JANUARY 2014
Lathe – Introduction 
LATHE – Longitudinal Axis Tool Holding Equipment 
DMTG Extra Heavy Duty Lathe is a machine widely used for wood 
works and metal parts. Lathe is a machine which turns the work piece 
against a machine tool. The Lathe is used for facing, turning, taper cutting, 
threading, gear cutting and many other metal and wood works.
History of Lathe 
Lathe was also known and used in Assyria and Greece. Ancient 
Romans came to know about this machine and they further developed this 
machine. During the medieval period, the use of this machine had spread to 
most parts of Europe and it was during the Industrial revolution when this 
machine gained popularity with its use in all the industries. After the 
development of electronics, automated lathes have been developed.
Product of Lathes Machines 
 Light duty lathe 
 Medium duty lathe 
 Heavy duty late 
 All geared lathe 
 Imported lathe 
 Manual lathe 
 CNC Lathe
History 
Premier Lathe Manufacturing Company, a manufacturer’s exporters of Lathe 
Machines with different models like Medium Duty, Heavy Duty, Extra Heavy Duty, HI-CUT 
and Roll Turning Machine. 
Established in the year 1971 at Rajkot in Gujarat, They are growing and 
flourishing under the bale guidance of Mr. Venibhai Maru. He with his years of experience 
and sound knowledge has driven the company towards the path of success.
Organization Structure 
B.O.D. 
M.D. 
Production 
Manager 
Finance 
Manager 
Supervisor 
Workers 
Accountant 
Personnel 
Manager 
Employee 
Marketing 
Manager 
Salesman
Products offer 
Available at competent rates, they have the capability to offer 
these machines at competitive rates. The product range includes: 
 Light Duty Lathe Machine 
 Medium Duty Lathe Machines 
 Heavy Duty Lathe Machine 
 Extra Heavy Duty Lathe Machines 
 HI-CUT Lathe Machines 
 Roll Turning Machine
Organization Of Marketing Department 
Marketing Department 
Marketing & sales 
managers 
M. R & D 
Engineer 
Customer 
relation 
M & Sales 
Quality control 
officer 
Field & clerical 
staff person 
Sales field 
Assistant 
Correspondence 
clerk
Market Segmentation 
In case of Primer Lathe Manufacturing Co., there is no need for 
market segmentation. Their market is fixed, so they think that there is no need 
of market segmentation. They produce the item according to orders they 
receive.
Pricing Policy 
Primer Lathe Manufacturing Co. pricing policy is 
cost of profit. Whatever expenses have incurred during the manufacturing 
of product is considered to profit. Competitors price are also considered, 
their prices are higher than their competitors. 
As for as Primer Lathe Manufacturing Co. is 
concerned their product's price remains fixed until there is any change in 
the raw material price.
Channel Of Distribution 
Manufacturing 
Of Company 
Dealer 
Consumers
Sales Promotion 
Sales promotion consists of short term incentives to 
encourage purchase or sales of a product or service. It is demand stimulating 
devices designed to supplement advertising and facilitate personal selling. It is 
a direct inducement which offers an extra value and incentive for the product 
and sales force distributors to ultimate customers. 
Advertisement 
Primer Lathe Manufacturing Co. uses newspaper, 
radio, magazine for giving advertisement of their products.
Marketing Research 
The systematic and objective collection to marketing problems 
of a business in order to develop an appropriate information base for 
decision making in the field of marketing. Thus marketing research is 
an invaluable technique for the company. 
Competitors 
 Jamnagar Machine Tools 
 Olympic Machine Tools 
 Paras Machine Tools 
 Yogi Machine Tool 
 Akshar machine Tools
Sources Of Capital 
The financial manager has to consider many factors in the 
selection of the capital sources in the evaluation of a suitable financial 
structure. 
Ever changing requirement for capital and the shifting conditions 
in financial market make necessary frequent review of company’s 
source of capital.
Total Fixed Assets 
NO. PARTICULAR AMOUNT 
1. Land (2000 Sqm @ Rs.3000) 60,00,000 
2. Building (1000 Sqm @ Rs.1800) 18,00,000 
3. Boundary Wall & Gate 1,00,000 
4. Plant & Machinery 
 Extra Duty Lathe Machine 
 Heavy Duty Lathe Machine 
 Medium Duty Lathe Machine 
 Light Duty Lathe Machine 
1,20,000 
1,00,000 
65,000 
50,000 
5. Furniture & Fixtures 1,50,000 
7. Computer & Telephones 1,00,000 
Total 84,85,000
Management of Working Capital 
The capital invested in current assets such as stock and 
materials and short term securities and cash at bank. 
The two parts of working capital which are used in this unit 
are cash credit and debtors collateral. 
Profitability 
Premier Lathe Manufacturing Co. continuous evaluates the 
efficiency of his company in terms of profit. Besides management of the 
company, creditors and owners are also interested in the profitability of the 
firm.
Recruitment & Selection 
There are two sources for recruitment. 
 Internal Sources 
 External Sources
Training For Worker 
Primer Lathe Manufacturing Co. have no separate department for training. 
They give the training through senior employee. The superior knows the new 
employee about work. 
Wage & Salary 
The wages of the labor depends upon the number of unit that is produced by 
them. Every year there is an increase in the salary of clerical Rs. 150 and 250 
depending on the work efficiency of employee and the demand of employee. 
Salaries are paid on every 7th of the monthly.
Promotion 
Promotion can be defined as a movement in job, 
means to move one step forward in post which result in to 
higher wages and salary, better status and prestige, higher 
challenger and authority. Promotion is given in this company 
on seniority basis.
Product 
Light Duty Lathe Machine Medium Duty Lathe Machine 
Heavy Duty Lathe Machine 
Extra Duty Lathe Machine
PL 510/610 
Drill Machine 
Hi-cut Lathe Machine 
PL-40 PL-40M
Raw Material 
Company Used raw material there are: 
 Bed 
 Head Stock 
 Spindle 
 Approach 
 Compound 
 Spindle ram 
 Threads 
 R/f Switch 
 Chuck Back Plate 
 Tool Post Spanner 
 Centre Adapter 
 Dead Center – 2 Nos 
 Motor Pulley 
 Change Gear Set 
 Face Plate 
 Motor Vee Belt 
 Steady Rest 
 Follow Rest 
 Carrier Plate 
 Dog Chuck 
 True Chuck 
 Spindle Bore 
 Electric Motor
Production Process 
RAW MATIRIAL 
CUTTIG 
HEAT TREATMENT 
HARDNESS CHECKING 
SHOT BLASTING 
MACHINING
Quality 
Their entire business activities are quality driven and at every phase, they 
check the quality parameters of the business activities. They follow certain stringent 
quality control measures. 
Their quality control measures starts right from the procurement of the raw 
material and even after the completion of the procurement process, these products 
are sent for several quality checks before they finally become available for the 
shipment. 
They check your finished machinery on the parameters of toughness, 
durability, efficiency, rigidity The entire quality control process is conducted as per 
their imperative business goal of getting excellence & recognition in the entire 
industry.
After taking industrial visit of Primer Lathe Manufacturing Co., I have 
realized good co-operation of their staff members to me. They have provided me 
practical knowledge of production process & lots of information about different 
aspects. 
Primer Lathe Manufacturing Co. is the unique unit in its field. The 
working environment of this unit is very systematic and is carried on perfectly by 
its working members. 
The management of this company has a positive attitude towards the 
market and the inside atmosphere of the company is also very healthy and cordial. 
I sincerely wish to Primer Lathe Manufacturing Co. all the best for its future and 
hope that it succeeds in achieving all the goals that it has planned.
Premier lathe manufacturing co.
Premier lathe manufacturing co.

Premier lathe manufacturing co.

  • 1.
  • 2.
    Lathe – Introduction LATHE – Longitudinal Axis Tool Holding Equipment DMTG Extra Heavy Duty Lathe is a machine widely used for wood works and metal parts. Lathe is a machine which turns the work piece against a machine tool. The Lathe is used for facing, turning, taper cutting, threading, gear cutting and many other metal and wood works.
  • 3.
    History of Lathe Lathe was also known and used in Assyria and Greece. Ancient Romans came to know about this machine and they further developed this machine. During the medieval period, the use of this machine had spread to most parts of Europe and it was during the Industrial revolution when this machine gained popularity with its use in all the industries. After the development of electronics, automated lathes have been developed.
  • 4.
    Product of LathesMachines  Light duty lathe  Medium duty lathe  Heavy duty late  All geared lathe  Imported lathe  Manual lathe  CNC Lathe
  • 5.
    History Premier LatheManufacturing Company, a manufacturer’s exporters of Lathe Machines with different models like Medium Duty, Heavy Duty, Extra Heavy Duty, HI-CUT and Roll Turning Machine. Established in the year 1971 at Rajkot in Gujarat, They are growing and flourishing under the bale guidance of Mr. Venibhai Maru. He with his years of experience and sound knowledge has driven the company towards the path of success.
  • 6.
    Organization Structure B.O.D. M.D. Production Manager Finance Manager Supervisor Workers Accountant Personnel Manager Employee Marketing Manager Salesman
  • 7.
    Products offer Availableat competent rates, they have the capability to offer these machines at competitive rates. The product range includes:  Light Duty Lathe Machine  Medium Duty Lathe Machines  Heavy Duty Lathe Machine  Extra Heavy Duty Lathe Machines  HI-CUT Lathe Machines  Roll Turning Machine
  • 8.
    Organization Of MarketingDepartment Marketing Department Marketing & sales managers M. R & D Engineer Customer relation M & Sales Quality control officer Field & clerical staff person Sales field Assistant Correspondence clerk
  • 9.
    Market Segmentation Incase of Primer Lathe Manufacturing Co., there is no need for market segmentation. Their market is fixed, so they think that there is no need of market segmentation. They produce the item according to orders they receive.
  • 10.
    Pricing Policy PrimerLathe Manufacturing Co. pricing policy is cost of profit. Whatever expenses have incurred during the manufacturing of product is considered to profit. Competitors price are also considered, their prices are higher than their competitors. As for as Primer Lathe Manufacturing Co. is concerned their product's price remains fixed until there is any change in the raw material price.
  • 11.
    Channel Of Distribution Manufacturing Of Company Dealer Consumers
  • 12.
    Sales Promotion Salespromotion consists of short term incentives to encourage purchase or sales of a product or service. It is demand stimulating devices designed to supplement advertising and facilitate personal selling. It is a direct inducement which offers an extra value and incentive for the product and sales force distributors to ultimate customers. Advertisement Primer Lathe Manufacturing Co. uses newspaper, radio, magazine for giving advertisement of their products.
  • 13.
    Marketing Research Thesystematic and objective collection to marketing problems of a business in order to develop an appropriate information base for decision making in the field of marketing. Thus marketing research is an invaluable technique for the company. Competitors  Jamnagar Machine Tools  Olympic Machine Tools  Paras Machine Tools  Yogi Machine Tool  Akshar machine Tools
  • 14.
    Sources Of Capital The financial manager has to consider many factors in the selection of the capital sources in the evaluation of a suitable financial structure. Ever changing requirement for capital and the shifting conditions in financial market make necessary frequent review of company’s source of capital.
  • 15.
    Total Fixed Assets NO. PARTICULAR AMOUNT 1. Land (2000 Sqm @ Rs.3000) 60,00,000 2. Building (1000 Sqm @ Rs.1800) 18,00,000 3. Boundary Wall & Gate 1,00,000 4. Plant & Machinery  Extra Duty Lathe Machine  Heavy Duty Lathe Machine  Medium Duty Lathe Machine  Light Duty Lathe Machine 1,20,000 1,00,000 65,000 50,000 5. Furniture & Fixtures 1,50,000 7. Computer & Telephones 1,00,000 Total 84,85,000
  • 16.
    Management of WorkingCapital The capital invested in current assets such as stock and materials and short term securities and cash at bank. The two parts of working capital which are used in this unit are cash credit and debtors collateral. Profitability Premier Lathe Manufacturing Co. continuous evaluates the efficiency of his company in terms of profit. Besides management of the company, creditors and owners are also interested in the profitability of the firm.
  • 17.
    Recruitment & Selection There are two sources for recruitment.  Internal Sources  External Sources
  • 18.
    Training For Worker Primer Lathe Manufacturing Co. have no separate department for training. They give the training through senior employee. The superior knows the new employee about work. Wage & Salary The wages of the labor depends upon the number of unit that is produced by them. Every year there is an increase in the salary of clerical Rs. 150 and 250 depending on the work efficiency of employee and the demand of employee. Salaries are paid on every 7th of the monthly.
  • 19.
    Promotion Promotion canbe defined as a movement in job, means to move one step forward in post which result in to higher wages and salary, better status and prestige, higher challenger and authority. Promotion is given in this company on seniority basis.
  • 20.
    Product Light DutyLathe Machine Medium Duty Lathe Machine Heavy Duty Lathe Machine Extra Duty Lathe Machine
  • 21.
    PL 510/610 DrillMachine Hi-cut Lathe Machine PL-40 PL-40M
  • 22.
    Raw Material CompanyUsed raw material there are:  Bed  Head Stock  Spindle  Approach  Compound  Spindle ram  Threads  R/f Switch  Chuck Back Plate  Tool Post Spanner  Centre Adapter  Dead Center – 2 Nos  Motor Pulley  Change Gear Set  Face Plate  Motor Vee Belt  Steady Rest  Follow Rest  Carrier Plate  Dog Chuck  True Chuck  Spindle Bore  Electric Motor
  • 23.
    Production Process RAWMATIRIAL CUTTIG HEAT TREATMENT HARDNESS CHECKING SHOT BLASTING MACHINING
  • 24.
    Quality Their entirebusiness activities are quality driven and at every phase, they check the quality parameters of the business activities. They follow certain stringent quality control measures. Their quality control measures starts right from the procurement of the raw material and even after the completion of the procurement process, these products are sent for several quality checks before they finally become available for the shipment. They check your finished machinery on the parameters of toughness, durability, efficiency, rigidity The entire quality control process is conducted as per their imperative business goal of getting excellence & recognition in the entire industry.
  • 25.
    After taking industrialvisit of Primer Lathe Manufacturing Co., I have realized good co-operation of their staff members to me. They have provided me practical knowledge of production process & lots of information about different aspects. Primer Lathe Manufacturing Co. is the unique unit in its field. The working environment of this unit is very systematic and is carried on perfectly by its working members. The management of this company has a positive attitude towards the market and the inside atmosphere of the company is also very healthy and cordial. I sincerely wish to Primer Lathe Manufacturing Co. all the best for its future and hope that it succeeds in achieving all the goals that it has planned.