China Water PPP and
Cases Sharing
Min Zhou, CEO, Beijing Enterprises Water Group
Email:zm@bewg.net.cn;luoxuegeng@bewg.net.cn
1994-2002
• Feature: Market reform, brought
in foreign investment
• Typical projects: BOT projects like
Chengdu No.6 WTP, Beijing No.
10 WTP, etc.
• Effect: Brought in the BOT model
and established market-oriented
pilots.
2002-2014 2014-till now
• Feature: Established a market-oriented
mechanism to meet the needs of
water supply and wastewater
treatment.
• Typical projects: Mianyang Taziba STP,
Beijing Daoxiang Lake STP, etc.
• Effect: Rapid development of private
sector, a large number of market-
oriented private enterprises emerged,
and the level of public services
increased significantly.
• Feature: Comprehensively improve
the ecological environment and
encourage social capital investment
• Typical projects: River basin
management project of Beijing
Xinfeng River, water environment
management project of Yuhang Tang
River Basin, etc.
• Effect: Significant improvement in
water quality; diversification of
investment and financing entities
Water Supply Water supply and waste water treatment
Water supply/waste water
treatment/water environment
Pilot
Phase
PPP Development in Chinese Water Sector
Advancement
Phase
Popularization
Phase
 The government has formulated
supporting policies and regulations,
to guarantee PPP development
 Effective tariff collection system
 Incorporate water and sewage tariff
into one bill
 Only qualified projects are
included in the national PPP
project library.
 Complete money evaluation,
financial affordability evaluation,
preliminary implementation plan
 Government budget guarantee
 Bottom line delineation
 Gradually pay attention to OM
 Pay-per-effect, construction cost
30% linked
 Establish National PPP Fund and Provincial
PPP Fund
 Encourage social capital to explore a
variety of financing channels, such as the
issuance of PPP project special bonds,
green bonds, ABS, REITs, etc.; BEWG has
issued 6.3 billion green bonds
PPP Practice in Chinese Water Sector
Policy and Regulation System User Pay
Government Monitoring Effect Oriented
Risk Management
Financing Support
TOP1
In sector 28
provinces
100+
cities
1047
plants
100million+
population
Kuala Lumpur Pantai 2
underground STP
(320,000 tons/day)
Singapore Changi 2nd NeWater Plant
(228,000tons/day)
As of 30 June,2019, BEWG owns and operates 1,047 plants,
including 875 sewage treatment plants, 140 water treatment
plants, 30 reclaimed water plants and 2 seawater desalination
plants, total design capacity over 37 million tones/day.
Adelaide Seawater Desalination Plant,
Australia
(320,000 tons/day)
Portugal
Malaysia Singapore
Australia New
Zealand
China Botswana
Angola
Business distributes
in 8 countries
BEWG Business Profile
Investment
Capability
 Strong investment capability
supported by diversified and
efficient financing channels.
 According to GWI
statistics(2016), BEWG ranked
TOP1 BOT developer in the
global private water sector.
EPC
Capability
Operation
Capability
 Provide best EPC solution
based on operation data and
experience of over thousand
plants owned by BEWG.
 Professional low cost
operation technology.
 Smart Water operation
platform supported by big
data.
“Global TOP40 Water
Companies”
No.3 by service population
——By GWI
Total assets, total revenue
and water treatment scale ranks
TOP1 in water sector in China
2010-2018
“Top Ten Influential Enterprises in
China's Water Industry”
TOP 1
China's TOP 500 in 2018
No. 401
——《Fortune》(Chinese
Version)
BEWG’s Three Major Capabilities and Sector Rankings
Total investment: CNY 2.3 billion
Project Scope:
Four sub-projects, including sewage treatment
plant(STP), river ecological recovering,
landscaping, park facilities construction, etc.
River rehabilitation PPP project of Tang River Basin,
Yuhang District, Hangzhou, Zhejiang Province, China
Before the project
-Tang River
After the project
-Tang River
BEWG CASE 01
Project Life Cycle:
STP sub-project: 2 years construction+28 years OM;
Water Environment sub-project:
2 years construction+13 years OM;
Project Mode: DBFOT
Before After
River rehabilitation PPP project of Tang River Basin,
Yuhang District, Hangzhou, Zhejiang Province, China
Differentiated charging mechanism
 STP charges: payment based on treated effluent
quantity
 Water environment charges: availability charge +
O&M service fee based on KPI evaluation
Project Feature
Integration of investment, operation and
construction
 Full project cycle, including: design, investment,
construction, operation and maintenance.
 Whole industry chain: traditional water + water
environment.
Smart Operation
Smart platform for River Chief, and smart
management system covering all stages of
investment, construction and operation.
High proportion Operational assets:above 40%
of CAPAX
Deal Structure
Consortium
Members
SPV
Financial
Institution
Pay-per-effect
according to PPP
agreement
Minority
Equity%: 1/3
Bank
loan%: 2/3
Tang River Basin PPP project,
Yuhang District
BEWG
(Leader)
Majority
Authorize
District
Government
Committee of
Future Technology &
City Management
Open
Tender
Consortium
Design/Investment/Cons
-truction/Operation
Repayment
of principal
and interest
BEWG CASE 01
Investment Amount:CNY 4.148 billion
Project Scope:
Sewage treatment, interception, black and odor water
treatment, river renovation, landscape improvement, sponge
city projects and smart water system, etc.
Project Life Cycle: 20 years, construction 2 years+ 18 years OM
Project Mode:DBFOT
工程实施前 工程实施后
Highlight:
So far the biggest complete PPP water comprehensive
environment treatment project in Beijing, which applied
river ecological restoration and cross-sectional water
quality standards as project performance evaluation
targets.
River rehabilitation PPP project of Xinfeng River Basin,
Daxing District, Beijing, China
Taiwan Street culvert exit
-Before the project
After the project
BEWG CASE 02
Controlled execution
Included in the PPP project library of the Ministry
of Finance, and strictly controlled the expenditure
overrun less than 10% of government budget.
Project Feature
Optimizing engineering and operational cost
Optimal solution: priority for natural condition
and landscapes to reduce engineering and O&M
cost;
Capex & Opex reduced:Wetland investment
reduced 24%, annual operation cost reduced 20%;
Deal Structure
Daxing
Government
Daxing Water
Bureau
BEWG
Daxing Materials
Group
Project SPV
Xinfeng River Basin
Manageemnt
Daxing Finance
Bureau
Town
governments
along the river
basin
AuthorizeAuthorize
Open
Tender
PPP contract signing
Performance appraisal,
supervision
Governm-
ent
Procure
service
Apply for service
fee according to
performance
Investment, design,
Construction, O&M
Majority Minority
River rehabilitation PPP project of Xinfeng River Basin,
Daxing District, Beijing, China
BEWG CASE 02
Project Profile
Planned capacity 260,000 tons/day,
phase one 80,000 m3/day, sewage
catchment area 67km2, service
population over 1 million, in BOT mode, c
30 years conssession operation.
Project Feature
 The first underground sewage treatment
plant under operation in northern China,
saved land for the Capital;
 A typical demonstration project that
implements ecological civilization
construction with conventional urban
sewage treatment plant. Harmony design of the plant with the environment,
interpret enterprise culture concept of "Water, Life, Love"
科研中试基地
BOT Project of Daoxiang Lake sewage treatment Plant, Beijing
BEWG CASE 03
PPP
ADBLoan
Government
guidance to the
market; Supporting
policies and
legislation
Establish an
effective tariff
collection
system;
Water and
sewage tariff in
one bill
EPC+2~3
years O&M
to ensure
effective
operation
Government
funding
+
Equity shared by
EPC contractor
+
Bank Loan
Suggestions on Development of Water Business
in Municipal Public Service
THANK YOU!

More Related Content

Similar to Presentation - Fifth Roundtable on Financing Water - Mr. Min Zhou

China sewage treatment industry report, 2010 2011
China sewage treatment industry report, 2010 2011China sewage treatment industry report, 2010 2011
China sewage treatment industry report, 2010 2011ResearchInChina
 
Singapore Experience in Water Financing
Singapore Experience in Water FinancingSingapore Experience in Water Financing
Singapore Experience in Water FinancingGWP SOUTHEAST ASIA
 
CV Ngo Viet Thuc (1)
CV Ngo Viet Thuc (1)CV Ngo Viet Thuc (1)
CV Ngo Viet Thuc (1)Viet Thuc
 
Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)Shisam Neupane
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi7391456
 
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAMCHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAMiQHub
 
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfWATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfssuser493fb4
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportFesto Wasukira
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationIwl Pcu
 
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi Wang
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi WangPresentation - Fifth Roundtable on Financing Water - Mr. Tianyi Wang
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi WangOECD Environment
 
IN-HOUSE R&D PROPOSALS-PRT.ppt
IN-HOUSE R&D PROPOSALS-PRT.pptIN-HOUSE R&D PROPOSALS-PRT.ppt
IN-HOUSE R&D PROPOSALS-PRT.pptSrini Vasan
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David TylerBecarAsset
 
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYwle-ss
 

Similar to Presentation - Fifth Roundtable on Financing Water - Mr. Min Zhou (20)

China sewage treatment industry report, 2010 2011
China sewage treatment industry report, 2010 2011China sewage treatment industry report, 2010 2011
China sewage treatment industry report, 2010 2011
 
TNT'CV-2016
TNT'CV-2016TNT'CV-2016
TNT'CV-2016
 
Singapore Experience in Water Financing
Singapore Experience in Water FinancingSingapore Experience in Water Financing
Singapore Experience in Water Financing
 
CV Ngo Viet Thuc (1)
CV Ngo Viet Thuc (1)CV Ngo Viet Thuc (1)
CV Ngo Viet Thuc (1)
 
Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)
 
Rahul jarariya OSTP-IEPM.pdf
Rahul jarariya OSTP-IEPM.pdfRahul jarariya OSTP-IEPM.pdf
Rahul jarariya OSTP-IEPM.pdf
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi
 
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAMCHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
 
Environtech - Investor Introduction
Environtech - Investor IntroductionEnvirontech - Investor Introduction
Environtech - Investor Introduction
 
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfWATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement Report
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project Presentation
 
Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2
 
201402CIR6
201402CIR6201402CIR6
201402CIR6
 
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi Wang
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi WangPresentation - Fifth Roundtable on Financing Water - Mr. Tianyi Wang
Presentation - Fifth Roundtable on Financing Water - Mr. Tianyi Wang
 
IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016 IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016
 
IN-HOUSE R&D PROPOSALS-PRT.ppt
IN-HOUSE R&D PROPOSALS-PRT.pptIN-HOUSE R&D PROPOSALS-PRT.ppt
IN-HOUSE R&D PROPOSALS-PRT.ppt
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
 
Market conditions and technical demands of water environment protection in China
Market conditions and technical demands of water environment protection in ChinaMarket conditions and technical demands of water environment protection in China
Market conditions and technical demands of water environment protection in China
 
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
 

More from OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Recently uploaded

VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 

Recently uploaded (20)

VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Green Banking
Green Banking Green Banking
Green Banking
 

Presentation - Fifth Roundtable on Financing Water - Mr. Min Zhou

  • 1. China Water PPP and Cases Sharing Min Zhou, CEO, Beijing Enterprises Water Group Email:zm@bewg.net.cn;luoxuegeng@bewg.net.cn
  • 2. 1994-2002 • Feature: Market reform, brought in foreign investment • Typical projects: BOT projects like Chengdu No.6 WTP, Beijing No. 10 WTP, etc. • Effect: Brought in the BOT model and established market-oriented pilots. 2002-2014 2014-till now • Feature: Established a market-oriented mechanism to meet the needs of water supply and wastewater treatment. • Typical projects: Mianyang Taziba STP, Beijing Daoxiang Lake STP, etc. • Effect: Rapid development of private sector, a large number of market- oriented private enterprises emerged, and the level of public services increased significantly. • Feature: Comprehensively improve the ecological environment and encourage social capital investment • Typical projects: River basin management project of Beijing Xinfeng River, water environment management project of Yuhang Tang River Basin, etc. • Effect: Significant improvement in water quality; diversification of investment and financing entities Water Supply Water supply and waste water treatment Water supply/waste water treatment/water environment Pilot Phase PPP Development in Chinese Water Sector Advancement Phase Popularization Phase
  • 3.  The government has formulated supporting policies and regulations, to guarantee PPP development  Effective tariff collection system  Incorporate water and sewage tariff into one bill  Only qualified projects are included in the national PPP project library.  Complete money evaluation, financial affordability evaluation, preliminary implementation plan  Government budget guarantee  Bottom line delineation  Gradually pay attention to OM  Pay-per-effect, construction cost 30% linked  Establish National PPP Fund and Provincial PPP Fund  Encourage social capital to explore a variety of financing channels, such as the issuance of PPP project special bonds, green bonds, ABS, REITs, etc.; BEWG has issued 6.3 billion green bonds PPP Practice in Chinese Water Sector Policy and Regulation System User Pay Government Monitoring Effect Oriented Risk Management Financing Support
  • 4. TOP1 In sector 28 provinces 100+ cities 1047 plants 100million+ population Kuala Lumpur Pantai 2 underground STP (320,000 tons/day) Singapore Changi 2nd NeWater Plant (228,000tons/day) As of 30 June,2019, BEWG owns and operates 1,047 plants, including 875 sewage treatment plants, 140 water treatment plants, 30 reclaimed water plants and 2 seawater desalination plants, total design capacity over 37 million tones/day. Adelaide Seawater Desalination Plant, Australia (320,000 tons/day) Portugal Malaysia Singapore Australia New Zealand China Botswana Angola Business distributes in 8 countries BEWG Business Profile
  • 5. Investment Capability  Strong investment capability supported by diversified and efficient financing channels.  According to GWI statistics(2016), BEWG ranked TOP1 BOT developer in the global private water sector. EPC Capability Operation Capability  Provide best EPC solution based on operation data and experience of over thousand plants owned by BEWG.  Professional low cost operation technology.  Smart Water operation platform supported by big data. “Global TOP40 Water Companies” No.3 by service population ——By GWI Total assets, total revenue and water treatment scale ranks TOP1 in water sector in China 2010-2018 “Top Ten Influential Enterprises in China's Water Industry” TOP 1 China's TOP 500 in 2018 No. 401 ——《Fortune》(Chinese Version) BEWG’s Three Major Capabilities and Sector Rankings
  • 6. Total investment: CNY 2.3 billion Project Scope: Four sub-projects, including sewage treatment plant(STP), river ecological recovering, landscaping, park facilities construction, etc. River rehabilitation PPP project of Tang River Basin, Yuhang District, Hangzhou, Zhejiang Province, China Before the project -Tang River After the project -Tang River BEWG CASE 01 Project Life Cycle: STP sub-project: 2 years construction+28 years OM; Water Environment sub-project: 2 years construction+13 years OM; Project Mode: DBFOT Before After
  • 7. River rehabilitation PPP project of Tang River Basin, Yuhang District, Hangzhou, Zhejiang Province, China Differentiated charging mechanism  STP charges: payment based on treated effluent quantity  Water environment charges: availability charge + O&M service fee based on KPI evaluation Project Feature Integration of investment, operation and construction  Full project cycle, including: design, investment, construction, operation and maintenance.  Whole industry chain: traditional water + water environment. Smart Operation Smart platform for River Chief, and smart management system covering all stages of investment, construction and operation. High proportion Operational assets:above 40% of CAPAX Deal Structure Consortium Members SPV Financial Institution Pay-per-effect according to PPP agreement Minority Equity%: 1/3 Bank loan%: 2/3 Tang River Basin PPP project, Yuhang District BEWG (Leader) Majority Authorize District Government Committee of Future Technology & City Management Open Tender Consortium Design/Investment/Cons -truction/Operation Repayment of principal and interest BEWG CASE 01
  • 8. Investment Amount:CNY 4.148 billion Project Scope: Sewage treatment, interception, black and odor water treatment, river renovation, landscape improvement, sponge city projects and smart water system, etc. Project Life Cycle: 20 years, construction 2 years+ 18 years OM Project Mode:DBFOT 工程实施前 工程实施后 Highlight: So far the biggest complete PPP water comprehensive environment treatment project in Beijing, which applied river ecological restoration and cross-sectional water quality standards as project performance evaluation targets. River rehabilitation PPP project of Xinfeng River Basin, Daxing District, Beijing, China Taiwan Street culvert exit -Before the project After the project BEWG CASE 02
  • 9. Controlled execution Included in the PPP project library of the Ministry of Finance, and strictly controlled the expenditure overrun less than 10% of government budget. Project Feature Optimizing engineering and operational cost Optimal solution: priority for natural condition and landscapes to reduce engineering and O&M cost; Capex & Opex reduced:Wetland investment reduced 24%, annual operation cost reduced 20%; Deal Structure Daxing Government Daxing Water Bureau BEWG Daxing Materials Group Project SPV Xinfeng River Basin Manageemnt Daxing Finance Bureau Town governments along the river basin AuthorizeAuthorize Open Tender PPP contract signing Performance appraisal, supervision Governm- ent Procure service Apply for service fee according to performance Investment, design, Construction, O&M Majority Minority River rehabilitation PPP project of Xinfeng River Basin, Daxing District, Beijing, China BEWG CASE 02
  • 10. Project Profile Planned capacity 260,000 tons/day, phase one 80,000 m3/day, sewage catchment area 67km2, service population over 1 million, in BOT mode, c 30 years conssession operation. Project Feature  The first underground sewage treatment plant under operation in northern China, saved land for the Capital;  A typical demonstration project that implements ecological civilization construction with conventional urban sewage treatment plant. Harmony design of the plant with the environment, interpret enterprise culture concept of "Water, Life, Love" 科研中试基地 BOT Project of Daoxiang Lake sewage treatment Plant, Beijing BEWG CASE 03
  • 11. PPP ADBLoan Government guidance to the market; Supporting policies and legislation Establish an effective tariff collection system; Water and sewage tariff in one bill EPC+2~3 years O&M to ensure effective operation Government funding + Equity shared by EPC contractor + Bank Loan Suggestions on Development of Water Business in Municipal Public Service