International (Program Manager) JOB TITLE : Project Controls Manager Project Projects Description: Client Consultant Main Contractor Approximate Project Value Mubadala - ERWDA (Environment Agency) Building Project The Mubadala / ERWDA Building is measuring about 18,950 m2 with a scope of Work comprising butnot limited to the following: (a) Office Building (Partial basement, Ground, Mezzanine, Nine upper floors and Roof Penthouse) (b) Laboratory Building (Ground, Mezzanine, Two upper floors, Roof/Penthouse) (c) Carpark Building (Ground and Six upper floors) (d) On Site Parking (e) Roads & Pavements (f) Landscaping (g) All other associated works including interior design. Exterior finishes are reconstituted stone cladding, and upside down Roofing system. The Project includes fair amount of solar tinted, double glazed,aluminium Curtain walling. ALDAR Properties PJSC Jung Brannen Associates (Prime Consultant) Khatib & Alami (Main Consultant) Consolidated Contractors International Company AED 230 Million (Approx: $64M) Shuweihat Water Transmission Scheme Lot A – Twin D.I 1600 dia. Pipeline from Shuweihatto Mirfa (97.3km) plus branch lines and structural works including washout,air release valve , bypass chambers,thrust blocks,Non disruptive road crossing works and connection via fiber optic cables to main control system Abu Dhabi Water & Electricity Authority Maunsel Marubeni/Taisei Consortium $261million Shuweihat Water Transmission Scheme Lot B - Twin D.I 1600 dia. Pipeline from Mirfa to Mussafah (127km) & single 1600 dia pipeline from Mussafah to Unit IV (13.2km) plus related works similar to LotA above. Abu Dhabi Water & Electricity Authority Tebodin Marubeni/Taisei Consortium $348million Shuweihat Water Transmission Scheme Lot C – Intermediate Pumping Station at Mirfa along with 4 reservoirs of10MG capacities each, surge vessels, compressors,chlorination facility, overflow lagoon,piping works, SCADA/control/telemetry Abu Dhabi Water & Electricity Authority Tebodin Marubeni/Taisei Consortium $92million
  • 6. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 6 of 8 systems,accommodation and office buildings Shuweihat Water Transmission Scheme Lot D – Water Distribution Pumping Station with 6 no. 10MG capacity reservoirs and 1200dia distribution line to Mussafah plus related works similar to LotC above Abu Dhabi Water & Electricity Authority Penspen Marubeni/Taisei Consortium $81million Shuweihat Water Transmission Scheme Lot E – DN 1000 D.I. Pipeline from Shuweihatto new Sila tank compound (104km) plus related works similar to Lot A above. Pump Station plus related works similar to Lot C above. Abu Dhabi Water & Electricity Authority ItalConsult Al Jaber Microtunneling $72million Shuweihat Water Transmission Scheme Lot F – DN 1200 DI pipeline from Mussafah to Al Wathba (27km),branch line connections to existing networks plus supply and installation ofvariable speed pumps Abu Dhabi Water & Electricity Authority Penspen Al Jaber Energy Services $51million EMPLOYER : Petrofac International JOB TITLE : Project Controls Engineer (ContractPosition-UAE) Projects/Prop osals Description: Works Description Client Bidders/Main Contractor Approximate Project Value Proposal Sohar (Oman) Refinery Proposal Engineering,Procurement,Construction ofan oil refinery based in Sohar,Oman. The projectconsisted ofa number of process units,utilityunits,offsite facilities and marine facilities. Petrofac’s scope ofwork limited to EPC of twelve units including, gas oil recovery; LPG Merox; Kerosene- Merox;Amine/Hydrogen, Sour Water Stripper; Sulfur Recovery1&2;Tail Gas Treating; Marine Loading Facilities and Sulfur Granulation & Packaging. Oman Petroleum Joint Venture Between: LURGI Oel-Gas- Chemie GmbH, Petrofac International,SK Engineering & Construction, Galfar Eng & Contg. L.L.C $1billion Proposal AZERBAIJA N-GEORGIA- TURKEY (AGT) PIPELINES PROPOSAL AGT Pipelines Projectsetup to manage the Engineering, Procurement,Installation & Commissioning ofthe Baku- Tbilisi-Ceyhan (BTC) Oil Export Pipeline (approx: 1750km,42” to 46” Diameter Pipeline) and the South Caucasus Pipeline (SCP) Gas Export (approx: 690km,42” Diameter Pipeline).The pipeline System includes a head pump station and three intermediate Pump Stations,four intermediate Pigging Stations,pig traps,valve stations,a cathodic protection system,an optical fiber based communications systems and an Integrated Control System (ICS). The ICS comprises a SupervisoryControl and Data Acquisition (SCADA) system,pipeline shutdown (PSD) system,local emergencyshutdown (ESD) system, fire and gas detection (F&G) system,leak detection system and telecommunications Value Approximately: British Petroleum Joint Venture Between: Petrofac/SPIE $900million Project - NFGP – AGRU/ SRU Modification Works Engineering,Procurement,Installation & Commissioning of the Acid Gas Removal Unit/ Sulfur Recovery unit modifications work.The upgrade of the AGRU is required to achieve a maximum of1.0% mole CO2 in the treated gas. Qatar Petroleum $9million EMPLOYER : Abu Dhabi Free Zone Authority, UAE (Government Authority responsible for the construction of a “Free Zone” on the Saadiyat Island) JOB TITLE : ProjectPlanning Manager (Contract Position-UAE)
  • 7. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 7 of 8 Project Project Description Establishment of the Abu Dhabi Securities Market (Stock Exchange) To establish ADSM as a legal entity, review the SEC laws,to establish trading rules;clearing, depositoryand settlementrules & regulations,listing rules,brokers rules,committees roles, business rules,securities management system functional requirements,systems acceptance test criteria,to define technology/infrastructure requirements,to selectinformation technology& IT contractors,to establish a training works plan,public awareness program,to convert from a ‘materialized’ to a ‘dematerialized’ market,to implement the civil contractor works plan,to supply& install electronic trading systems,to recruit, listcompanies,register brokers broker,to undertake marketing/advertisementcampaigns and to transfer company shareholder registers. Development of Saadiyat Island The development of Saadiyat Island, to include the following facilities: stock exchange, futures and options exchange,commodities exchange,clearing house,specialized commodities storage, handling and warehousing facilities, sea port and handling facilities, industrial zone and cargo village, commercial and residential real estate, communications and information infrastructure, social and leisure facilities,and supporting infrastructure including a bridge to Abu Dhabi city and an airport. The ADFZA project was a Major Abu Dhabi GovernmentAcquisition Programme. EMPLOYER : British Aerospace Military Aircraft & Aerostructures,Warton (uk) JOB TITLE : Network Controller (ContractPosition-UK) Project Project Description Future Offensive Aircraft Systems FOAS, The Future Offensive Aircraft System was a UK Ministry of Defense Sponsored research & developmentprojectto find a ‘system’ thatcould replace its fleet of Tornado GR.4 interdictor strike aircraft early in the 21stcentury. The true 'system of systems'conceptevolved into a combination ofmanned,unmanned and conventional air-launched cruise missile (CALCM). FOAS comprised ofconceptstudies and technologydemonstrator programmes involving nine Integrated Product Teams (flightcontrols,propulsions,vehicle systems,weapons,mission, supportand training,cockpit, systems and requirements) and alliance partners including GEC Marconi, Rolls Royce, Racal and Smith Industries. EMPLOYER : Biwater International (U.A.E) JOB TITLE : Assistantto Planning Manager Project Project Description Sewage Treatment Works Extension at Al Mafraq The construction ofa sewage treatmentworks extension atAl Mafraq in Abu Dhabi.The plant provides full tertiary treatmentfor approx 164,000 m³/d with 100% of the effluent being re-used for the irrigation of Abu Dhabi.Works included Engineering,Procurement,Construction and Commissioning of:(a) 6 primaryclarifiers,2 grit removal units,12 aeration tanks,12 secondary settlementtanks,8 primaryand 32 secondarysludge digesters,sludge recirculation pump station,18 gas holding tanks,48 sludge drying beds,12 effluentstorage tanks and a central building complex. My Role: EMPLOYER : Al Manbaa Drilling Company.(UAE) JOB TITLE : Planning and DevelopmentManager Project Projects Description Various projects Projects included soil stabilization works as well as pipe laying of300mm to 3000mm diameter duct/water/sewage pipes underground using non-disruptive methods (NDRC).Both conventional pipe jacking and micro tunneling techniques were used.Iseki & Soltau micro tunneling machines were used to achieve very accurate line and grade tolerances (one inch),they were also ideal for use in unstable soil conditions and below ground water level.
  • 8. CV for Majed Bushnaq BEng(UK)., MBA(UK)., MIET(UK) Page 8 of 8 EMPLOYER : British Rail (UK) JOB TITLE : Technical Officer (UK Position) Project Projects Description Various projects Railwayrelated projects including, infrastructure managementand maintenance,signalling design, installation,testing and commissioning,operational telecommunication design, installation,testing and commissioning and track renewals.Projects ranged between one day and three years in duration.