Quality Control Measures
Visi-Trak™ System is the name of Premier’s die cast process
monitoring system and eliminating production errors is its game!
Defect prevention is less
expensive than defect
detection in manufacturing,
which allows us to pass
our savings on to you!
Visi-Trak™
● Constantly monitors the balance of the machines
and “closed loop cells”
● Ensures product consistency “shot to shot”
● Expedites correction of any problems during
operation
● Assures production consistency day in
and day out
With the implementation of our advanced Visi-Trak™ System,
quality is assured as it:
Vacuum systems improve the integrity of our castings and
reduces wear on the die by evacuating the air in the cavity
before alloy injection.
This process allows the
part to “quick fill” by a
combination of reduced
back pressure and a
high injection rate.
Vacuum Aluminum Die Casting
Thurner Minimum Fill Time (MFT)
● better surface finish
● reduced gas porosity
● reduced leakage problems
The MFT system produces a product with:
With MFT, your creations are made better, inside and out –
complimenting the cost efficiency of our die casting process.
Contact Us
Website: https://www.diecasting.com
Phone: (800) 394-3006
Address: 1177 Rahway Ave
Avenel, NJ 07001

More Related Content

Viewers also liked (13)

Cold forging Process and Product Development - Case study
Cold forging Process and Product Development - Case studyCold forging Process and Product Development - Case study
Cold forging Process and Product Development - Case study
 
Aluminum alloys for hobby foundry
Aluminum alloys for hobby foundry Aluminum alloys for hobby foundry
Aluminum alloys for hobby foundry
 
Forging and casting technology
Forging and casting technologyForging and casting technology
Forging and casting technology
 
Industry Classification & Systems
Industry Classification & SystemsIndustry Classification & Systems
Industry Classification & Systems
 
1 Basic Punching Theory Tt 2010
1  Basic Punching Theory Tt  20101  Basic Punching Theory Tt  2010
1 Basic Punching Theory Tt 2010
 
Aluminium wheel manufacture
Aluminium wheel manufactureAluminium wheel manufacture
Aluminium wheel manufacture
 
Forging Process. [Workshop Practices]
Forging Process. [Workshop Practices]Forging Process. [Workshop Practices]
Forging Process. [Workshop Practices]
 
Dies Design - Cutting Operations Part 2
Dies Design - Cutting Operations Part 2Dies Design - Cutting Operations Part 2
Dies Design - Cutting Operations Part 2
 
Industries
IndustriesIndustries
Industries
 
PPT ON FORGING
PPT ON FORGINGPPT ON FORGING
PPT ON FORGING
 
Classification of Bearings
Classification of BearingsClassification of Bearings
Classification of Bearings
 
forging processes
forging processesforging processes
forging processes
 
Industries for class 8
Industries for class 8Industries for class 8
Industries for class 8
 

Recently uploaded

School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
tuuww
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
Kamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
tuuww
 

Recently uploaded (20)

School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
 
1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptx
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 

Aluminum Die Casting

  • 2. Quality Control Measures Visi-Trak™ System is the name of Premier’s die cast process monitoring system and eliminating production errors is its game! Defect prevention is less expensive than defect detection in manufacturing, which allows us to pass our savings on to you!
  • 3. Visi-Trak™ ● Constantly monitors the balance of the machines and “closed loop cells” ● Ensures product consistency “shot to shot” ● Expedites correction of any problems during operation ● Assures production consistency day in and day out With the implementation of our advanced Visi-Trak™ System, quality is assured as it:
  • 4. Vacuum systems improve the integrity of our castings and reduces wear on the die by evacuating the air in the cavity before alloy injection. This process allows the part to “quick fill” by a combination of reduced back pressure and a high injection rate. Vacuum Aluminum Die Casting
  • 5. Thurner Minimum Fill Time (MFT) ● better surface finish ● reduced gas porosity ● reduced leakage problems The MFT system produces a product with: With MFT, your creations are made better, inside and out – complimenting the cost efficiency of our die casting process.
  • 6. Contact Us Website: https://www.diecasting.com Phone: (800) 394-3006 Address: 1177 Rahway Ave Avenel, NJ 07001