A Study on Operation &
Maintenance of Steam Boiler at
DK knitwear Ltd.
3
4
Contents
 Introduction
 Objectives
 Company Overview
 Boiler
 Types of Boiler
 Boiler Auxiliaries
 Operation
 Maintenance
 Problem and Solution
 Safety
 Limitation
 Recommendation
 Conclusion
Introduction
I am going to discuss about Introduction of boiler , Type of
Boiler ,Operation & Maintenance, Problem & solution and
also objectives of this internship.
5
6
ObjectivesObjectives
The main objective of this internship is to gather practical
knowledge, experience and understand the pros and cons of
the steam boiler and understanding the basic operation and
maintenance of steam fire tube boiler.
Specific Objectives
To learn operation process of Steam Boiler.
To know about maintenance of Steam Boiler.
To gather knowledge about boiler controlling system.
To Study on components of Steam Boiler.
To learn about troubleshooting of fire tube boiler.
7
8
Company Overview
Front view of DK knitwear Ltd.
DK. Knitwear Ltd. is a 100% export oriented knit
fabric & garments manufacturing & export
industries in Bangladesh. It started to walk since
2004. It has a well trained and experienced member
of staff. Committed to top quality, best price
negotiate, on time delivery.They Always caring for best
quality.
9
Company Address
Corporate Head office
House# 15, Road# 68/A, Gulshan 1,
Dhaka-1111, Bangladesh.
Tel: 8801-8814070, 9898107
Email: info@dkgbd.com
Web: www.dkgbd.com
Factory
Zamgara, Savar, Dhaka, Bangladesh
Email: dkkl@dkgbd.com Web: www.dkgbd.com
10
Vision statement
To be the most preferred garment, home textile, bags and other
sourcing agency for global clients and to provide automated
warehousing and re-distribution solutions to global clients.
Mission statement
To conduct the business of DK Group so as to maintain there
reputation for credibility and integrity with there clients,
vendors, and employees.To provide customized sourcing and
logistic solutions to global clients having unique requirements.
To achieve consistent high quality levels and on-time delivery
schedules, through a team of committed personnel and a proven
set of vendors with World Class, systematic manufacturing
facilities. To open window for new avenue of business
diversity.
11
Main Production Items of Dk Knitwear Ltd
They produce all kinds of men, ladies, and children's polo, basic
t-shirt, fancy t-shirts along with embroidery, print, sequence
etc.They also do all kinds of pigment wash, stone wash,
garment wash t-shirt.Finally they produce T-shirt, feeder stripe
and Eng stripe t-shirt.
12
13
Production Capacity of Dk Knitwear Ltd
Name of Products Pcs. / Day
Basic Tee shirt 40000 pcs
Fancy Tee 10000 pcs
Polo Shirt 10000 pcs
14
Organogram of Employees
Boiler
15
Boiler is a closed vessel made of steel. Its function is to transfer
the heat produced by the combustion of fuel (Solid, liquid,
gaseous) to water, and ultimately generated steam.
Specification of Boiler
Produce of steam 6 ton/h
Pressure 10.5 bar
Steam condensed 600 kg/h
Fuel used 450 m3/h
Temperature of the boiler house 280
c
Feed water temperature 500
c
Saftey valve pressure 7.5 kg/cm 2 16
17
History of boiler
It may be debated who developed the
first steam-generating boiler; however,
most will agree that George Babcock
and Steven Wilcox were two of the
founding fathers of the steam-generating
boiler. They were the first to patent their
boiler design, which used tubes inside a
firebrick-walled structure to generate
steam, in 1867.
Materials of Boiler
 Steel /alloy steel
 Wrought iron
 Ferritic stainless steel
 Copper
 Brass
18
Steam uses is Dk knitwear Ltd.
 Steam use in Yarn Dying Machine for colour the Yarn.
 Steam use in Knit Dying Machine for colour and
washing the Knit.
 For colour and Chemical Mixture.
19
Important Terms of Boiler
1. Boiler Shell
2. Combustion Chamber
3. Grate
4. Furnace
5. Heating Surface
6. Mountings
7. Accessories
20
21
Types of Boiler
According to the axis of the Shell
Vertical Boiler Horizontal Boiler
Stationary Boiler
Mobile Boiler
22
According to the use
23
Fire Tube BoilerWater Tube Boiler
According to the contents in the tube
24
According to the position of the furnace
Internally Fired Boiler Externally Fired
Boiler
25
Fire Tube Boiler
Fire tube boiler is a boiler where the flue gasses is inside the tube
and water is surround from furnace.Actually it is uses in small
power plant and small and medium sized industrial installations.
Fire tube boiler can be classified into following types
1. Lancashire boiler
2. Marine scotch boiler
3. Locomotive boiler
4. Cornish boiler
5. Vertical boiler
6. Cochrane boiler
26
Operation of Fire Tube Boiler
27
28
Advantages of Fire tube boiler
 Fire tube boiler is so easy to use, operate, clean and
maintenance.
 Fire tube boiler can be used in small scale industries.
 Fire tube boiler is relatively cheaper than water tube
boiler.
29
Disadvantages of Fire tube boiler
 From the furnace combustion side, required time to
fill water is longer than to increase temperature and
pressure.
 The fire tube boiler can not produce steam at a
pressure higher than 24.5 bar
 Capacity of generated steam is limited.
Boiler Auxiliaries
Boiler auxiliaries are-
1.Boiler mountings
2.Boiler accessories
3.Another equipment’s
30
31
Boiler Mountings
These are the fittings, which are mounted on the boiler for
its proper and safe functioning.
The boiler mountings are
 Water level indicator
 Pressure gauge
 Safety valves
 Steam stop valve
 Feed check valve
32
Boiler Mountings
A water level indicator (gauge
glass) shows the current level of
water in the boiler, regardless of the
boiler's operating conditions. It is an
important fitting.
Water level Indicator
Blow Off Cock
It is fitted at the bottom of the boiler drum.
The functions of blow off cock is
(i)To empty the boiler whenever required.
(ii)To discharge the scale, mud and
sediments which gets collected at the
bottom of the boiler.
33
Fusible Plug
 It is fitted to the crown plate of
the furnace or firebox.
 Its function is to extinguish fire
in the furnace when the water
level in the boiler falls to an
unsafe limit.
34
35
Pressure Gauge
Pressure gauge is used to
measure the Pressure of Steam
inside the steam boiler.
It is fixed in front of the steam
boiler.
Pressure gauges are connected
to the steam spaces in the boiler.
Safety Valves
 Safety valves are attached to
the steam chest for
preventing explosions due to
excessive internal pressure of
steam.
 These are directly placed on
the boiler.
 Its function is to blow off the
steam when the pressure of
steam inside the boiler
exceeds the working
pressure.
36
Steam Stop Valve
It is the largest valve on the
steam boiler. Principle
function of a stop valve are:
 To control the flow of steam
from the boiler to the main
steam pipe.
 To shut off the steam
completely when required.
37
Feed checked valve
 It is a non return valve
 This valve must have its
spindle lifted before
the pump start.
 Feed checked valve
distribute the water in
uniformly
38
39
Boiler Accessories
These are the devices which are used as integral parts of a
boiler, and help in running efficiently.
The boiler accessories are
 Feed pump
 Economizer
 Super heater
 Air pre-heater
Boiler Accessories
Feed Pump
A feed pump may be centrifugal
type or reciprocating type .Thus
we need a feed pump to deliver
water to the boiler.
40
41
Economizer
An economizer is a device
used to heat the feed water by
utilizing the heat in the
exhaust flue gases before
leaving through chimney.
The economizer improves the
economy of the steam boiler.
Super Heater
A super heater is a
device used to convert
saturated steam or wet
steam into superheated
steam or dry steam.
42
43
Air Pre-heater
Air pre heater is a heat recover
unit. An air pre heater is used to
recover the heat from the exhaust
flue gases.
 The preheated air gives higher
furnace temperature.
 Its results in better combustion
with less smoke.
Another Boiler equipment
Boiler drum
A boiler drum is a pressurized
vessel where saturated steam and
feed water gets separated .It is a
pressure vessel because high
pressure feed water is pumped to
the boiler drum .it’s a most critical
element in the boiler.
44
Furnace Chamber
A furnace chamber is a device used for
high temperature heating .
FD fan
FD fan is basically mentioned here for
forced draft fan. A fan is used to force air
into the boiler to provide more air for
combustion. This is called FD fan.
45
Id fan
ID fan is basically mentioned here
induced forced draft fan .A fan is
used to extract the air
from boiler post combustion via to
exhaust through the chimney. This
is called ID fan.
Chimney
A chimney is a structure that
provides vemtilation for hot flue
gases for smoke from a boilers to
outside atmosphere.
46
Operation
47
Boiler Starting System
Before going to light up the boiler certain checks shall be
done –

All manhole doors on the boiler and ducts are to be closed.

All dampers in the flue gas path, primary air path, &
secondary air path shall be checked for their correct position.

Power supplies for all electrically operated dampers shall be
switched on.

Breakers of all auxiliaries shall be kept in service position.
48

D C control supplies shall be ensured for all auxiliaries.

Local push buttons shall be kept released.

All breakers shall be selected for remote operation.

Valves status shall be checked on the boiler.

Fuel oil pump shall be kept in service.

Fuel oil heating system shall be kept in service and the fuel
oil shall be kept under circulation to raise its temperature.
49
50
Control Panel Board
The plug should be inserted at the
control panel. And step by step switch
on all the plugs of control board. If it
will show the green light then it will
work well. If it found the yellow light,
there is something wrong.
Switching on Boiler
1.Switching on main ON/OFF switch and
the boiler fills automatically. The filling
time is approx 10-20 minutes, until the
water is visible in the sight glass.
2. When both low water level lights come
on, pressing the re-set button which
releases the locking relays and the boiler is
ready for operation.
51
Boiler shut downing system
1.Before shutting the boiler down, giving it a good blowdown to
remove as much sediment as possible. Stoping when the drain
runs clear.
2. Puting the boiler steam pressure control in manual mode, and
slowly reduce the firing rate. Watching he main steam header
pressure to make sure that the other boilers are taking up the
load. Do not reduce the firing rate below that necessary to
maintain a stable flame. 52
3. Allowing the fan to the furnace with a reduced air flow, and
then shut the fan down. Being particularly careful not to let the
fan supply large amounts of cold air into the furnace in the
winter.
4. Closing the boiler header stop valve.
53
Maintenance
54
55
steam boiler problems typically occur over a long period of time,
regular monitoring and maintenance go a long way in avoiding
failures or catastrophic disasters. In the maintenance of boiler is
a part of scheduled maintenance. There are several types of
maintenance-
Operation and maintenance at running condition
1. Keep the room clean
2. Inspect boiler drum level.
3. Inspect fans. Air heaters periodically
4. Ensure water quality
5. Maintain constant pressure and temperature of steam
Scheduled maintenance
1. Daily maintenance
2. Weekly maintenance
3. Monthly maintenance
4. Yearly maintenance
56
Daily Maintenance
57
1.Checking feed water quality.
2.To ensure water level.
3.To ensure water quality.
4.To ensure steam temperature and pressure .
5.To ensure fuel gas temperature .
6.To ensure quantity of blow down.
7.To ensure the working environment clean.
Weekly Maintenance
1.Checking the working of low level & extra low level alarm by
reducing the water level.
2.Ensure proper lubrication of all moving parts.
3.Cleaning the flame sensor and viewing glass.
4.Checking the conditions of door seals.
5.Checking that there are no variations in the fuel pressure as
compared with that at commissioning time.
58
Monthly Maintenance
1.To ensure function ability of all safety valves .
2.Checking water pump gaskets and non-return valve.
3.Lubricate the modulation motor linkages.
4.Cleaning the burner nozzle and ignition electrodes.
5.Checking and clean, if necessary, the furnace.
6.To ensure the opening of drain valves .
59
Yearly Maintenance
1.To inspect boiler tube inside for scale ,corrosion.
2.To inspect and tightening bolts
3.To inspect and repair of all manhole ,Connection points and headers
for crack, corrosion or erosion .
4.To perform hydraulic test for pressure parts .
5.Cleaning the water side of the boiler thoroughly.
6.To Review boiler log book .maintenance register and water quality log
book.
60
Boiler Blowdown
Boiler blow down is done to
remove the scale from the Boiler
Drum. when boiler is shut down
the remaining water in Boiler
drum create solid & chemical
layer. It is called scale.
61
62
Boiler Blowdown Benefits
• Less maintenance and repair cost.
• Saves manual supervision for other tasks.
• Reduced operating cost.
Problem & Solution
63
64
SI.
No.
Problem Cause Solution
01 Leaking
and
dripping
broken internal
component, such as a
pump seal or pressure
valve.
pump seal may
have become worn out
and need replacing.
02. Strange
banging,
whistling
or gurgling
noises
a. the water pressure is
too low.
b. kettling. Imminent
pump failure.
the pressure relief
valve needs replacing
and increasing water
pressure of the boiler.
03. Flame
failure.
Air flow high. Adjusting air flow.
65
SI.
No.
Problem Cause Solution
04 Furnace
vibration
Incomplete combustion Adjusting air, fuel
ratio.
05 Steam
quality
low
Insufficient blow
down.
Check & action.
Increasing blow down.
06 Very loud
explosive
noise on
ignition
A lot of gas in the
chamber which causes
explosive ignition.
Replaced the ignition
leads and the flame
sensor.
66
SI.
No.
Problem Cause Solution
07 Boiler fails to
ignite
when dirt and carbon
build up on the ignition
and flame sensor .
Boiler must be
stripped down and
should clean.
08 Boiler doesn’t
switch on
Internal problem in
power control board
Power control
board need to
replace .
09 Boiler keeps
switching
itself off
Low water pressure
problem with
thermostat and lacks
of water supply.
Checked the water
pressure and water
supply and taking
necessary action .
67
Safety for Boiler Room
The safety should be followed during operating the boiler at
boiler room are-
Used Apron , Hand gloves, Shoe , Ear plug properly .
Following fire alarms, Pressure regulator,
Checking electric connection, safety tools of boiler .
Used the Fire extinguisher bottle to quench the fire.
Actually it contains CO2 gas.
68
Fire extinguisher bottle Fire alarm
Head phone type Ear plug
69
Limitation
DK knitwear Ltd has provided me the best opportunity to
learn about Fire Tube Boiler. But there are some limitations.
The limitations are
 I did not get some information because of company privacy.
 During my practicum I didn’t face any big trouble. So I have
missed the study about big trouble shooting.
 I did not get any assembly or installation of a new boiler.
70
Recommendation
.
1. During the practicum period , I noticed that they did not
check the regulator and gas line properly . The regulator and
gas line properly should be checked.
2. I saw that they did not check safety components
regularly .It may be dangerous that’s why safety
components should be checked.
3. There is no economizer for waste heat recovery.
Economizer could be used for waste heat recovery .
4. I noticed that they did not use insulate and sheet to cover
hot line. Reducing heat loss by insulating & sheet covering of
hot line should be used.
5. They do not maintain the maintenance schedule.Weekly
report should be checked for taking necessary action for
maintenance
71
72
Conclusion
73
Industry like DK Knitwear Ltd. has a very good impact in the
sector of our main economy. Boiler is an important part for
Garments industries. Doing this practicum of steam boiler I
acquired much practical knowledge about boiler, its starting and
shutdown system and maintenance & troubleshooting . My
experience during the short time stay at DK Knitwear Ltd. has
not only increased my depth of knowledge, but also has given
me the feeling of challenges I faced in engineering profession. I
hope it will help me in my service life a lot .
74
Thanks to allThanks to all
75

More Related Content

What's hot

Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Boilers and its types & components
Boilers and its types & componentsBoilers and its types & components
Boilers and its types & componentsYoga Sathish
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plantTarek Erin
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Steam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghSteam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghVarun Pratap Singh
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.Anuj Maurya
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its InternalsAshrant Dass
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam TurbineSumit Sharma
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilersTariq Jamshaid
 

What's hot (20)

Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Boilers and its types & components
Boilers and its types & componentsBoilers and its types & components
Boilers and its types & components
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
Compressor
CompressorCompressor
Compressor
 
Steam generator part 1
Steam generator part 1Steam generator part 1
Steam generator part 1
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 
Steam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghSteam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap Singh
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.
 
Turbo generator & its auxiliaries
Turbo generator & its auxiliariesTurbo generator & its auxiliaries
Turbo generator & its auxiliaries
 
Boiler turbe failores
Boiler turbe failoresBoiler turbe failores
Boiler turbe failores
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilers
 

Similar to presentation report on steam boiler

Final Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxFinal Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxmehede1
 
Manufacturing process of fire tube boiler
Manufacturing process of fire tube boilerManufacturing process of fire tube boiler
Manufacturing process of fire tube boilermithunmsm95
 
ptherml power palnt basica nd advancded.pptx
ptherml power palnt basica nd advancded.pptxptherml power palnt basica nd advancded.pptx
ptherml power palnt basica nd advancded.pptxramsao2018com
 
How to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerHow to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerMd Rabiul Hasan
 
Cochran boiler
Cochran boiler Cochran boiler
Cochran boiler Tarak Shah
 
Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesYagnesh Virani
 
Report on Industrial Training
Report on Industrial TrainingReport on Industrial Training
Report on Industrial TrainingNashiyat Fyza
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaAditya Bhattacharjee
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power PlantManish Kumar
 

Similar to presentation report on steam boiler (20)

Final Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxFinal Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptx
 
Manufacturing process of fire tube boiler
Manufacturing process of fire tube boilerManufacturing process of fire tube boiler
Manufacturing process of fire tube boiler
 
Group 6. pptx.pptx
Group 6. pptx.pptxGroup 6. pptx.pptx
Group 6. pptx.pptx
 
Cheema
CheemaCheema
Cheema
 
Boilers
BoilersBoilers
Boilers
 
steam boilers.pptx
steam boilers.pptxsteam boilers.pptx
steam boilers.pptx
 
ptherml power palnt basica nd advancded.pptx
ptherml power palnt basica nd advancded.pptxptherml power palnt basica nd advancded.pptx
ptherml power palnt basica nd advancded.pptx
 
How to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerHow to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boiler
 
Cochran boiler
Cochran boiler Cochran boiler
Cochran boiler
 
boilerfinal-190101224443.pdf
boilerfinal-190101224443.pdfboilerfinal-190101224443.pdf
boilerfinal-190101224443.pdf
 
Steam genrator
Steam genratorSteam genrator
Steam genrator
 
Steam and Steam Boiler
Steam and Steam BoilerSteam and Steam Boiler
Steam and Steam Boiler
 
Steam boiler
Steam boilerSteam boiler
Steam boiler
 
Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessories
 
Boilers
BoilersBoilers
Boilers
 
Report on Industrial Training
Report on Industrial TrainingReport on Industrial Training
Report on Industrial Training
 
cheema boiler
cheema boilercheema boiler
cheema boiler
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- Aditya
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Utility_01.pptx
Utility_01.pptxUtility_01.pptx
Utility_01.pptx
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

presentation report on steam boiler

  • 2. 2 Presenter Lipon Islam ID # 14207082 Department of Mechanical Engineering IUBAT—International University of Business Agriculture & Technology 26th April 2018
  • 3. A Study on Operation & Maintenance of Steam Boiler at DK knitwear Ltd. 3
  • 4. 4 Contents  Introduction  Objectives  Company Overview  Boiler  Types of Boiler  Boiler Auxiliaries  Operation  Maintenance  Problem and Solution  Safety  Limitation  Recommendation  Conclusion
  • 5. Introduction I am going to discuss about Introduction of boiler , Type of Boiler ,Operation & Maintenance, Problem & solution and also objectives of this internship. 5
  • 6. 6 ObjectivesObjectives The main objective of this internship is to gather practical knowledge, experience and understand the pros and cons of the steam boiler and understanding the basic operation and maintenance of steam fire tube boiler.
  • 7. Specific Objectives To learn operation process of Steam Boiler. To know about maintenance of Steam Boiler. To gather knowledge about boiler controlling system. To Study on components of Steam Boiler. To learn about troubleshooting of fire tube boiler. 7
  • 8. 8 Company Overview Front view of DK knitwear Ltd.
  • 9. DK. Knitwear Ltd. is a 100% export oriented knit fabric & garments manufacturing & export industries in Bangladesh. It started to walk since 2004. It has a well trained and experienced member of staff. Committed to top quality, best price negotiate, on time delivery.They Always caring for best quality. 9
  • 10. Company Address Corporate Head office House# 15, Road# 68/A, Gulshan 1, Dhaka-1111, Bangladesh. Tel: 8801-8814070, 9898107 Email: info@dkgbd.com Web: www.dkgbd.com Factory Zamgara, Savar, Dhaka, Bangladesh Email: dkkl@dkgbd.com Web: www.dkgbd.com 10
  • 11. Vision statement To be the most preferred garment, home textile, bags and other sourcing agency for global clients and to provide automated warehousing and re-distribution solutions to global clients. Mission statement To conduct the business of DK Group so as to maintain there reputation for credibility and integrity with there clients, vendors, and employees.To provide customized sourcing and logistic solutions to global clients having unique requirements. To achieve consistent high quality levels and on-time delivery schedules, through a team of committed personnel and a proven set of vendors with World Class, systematic manufacturing facilities. To open window for new avenue of business diversity. 11
  • 12. Main Production Items of Dk Knitwear Ltd They produce all kinds of men, ladies, and children's polo, basic t-shirt, fancy t-shirts along with embroidery, print, sequence etc.They also do all kinds of pigment wash, stone wash, garment wash t-shirt.Finally they produce T-shirt, feeder stripe and Eng stripe t-shirt. 12
  • 13. 13 Production Capacity of Dk Knitwear Ltd Name of Products Pcs. / Day Basic Tee shirt 40000 pcs Fancy Tee 10000 pcs Polo Shirt 10000 pcs
  • 16. Boiler is a closed vessel made of steel. Its function is to transfer the heat produced by the combustion of fuel (Solid, liquid, gaseous) to water, and ultimately generated steam. Specification of Boiler Produce of steam 6 ton/h Pressure 10.5 bar Steam condensed 600 kg/h Fuel used 450 m3/h Temperature of the boiler house 280 c Feed water temperature 500 c Saftey valve pressure 7.5 kg/cm 2 16
  • 17. 17 History of boiler It may be debated who developed the first steam-generating boiler; however, most will agree that George Babcock and Steven Wilcox were two of the founding fathers of the steam-generating boiler. They were the first to patent their boiler design, which used tubes inside a firebrick-walled structure to generate steam, in 1867.
  • 18. Materials of Boiler  Steel /alloy steel  Wrought iron  Ferritic stainless steel  Copper  Brass 18
  • 19. Steam uses is Dk knitwear Ltd.  Steam use in Yarn Dying Machine for colour the Yarn.  Steam use in Knit Dying Machine for colour and washing the Knit.  For colour and Chemical Mixture. 19
  • 20. Important Terms of Boiler 1. Boiler Shell 2. Combustion Chamber 3. Grate 4. Furnace 5. Heating Surface 6. Mountings 7. Accessories 20
  • 21. 21 Types of Boiler According to the axis of the Shell Vertical Boiler Horizontal Boiler
  • 23. 23 Fire Tube BoilerWater Tube Boiler According to the contents in the tube
  • 24. 24 According to the position of the furnace Internally Fired Boiler Externally Fired Boiler
  • 25. 25 Fire Tube Boiler Fire tube boiler is a boiler where the flue gasses is inside the tube and water is surround from furnace.Actually it is uses in small power plant and small and medium sized industrial installations.
  • 26. Fire tube boiler can be classified into following types 1. Lancashire boiler 2. Marine scotch boiler 3. Locomotive boiler 4. Cornish boiler 5. Vertical boiler 6. Cochrane boiler 26
  • 27. Operation of Fire Tube Boiler 27
  • 28. 28 Advantages of Fire tube boiler  Fire tube boiler is so easy to use, operate, clean and maintenance.  Fire tube boiler can be used in small scale industries.  Fire tube boiler is relatively cheaper than water tube boiler.
  • 29. 29 Disadvantages of Fire tube boiler  From the furnace combustion side, required time to fill water is longer than to increase temperature and pressure.  The fire tube boiler can not produce steam at a pressure higher than 24.5 bar  Capacity of generated steam is limited.
  • 30. Boiler Auxiliaries Boiler auxiliaries are- 1.Boiler mountings 2.Boiler accessories 3.Another equipment’s 30
  • 31. 31 Boiler Mountings These are the fittings, which are mounted on the boiler for its proper and safe functioning. The boiler mountings are  Water level indicator  Pressure gauge  Safety valves  Steam stop valve  Feed check valve
  • 32. 32 Boiler Mountings A water level indicator (gauge glass) shows the current level of water in the boiler, regardless of the boiler's operating conditions. It is an important fitting. Water level Indicator
  • 33. Blow Off Cock It is fitted at the bottom of the boiler drum. The functions of blow off cock is (i)To empty the boiler whenever required. (ii)To discharge the scale, mud and sediments which gets collected at the bottom of the boiler. 33
  • 34. Fusible Plug  It is fitted to the crown plate of the furnace or firebox.  Its function is to extinguish fire in the furnace when the water level in the boiler falls to an unsafe limit. 34
  • 35. 35 Pressure Gauge Pressure gauge is used to measure the Pressure of Steam inside the steam boiler. It is fixed in front of the steam boiler. Pressure gauges are connected to the steam spaces in the boiler.
  • 36. Safety Valves  Safety valves are attached to the steam chest for preventing explosions due to excessive internal pressure of steam.  These are directly placed on the boiler.  Its function is to blow off the steam when the pressure of steam inside the boiler exceeds the working pressure. 36
  • 37. Steam Stop Valve It is the largest valve on the steam boiler. Principle function of a stop valve are:  To control the flow of steam from the boiler to the main steam pipe.  To shut off the steam completely when required. 37
  • 38. Feed checked valve  It is a non return valve  This valve must have its spindle lifted before the pump start.  Feed checked valve distribute the water in uniformly 38
  • 39. 39 Boiler Accessories These are the devices which are used as integral parts of a boiler, and help in running efficiently. The boiler accessories are  Feed pump  Economizer  Super heater  Air pre-heater
  • 40. Boiler Accessories Feed Pump A feed pump may be centrifugal type or reciprocating type .Thus we need a feed pump to deliver water to the boiler. 40
  • 41. 41 Economizer An economizer is a device used to heat the feed water by utilizing the heat in the exhaust flue gases before leaving through chimney. The economizer improves the economy of the steam boiler.
  • 42. Super Heater A super heater is a device used to convert saturated steam or wet steam into superheated steam or dry steam. 42
  • 43. 43 Air Pre-heater Air pre heater is a heat recover unit. An air pre heater is used to recover the heat from the exhaust flue gases.  The preheated air gives higher furnace temperature.  Its results in better combustion with less smoke.
  • 44. Another Boiler equipment Boiler drum A boiler drum is a pressurized vessel where saturated steam and feed water gets separated .It is a pressure vessel because high pressure feed water is pumped to the boiler drum .it’s a most critical element in the boiler. 44
  • 45. Furnace Chamber A furnace chamber is a device used for high temperature heating . FD fan FD fan is basically mentioned here for forced draft fan. A fan is used to force air into the boiler to provide more air for combustion. This is called FD fan. 45
  • 46. Id fan ID fan is basically mentioned here induced forced draft fan .A fan is used to extract the air from boiler post combustion via to exhaust through the chimney. This is called ID fan. Chimney A chimney is a structure that provides vemtilation for hot flue gases for smoke from a boilers to outside atmosphere. 46
  • 48. Boiler Starting System Before going to light up the boiler certain checks shall be done –  All manhole doors on the boiler and ducts are to be closed.  All dampers in the flue gas path, primary air path, & secondary air path shall be checked for their correct position.  Power supplies for all electrically operated dampers shall be switched on.  Breakers of all auxiliaries shall be kept in service position. 48
  • 49.  D C control supplies shall be ensured for all auxiliaries.  Local push buttons shall be kept released.  All breakers shall be selected for remote operation.  Valves status shall be checked on the boiler.  Fuel oil pump shall be kept in service.  Fuel oil heating system shall be kept in service and the fuel oil shall be kept under circulation to raise its temperature. 49
  • 50. 50 Control Panel Board The plug should be inserted at the control panel. And step by step switch on all the plugs of control board. If it will show the green light then it will work well. If it found the yellow light, there is something wrong.
  • 51. Switching on Boiler 1.Switching on main ON/OFF switch and the boiler fills automatically. The filling time is approx 10-20 minutes, until the water is visible in the sight glass. 2. When both low water level lights come on, pressing the re-set button which releases the locking relays and the boiler is ready for operation. 51
  • 52. Boiler shut downing system 1.Before shutting the boiler down, giving it a good blowdown to remove as much sediment as possible. Stoping when the drain runs clear. 2. Puting the boiler steam pressure control in manual mode, and slowly reduce the firing rate. Watching he main steam header pressure to make sure that the other boilers are taking up the load. Do not reduce the firing rate below that necessary to maintain a stable flame. 52
  • 53. 3. Allowing the fan to the furnace with a reduced air flow, and then shut the fan down. Being particularly careful not to let the fan supply large amounts of cold air into the furnace in the winter. 4. Closing the boiler header stop valve. 53
  • 55. 55 steam boiler problems typically occur over a long period of time, regular monitoring and maintenance go a long way in avoiding failures or catastrophic disasters. In the maintenance of boiler is a part of scheduled maintenance. There are several types of maintenance-
  • 56. Operation and maintenance at running condition 1. Keep the room clean 2. Inspect boiler drum level. 3. Inspect fans. Air heaters periodically 4. Ensure water quality 5. Maintain constant pressure and temperature of steam Scheduled maintenance 1. Daily maintenance 2. Weekly maintenance 3. Monthly maintenance 4. Yearly maintenance 56
  • 57. Daily Maintenance 57 1.Checking feed water quality. 2.To ensure water level. 3.To ensure water quality. 4.To ensure steam temperature and pressure . 5.To ensure fuel gas temperature . 6.To ensure quantity of blow down. 7.To ensure the working environment clean.
  • 58. Weekly Maintenance 1.Checking the working of low level & extra low level alarm by reducing the water level. 2.Ensure proper lubrication of all moving parts. 3.Cleaning the flame sensor and viewing glass. 4.Checking the conditions of door seals. 5.Checking that there are no variations in the fuel pressure as compared with that at commissioning time. 58
  • 59. Monthly Maintenance 1.To ensure function ability of all safety valves . 2.Checking water pump gaskets and non-return valve. 3.Lubricate the modulation motor linkages. 4.Cleaning the burner nozzle and ignition electrodes. 5.Checking and clean, if necessary, the furnace. 6.To ensure the opening of drain valves . 59
  • 60. Yearly Maintenance 1.To inspect boiler tube inside for scale ,corrosion. 2.To inspect and tightening bolts 3.To inspect and repair of all manhole ,Connection points and headers for crack, corrosion or erosion . 4.To perform hydraulic test for pressure parts . 5.Cleaning the water side of the boiler thoroughly. 6.To Review boiler log book .maintenance register and water quality log book. 60
  • 61. Boiler Blowdown Boiler blow down is done to remove the scale from the Boiler Drum. when boiler is shut down the remaining water in Boiler drum create solid & chemical layer. It is called scale. 61
  • 62. 62 Boiler Blowdown Benefits • Less maintenance and repair cost. • Saves manual supervision for other tasks. • Reduced operating cost.
  • 64. 64 SI. No. Problem Cause Solution 01 Leaking and dripping broken internal component, such as a pump seal or pressure valve. pump seal may have become worn out and need replacing. 02. Strange banging, whistling or gurgling noises a. the water pressure is too low. b. kettling. Imminent pump failure. the pressure relief valve needs replacing and increasing water pressure of the boiler. 03. Flame failure. Air flow high. Adjusting air flow.
  • 65. 65 SI. No. Problem Cause Solution 04 Furnace vibration Incomplete combustion Adjusting air, fuel ratio. 05 Steam quality low Insufficient blow down. Check & action. Increasing blow down. 06 Very loud explosive noise on ignition A lot of gas in the chamber which causes explosive ignition. Replaced the ignition leads and the flame sensor.
  • 66. 66 SI. No. Problem Cause Solution 07 Boiler fails to ignite when dirt and carbon build up on the ignition and flame sensor . Boiler must be stripped down and should clean. 08 Boiler doesn’t switch on Internal problem in power control board Power control board need to replace . 09 Boiler keeps switching itself off Low water pressure problem with thermostat and lacks of water supply. Checked the water pressure and water supply and taking necessary action .
  • 67. 67 Safety for Boiler Room The safety should be followed during operating the boiler at boiler room are- Used Apron , Hand gloves, Shoe , Ear plug properly . Following fire alarms, Pressure regulator, Checking electric connection, safety tools of boiler . Used the Fire extinguisher bottle to quench the fire. Actually it contains CO2 gas.
  • 68. 68 Fire extinguisher bottle Fire alarm Head phone type Ear plug
  • 69. 69 Limitation DK knitwear Ltd has provided me the best opportunity to learn about Fire Tube Boiler. But there are some limitations. The limitations are  I did not get some information because of company privacy.  During my practicum I didn’t face any big trouble. So I have missed the study about big trouble shooting.  I did not get any assembly or installation of a new boiler.
  • 70. 70 Recommendation . 1. During the practicum period , I noticed that they did not check the regulator and gas line properly . The regulator and gas line properly should be checked. 2. I saw that they did not check safety components regularly .It may be dangerous that’s why safety components should be checked. 3. There is no economizer for waste heat recovery. Economizer could be used for waste heat recovery .
  • 71. 4. I noticed that they did not use insulate and sheet to cover hot line. Reducing heat loss by insulating & sheet covering of hot line should be used. 5. They do not maintain the maintenance schedule.Weekly report should be checked for taking necessary action for maintenance 71
  • 73. 73 Industry like DK Knitwear Ltd. has a very good impact in the sector of our main economy. Boiler is an important part for Garments industries. Doing this practicum of steam boiler I acquired much practical knowledge about boiler, its starting and shutdown system and maintenance & troubleshooting . My experience during the short time stay at DK Knitwear Ltd. has not only increased my depth of knowledge, but also has given me the feeling of challenges I faced in engineering profession. I hope it will help me in my service life a lot .
  • 75. 75